9003 - Addendum No. 2 - Revised Documents.pdf

PDF 792 KB Posted

Attached to
FION OPTICAL TRANSMISSION SYSTEM UPGRADE AND VIDEO DISTRIBUTION ROUTER ADDITIONS PHASE 4
Solicitation number
RFP-11309
Issued by
Leon County, Florida

About this file

This is Addendum No. 2 issued by the Florida Department of Transportation (FDOT) for the FION Optical Transmission System Upgrade and Video Distribution Router Additions Phase 4 procurement (DOT-RFP-25-9003-SJ). The addendum revises the Price Proposal Form, updates several pages of Exhibit A - Technical Specifications, and modifies Attachments 1-4 which will be distributed to firms who attended the Mandatory Pre-Proposal Meeting and have current Exempt Documents Distribution Agreements. The bid opening is scheduled for February 28, 2025 at 10:00 AM EST. The project involves installing communications network equipment at FDOT's FION sites throughout Florida, including optical routed sites, optical amplified sites, tower sites, RTMCs and roadside master hubs.

The revised price proposal form includes 94 line items covering equipment and services such as Nokia 7250 IXR-R6 routers, optical amplifiers, ROADM shelves, SFP modules, and technical support hours. Key equipment quantities include 4 Nokia 7250 IXR-R6 chassis, 8 power supplies, 8 CPIOM cards, 4 10-port 10GE cards, and 10 100GE/10GE combo cards. The work is divided into two milestones - engineering/planning and equipment staging - with milestone payments of 25% and 100% of the equipment subtotal respectively. Technical support is estimated at 200 hours. Unit pricing will apply to both initial term and any renewal periods.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLORIDA DEPARTMENT OF TRANSPORTATION

Procurement Office

605 Suwannee Street, MS 20 Tallahassee, Florida 32399-0450

Phone: (850) 414-4381

ADDENDUM NO. 2 DATE: February 4, 2025

BID No.: DOT-RFP-25-9003-SJ

BID Title: FION Optical Transmission System Upgrade and Video Distribution Router Additions

OPENING DATE: Friday, February 28, 2025 @ 10:00 AM EST

Notice is hereby given of the following changes to the above-referenced SOLICITATION:

• Price Proposal Form has been revised. The original Price Proposal Form is hereby deleted in its entirety and replaced with the below attached Exhibit C – Price Proposal Form (Rev. 02.03.2025)

• Several pages of Exhibit A – Technical Specifications have been updated/revised.

The original pages are hereby deleted in their entirety and replaced with the below revised pages noted with Addendum 2.

• Attachments 1 through 4 have been updated/revised. These documents will be sent out to those firms who attended the Mandatory Pre-Proposal Meeting and have a current Exempt Documents Distribution Agreement on file.

Bidders/Proposers must acknowledge receipt of this Questions and Answers Document by completing and returning to the Procurement Office, by no later than the time and date of the bid/proposal opening. Failure to do so may subject the bidder/proposer to disqualification.

Sherill Johnson, Procurement Agent

Bidder/Proposer

Address

Submitted by (Signature)

Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.

RFPSHELL. 10/21/2024

EXHIBIT C - PRICE PROPOSAL FORM (Page 1 of 7)

RFP Number: DOT-RFP-25-9003-SJ FOB: STATEWIDE

RFP Title: FION Optical System Upgrade and Video Distribution Router Additions – Phase 4

Services to be provided as specified in attached Exhibit “A”, Technical Specifications, and the Contract Plans (Attachment 1, 2, 3, and 4).

PAY

ITEM

NO.

