Sanitary Sewer Connections of Single-Family Residences in the Hague Avenue Service Area
Solicitation number
RFP 2026-09-08
Issued by
Franklin County, Ohio

About this file

This is a Scope of Work or Purchase Description document for a County procurement of an air compressor system installation project. The County seeks a vendor-furnished and installed compressor system with all labor, tools, rigging, and incidental materials required for mechanical assembly, connection to existing compressed air distribution infrastructure, and condensate drain line installation. The installation must be completed by August 17, 2026, and the project includes factory-authorized startup and commissioning with documentation submitted within five business days of completion. Vendor responsibilities encompass delivery via lift-gate equipped truck with offloading and staging at the installation site, operator and maintenance training of minimum two hours duration conducted by the vendor's factory-authorized technician, and provision of operation and maintenance manuals. The vendor must ensure all components and sub-assemblies can pass through a 46-inch wide doorframe without structural building modification and must coordinate delivery access with the County at least five business days in advance.

The pricing structure requires vendors to submit a total all-inclusive cost for the system, installation, training, and warranty as a single line item. The vendor is responsible for all required permits, licenses, and calibration certificates at vendor expense. The package includes a 24-month warranty on the compressor pump and a 12-month warranty covering parts and labor on the entire system, with an optional extended warranty coverage available on an annual basis for years one through five. The County is responsible for completing electrical rough-in (conduit, disconnect switch, and branch circuit wiring), providing a level reinforced concrete floor adequate for unit weight, and completing compressed air distribution piping beyond the system outlet connection point prior to startup and commissioning.

View the file

Other files

File Type Posted
6D302278-A5F3-8508-AEC851283D91EF01.pdf PDF
56D1E25C-D6F7-A070-782594700401C348.docx DOCX document
1FF7D8D0-C608-E689-8D121B0F5CC22DA9.pdf PDF
441C7CE8-FE79-FFAD-86876E5C9E330E9F.pdf PDF
DE522D80-FE3B-40B1-1C32D6110AF0CD6F.pdf PDF
5FEA932D-A443-F834-C369AEC7AD13A552.pdf PDF
4ADBBFB5-F75A-53E0-AE23AAE483992AC8.pdf PDF
8BE999EA-C1F3-6CAA-1ED2B57E621612FB.pdf PDF
A468A6C0-ADFF-A361-D0B6A6D23BE37251.pdf PDF
1FF8629C-E097-4138-B3B7BE56C0FCD3F5.pdf PDF
56D200B6-A79A-5846-53B374D48289713F.xlsx XLSX spreadsheet
BEA8591A-F056-8D68-013C92A00C2DA843.pdf PDF
A3F924CA-A2E1-A38A-2E6F296BD4EAE5D4.pdf PDF
48FFA356-A619-FDBE-4B4D833D8E7B2589.pdf PDF
D1C78A42-D40E-4E7A-6D1A7D2FA849B7AF.pdf PDF
600ACEFD-D8A4-EF86-6746123A35214FBD.pdf PDF
ED338BF8-FCF8-7E6B-4327CDB3236D9A0A.pdf PDF
48FFE6B8-C249-DC8C-BA6A621BAD5FF49F.xlsx XLSX spreadsheet
44B739A8-A554-F8F5-C38D97EF8EFBF991.xlsx XLSX spreadsheet
E990E137-C5A3-F52C-C390BB811E5E078A.pdf PDF
600AF88E-C800-4399-20BE9FDE4A50714B.docx DOCX document
1FF7F5A5-B656-F561-D618C609C0908F61.pdf PDF
36771012-968A-47BA-49FB1CC4DFFFEC63.pdf PDF
4764BD72-A4C9-CB3B-C1392F63B1D7AA28.pdf PDF
340E518F-B0A2-92CD-5CE67BE8C5C74ADC.pdf PDF
82C4A68E-CF20-D525-DD84F11D8BE54C23.pdf PDF
D465A6BC-B38E-009F-4BA8EFA38CE55315.pdf PDF
6A9BE711-E1B2-9B67-147E88484CF79F1A.pdf PDF
4ADC54F2-C74F-3F02-B4900398FFBEE5A5.xlsx XLSX spreadsheet
441CA1BC-A59E-E520-9F472E421C5515A7.pdf PDF
45745F40-E0BA-1577-1AE1A9CC2179CA13.pdf PDF
44F2E64B-E391-5EAC-DD33927813E7BE98.xlsx XLSX spreadsheet
E99082A3-014B-96AB-48063D8559F32599.pdf PDF
4703BAFF-A637-A4BC-D31224A6D85981B6.pdf PDF
8BD45E27-AD3D-2A81-9DC34421F6415618.pdf PDF
477EEBB5-9B64-4073-39F4D92B43E61BB0.pdf PDF
1FF79148-03D3-7B1B-77CF64FD687ECA4C.pdf PDF
76154B86-0D35-C013-E46368EB2B8F2266.pdf PDF
BCDA75E7-EC2E-694E-CB30EC7B8D89F683.pdf PDF
47039A14-CC1D-3979-F8226F8E1E768343.pdf PDF
4ADBF0DE-FA15-F6CB-0B2B1FFF2D166DEF.pdf PDF
1FF76D77-0146-31BD-B70AC2B9310C078F.pdf PDF
454029A5-B65E-2FDC-FF40A109E3768126.pdf PDF
600B193E-A6DE-E459-0374B7046DEB49BE.xlsx XLSX spreadsheet
98B00E89-F3C2-2215-1B6B7A585EA6B903.pdf PDF
47A09361-9A16-2F9F-03970F0DC73EAB8D.pdf PDF
7D243EA3-FAAD-CF0C-AFFD3FFE55D5912C.pdf PDF
441CC2FC-B00B-E914-728A3B9F6E284C71.pdf PDF
A4692B9C-E659-F33F-532C87A025A11AC2.pdf PDF
471F2B18-FADB-16E3-6A13A124C82D15B3.pdf PDF
Show 40 more

