This is a technical drawing set for electrical and communication infrastructure at John W. Hubert Middle School in Savannah, Georgia, prepared by Greenline Architecture, Inc. for the Savannah-Chatham County Public School System (SCCPSS) renovation project. The drawings depict communication plans across six zones showing data cabling, camera locations, intercommunication systems, and network distribution infrastructure. The project includes installation of three Intermediate Distribution Frames (IDFs) and one Main Distribution Frame (MDF) with specifications for 56 security cameras (including corner-mounted models), approximately 350 data cables, 75 indoor and 3 outdoor wireless access points, 10 audio enhancement data drops, and associated conduit and box installations. The drawings indicate multiple data drop locations at teacher desks, wall-mounted locations, and ceiling-mounted projector boxes, with specific reference to mounting heights and conduit requirements detailed in technical specifications. The work is organized across five construction phases, with Phase 1 omitted from the current scope; Phases 2 through 5 are addressed in these documents, which are dated September 5, 2025 for the construction bid set.
The technical drawings include multiple revision notes and clarification requests from the design team regarding scope definition, conduit sizing, equipment locations, and mounting specifications. Several notes indicate that certain equipment items—including wall-mounted enclosures, XD receivers, double-gang boxes, and amplifiers—are designated as "by others" and fall outside the contractor's scope. The IDF and MDF locations are specified across electrical rooms (Rooms 102, 107, and 91.1), with the MDF relocated to the electrical room at location 63. The drawings utilize standardized symbols for data outlets, intercommunication equipment, fire alarm systems, PA system components, and video intercom stations. All work must comply with SCCPSS Technology Design Plan requirements, including Category 6 cabling, specific Cisco networking equipment, Vertiv UPS systems, and 12-strand multimode fiber optic cabling with SC terminations. A BICSI-certified RCDD must be present during installation, with a 15-year manufacturer and performance warranty required upon completion.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9-5-25 edrbuc93 Text Box New MDF edrbuc93 Highlight edrbuc93 Text Box Elec 102 IDF 1 edrbuc93 Highlight edrbuc93 Highlight edrbuc93 Text Box Elec 91.1 IDF 3 edrbuc93 Highlight edrbuc93 Highlight edrbuc93 Text Box Elec 107 IDF 2 edrbuc93 Highlight edrbuc93 Highlight edrbuc93 Highlight
RhoWri29 Text Box 13 Cafe Cameras -
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Covert CCTV Motion Detector
RhoWri29 Rectangle
RhoWri29 Ellipse
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Ellipse
RhoWri29 Ellipse
RhoWri29 Ellipse
RhoWri29 Ellipse
RhoWri29 Text Box IDF3 17 cameras 1 door trove
RhoWri29 Rectangle
RhoWri29 Arrow
RhoWri29 Rectangle
RhoWri29 Arrow
RhoWri29 Snapshot
RhoWri29 Text Box
RhoWri29 Text Box IDF2 14 Cameras 1 door trove
RhoWri29 Arrow
RhoWri29 Text Box MDF 13 cameras 1 connector 1 door trove
RhoWri29 Rectangle
RhoWri29 Text Box
RhoWri29 Rectangle
RhoWri29 Text Box IDF1 12 Cameras 1 door trove edrbuc93 Text Box Data Drop for at wall location edrbuc93 Text Box Data drop for halo edrbuc93 Text Box Data drop for wireless, camera, AE Camera edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Engineer edrbuc93 Engineer
36010 Corner Mount
P3735-PLE
9-5-25 gzumbro Rectangle gzumbro Text Box
CONFIRMATION NEEDING ON THE FOLLOWING ITEMS.
1- SAMETS ONLY SCOPE HERE IS TO PROVIDE & INSTALL THE BOXES & CONDUITS CORRECT?
2-SAMET TO PROVIDE ALL BOXES SHOWN MINUS THE WALL MOUNTED ENCLOSURE, XD RECEIVER, DOUBLE GANG BOX, & AMPLIFIER.
3-WHAT SIZE CONDUIT IS REQUIRED TO BE INSTALLED BY SAMET.
