9003 - Clarification Questions and Answers.pdf
PDF 75 KB Posted
- Attached to
- FION OPTICAL TRANSMISSION SYSTEM UPGRADE AND VIDEO DISTRIBUTION ROUTER ADDITIONS PHASE 4
- Solicitation number
- RFP-11309
- Issued by
- Leon County, Florida
About this file
This is a clarification questions and answers document from the Florida Department of Transportation (FDOT) regarding bid number DOT-RFP-25-9003-SJ for the FION Optical Transmission System Upgrade and Video Distribution Router Additions project, with responses due March 17, 2025 at 10:00 AM EST. The document addresses technical and procedural questions about equipment staging, testing requirements, and installation procedures. Key timeline requirements include 10 business days advance notice for both system staging testing and field acceptance testing, with FDOT maintaining active oversight and participation throughout the project.
The document provides detailed pricing structure guidance, explaining that for a hypothetical $10M project cost, vendors should allocate $4.44M for Pay Items 1-91, $1.11M (25%) for Milestone 1 (Pay Item 92), and $4.44M (100%) for Milestone 2 (Pay Item 93). Pay Item 94 covers vendor-provided technical support for non-warranty issues such as MPLS router configuration changes. The document clarifies that if fiber optic characterization results are worse than predicted and require additional amplification sites, FDOT would initiate change orders under Section 1.7. The procurement includes requirements for both AC and DC power supply testing during the staging phase.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLORIDA DEPARTMENT OF TRANSPORTATION
Procurement Office
605 Suwannee Street, MS 20 Tallahassee, Florida 32399-0450
Phone: (850) 414-4381
CLARIFICATION QUESTIONS AND ANSWERS DATE: February 21, 2025
BID No.: DOT-RFP-25-9003-SJ
BID Title: FION Optical Transmission System Upgrade and Video Distribution Router Additions
OPENING DATE: Monday, March 17, 2025 @ 10:00 AM EST
QUESTIONS AND ANSWERS PROVIDED BELOW
Clarification Question 1
We understand when each milestone will be paid out, we are still unsure on how much money will be paid at each milestone. For example, if our total cost is 10M for all hardware and services not including maintenance. Does that mean we should write down 4,000,000 for Pay
Items 1-91, 2,000,000 for Pay Item 92, 4,000,000 for Pay Item 93? So, then the total in Pay
Item 94 is 10M (not including maintenance)?
Reference: Answer Number 1
Clarification Answer 1
The Price Proposal bid sheet is a mandatory format. Ignoring Pay Item 94, if a Vendor has determined their overall cost Bid of the project is $10M, the Vendor shall complete the bid sheet such that the overall cost of the project is $10M. In this example, the Vendor would enter in unit prices in Pay Items 1 through 91 such that the subtotals of those Pay Items equals $4.44M.
For Milestone 1 (Pay Item 92), the Vendor would enter $1.11M (25% of $4.44M). For Milestone 2 (Pay Item 93), the Vendor would enter $4.44M (100% of $4.44M). The Grand Total Bid would be the sum of Pay Items 1 through 93, which would equal $10M (Pay Items 1-91 = $4.44M, Pay Item 92 = $1.11M, Pay Item 93 = $4.44M). The FDOT has provided a spreadsheet for the Vendor to utilize to complete their Price Proposal. See Addendum No. 4
Clarification Question 2
The new Pay Item 94 “Technical Support” is stated this will include Section 13. Section 13 contains maintenance and specifically talks about SLAs, Next business day arrival, and technical support. Our price here should be for the 5 years of maintenance requested. If it is only for 200 hours of maintenance, where would you like the rest of the maintenance cost to go? Reference:
Answer Number 17
Clarification Answer 2
The Technical Specifications, Section 13 have been revised to include subsection numbers to make a clearer distinction between Vendor-provided technical support and equipment manufacturer provided technical support. The description for Pay Item 94 has been revised to indicate that the Pay Item is for Vendor-provided technical support. The purpose of Pay Item 94 is to allow the FDOT to engage the Vendor for support with items that are not warranty related issues. An example of such would be providing consulting and technical support for MPLS router configuration changes. See Revised Technical Specifications - Addendum 3.
Clarification Question 3
We read in Section 1.7 that the changes in scope will be “initiated by FDOT”, if FC results are much worse than predicted and require the addition of amplification at non-amplifier sites, would this be considered a “initiated by FDOT” JCO? Subsequently changing the equipment quantities and total price. We cannot predict what these results would be, so our engineering cannot accommodate for it, therefore we believe this would be an “initiated by FDOT” JCO.
Reference: Answer Number 60
Clarification Answer 3
Yes, if fiber optic characterization results are much worse than predicted and a new amplification site is required, the FDOT would initiate a change order in accordance with Section 1.7
Clarification Question 4
Using round numbers, if we were to assume the total cost of the deal is $10M ($7M in Hardware/software) and $3M in professional services is phase 1 20% of the $7M or 20% of the $7M and 20% of the $3M? Looking for the percentage of each in the $10M example.
Clarification Answer 4
See Clarification Question 1 and Answer 1
Clarification Question 5
We recognize that as vendor we are accountable for the installation timeframe for staging and final installation, but FDOT impacts that schedule as far as being available when needed to approve the staging as well as access to building for final install, and revisiting sites if necessary. We would like to understand the reaction time of FDOT when the vendor contacts them to sign-off on staging and completing installation. This is an important factor in understanding how long the time horizon is between shipping equipment and getting paid. Also, as I reread the answer it appears the total now adds up to 120%. Please clarify.
Clarification Answer 5
The Technical Specifications and the answers to the questions provide guidance to the Vendor as to the requirements of and timeframe to gain access to sites for project fiber characterization, surveying, and construction. The Vendor should note that the FDOT will be an active participant in this project and the Vendor shall expect a high level of involvement and oversight. The FDOT and Vendor shall work closely together to establish and maintain the project schedule.
With regard to system equipment staging, the Vendor shall install, configure, and verify that the system is ready for FDOT to witness the System Staging Testing. The Vendor shall notify the FDOT 10 business days prior to the proposed scheduled staging testing.
After successfully completing staging testing, the Vendor shall install the equipment in the field and verify that the equipment is ready for FDOT to inspect and witness the Field Acceptance Testing. The Vendor shall notify the FDOT 10 business days prior to the proposed scheduled field acceptance testing.
Clarification Question 6
With the key financial aspects of this RFP not being clear we cannot put together the financial picture and assess the risk, so I am requesting an extension of the deadline until March 28th.
Clarification Answer 6
Per Addendum No. 3, responses are now due Monday, March 17, 2025, @ 9:00AM
Clarification Question 7
Subject: Clarification of Question 92, Answer 92
Question: Would it be acceptable to use a single AC power source in each device for staging the production environment, or is redundant AC/DC power required to match the final deployment conditions?
Clarification Answer 7
Yes, it is acceptable to use a single AC power supply in each device for staging the production environment. However, each AC and DC power supply to be furnished as part of this project shall be tested and shown to be to be working during staging. This can be accomplished by swapping in and out AC and DC power supplies into one or more devices as part of an FDOT-approved Staging Test Plan and Staging Test Procedure.