DESCRIPTION UNIT

ESTIMATED

QUANTITY

UNIT RATE PAY ITEM TOTAL

Milton DOT - Furnished & Installed per contract plans

Optical Routed Site 1

Holt - Furnished & Installed per contract plans

Optical Amplified Site 1

Mossy Head - Furnished & Installed per contract plans

Caryville - Furnished & Installed per contract plans

Chipley - Furnished & Installed per contract plans

Aspalaga - Furnished & Installed per contract plans

Midway Operations - Furnished & Installed per contract plans

Optical Amplified Site 1

Tallahassee PSC - Furnished & Installed per contract plans

Tallahassee FHP - Furnished & Installed per contract plans

TERL Building - Furnished & Installed per contract plans

SEOC Building - Furnished & Installed per contract plans

Barry Building - Furnished & Installed per contract plans

Burns Building - Furnished & Installed per contract plans

Greenville - Furnished & Installed per contract plans

Falmouth - Furnished & Installed per contract plans

Exhibit C - Price Proposal Form Rev. 02.03.2025

Addendum No. 2

EXHIBIT C - PRICE PROPOSAL FORM (Page 2 of 7)

PAY

ITEM

NO.

DESCRIPTION UNIT

ESTIMATED

QUANTITY

UNIT RATE PAY ITEM TOTAL

Lake City Operations - Furnished & Installed per contract plans

District 2 HQ - Furnished & Installed per contract plans Optical

Sanderson - Furnished & Installed

I-10/SR23 Interchange Hub - Furnished & Installed per contract plans

Jacksonville FHP - Furnished & Installed per contract plans Optical Routed

SR16 - Furnished & Installed per contract plans Optical

Gopher Ridge - Furnished & Installed per contract plans Optical

Amplified Site 1

I-4/I-95 Interchange Hub - Furnished & Installed per contract plans

Edgewater - Furnished & Installed

I-95/SR528 Interchange Hub - Furnished & Installed per contract plans

District 5 RTMC - Furnished &

Deland DOT - Furnished & Installed per contract plans Optical Routed

Brevard County Line - Furnished & Installed per contract plans Optical

District 4 Hub #2 - Furnished &

SR222 - Furnished & Installed per contract plans

Optical

EXHIBIT C - PRICE PROPOSAL FORM (Page 3 of 7)

PAY

ITEM

NO.

DESCRIPTION UNIT ESTIMATED

QUANTITY UNIT RATE PAY ITEM TOTAL

CR318 - Furnished & Installed per contract plans

Wildwood - Furnished & Installed

Jessamine - Furnished & Installed per contract plans

I-75/I-275 North Apex Hub - Furnished & Installed per contract plans

Orlando West - Furnished & Installed per contract plans

Turkey Lake RTMC - Furnished & Installed per contract plans Optical Routed

Site 1

Orlando South - Furnished & Installed per contract plans

Canoe Creek - Furnished & Installed per contract plans Optical

Kenansville - Furnished & Installed

Site X - Furnished & Installed per contract plans Optical

Ft. Pierce Interchange - Furnished & Installed per contract plans Optical Routed

Ft. Pierce Maintenance - Furnished

Jupiter Interchange - Furnished &

West Palm Beach Interchange - Furnished & Installed per contract plans

Pompano RTMC - Furnished & Installed per contract plans

Optical Routed Site 1 $ $

District 4 RTMC - Furnished & Installed per contract plans

Site 1 $ $

EXHIBIT C - PRICE PROPOSAL FORM (Page 4 of 7)

PAY

ITEM

NO.

DESCRIPTION UNIT ESTIMATED

QUANTITY UNIT RATE PAY ITEM TOTAL

McArthur-Sunrise - Furnished &

Martin Weigh Station - Furnished

Atlantic Ave Hub - Furnished & Installed per contract plans

Optical Amplified Site

Golden Glades Whatley Hub - Furnished & Installed per contract plans

Coral Reef - Furnished & Installed

HEFT/US1 Cabinet - Furnished & Installed per contract plans

Optical Routed Site 1

District 6 RTMC - Furnished &

Andytown - Furnished & Installed per contract plans

Collier County Rest Area - Furnished & Installed per contract plans

Naples FHP - Furnished & Installed per contract plans

District 1 RTMC - Furnished &

Port Charlotte - Furnished &

Fruitville - Furnished & Installed

District 1 STMC - Furnished & Installed per contract plans Optical Routed

Site 1

I-75/I-275 South Apex Hub - Furnished & Installed per contract plans

Kennedy Hub - Furnished & Installed per contract plans Optical

Amplified Site 1

Brooksville

Operations - Furnished & Installed per contract plans

District 7 RTMC - Furnished & Installed per contract plans

Optical Routed Site 1 $ $

Exhibit C - Price Proposal Form

EXHIBIT C - PRICE PROPOSAL FORM (Page 5 of 7)

PAY

ITEM

NO.

