A00802-608460.pdf
PDF 933 KB Posted
- Attached to
- 608460 HADLEY FAP No. NHP(BRR-ON)-003S(813)X Bridge Replacement, H-01-005, Bay Road (Route 47) ove
- Solicitation number
- BD-25-1030-0H100-0H002-116001
- Issued by
- Hampshire County, Massachusetts
About this file
This document is a Detail Sheets file from the Massachusetts Department of Transportation (MassDOT) Highway Division for Proposal No. 608460-130088, detailing a bridge replacement project on Bay Road (Route 47) in Hadley, Massachusetts, scheduled for Federal Fiscal Year 2025. The project involves full depth pavement construction, fine milling and overlay, and various infrastructure improvements including water main replacement, drainage structures, guardrails, and curbing. Key quantities include 150 CY of earth excavation, 590 CY of gravel borrow, 340 SY of pavement fine milling, and construction of cement concrete sidewalks and wheelchair ramps. The project encompasses approximately 1,828 SY of full depth construction and 340 SY of fine milling and overlay, with specific pavement layer specifications including Superpave surface, intermediate, and base courses.
The project includes comprehensive infrastructure work with multiple components such as 12-inch ductile iron water pipe installation, water pipe fittings, gate boxes, drainage structures, and temporary traffic control measures. Specific environmental considerations include wetland mitigation areas with compost blanket and wetland mix plantings. The detail sheets provide precise station and offset locations for various elements like guardrails, curbing, and utility installations, indicating a meticulously planned transportation infrastructure replacement and improvement project. While specific funding sources are not explicitly detailed in the document, the project is designated for Federal Fiscal Year 2025 and appears to be a planned infrastructure investment by the Massachusetts Department of Transportation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00844-608460.pdf | ||
| HADLEY-608460-130088-A-1.pdf | ||
| A00828-608460.pdf | ||
| A00820-608460.pdf | ||
| A00841-608460.pdf | ||
| 608460 - Bid Tabulations.pdf | ||
| 608460 - Notice to Contractors.pdf | ||
| A00804-608460.pdf | ||
| A00819-608460.pdf | ||
| HADLEY-608460-130088-A-2.pdf | ||
| A00834-608460.pdf | ||
| 608460 Bid Items.txt | TXT text file | |
| A00801-608460~1.pdf | ||
| Link to Bid Opening 9-3-2025~2.pdf | ||
| A00826-608460.pdf | ||
| BIDS OPENED - Wednesday - September 3-2025.pdf | ||
| A00846-608460.pdf | ||
| A00810-608460.pdf | ||
| A00831-608460.pdf | ||
| 608460 - Updated Plan Holders List.pdf | ||
| A00875-608460.pdf | ||
| A00808-608460.pdf | ||
| A00818-608460.pdf | ||
| A00811-608460.pdf | ||
| 608460 - Plan Holders List~1.pdf | ||
| A00829-608460.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Massachusetts Department Of Transportation Highway Division Proposal No. 608460-130088
A00802 - 1
DOCUMENT A00802
DETAIL SHEETS
A00802 - 2
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT NO. 608460
THE COMMONWEALTH OF MASSACHUSETTS
MASSACHUSETTS HIGHWAY DEPARTMENT
TEN PARK PLAZA, BOSTON, MA
-ESTIMATE OF QUANTITIES - DETAIL SHEET-
CITY/TOWN: Hadley YEAR: FFY 2025
CLASS:
TYPE OF PROJECT:
Urban Principal Arterial
Bridge Replacement
ROAD:
DATE:
Bay Road (Route 47)
May 30, 2024
Earth Excavation 150 CY Gravel Borrow 590 CY Pavement Fine Milling 340 SY Sand Borrow 80 CY Gravel Borrow for 74 CY Loam Borrow 255 CY Backfilling Structures and Pipes Ordinary Borrow 740 CY
Class A Rock Excavation 3 CY Class B Trench Excavation 100 CY Test Pit for Exploration 10 CY Class B Rock Excavation 5 CY Crushed Stone 45 TON
PAVEMENT NOTES
PROPOSED FULL DEPTH CONSTRUCTION WITH RECLAIMED BASE
AREA = 1828 SY
SURFACE: 1-1/2" SUPERPAVE BRIDGE SURFACE COURSE – 9.5 (SSC-B-9.5) OVER
INTERMEDIATE: 2” SUPERPAVE INTERMEDIATE COURSE – 12.5 (SIC-12.5) OVER
BASE: 4-1/2” SUPERPAVE BASE COURSE – 37.5 (SBC-37.5) OVER
SUBBASE: VARIES (8” MIN.) RECLAIMED PAVEMENT SUPPLEMENTED WITH GRAVEL
BORROW (TYPE b) AS REQUIRED
PROPOSED FINE MILLING AND OVERLAY
AREA = 340 SY
SURFACE: 1-1/2” SUPERPAVE BRIDGE SURFACE COURSE – 9.5 (SSC-B-9.5) OVER
PREPARATION: 1-1/2” PAVEMENT MICROMILLING
A00802 - 3
PAVEMENT NOTES (CONT’D)
PROPOSED HMA WEARING SURFACE FOR BRIDGE
AREA = 476 SY
SURFACE: 1-1/2” SUPERPAVE BRIDGE SURFACE COURSE – 9.5 (SSC-B-9.5) OVER
RS-1H ASPHALT EMULSION FOR TACK COAT OVER
PROTECTIVE: 1-1/2” SUPERPAVE BRIDGE PROTECTIVE COURSE – 9.5 (SPC-B-9.5) OVER
POLYMER MODIFIED TACK COAT OVER
SPRAY APPLIED MEMBRANE WATERPROOFING
PROPOSED HMA FOR DRIVEWAYS
AREA = 39 SY
SURFACE: 1-1/2” SUPERPAVE SURFACE COURSE – 9.5 (SSC-9.5) OVER
INTERMEDIATE: 2-1/2” SUPERPAVE SURFACE COURSE – 12.5 (SSC-12.5) OVER
SUBBASE: 8” GRAVEL BORROW (TYPE b)
PROPOSED CEMENT CONCRETE SIDEWALKS AND WHEELCHAIR RAMPS
AREA = 28 SY
SURFACE: 4” (AIR-ENTRAINED, 4000 PSI, ¾”, 610) CEMENT CONC.
POURED IN ONE COURSE
SUBBASE: 8” GRAVEL BORROW (TYPE b)
A00802 - 4
ALL ITEMS NOT COMPLETELY DESCRIBED AND LOCATED ON THE PLANS ARE
TO BE DETAILED AS SHOWN BELOW:
The following shall define the limits between the Bridge Lump Sum items (i.e. Bridge
Excavation) and Highway items (i.e. Earth Excavation):
South Approach Sta. 05+36
North Approach Sta. 06+96
ITEM 101. CLEARING AND GRUBBING
This item shall be used for the following:
• Where shown on the Construction Plans
• Where brush and shrubs are to be removed for proposed slope work along both sides of the bridge
• Contractor access along the west side of the bridge
• Installation of riprap
Elsewhere as required by the Engineer.
ITEM 102.1 TREE TRIMMING
Required for the relocation of UP 4B/74 and UP 61 and accompanying overhead wires.
Station Offset To Station Offset
04+92 ± LT 07+22 ± LT
Elsewhere for work around tree line, as determined by the Engineer.
ITEM 102.511 TREE PROTECTION – ARMORING AND PRUNING
To be used as a contingency item for the protection of trees, as required by the Engineer.
ITEM 102.521 TREE AND PLANT PROTECTION FENCE
Station Offset
07+50 ± LT
Elsewhere along the treeline as required by the Engineer.
ITEM 120. EARTH EXCAVATION
This item includes:
• Areas of cuts from cross sections
• Remove existing pavement and loam in areas of fill, prior to filling
• Remove and discard all highway guard not designated to be removed and stacked
A00802 - 5
This item does not include:
• Cuts as a result of reclaimed pavement for base course operation
ITEM 121. CLASS A ROCK EXCAVATION
To be used as a contingency item.
ITEM 141.1 TEST PIT FOR EXPLORATION
Use to locate underground facilities throughout the project, where directed by the Engineer.