4- CONFIRM THAT THE LAYOUT & LOCATIONS SHOWN IN THE COMMUNICATION DRAWINGS & MOUNTING HEIGHTS ARE CORRECT AS SHOWN IN DETAIL 3/A0.2. ARE THERE ANY ADDITIONAL LOCATIONS THAT REQ THIS NOT SHOWN IN THE ELECTRICAL DRAWINGS?
5- PROVIDE MOUNTING HEIGHT OF WALL MOUNTED ENCLOSURE BY OTHERS FOR US TO RUN CONDUIT TO.
R E
V
IS
IO
N S
JOB NO:
ISSUE DATE:
DRAWN:
Architect for further clarification.
not always drawn to scale. Use dimensions given or consult the
3. Do not scale dimensions from prints. Plans and details are size between the print and the original drawing.
only and are hereby changed in proportion to the difference in
2. Scales as stated hereon are valid on the original drawing request.
not to be used on any other project and is to be returned on and is not to be reproduced or copied in whole or in part. It is
1.The drawing is the property of GREENLINE ARCHITECTURE, INC.
WWW.GREENLINEARCH.COM
F 912.447.8381
T 912.447.5665
23.020
E:\BOE Hubert Middle School - 23068.00\CADD\E4.01.dgn
C A
D
P L
O T b m o y e
:0
S
E P
FOR CONSTRUCTION
BID SET
9-5-2025
S A
V A
N N
A H
G E
O R
G
IA
G
R A
N T S
T
M
ID
D L E S
C H
O O
L F
O R S
C C
P S S
R E
N O
V A
T
IO
N T
O J
O H
N W
H U
B E
T
F A
C
IL
IT
Y C
O D
E -2
F
T E C
A P
O U
T L A
Y -6
-0
SAVANNAH, GA 31401
611 EAST BAY ST
H E
A T
P
U M
P
W A
L L
M O
U N
T
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
T T
TT TT
T T
T T
TT TT
T T
T T
T T
TT
T T
TT TT
T TT T
TT
T
BATH
ROOM
BATH
ROOM
ELEC.
10.1
MATH
CLASSROOM
ADMIN
SPECIAL
EDUCATION
ADAPTIVE
SOCIAL
STUDIES
ELA
SOCIAL
SCIENCE
ELEC
BATH
ROOM
BATH
STORAGE
HALLWAY
1.01
CUSTODIAL
HB HB
FAN
EX.
FAN
EX.
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
B.C.
T T
B.C. B.C.
T
B.C.
B.C.
T T
B.C. B.C.
T
B.C.
T
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
B.C.
T
B .C
NOTE A
NOTE A
NOTE A
NOTE A NOTE A NOTE A
NOTE A
NOTE A
NOTE A
NOTE G43
IT BACKBOARD
JV
E4.011
1/8" = 1'-0"
KEY PLANELECTRICAL COMMUNICATION PLAN - ZONE 1
E4.01
COMMUNICATION PLAN NOTES:
Z O
N E
C O
M M
U N
IC
A T
IO
N
E C
T R
IC
A . PROVIDE BOX AND DATA WIRING FOR PROJECTOR IN CEILING.
TV
I
S
C
DS
DS
F
I
TV
F
CF
S
S CF S S S SCF CF
DS DS
I
TV
S
CF
I
CF
S
TV TV
I
CF
S
TV
S
CF
I
I
TV
CF
S
I
TV
CF
S
FSTS
F
F
C
F
C
I
CF
S
TV
S S SS
S S S S S S
SS SS
S
S
S
S
S S SS S S S S S S
DS
F I
CFS
S
S
TV
S S
SS
F F C C
S
CF
S
I M
I M
I
MI
M
IM IM
CT CT CT CT CT CT CT CT CT
I M
I M
I M
I M
I M
6 7 8 9 10
1 1 1 1
I M
H
H gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Text Box GREEN BOXES INDICATE BLIND CORNER EQUIPMENT LOCATIONS-PLEASE CONFIRM IF THERE ARE ANY LOCATIONS NOT SHOWN THAT REQ THIS.