DESCRIPTION UNIT ESTIMATED

QUANTITY UNIT RATE PAY ITEM TOTAL

I-4/I-75 Interchange Hub - Furnished & Installed per contract plans

District 1 HQ - Furnished & Installed

Tampa Maintenance - Furnished & Installed per contract plans Optical Routed

US98 Hub - Furnished & Installed per contract plans

District 5 Master Hub #1 - Furnished & Installed per contract plans

Ft. Pierce Admin - Removal of existing equipment per contract plans

Removal Site 1

Nokia 7250 IXR-R6, chassis and other necessary parts Per unit 4

Nokia 7250 IXR-R6, power supply

Per unit 8

Nokia 7250 IXR-R6, CPIOM card

Per unit 8

Nokia 7250 IXR-R6, 10 port, 10GE card Per unit 4

Nokia 7250 IXR-R6, 1 x 100GE, 6 x 10GE card Per unit 10

Nokia 7250 IXR-R6, fan tray

Per unit 4

Nokia 7750 SAR-a8, chassis and other necessary parts. Per unit 1

Nokia 7750 SAR-a8, 2x10GE, 12 x 1GE card Per unit 1 $ $

Nokia 7750 SAR-a8, power supply

Per unit 2

Nokia 7750 SAR-a8, IO module

Per unit 1

Nokia 7750 SAR-a8, CPU card

Per unit 2

Nokia 7750 SAR-a8, fan tray

Per unit 1 $ $

Exhibit C - Price Proposal Form

EXHIBIT C - PRICE PROPOSAL FORM (Page 6 of 7)

PAY

ITEM

NO.

DESCRIPTION UNIT ESTIMATED

QUANTITY UNIT RATE PAY ITEM TOTAL

Optical Amplifier Shelves, including power supplies and control modules

Per unit 3

84 Optical Amplifier Line Card Per unit 6

Optical ROADM Shelves, including power supplies and control modules

Per unit 4

86 Optical ROADM Line/Transponder Card Per Unit 10

87 Optical ROADM Client Card Per Unit 10

Small Formfactor Pluggable (SFP) 100 Gigabit Transponder Optics, spare unit

Per Unit 12

Small Formfactor Pluggable (SFP) 100 GBase-SR Multimode, spare unit

Per Unit 12

90 Small Formfactor Pluggable (SFP) 10 GBase-LR Per Unit 6

91 Small Formfactor Pluggable (SFP) 10 GBase-ER Per Unit 6

SUBTOTAL:

Pay Items 1 – 91, inclusive

Milestone 1: Task Work Order 1:

Engineering plans and submittals, including fiber characterization and site surveys, per Exhibit A, Technical Specifications, Section 5

Milestone 1 1

25% of Price Proposal Subtotal for Pay Items 1 through 91 above, inclusive (rounded to 2 decimal places)

Milestone 2: Task Work Order 2:

Equipment Staging, per Exhibit A, Technical Specifications, Section 9

Milestone 2 1

100% of Price Proposal Subtotal for Pay Items 1 through 91 above, inclusive (rounded to 2 decimal places.)

Technical Support: Network engineering consultation and technical support, per Exhibit A, Technical Specifications, Section

Per Hour 200 $ $

GRAND TOTAL (Sum of Pay Items 1 through 94): $ Exhibit C - Price Proposal Form

EXHIBIT C - PRICE PROPOSAL FORM (Page 7 of 7)

RENEWAL: see Special Condition 33).

THE UNIT RATE(s) WILL APPLY TO THE INITIAL TERM AND ANY RENEWAL PERIODS.