ITEM 146. DRAINAGE STRUCTURE REMOVED
Structure Name Station Offset
CB 05+36 LT
If required by the Engineer, use for the removal of temporary drainage.
ITEM 151. GRAVEL BORROW
Use for the following work:
• As shown in the Pavement Notes
• Temporary pavement transitions, as shown in the Temporary Traffic Control Plans
• Backfill of drainage and water piping trenches if unsuitable material is encountered, as determined by the Engineer
Elsewhere as directed.
ITEM 154. SAND BORROW
Use for bedding under all proposed water main.
ITEM 156. CRUSHED STONE
Use for bedding under proposed drainage pipes and structures if unsuitable subgrade is encountered, as determined by the Engineer.
ITEM 201. CATCH BASIN
Structure Name Station Offset
CBCI-1 05+06 LT
CBCI -2 07+58 LT
A00802 - 6
ITEM 202. MANHOLE
Structure Name Station Offset
DMH-2 05+09 RT
ITEM 208. DROP INLET, TYPE C
For use as temporary drainage during construction.
Structure Name Station Offset
TEMP CBCI 05+06 LT
ITEM 221. FRAME AND COVER
For use with all new manholes. Refer to Item 202.
ITEM 222.1 FRAME AND GRATE – MASSDOT CASCADE TYPE
For use with all new catch basins. Refer to Item 201.
ITEM 222.2 FRAME AND GRATE – MASSDOT DROP INLET
For use with all new drop inlets. Refer to Item 208.
ITEM 223.1 FRAME AND GRATE (OR COVER) REMOVED AND STACKED
For use with all existing and temporary drainage structures to be removed. Refer to Item 146.
ITEM 227.3 REMOVAL OF DRAINAGE STRUCTURE SEDIMENT
Use for removal of sediment in existing catch basin structure at Sta 02+89 LT.
ITEM 227.31 REMOVAL OF DRAINAGE PIPE SEDIMENT
Use for removal of sediment in pipes connecting to existing catch basin structure at Sta 02+89 LT.
ITEM 230.12 12 INCH CORRUGATED METAL PIPE
From To Length (FT)
DMH-1 Outfall 44
ITEM 241.12 12 INCH REINFORCED CONCRETE PIPE
From To Length (FT)
CBCI-1 DMH-1 40
CBCI-2 Outfall 12 TEMP. CBCI DMH-1 43 For use as temporary drainage during construction.
A00802 - 7
ITEM 258. STONE FOR PIPE ENDS
For use at drainage outfall.
Station Offset Area (SY)
05+54 ± RT 5
07+58 LT 5
ITEM 302.12 12 INCH DUCTILE IRON WATER PIPE (RUBBER GASKET)
Station Offset To Station Offset
03+84 RT 04+37 RT
03+93 RT 03+95 RT
04+37 RT 05+95 LT
04+95 LT 05+20 LT
07+16 LT 07+67 LT
07+67 LT 07+75 LT
07+75 LT 07+89 LT
07+87 LT 07+86 LT
ITEM 303.12 12 INCH DUCTILE IRON WATER PIPE (MECHANICAL JOINT)
Station Offset To Station Offset
05+20 RT 07+16 LT
ITEM 309. DUCTILE IRON FITTINGS FOR WATER PIPE
Station Offset Fitting
03+94 ± RT 12” Tee 03+95 ± RT 12”- 8” Reducer 04+05 ± RT 8” Cap 04+37 ± RT 12”- 45 degree 04+95 ± LT 12”- 45 degree 05+22 ± LT 12”- 45 degree 05+31 ± LT 12”- 45 degree 07+06 ± LT 12”- 45 degree 07+20 ± LT 12”- 45 degree 07+67 ± LT 12”- 45 degree 07+75 ± LT 12”- 45 degree 07+80 ± LT 8” Cap 07+87 ± LT 12” Tee
A00802 - 8
ITEM 315.08 8 INCH WATER MAIN REMOVED AND STACKED
Station Offset To Station Offset
04+00 RT 07+80 RT
ITEM 350.12 12 INCH GATE AND GATE BOX
For use at existing 12” water gates where both the gate and gate box are to be replaced.