Latest 50 of 143 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Quantity Units Description Cost

1 1 Each

Installation by August 17, 2026 (Must be installed by date.) Vendor shall furnish all labor, tools, rigging, and incidental materials required to set, assemble, level, anchor, and connect the compressor system at the designated installation location. Installation shall include: mechanical assembly and re-connection of any components disassembled for transport; connection to the existing compressed air distribution header at the point of connection identified by the County; connection of condensate drain lines to the nearest available floor drain; and verification that all safety devices, gauges, and controls are properly mounted and functional. Electrical rough-in (conduit, disconnect, and branch circuit wiring to the single power connection point on the unit) is the responsibility of the County and shall be completed prior to the Vendor’s installation visit.

Installation to be completed by:

Included

2 1 System

Model Type and Number:

BRAND NAME(s) OR EQUAL PURCHASE

DESCRIPTION:

3 1 System

SITE READINESS: The County shall provide a level, reinforced concrete or structural floor adequate for the unit weight prior to the scheduled installation date. Vendor shall provide certified weight data to the County not less than ten

(10) business days in advance of delivery to allow floor-loading verification. Included

ELECTRICAL ROUGH-IN (COUNTY-FURNISHED):

Electrical conduit, disconnect switch, and branch circuit wiring from the County facility panel to the single power connection point on the compressor unit is the responsibility of the County and shall be completed and inspected before the Vendor’s startup visit. County

COMPRESSED AIR DISTRIBUTION PIPING

(COUNTY-FURNISHED): Compressed air distribution piping beyond the system outlet connection point to the laboratory header is the responsibility of the County and shall be completed prior to the startup and commissioning visit. County

FACTORY-AUTHORIZED STARTUP AND

COMMISSIONING: Documentation of all commissioning data on a startup report to be submitted to the County within five (5) business days of completion. Included

6 1 System Training

OPERATOR AND MAINTENANCE TRAINING: The Vendor’s factory-authorized technician shall conduct on-site operator and maintenance training at the time of startup and commissioning. O&M manual is provided. Training shall be a minimum of two (2) hours in duration.

Included

7 24 Months Warranty – compressor pump ≥ 24 months from acceptance

Included

8 12 Months Warranty – system ≥ 12 months parts and labor

Included

CRITICAL:

All components and sub-assemblies of the air compressor package, whether shipped assembled or knocked down, must be capable of passing through a 46-inch (46") wide doorframe without structural modification to the building.

Included

DELIVERY:

F.O.B. – Destination: System shall be delivered via lift-gate equipped truck to the designated delivery point at the County facility. The Vendor shall offload and stage the equipment at the installation site. Any disassembly required for transport through the 46-inch doorframe shall be documented, and re-assembly instructions shall be provided. Vendor shall coordinate delivery access with the County not less than five

(5) business days before the scheduled delivery date.

Any required permits or licenses are the responsibility and cost of Vendor. Any calibration will have a certificate provided to the County at the responsibility and cost of Vendor. Included

12 All Costs Included

Total Costs with System, Installation, Training, and Warranty $

13 1-5 Annual Rate Optional Extended Warranty Coverage $

Vendor Name

Completed By

Date