MFMP Transaction Fee:

All payment(s) to the vendor resulting from this competitive solicitation WILL be subject to the MFMP Transaction Fee in accordance with the referenced Form PUR 1000 General Contract Condition #7d.

The Transaction Fees imposed shall be based upon the date of issuance of the payment.

NOTE: In submitting a response, the proposer acknowledges they have read and agree to the solicitation terms and conditions and their submission is made in conformance with those terms and conditions.

ACKNOWLEDGEMENT: I certify that I have read and agree to abide by all terms and conditions of this solicitation and that I am authorized to sign for the proposer. I certify that the response submitted is made in conformance with all requirements of the solicitation.

Proposer: FEID #

Address: City, State, Zip

Authorized Signature: Date:

Printed / Typed: Title:

REVISED PAGES OF EXHIBIT A – TECHNICAL SPECIFICATIONS

FION OPTICAL TRANSMISSION SYSTEM UPGRADE AND VIDEO DISTRIBUTION ROUTER ADDITIONS

PHASE 4

Addendum 2 - Page 20 groups for connected entities to improve network reliability, redundancy, and overall operations.

3.3.1.7 Border Gateway Protocol (BGP) and Multiprotocol Extensions for

BGP (MBGP)

Currently, the FDOT connects to District and other Partners’ ITS networks via a /30 IP address pair in most cases, and uses static routes configured on both sides. The FDOT desires to migrate to a BGP/MBGP route distribution technology to exchange route information with connected entities where external BGP route distribution is supported by the connected entity. The use of BGP/MBGP will help ensure that Reverse Path Forwarding (RPF) checks pass.

The Vendor may augment the OSPF dynamic routing protocol with internal BGP (iBGP) or Intermediate System to Intermediate System (IS-IS) for distribution of internal FION routes and MPLS Label Switched Paths (LSPs).

The Vendor shall configure the equipment for route distribution with connected entities via static routes for IPv4 routes and MBGP for multicast group addresses.

3.3.1.8 Static mroutes or multicast VPRN

At the time this RFP was developed, Districts 5 and 7 RTMCs are unable to support MBGP for multicast route distribution to/from the FION. Therefore, these connected entities will rely solely on static mroutes and MSDP peering for sharing their multicast video streams. This limitation shall be accounted for by the Vendor in developing equipment configurations on the 7250 IXR-R6 devices in the network.

3.3.1.9 Intermediate System to Intermediate System (IS-IS)

The FDOT’s FION system has a multi-node 10 Gb/s Ethernet ring network in the Tallahassee area comprised of Extreme Networks’ Shortest Path Bridging (SPB) equipment. The 7250 IXR-R6 MPLS network will be extended into the Tallahassee ring to deliver multicast video and other data and services. Certain nodes of this ring will replace the Extreme Network’s ISIS switches with Nokia 7250 IXR-R6 Interconnect Routers. Additionally, the recently upgraded optical portion of the network utilizes IS-IS as an underlying interior gateway protocol (IGP). The primary protocol to communicate with these network nodes shall be via OSPF routing, IS-IS and internal BGP as required. The FDOT will reconfigure remaining Extreme Network switches at the Burns Building for Layer 2 operation.

Addendum 2 - Page 21

3.3.1.10 Network Time Protocol

The network time protocol (NTP) shall be implemented for network time synchronization. The Vendor shall utilize the FDOT’s existing NTP server.

3.4 Integration with Optical Transport and other Equipment

3.4.1 Standardized Port descriptions

The Vendor shall follow a standardized description to label all ports that are configured to have connections to other equipment. All ports connected to another device shall include “to/from {device}” in the description, where {device} is the name of the far-end 7250 IXR-R6 device for the particular link or connected Partner’s device (e.g., to/from I-4/I-75 Master Hub, or to/from District 6 ITS).

3.4.2 Routed-Virtual Private LAN Service (R-VPLS) and Internet Enhanced Service

(IES)

The Vendor shall define the Routed-Virtual Private LAN Service (R-VPLS) and Internet Enhanced Service (IES) service-id 14080, under Customer 1, with the name site-mgmt and description Site-Mgmt. This service will support interfaces to all the managed equipment and the interface to the existing FION MPLS network.

