This is a procurement specification document for a County agency outlining the installation and commissioning of an air compressor system. The vendor is responsible for delivering and installing a compressor system by August 17, 2026, including mechanical assembly, connection to the existing compressed air distribution header, and condensate drain line installation. The scope encompasses factory-authorized startup and commissioning with documentation submitted within five business days of completion, as well as on-site operator and maintenance training lasting a minimum of two hours conducted by a factory-authorized technician. The compressor system must be capable of passing through a 46-inch doorframe without structural modification, and delivery shall be made via lift-gate equipped truck with vendor coordination required at least five business days prior to the scheduled delivery date. The vendor must provide certified weight data no less than ten business days in advance of delivery to permit floor-loading verification.

Warranty coverage includes 24 months for the compressor pump from acceptance and 12 months of parts and labor for the entire system. All installation costs, labor, tools, rigging, materials, training, startup, commissioning, warranties, permits, licenses, and calibration certificates are the vendor's responsibility and are included in the total cost. The County is responsible for electrical rough-in work, compressed air distribution piping beyond the system outlet connection point, and site readiness including a level reinforced concrete or structural floor adequate for unit weight. An optional extended warranty coverage is available on an annual basis for years one through five. Pricing is to be completed by the vendor with total costs clearly specified for the complete system package.

View the file

Other files

File Type Posted
F13E338C-C030-4C55-2FE32EE64813CA9E.docx DOCX document
0D016D70-E47F-20E8-0F04921174A75D50.pdf PDF
E99102BF-B146-146D-35DFAF9763C1170B.pdf PDF
9AEA49E5-D258-E830-CAAB03DD9BBE7883.pdf PDF
4ADB9154-92D0-FA39-8C51818579A9E699.pdf PDF
A468A6C0-ADFF-A361-D0B6A6D23BE37251.pdf PDF
471F0983-EB69-959C-3B62A289547CA11E.xlsx XLSX spreadsheet
4491B391-0B2C-57F1-169E865F334A5FAD.xlsx XLSX spreadsheet
56D200B6-A79A-5846-53B374D48289713F.xlsx XLSX spreadsheet
441C7CE8-FE79-FFAD-86876E5C9E330E9F.pdf PDF
D1C75C4E-ACBE-A700-94A3260C246A50BF.pdf PDF
600AF88E-C800-4399-20BE9FDE4A50714B.docx DOCX document
7D243EA3-FAAD-CF0C-AFFD3FFE55D5912C.pdf PDF
48FFA356-A619-FDBE-4B4D833D8E7B2589.pdf PDF
44F28715-E1AF-A884-828CBEAF47CBA5D7.xlsx XLSX spreadsheet
47A070EA-AA3B-485A-6C240303241C99D2.pdf PDF
47649CE8-A0E3-2433-AC9846884D7DA4C4.pdf PDF
E990A518-E8F3-4318-3125803AC770B0DD.pdf PDF
4ADC3DEA-9D5B-9827-C369A2B1FCFC62A9.xlsx XLSX spreadsheet
C0135AC1-FF9D-F3AC-BDB7FB4697056E65.pdf PDF
471F2B18-FADB-16E3-6A13A124C82D15B3.pdf PDF
47B899A6-E73C-31FA-C552C2E2911070DF.pdf PDF
BCCA0BAC-C5BA-CDB6-49D2EFF559EDAF11.pdf PDF
8BE169B1-0EA5-67F3-FE8D32CD74B2BC3C.pdf PDF
E920A267-FB29-7597-A525F8234B855C09.pdf PDF
BEA8591A-F056-8D68-013C92A00C2DA843.pdf PDF
8B0111A9-AB26-EF6C-1377B5BEC77C1480.pdf PDF
260F9701-94BA-EFEA-FCAED968AC730EE0.docx DOCX document
A468D9BE-C742-A53B-A0E51044FC47530E.pdf PDF
8B00ECA9-D368-AD09-80DA20EDC1915543.pdf PDF
48FFE6B8-C249-DC8C-BA6A621BAD5FF49F.xlsx XLSX spreadsheet
9705A9CE-B76B-3514-2AB6D46F5013FD96.pdf PDF
1FF70774-E56E-EAC8-88A7694DAF5EB82C.pdf PDF
56D1E25C-D6F7-A070-782594700401C348.docx DOCX document
1FF7F5A5-B656-F561-D618C609C0908F61.pdf PDF
1FF79148-03D3-7B1B-77CF64FD687ECA4C.pdf PDF
9EDCD8B0-B36E-8610-B9A1060DE4F7BDD1.pdf PDF
4703BAFF-A637-A4BC-D31224A6D85981B6.pdf PDF
1FF6D412-D5CF-E3DA-42373990EB63A4DE.docx DOCX document
4ADC54F2-C74F-3F02-B4900398FFBEE5A5.xlsx XLSX spreadsheet
BEA8B132-08B9-5848-83E1018BFD8D09C5.xlsx XLSX spreadsheet
47647B12-EF69-CBAE-3877E615229CE346.pdf PDF
98B00E89-F3C2-2215-1B6B7A585EA6B903.pdf PDF
4ADC0CC3-B76B-A18D-C62DDED0F769FB5E.xlsx XLSX spreadsheet
44A3FAEC-97F9-FAD6-B54F90D5CEDD52DA.xlsx XLSX spreadsheet
1FF8629C-E097-4138-B3B7BE56C0FCD3F5.pdf PDF
4ADBF0DE-FA15-F6CB-0B2B1FFF2D166DEF.pdf PDF
A46910BC-E967-DD22-10B71BADEA153824.docx DOCX document
1FF7330C-CAC3-999B-9E6EF28469A04621.pdf PDF
98C3F6F7-A2E4-2584-EE8EB79AF1AA8052.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 142 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Quantity Units Description Cost