edrbuc93 Highlight edrbuc93 Text Box
IDF 3
Highlight edrbuc93 Text Box The data drops should be down at the Teachers desk what you are calling BC edrbuc93 Text Box 2 data drops and 1 quad power receptacle edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delete edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delete edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delete edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delete edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText
RhoWri29 Ellipse
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Text Box Camera Corner Mounted
RhoWri29 Text Box Camera Corner Mounted edrbuc93 Delta edrbuc93 FreeText edrbuc93 Engineer edrbuc93 Engineer edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Text Box Data Drop for at wall location edrbuc93 Text Box Data drop for halo edrbuc93 Text Box Data drop for wireless, camera, AE Camera edrbuc93 Engineer edrbuc93 Engineer edrbuc93 Engineer edrbuc93 Engineer edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText
V
IS
IO
N S
JOB NO:
ISSUE DATE:
DRAWN:
Architect for further clarification.
not always drawn to scale. Use dimensions given or consult the
3. Do not scale dimensions from prints. Plans and details are size between the print and the original drawing.
only and are hereby changed in proportion to the difference in
2. Scales as stated hereon are valid on the original drawing request.
not to be used on any other project and is to be returned on and is not to be reproduced or copied in whole or in part. It is
1.The drawing is the property of GREENLINE ARCHITECTURE, INC.
WWW.GREENLINEARCH.COM
F 912.447.8381
T 912.447.5665
23.020
E:\BOE Hubert Middle School - 23068.00\CADD\E4.02.dgn
C A
O T b m o y e
:1
S
E P
FOR CONSTRUCTION
BID SET
9-5-2025
S A
V A
N N
A H
G E
O R
G
IA
G
R A
N T S
T
M
ID
D L E S
C H
O O
L F
O R S
C C
P S S
R E
N O
V A
T
IO
N T
O J
O H
N W
H U
B E
C
IL
IT
Y C
O D
E -2
F
T E C
A P
O U
T L A
Y -6
-0
SAVANNAH, GA 31401
611 EAST BAY ST
H E
A T
P
U M
P
W A
L L
M O
U N
T
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
T
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T
T T
T T
T T
TT
TT
TT
T TTT TT T T
T TTT TT T T
T T
T T TT
T TTT TT T TT T TT
OFFICE
96.3
96.1
96.2
CTAE
BUSINESS LAB
FAMILY
ENGAGEMENT
BATH
SOCIAL
SOCIAL
J.C.
BATH
1.02
HALLWAY
1.05
SUPPLY
STORAGE
97.1
TT
TT TT
T T
T T
TT
T T
T T
T T
T T
H E
A T
P
U M
P
W A
L L
M O
U N
T
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALLFAN
EX.
FAN
EX.
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
T T T T
T
T T
1241 SQ. FT.
73 SQ. FT.
NOTE A NOTE A NOTE A NOTE A
NOTE A
NOTE A
NOTE A
NOTE A NOTE A
NOTE A
NOTE A
NOTE A
NOTE G43
DATA BACKBOARD
JV
E4.021
1/8" = 1'-0"
KEY PLAN
E4.02
ELECTRICAL COMMUNICATION PLAN - ZONE 2
Z O
N E
C O
M M
U N
IC
A T
E C
T R
IC
COMMUNICATION PLAN NOTES:
PROVIDE BOX AND DATA WIRING FOR PROJECTOR IN CEILING.A.
TS
FS
F C
F C
DS
DS
I
S
F C
S S S S
F C F C
F
I I II
I I II
S
F C
TV TV
S
F C
TV
S
F C
TV
S
F C
TV
S
F C
F
TV
F C
S
F C
S
TVTV
F C
S
TV
F C
S
DS
IF
TV
S F C
F C
S
TV
DS
F I
S F C
TV
S S SS
S S S S S S
SS SS SS
S S S SS S S S S
S
S
S
S
S
I
S
S
I M I M I M
I M
I M
15 16
IMIM
CT CT CT CT CT CT CT CT CT
20 21
1 1 1 1 1
S S
F C
I M I M
I M
17 18
I M
I M
22 23
H
H
I M
I M gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Text Box GREEN BOXES INDICATE BLIND CORNER EQUIPMENT LOCATIONS-PLEASE CONFIRM IF THERE ARE ANY LOCATIONS NOT SHOWN THAT REQ THIS.