The Vendor shall define a dedicated technician port with R-VPLS IES service-id 34080, under Customer 1, with name network-mgmt and description Network-Mgmt.

The Vendor shall define Dynamic Host Configuration Protocol (DHCP) on the port with a pool of IP addresses on each node as specified in the Network Interface Parameters workbook.

3.4.3 Multicast Virtual Private Routed Network (M-VPRN)

Four nodes on the upgraded network will need to participate in the FION’s M-VPRN service for ingesting multicast video and other data. These node locations are Milton, Chipley, Tallahassee Public Safety Complex, and Turkey Lake. This is because there will be new connections to Districts/Partners made at these locations where this data can be ingested.

3.5 Support Equipment

3.5.1 Surge Protective Devices

The Vendor shall furnish and install Gigabit Ethernet SPDs for each new copper Ethernet cable installed by the Vendor that connects the Vendor installed network equipment to existing FDOT equipment.

Addendum 2 - Page 22

The Gigabit Ethernet SPDs shall be Eaton MTL, model ZB24596, or approved equivalent. The Vendor shall furnish and install a 19-inch DIN rail within the 19-inch equipment cabinets/racks for the SPDs to be mounted or run cabling to an existing DIN rail mounted in an adjacent or nearby cabinet or rack. The Vendor shall install the SPDs on the DIN rail. The DIN rail shall be properly grounded. The Vendor may use existing on-site DIN rails if there is adequate space available and the DIN rails are properly grounded.

3.5.2 Maintenance Spares

The Vendor shall furnish the following optical equipment as maintenance spares:

Qty. (4) Reconfigurable Optical Add/Drop Multiplexer (ROADM) shelf including power supplies and control modules.

Qty. (10) ROADM line/transponder cards and client cards.

Qty. (3) In-line Amplifier shelves including power supplies and control modules.

Qty. (6) In-line Amplifier line cards and optical transceivers.

Qty. (12) SFP 100 Gigabit Transponder Optics.

Qty. (12) SFP 100 GBase-SR Multimode Optics.

Qty. (6) SFP 10 GBase-LR Optics.

Qty. (6) SFP 10 GBase-ER Optics.

The Vendor shall also furnish the following Nokia 7250 IXR-R6 router equipment as maintenance spares:

Qty. (4) Nokia 7250 IXR-R6 Chassis, Part Number 3HE11278AARB01, and other necessary parts to provide fully functional units

Qty. (8) AC to DC Rectifier Modules, Part Number 3HE09432AA Qty. (8) CPIOM Card, Part Number, Part Number 3HE11283AARC01 Qty. (4) 10-port 10GE Card, Part Number 3HE11280AARB01 Qty. (10) 1 x 100GE, 6 x 10GE Card, Part Number 3HE11282AARB01 Qty. (4) Fan Tray, Part Number 3HE11279AARC01 Other necessary parts to provide a three fully functional Nokia 7250 IXR-R6 router.

The Vendor shall also furnish the following Nokia 7750 SAR-a8 router equipment to be used during staging testing and then provided as a maintenance spare:

Qty. (1) 7750 SAR-a8 Chassis, Part Number 3HE09196AARC01, and other necessary parts to provide fully functional units.

Addendum 2 - Page 23

Qty. (1) 2 x 10GE, 12 x 1GE Card, Part Number 3HE09205AA Qty. (2) Power Supply, Part Number 3HE09199AARB01 Qty. (1) IO Module, Part Number 3HE09202BA Qty. (2) CPU Card, Part Number 3HE09201AARB01 Qty. (1) Fan Tray, Part Number 3HE09198AARD01 Other necessary parts to provide a fully functional Nokia 7750 SAR-a8 router.

The 7750 SAR-a8 shall be used during staging as the multicast rendezvous point/MSDP host and shall become a maintenance spare following staging testing.