ITEM 357.08 8 INCH GATE BOX
For use at existing 8” water gates where only the gate box is to be replaced.
ITEM 357.12 12 INCH GATE BOX
For use at existing 12” water gates where only the gate box is to be replaced.
ITEM 371.12 12 INCH COUPLING
1 expansion coupling required at each bridge abutment.
ITEM 373.12 12 INCH WATER PIPE INSULATION
Required for above ground section of water main at bridge crossing.
Station Offset To Station Offset
05+20 LT 07+16 LT
ITEM 379.075 3/4 INCH AIR RELEASE VALVE
1 required at high point of water main bridge crossing.
ITEM 472. TEMPORARY ASPHALT PATCHING
For use as temporary HMA trench patching for water main and drainage pipe installation prior to full depth construction.
Elsewhere as required for miscellaneous ramping, as determined by the Engineer.
ITEM 504. GRANITE CURB TYPE VA4 – STRAIGHT
Station Offset To Station Offset
02+90 LT 05+03 LT
05+09 LT 05+33 LT
05+10 RT 05+28 RT
06+99 LT 07+55 LT
07+11 RT 07+50 RT
A00802 - 9
ITEM 504.2 GRANITE CURB TYPE VA4 – SPLAYED END
Required at each corner of bridge to match bridge curb.
Station Offset To Station Offset
05+33 LT 05+39 LT
05+46 RT 05+51 RT
06+81 RT 06+86 RT
06+93 LT 06+99 LT
ITEM 509. GRANITE TRANSITION CURB FOR WHEELCHAIR RAMPS –
STRAIGHT
WCR# High-Side Transition (FT) Low-Side Transition (FT)
N/A 10 - N/A 10 - 1 6.5 6.5 2 14 6.5 N/A 6 - N/A 6 -
ITEM 514. GRANITE CURB INLET - STRAIGHT
Structure Name Station Side
CBCI-1 05+06 LT
CBCI-2 07+58 LT
ITEM 594. CURB REMOVED AND DISCARDED
Contingency item, use if existing curb is encountered within project limits during construction.
ITEM 595. CURB INLET REMOVED AND DISCARDED
Use where existing catch basins are to be removed. Refer to Item 146.
ITEM 620.13 GUARDRAIL, TL-3 (SINGLE FACED)
Station Offset To Station Offset
02+92 LT 05+06 LT
04+81 RT 05+06 RT
07+25 LT 07+67 LT
08+38 LT 09+64 LT
07+25 RT 09+60 RT
A00802 - 10
ITEM 627.83 GUARDRAIL TANGENT END TREATMENT, TL-3
Station From Offset
02+80 LT
04+69 RT
07+79 LT
08+26 LT
09+72 RT
09+76 LT
ITEM 628.24 TRANSITION TO BRIDGE RAIL
Station From Offset
05+40 LT
05+40 RT
06+91 LT
06+91 RT
ITEM 630.1 HIGHWAY GUARD REMOVED AND STACKED
Station Offset To Station Offset
02+80 ± LT 05+26 ± LT
06+80 ± LT 07+58 ± LT
ITEM 657. TEMPORARY FENCE
For use as required during construction to protect the public from the work zone, as shown on the
Temporary Traffic Control Plans and as determined by the Engineer.
ITEM 657.5 TEMPORARY FENCE REMOVED AND RESET
Temporary fence shall be removed and reset between each stage of construction, as shown on the
Temporary Traffic Control Plans.
ITEM 751.7 COMPOST BLANKET
To be used in wetland mitigation areas.
ITEM 765.555 WETLAND MIX – PART SHADE
To be used in wetland mitigation areas.
A00802 - 11
ITEM 901. 4000 PSI, 1.5 INCH, 565 CEMENT CONCRETE
Use for the following work:
• Drainage outflow headwall, in accordance with MassDOT Construction Standards E206.4.0 and E206.4.1
• Thrust blocks at bends and pipe ends in water pipe
ITEM 910. STEEL REINFORCEMENT FOR STRUCTURES
For use in drainage outflow headwall in accordance with MassDOT Construction Standards
E206.4.0 and E206.4.1
A00802 - 12
File details come from the government source that posted it. Updated .