edrbuc93 Note Move to Electrical Rm 107 edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delete edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Text Box IDF Move to RM 107 edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Text Box Camera Corner Mounted
RhoWri29 Text Box Camera Corner Mounted edrbuc93 Engineer edrbuc93 Engineer edrbuc93 Engineer edrbuc93 Engineer edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93
V
IS
IO
N S
JOB NO:
ISSUE DATE:
DRAWN:
Architect for further clarification.
not always drawn to scale. Use dimensions given or consult the
3. Do not scale dimensions from prints. Plans and details are size between the print and the original drawing.
only and are hereby changed in proportion to the difference in
2. Scales as stated hereon are valid on the original drawing request.
not to be used on any other project and is to be returned on and is not to be reproduced or copied in whole or in part. It is
1.The drawing is the property of GREENLINE ARCHITECTURE, INC.
WWW.GREENLINEARCH.COM
F 912.447.8381
T 912.447.5665
23.020
E:\BOE Hubert Middle School - 23068.00\CADD\E4.03.dgn
C A
O T b m o y e
:1
S
E P
FOR CONSTRUCTION
BID SET
9-5-2025
S A
V A
N N
A H
G E
O R
G
IA
G
R A
N T S
T
M
ID
D L E S
C H
O O
L F
O R S
C C
P S S
R E
N O
V A
T
IO
N T
O J
O H
N W
H U
B E
C
IL
IT
Y C
O D
E -2
F
T E C
A P
O U
T L A
Y -6
-0
SAVANNAH, GA 31401
611 EAST BAY ST
T T
T T
T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T T
T
T
TT TT
T TT T
TT TT
T TT T
TT
TT
TT
TT
TT TT
T TT T
TTTT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
I.S.S.
COM. LAB
ADMIN.
ADMIN.
SOCIAL
STUDIES
BATH
ROOM
BATH
91.1
BATH
CLINIC
CLINIC
96.7
96.6
96.5
96.4
96.3
STUDENT
SERVICES
CONF.
96.8
96.1
96.2
1.03
HALL
96.8
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
PTAC PTAC
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL
HEAT PUMP
THRU WALL FAN
EX.
FAN
EX.
HEAT PUMP
THRU WALL
T T T
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
T
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
T
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
T
T
NOTE A NOTE A NOTE A NOTE A
NOTE A
NOTE A NOTE A NOTE A NOTE A
NOTE A
NOTE 4
NOTE G43
BACKBOARD
DATA
JV
E4.031
1/8" = 1'-0"
KEY PLAN
COMMUNICATION PLAN NOTES:
E4.03
ELECTRICAL COMMUNICATION PLAN - ZONE 3
Z O
N E
C O
M M
U N
IC
A T
E C
T R
IC
PROVIDE BOX AND DATA WIRING FOR PROJECTOR IN CEILING.A.
TV
S
F C
SS
DS
DS
F
SS S S S S S
F C
I
S S
F C
S S
F C
SF C
TV TV TV TV
S
F C
SS
S
F C
SS
S
F C
SS
I I I
S
F C
SS
I
TV
FC
S
S
TV
FC
S
S
I
TV
S
F C
S
S S
F C
S
S S
F C
S
S S
F C
S
S
I I
TV TV TV
FC
S
FC
S
DS
F I
F CS
S
S
TV
TV
I
S F C
S
S
S
S
S
FC
I
S
FC
S
48"
F CS
S
S
F C
S
TV
48" S
S
S
S
S
S
S
S S
S
S S
F C
S
I M
I M
I
29 28
I
34 33
I M
I M
IMIM
1 1 1 1 1
CT CT CT CT CT CT CT CT CT
I M
27 26
I M
I M
25 24
I M
I M
I M
S
I M
I M
H
H
I M
I M
I M
I M
I M
2-2"C gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Rectangle gzumbro Text Box GREEN BOXES INDICATE BLIND CORNER EQUIPMENT LOCATIONS-PLEASE CONFIRM IF THERE ARE ANY LOCATIONS NOT SHOWN THAT REQ THIS.
edrbuc93 Text Box edrbuc93 Text Box
IDF 1
edrbuc93 Highlight edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delete edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delete edrbuc93 Delete edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText
RhoWri29 Ellipse
RhoWri29 Snapshot
RhoWri29 Snapshot edrbuc93 Engineer edrbuc93 Engineer edrbuc93 Engineer edrbuc93 Engineer edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93
V
IS
IO
N S
JOB NO:
ISSUE DATE:
DRAWN:
Architect for further clarification.
not always drawn to scale. Use dimensions given or consult the
3. Do not scale dimensions from prints. Plans and details are size between the print and the original drawing.
only and are hereby changed in proportion to the difference in
2. Scales as stated hereon are valid on the original drawing request.
not to be used on any other project and is to be returned on and is not to be reproduced or copied in whole or in part. It is
1.The drawing is the property of GREENLINE ARCHITECTURE, INC.