After successful staging testing the Vendor shall deliver the 7750 SAR-a8 to the FDOT FION Maintenance Contractor (TransCore, LLC) in Orlando, FL.

3.6 Network Management

3.6.1 Optical Transport Element Manager

The Vendor shall furnish and install the optical transport manufacturer’s element manager as part of this project. The element manager shall provide a graphical user interface for the operation, administration, management, and provisioning of the optical transport equipment. The element manager shall be configured in a geographically redundant configuration at two FDOT locations to be specified by the

FDOT.

The FDOT will provide geographically encoded information of the FDOT’s fiber optic system to the Vendor for importation into the element manager. The Vendor shall use this information to graphically display the network as well as to indicate the location of OTDR discovered fiber outside plant issues. The FDOT will provide the Vendor with Geographic Information System (GIS) files in an industry-standard format that defines the routing of the fiber and locations of splice vaults, pull boxes, etc. where excess fiber optic cable is located. The Vendor shall utilize these files to populate the element manager to accurately depict the fiber on a map. The element manager shall provide a zoomable and pannable map to a 1:4000 scale, or better.

The element manager will not have Internet access and therefore the map should be provided directly by the element manager or a Vendor-provided local mapping server using a Vendor-provided data source.

The Vendor shall furnish and install 19-inch rack-mounted servers powered by -48 VDC (either natively through -48 VDC power supplies or using Vendor-furnished DC-

Addendum 2 - Page 28

6 INITIAL FIELD WORK

6.1 Sites of Work

This project involves installation of communications network equipment at the FDOT’s FION communications sites located throughout Florida. The project site list is contained in the Contract Plans. A detailed site list with addresses is provided in the FDOT Node Distances workbook found in Attachment 3 – Supporting Documentation.

Additionally, a complete site list follows, grouped by the type of site. Generally, there are three types of sites comprising the FION system: Tower Sites, RTMCs and roadside Master Hubs.

These tables also describe FDOT’s anticipated use at the site based on FDOT’s initial system design, how many degrees of ROADM will be installed at the site, and whether the site is a routed node (e.g., receives or has an existing Nokia 7250 IXR- R6 MPLS router), as well as whether the site requires removal of existing Ciena OM- 5200 ROADM or optical regeneration shelves.

6.1.1 Tower Sites

Site Name Anticipated Use

Anticipated Equipment to be Added

ROADM

Degrees

7250 IXR-

R6

Remove

OM-5200

Milton New drop for District 3, MPLS routing

ROADM and Router

1 Add

Holt Regeneration In-line Amplifier Mossy Head Regeneration In-line Amplifier Caryville Regeneration In-line Amplifier Chipley New drop for

District 3, MPLS routing

ROADM and Router

2 Add

Aspalaga Regeneration In-line Amplifier Tallahassee

FHP

10 Gigabit Metro Ring

Router Add

Greenville Regeneration In-line Amplifier Falmouth Regeneration In-line Amplifier Lake City Operations

Existing drop for District 2, MPLS routing

ROADM 4 Existing

Sanderson Regeneration In-line Amplifier Jacksonville

FHP

Existing drop for District 2

ROADM 2 (1 w/ two lambda)

Existing

SR16 Regeneration In-line Amplifier

Addendum 2 - Page 29

Gopher Ridge Regeneration In-line Amplifier Edgewater Regeneration In-line Amplifier DeLand FDOT New drop for

District 5 (future), MPLS routing

ROADM and Router

3 Add

Brevard County Line

Regeneration In-line Amplifier

SR222 Regeneration In-line Amplifier CR318 Regeneration In-line Amplifier Wildwood

(FDOT)

MPLS routing ROADM and Router

3 Add

Jessamine Regeneration In-line Amplifier Orlando West MPLS routing ROADM and

Router 3 Add

Orlando South MPLS routing ROADM and Router

5 Add

Canoe Creek Regeneration In-line Amplifier Yes Kenansville Regeneration In-line Amplifier Yes Site X Regeneration In-line Amplifier Yes Ft Pierce Interchange

