A004 Technical Review of Task Orders.pdf
PDF 164 KB Posted
- Attached to
- Aberdeen Test Center- Scientific and Engineering Support Federal contract opportunity
- Solicitation number
- W91CRB-20-R-0019
About this file
This document contains a Contract Data Requirements List (CDRL) and details of a solicitation for scientific and engineering support services. The CDRL outlines technical review requirements for all task orders requiring design reviews under the contract. Reviews must include summaries of current and planned work, relevant design documents, and informal descriptions of recent changes. Preliminary and critical design reviews are required at frequencies specified in task order statements of work. The first review is due the week work begins, with subsequent reviews at frequencies in the statements of work. The final design must be submitted for review and approval before fabrication. Distribution will be one electronic copy to the technical point of contact and contracting officer representative.
The solicitation is for Aberdeen Test Center Scientific and Engineering Support Services at Aberdeen Proving Ground, Maryland. As a set-aside for small businesses, it is seeking an indefinite delivery/indefinite quantity contract over five years with cost plus fixed fee and firm fixed price contract line items. The contractor shall provide all resources necessary to perform instrumentation system development, fabrication, configuration and production as defined in the performance work statement. Required services include mechanical, electrical/electronic, software, systems engineering and testing facilities support. Questions are due by May 19, 2020 and proposals by May 29, 2020 and must be emailed to the address provided.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
| 1_DATA_ITEM_NO: A004 |
| 2_TITLE_OF_DATA_ITEM: Technical Review of Task Orders |
| 3_SUBTITLE: Technical Review |
| 4_AUTHORITY_Data_Acquisit: N/A |
| 5_CONTRACT_REFERENCE: Task Order SOW |
| 6_REQUIRING_OFFICE: Aberdeen Test Center |
| 7_DID_250_REQ: XX |
| 8_APP_CODE: N/A |
| DIST_STATEMENT: C |
| 10_FREQUENCY: See Block 16 |
| 11_AS_OF_DATE: N/A |
| 12_DATE_OF_FIRST_SUBMISSI: See Block 16 |
| 13_DATE_OF_SUBSEQUENT_SUB: See Block 16 |
| addressee1: ATC TPOC |
| draft1: 1 |
| reg1: 1 |
| repro1: |
| addressee2: ATC COR |
| draft2: 1 |
| reg2: 1 |
| repro2: |
| addressee3: |
| draft3: |
| reg3: |
| repro3: |
| addressee4: |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 2 |
| total_repro: 0 |
| 16_REMARKS: |
Block 10: Technical Review should include a summary of current and planned work, relevant design documents, and brief informal description of recent changes. Technical reviews include Preliminary Design Reviews (PDRs) and Critical Design Reviews (CDRs). Additional information may be requested where necessary. Technical reviews are required at the frequency as specified in the Task SOW.
Block 12: First review is due the week work begins.
Block 13: Reviews are required to be conducted at the frequency specified in the SOW. A week is defined as Monday through Friday. Final design shall be submitted for review and approval prior to fabrication.
Block 14 & 15: Distribution shall be one (1) electronic copy to the TPOC and COR.
| 17_PRICE_GROUP: | |
| ESTIMATED_TOTAL_PRICE: | |
| G_PREPARED_BY: | |
| H_DATE: 14 JAN 20 | |
| 1_APPROVED_BY: | |
| J_DATE: | |
| Page: 1 | |
| reg38t: 2 | |
| A_CONTRACT_LINE_ITEM_NO: | |
| B_EXHIBIT: A | |
| TDP: | |
| TM: | |
| OTHER: X | |
| DSYSTEMITEM: All tasks requiring design reviews. | |
| E_CONTRACTPR_NO: TBD | |
| FCONTRACTOR: TBD | |
| of_pages: 1 | |
| Reset: | |
| 2020-01-14T09:42:58-0500 | |
| GERDES.JOHN.WILLIAM.JR.1192847784 |
File details come from the government source that posted it. Updated .