WWW.GREENLINEARCH.COM
F 912.447.8381
T 912.447.5665
23.020
E:\BOE Hubert Middle School - 23068.00\CADD\E4.05.dgn
C A
O T b m o y e
:0
S
E P
FOR CONSTRUCTION
BID SET
9-5-2025
S A
V A
N N
A H
G E
O R
G
IA
G
R A
N T S
T
M
ID
D L E S
C H
O O
L F
O R S
C C
P S S
R E
N O
V A
T
IO
N T
O J
O H
N W
H U
B E
C
IL
IT
Y C
O D
E -2
F
T E C
A P
O U
T L A
Y -6
-0
SAVANNAH, GA 31401
611 EAST BAY ST
T T
T
T T
T
T T
T
T T
T
T T
T
T T
T
T T
T
T T
T
MEDIA
CENTER
FRONT
OFFICE
BATH
ROOM
BATH
SRO
108.6
108.7
BATH
ROOM
108.8
DATA
CLERK
108.5
TEACHERS
WORKROOM
108.4
CONFERENCE
108.1
PRINCIPAL
108.2
108.3
SERVER
ROOM
106.3
M.M.
PROD.
106.6
106.5
106.4
PRO
DEV
106.2
106.1
MAKER
STUDIO
106.7
1.05
108.9
NOTE B
NOTE B
NOTE C
PANEL
FIRE ALARM
ALARM PANEL
INTRUSTION
JV
E4.051
1/8" = 1'-0"
KEY PLAN
COMMUNICATION PLAN NOTES:
E4.05
ELECTRICAL COMMUNICATION PLAN - ZONE 5
Z O
N E
C O
M M
U N
IC
A T
E C
T R
IC
CS F
S
C
F
C
S
S
F C
S F
C
S
S
F C
S
F
C
SS
S
S
S
S
F C
S
S
48"
F C
S
F C
S
48"
F
C
S
48"F C
S
48" 48" 48"
SF
C
S
F
F
F
C
S S 48"
F C
S S
S
S
S S
S S
S
S
S
F
C
S
F
C
TV
DS
F
S
S
F
C
S F C
F
S S
S S
S S
F
C
F
C
S S
F
DS DS
F
S
F C
INTERCOM AND CATV HEADEND EQUIPMENT.C.
LOCATE DATA OUTLETS IN MILLWORK.B.
FIELD COORDINATE SWITCH LOCATIONS.A.
C T
C T
C T
C T
C T
C T
C T
I M
I M
I M
I M
I M
4-4" IM
IM
IM
4-4"
IM
IM
IM
IM KP
42 42
I M
S
S
S
S
SD
SD
G45,G46
NOTES
RTU-5
G45,G46
NOTES
RTU-1
gzumbro Text Box GREEN BOXES INDICATE BLIND CORNER EQUIPMENT LOCATIONS-PLEASE CONFIRM IF THERE ARE ANY LOCATIONS NOT SHOWN THAT REQ THIS.
edrbuc93 Text Box edrbuc93 Note MDF Relocated to Electrical room 63 edrbuc93 Text Box
IDF 2
edrbuc93 Highlight edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delete edrbuc93 Delete edrbuc93 Delete edrbuc93 Text Box MDF move to room 63 edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Text Box Camera Corner Mounted
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Ellipse
RhoWri29 Snapshot edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Engineer edrbuc93 Engineer
V
IS
IO
N S
JOB NO:
ISSUE DATE:
DRAWN:
Architect for further clarification.
not always drawn to scale. Use dimensions given or consult the
3. Do not scale dimensions from prints. Plans and details are size between the print and the original drawing.
only and are hereby changed in proportion to the difference in
2. Scales as stated hereon are valid on the original drawing request.
not to be used on any other project and is to be returned on and is not to be reproduced or copied in whole or in part. It is
1.The drawing is the property of GREENLINE ARCHITECTURE, INC.