MPLS routing ROADM and Router

3 Add

Ft Pierce Maintenance

Layer 3 Stub at

10GE

Router Add

Jupiter Interchange

Regeneration In-line Amplifier

West Palm Beach Interchange

Regeneration In-line Amplifier

McArthur- Sunrise

MPLS routing ROADM 3 Existing

Coral Reef MPLS routing ROADM and Router

3 Add

Andytown Regeneration In-line Amplifier Yes Collier County Rest Area

Regeneration In-line Amplifier Yes

Naples FHP Regeneration In-line Amplifier Yes Port Charlotte Regeneration In-line Amplifier Fruitville Regeneration In-line Amplifier Tampa Maintenance

MPLS routing ROADM and Router

Add

Brooksville Maintenance

New drop for District 7, MPLS routing

ROADM and Router

1 Add

Fort Pierce Admin

Yes

Addendum 2 - Page 30

6.1.2 RTMCs

Site Name Anticipated Use

Anticipated Equipment to be Added Degrees Routed

Node Remove

OM-5200

Midway Operations Regeneration In-line Amplifier

Tallahassee Public Safety Complex

Drop for District 3, MPLS routing

ROADM and Router

2 Add

Transportation Engineering Research Laboratory

10 Gigabit Metro Ring

Router Add

State Emergency Operations Center

10 Gigabit Metro Ring

Router Add

Barry Building 10 Gigabit Metro Ring

Router Add

Burns Building 10 Gigabit Metro Ring (IS-IS Stub)

Router Add

District 2 Headquarters

Layer 3 Stub at 10GE

Router Add

District 5 RTMC Existing drop for District 5, CFX, DIVAS, MPLS routing

ROADM 6 Existing

Turkey Lake (FTE North RTMC)

New drop for Turnpike, MPLS routing

ROADM and Router

2 Add

Pompano (FTE South RTMC)

Existing drop for Turnpike (existing), MPLS routing

ROADM 3 Existing

District 4 RTMC Existing drop for District 4, MPLS routing

ROADM 5 Existing

District 6 RTMC Existing drop for District 6, MPLS routing

ROADM 5 Existing

District 1 RTMC Existing drop for District 1, MPLS routing

ROADM 4 Existing

District 1 Satellite

TMC

New drop for District 1, MPLS routing

ROADM and Router

2 Add

District 7 RTMC Existing drop for District 7, MPLS routing

ROADM 3 Existing

District 1 Headquarters

New drop for District 1, MPLS routing

ROADM and Router

1 Add

Addendum 2 - Page 31

6.1.3 Roadside Master Hubs

Site Name Anticipated Use

Anticipated Equipment to be Added Degrees Routed

Node Remove

OM-5200

Golden Glades Whatley Hub

MPLS routing ROADM and Router

6 Add

I-10 / SR23 Master Hub

Drops for District 2, Turnpike (future)

ROADM and Router

3 (1 w/ two lambda)

Add

I-4 / I-95 Interchange Hub

MPLS routing ROADM and Router

4 Add

I-95 / SR528 Master Hub

MPLS routing ROADM and Router

3 Add

District 4 Hub #2 (Okeechobee Rd)

MPLS routing ROADM and Router

4 Add

MCSAW Martin County Weigh-in- Motion station (Northbound I-95)

Regeneration In-line Amplifier

Atlantic Ave Master Hub

Regeneration In-line Amplifier

HEFT (US-1 /

SR821 Interchange)

New drop for District 6 (future), MPLS routing

ROADM and Router

2 Add

I-75 / I-275 North Apex Hub

MPLS routing ROADM and Router

5 Add

Kennedy Blvd Hub Regeneration In-line Amplifier I-4 / I-75 Interchange Master Hub

MPLS routing ROADM and Router

7 Add

I-75 / I-275 South Apex Hub

MPLS routing ROADM and Router

5 Add

District 7 Hub 98 (I- 4)

Regeneration In-line Amplifier Yes

District 5 Hub 1 (I-4) Regeneration In-line Amplifier Yes

6.2 Site Surveys

The Vendor shall perform a physical survey of each site with the FDOT present to obtain agreement on the placement and installation details of all equipment to be installed. The Vendor shall document the locations, AC/DC power requirements, and cabling requirements.