1 1 Each

Installation by August 17, 2026 (Must be installed by date.) Vendor shall furnish all labor, tools, rigging, and incidental materials required to set, assemble, level, anchor, and connect the compressor system at the designated installation location. Installation shall include: mechanical assembly and re-connection of any components disassembled for transport; connection to the existing compressed air distribution header at the point of connection identified by the County; connection of condensate drain lines to the nearest available floor drain; and verification that all safety devices, gauges, and controls are properly mounted and functional. Electrical rough-in (conduit, disconnect, and branch circuit wiring to the single power connection point on the unit) is the responsibility of the County and shall be completed prior to the Vendor’s installation visit.

Installation to be completed by:

Included

2 1 System

Model Type and Number:

BRAND NAME(s) OR EQUAL PURCHASE

DESCRIPTION:

3 1 System

SITE READINESS: The County shall provide a level, reinforced concrete or structural floor adequate for the unit weight prior to the scheduled installation date. Vendor shall provide certified weight data to the County not less than ten

(10) business days in advance of delivery to allow floor-loading verification. Included

ELECTRICAL ROUGH-IN (COUNTY-FURNISHED):

Electrical conduit, disconnect switch, and branch circuit wiring from the County facility panel to the single power connection point on the compressor unit is the responsibility of the County and shall be completed and inspected before the Vendor’s startup visit. County

COMPRESSED AIR DISTRIBUTION PIPING

(COUNTY-FURNISHED): Compressed air distribution piping beyond the system outlet connection point to the laboratory header is the responsibility of the County and shall be completed prior to the startup and commissioning visit. County

FACTORY-AUTHORIZED STARTUP AND

COMMISSIONING: Documentation of all commissioning data on a startup report to be submitted to the County within five (5) business days of completion. Included

6 1 System Training

OPERATOR AND MAINTENANCE TRAINING: The Vendor’s factory-authorized technician shall conduct on-site operator and maintenance training at the time of startup and commissioning. O&M manual is provided. Training shall be a minimum of two (2) hours in duration.

Included

7 24 Months Warranty – compressor pump ≥ 24 months from acceptance

Included

8 12 Months Warranty – system ≥ 12 months parts and labor

Included

CRITICAL:

All components and sub-assemblies of the air compressor package, whether shipped assembled or knocked down, must be capable of passing through a 46-inch (46") wide doorframe without structural modification to the building.

Included

DELIVERY:

F.O.B. – Destination: System shall be delivered via lift-gate equipped truck to the designated delivery point at the County facility. The Vendor shall offload and stage the equipment at the installation site. Any disassembly required for transport through the 46-inch doorframe shall be documented, and re-assembly instructions shall be provided. Vendor shall coordinate delivery access with the County not less than five

(5) business days before the scheduled delivery date.

Any required permits or licenses are the responsibility and cost of Vendor. Any calibration will have a certificate provided to the County at the responsibility and cost of Vendor. Included

12 All Costs Included

Total Costs with System, Installation, Training, and Warranty $

13 1-5 Annual Rate Optional Extended Warranty Coverage $

Vendor Name

Completed By

Date