WWW.GREENLINEARCH.COM
F 912.447.8381
T 912.447.5665
23.020
E:\BOE Hubert Middle School - 23068.00\CADD\E4.06.dgn
C A
O T b m o y e
:1
S
E P
FOR CONSTRUCTION
BID SET
9-5-2025
S A
V A
N N
A H
G E
O R
G
IA
G
R A
N T S
T
M
ID
D L E S
C H
O O
L F
O R S
C C
P S S
R E
N O
V A
T
IO
N T
O J
O H
N W
H U
B E
C
IL
IT
Y C
O D
E -2
F
T E C
A P
O U
T L A
Y -6
-0
SAVANNAH, GA 31401
611 EAST BAY ST
T T
GYMNASIUM
FRONT
OFFICE
BATH
ROOM
BATH
66.1
66.2
BOOK
STORAGE
CONCESSION
STAND
GIRLS
LOCKER RM
BATH
ROOM
BATH
ROOM
BOYS
LOCKER RM
WEIGHT
ELEC.
89.4
WATER
HEATER
89.3
89.2
89.1
GYM
JC
76.1
74.1
80.1
79.1
CONCESSION
STORAGE
71.1
SECURITY
VESTIBULE
1.07
1.06
1.08
1.09
1.10
1234567891011
A
12131415
CC
1617181920
A
12345
A
CC
1011121314151617181920
A
1234567891011121314151617181920
B B
1234567891011121314151617181920
B B
1234567891011121314151617181920
C C
1234567891011121314151617181920
C C
1234567891011121314151617181920
D D
1234567891011121314151617181920
D D
1234567891011121314151617181920
E E
1234567891011121314151617181920
E E
1234567891011121314151617181920
GGG
F F
1234567891011121314151617181920
GGG
F F
12345678910111213141516171819202122232425261234567891011121314151617181920212223
NOTE A
48" AFF
ANNUNCIATOR
FIRE ALARM
NOTE D
JV
E4.061
1/8" = 1'-0"
KEY PLAN
COMMUNICATION PLAN NOTES:
E4.06
ELECTRICAL COMMUNICATION PLAN - ZONE 6
Z O
N E
C O
M M
U N
IC
A T
E C
T R
IC
S
S
S
S
S
F C
F C
S
S
F C
S
S
F C
SS
SS
S
FUTURE PA RACKD.
PA SYSTEM.
EXTEND 1"C TO JUNCTION BOX ABOVE CEILING IN 73 FOR FUTUREC.
MOUNT 80' ABOVE HIGHEST WALKWAY LEVEL.B.
PROVIDE METAL CAGES FOR ALARM DEVICES IN THIS AREA.A.
S
F
C
F
C
S F
C
S
F
DS
DSDS
F J
NOTE C
S
S
SS
F
C
S S
S
F C
S
S
F C
S
NOTE A
F
DS
DS
J
NOTE C
F
F
DSDS
FFF
NOTE B
S
J
NOTE C
S
J
NOTE C
STRUCTURE
MOUNT AT
DS
DS
F
S
S F
C
SS
S S
S
S
F C
F C
F
C
SS F
C
F
F
J
NOTE C
18"
SS
SS F
C
SS F
C
48"
S
F C
S
S
S
S
SS
S
F
C
SS
I
F
S
S
S
S
1 1
KP
C T
C T
C T
C T
C T
C T
C T
IM IM
IMIM
48 48
IM
IM
SD
G45,G46
NOTES
RTU-6
NOTE A
NOTE A
NOTE A
gzumbro Text Box GREEN BOXES INDICATE BLIND CORNER EQUIPMENT LOCATIONS-PLEASE CONFIRM IF THERE ARE ANY LOCATIONS NOT SHOWN THAT REQ THIS.
edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93 FreeText
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Covert CCTV Motion Detector
RhoWri29 Rectangle
RhoWri29 Ellipse
RhoWri29 Text Box Video Intercom
RhoWri29 Snapshot
RhoWri29 Snapshot
RhoWri29 Snapshot edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Ellipse edrbuc93 Group edrbuc93 Polygon edrbuc93 FreeText edrbuc93 Engineer edrbuc93 Engineer edrbuc93 Engineer edrbuc93 Engineer edrbuc93 Text Box This Section was included in Phase 1 edrbuc93 Text Box This Section was included in Phase 1 edrbuc93 Delta edrbuc93 FreeText edrbuc93 Delta edrbuc93
V
IS
IO
N S
JOB NO:
ISSUE DATE:
DRAWN:
Architect for further clarification.
not always drawn to scale. Use dimensions given or consult the
3. Do not scale dimensions from prints. Plans and details are size between the print and the original drawing.
only and are hereby changed in proportion to the difference in
2. Scales as stated hereon are valid on the original drawing request.
not to be used on any other project and is to be returned on and is not to be reproduced or copied in whole or in part. It is
1.The drawing is the property of GREENLINE ARCHITECTURE, INC.
WWW.GREENLINEARCH.COM
F 912.447.8381
T 912.447.5665
23.020
E:\BOE Hubert Middle School - 23068.00\CADD\E3.08.dgn
C A
O T b m o y e
:0
S
E P
FOR CONSTRUCTION
BID SET
9-5-2025
S A
V A
N N
A H
G E
O R
G
IA
G
R A
N T S
T
M
ID
D L E S
C H
O O
L F
O R S
C C
P S S
R E
N O
V A
T
IO
N T
O J
O H
N W
H U
B E
C
IL
IT
Y C
O D
E -2
F
T E C
A P
O U
T L A
Y -6
-0
SAVANNAH, GA 31401
611 EAST BAY ST
HB
MAINTENANCE
BUILDING
ATHLETICS
STORAGE
HB
MEN'S
BATHROOM
WOMEN'S
BATHROOM
HB
MEN'S
BATHROOM
WOMEN'S
BATHROOM
208V,1PH
4.8KW,
EH-22
120V,1PH
1/10HP,
EF-36
120V,1PH
1/10HP,
EF-38
NO.10
NO.10
NO.10
NO.10
FOR HAND DRYER
FOR HAND DRYER
HP
EF-35
NOTE A
EH-19
NOTE A
EH-20
NOTE A
EH-18
208V,1PH
4.8KW,
EH-21
30/2/1
30/2/1
E3.08
PANEL M
GF
WP
M-2
IE
GF
WP
GF
WP
GF
WP
IE
IE
I
I
XA
XA
XA
E3.08
MAINTENANCE BUILDING - ELECTRICAL
BPM
1 NO.10(G)
2 NO.10,
•"C W/
1 NO.10(G)
2 NO.10,
•"C W/
M-1
(30/2)
M-10
(30/2)
M-6
M-5
M-3
M-9
M-7
E3.08
W
WP
GF
GF
GF
GF
J
J
NEW (20/1)
6P-32
NEW (20/1)
6P-34
NEW (20/1)
6P-36
NEW (20/1)
6P-38
OS
OS
6L-21
H
H
H
H
HE
HE
HE
HE
F F J
J
E3.08
LIGHTING PLAN NOTES:
1/4" = 1'-0"
1/4" = 1'-0"
1/4" = 1'-0"
MAINTENANCE BUILDING - LIGHTING
MAINTENANCE BUILDING - POWER
M
POWER PLAN NOTES:
CONNECT TO EXHAUST FAN SHOWN. RATED 120V. INTERLOCK WITH LIGHTS. A.
NOTE A
1/15 HP,
EF-34,
NOTE A
1/15 HP,
EF-33,
SEE EQUIPMENT SCHEDULE ON SHEET E0.2 FOR ELECTRIC DETAILS.A.
PANEL DP4A
EXISTING
EXTEND TO
J
J gzumbro Text Box ANY LOCATIONS IN THE GREENHOUSE, MAINTENANCE BUILDING, OR RESTROOM GATEHOUSE THAT REQ ANY SORT OF DATA OR ACCESS CONTROL? NO COMMUNICATION DRAWINGS SHOWN FOR THESE AREAS OTHER THAN THE GREENHOUSE SHOWING US PROVIDE PATHWAY TO THE BUILDING ITSELF ONLY.
File details come from the government source that posted it. Updated .