After the completion of the site surveys, the Vendor shall provide a report that documents the space, power, and connectivity requirements at each location, for FDOT review and approval. The report shall include diagrammatic rack/cabinet diagrams that indicate where equipment is to be installed, the source of electrical

Addendum 2 - Page 36

Turkey Lake – Ruckus ICX-7750 Milton – Fortinet 1800F Chipley – Fortinet 3400E Tallahassee Public Safety Complex – Cisco 4500X

The FDOT will provide the Vendor with the current configuration files, or relevant portions thereof, for the above listed District equipment and the Vendor shall utilize this information to simulate the actual equipment during the staging testing. Other District equipment will have already been cutover to operate on the MPLS network and does not need to be tested during staging.

The Vendor is responsible for designing a Staging Testing Acceptance Plan to be approved by the FDOT. The FDOT will witness System Staging testing. The Staging Acceptance Plan shall be completely met before equipment may be deployed to the field.

The staging plan shall utilize the spare 7750 SAR-a8 router chassis and media device adapter cards to function as the rendezvous point and multicast source discovery protocol (MSDP) host for inter-domain multicast traffic. For testing purposes, multicast video traffic can be generated using a multicast-capable video device or simulated using a video streamed via Video Lan Corporation’s VLC Player application. Multicast video shall be tested using Source Specific Multicast (SSM) multicast group addresses.

9.3.1 Staging Test Plan

The Vendor shall develop and submit a test plan that identifies how the following tests are to be performed during system staging for FDOT’s review and approval.

The test plan shall demonstrate network redundancy for the following scenarios:

ROADM functionality:

Testing of add/drop multiplexing and wavelength switching, should wavelength switching technology be employed in the solution.

OTDR and power test:

Tests of OTDR functionality and accuracy in the new optical element manager indicating where a fiber outage has occurred.

Optical power loss test, to indicate optical elements are reporting alarms correctly when received signal level drops below threshold/loss budget.

Addendum 2 - Page 37

ILA/RAMAN amplifier tests – e.g., use of attenuators to simulate damaged fiber and that equipment operates within manufacturer’s specifications.

Wide area link testing (at 10 Gb/s):

Each wide area link shall be failure tested to ensure proper rerouting of network traffic over secondary link(s).

Multiple link failures to ensure proper rerouting of network traffic over tertiary or subsequent available link(s).

Successful network convergence and traffic re-routing following wide area link failure(s) and link restoration(s).

Successful PIM tree and multicast VPRN convergence following wide area link failure(s) and link restoration(s).

Successful OSPF, and iBGP route advertisement updates following wide area link failure(s) and link restoration(s).

Application performance following link failure(s).

Other testing parameters include:

Per wide area hop Ethernet throughput at multiple frame sizes at 100 Gb/s.

Per wide area hop Ethernet latency at multiple frame sizes at 100 Gb/s.

Transport of each defined service.

VLAN connectivity, if applicable.

Class of Service/Quality of Service policies.

Command Line Interface (CLI) via Secure Shell (SSH) protocol.

As each District has a different dedicated multicast address space, the staging plan shall include equipment to simulate that each District can receive other Districts’ multicast video via MSDP peering through the FION.

District 3 Nodes and Turnpike Turkey Lake Test multicast video sending from District 3 nodes (Milton, Chipley, Tallahassee Public Safety Complex) and ensure reception at Turnpike Turkey Lake.

Test multicast video sending from Turnpike Turkey Lake and ensure reception at District 3 (Milton, Chipley, Tallahassee Public Safety Complex).

Ensure the 7750 SAR-a8 MSDP host is receiving multicast source-active (SA) advertisements from Tallahassee Public Safety Complex and Turnpike Turkey Lake.

File details come from the government source that posted it. Updated .