About this file

This pre-solicitation notice announces a competitive total set-aside for Service-Disabled Veteran-Owned Small Businesses to renovate the second floor center of Building 52 at the Jefferson Barracks Division of the VA Saint Louis Health Care System. The project scope includes renovating approximately 7,200 square feet of former procedure rooms and administrative offices at an estimated cost between $2-5 million. The work must be completed within 410 calendar days of the notice to proceed and is classified under NAICS 236220 with a small business size standard of $39.5 million. Interested parties should monitor beta.sam.gov where the full solicitation will be posted on or about October 15, 2021. A site visit is scheduled and attendance is encouraged. Proposals are due as specified in the solicitation documents to be released.

View the file

Other files

File Type Posted
Scan_2021_11_02_14_28_13_296.pdf PDF
36C25522R0002 0001.docx DOCX document
36C25522R0002_1.docx DOCX document
3 Abate BD.pdf PDF
P09_S02 -20-028 Specifications 657-20-102JB (1448 pages) final.pdf PDF
2 Struct BD.pdf PDF
7 Plumb BD.pdf PDF
4 Arch BD.pdf PDF
5 IntD BD.pdf PDF
8 Mech BD.pdf PDF
Past Performance Questionnaire 36C25522R0002 (Project 657-20-102JB).pdf PDF
1 Gen BD.pdf PDF
6 FP BD.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L L

ELECTRICAL ABBREVIATIONS LIST

SR SURFACE RACEWAY

SS STAINLESS STEEL

SSW SELECTOR SWITCH

STD STANDARD

SURF SURFACE MOUNTED

SW SWITCH

SWBD SWITCHBOARD

SYM SYMMETRICAL

SYS SYSTEM

TC TIMECLOCK

TEL TELEPHONE

TEL/DATA TELEPHONE/DATA

TERM TERMINAL

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TR TAMPER RESISTANT

T-STAT THERMOSTAT

TTB TELEPHONE TERMINAL BOARD

TTC TELEPHONE TERMINAL

CABINET

TV TELEVISION

TYP TYPICAL

UC UNDER COUNTER

UE UNDERGROUND ELECTRICAL

UG UNDERGROUND

UH UNIT HEATER

UL UNDERWRITER'S LABORATORY

UT UNDERGROUND TELEPHONE

UTP UNSHIELDED TWISTED PAIR

UTIL UTILITY

UV UNIT VENTILATOR OR

ULTRAVIOLET

V VOLT

VA VOLT-AMPERES

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

W WATT

W/ WITH

WH WATER HEATER

W/O WITHOUT

WP WEATHERPROOF

XFMR TRANSFORMER

XFR TRANSFER

ANGLE

@ AT

DELTA

' FEET

" INCHES

# NUMBER

Φ PHASE

C CENTER LINE

P PLATE

MTR MOTOR, MOTORIZED

MTS MANUAL TRANSFER SWITCH

NA NOT APPLICABLE

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURER'S ASSOCIATION

NFDS NON-FUSED SAFETY DISCONNECT

SWITCH

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OH OVERHEAD

OL OVERLOAD

PA PUBLIC ADDRESS

PB PULL BOX OR PUSHBUTTON

PBPU PREFABRICATED BEDSIDE PATIENT

UNIT

PCB POLYCHLORINATED BYPHENYL

PC PHOTOELECTRIC CELL

PED PEDESTAL

PEND PENDANT

PF POWER FACTOR

PH PHASE

PIV POST INDICATING VALVE

PNL PANEL

POE POWER-OVER-ETHERNET

PR PAIR

PRI PRIMARY

PROJ PROJECTION

PRV POWER ROOF VENTILATOR

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE (CONDUIT)

PWR POWER

QTY QUANTITY

RCP REFLECTED CEILING PLAN

RCPT RECEPTACLE

REQD REQUIRED

RGS RIGID GALVANIZED STEEL

RM ROOM

RMS ROOT MEAN SQUARE

RTU ROOF TOP UNIT

SC SURFACE CONDUIT

SEC SECONDARY

SF SQUARE FEET/FOOT

SHT SHEET

SI INTERNATIONAL SYSTEM OF UNITS

SIM SIMILAR

S/N SOLID NEUTRAL

SPEC SPECIFICATION

SPKR SPEAKER

SP SPARE

1P 1 POLE (2P, 3P, 4P, ETC.)

1PH 1 PHASE

2/C TWO-CONDUCTOR (3/C, 4/C, ETC.)

W2 TWO-WIRE (3W, 4W, ETC.)

3PH 3 PHASE

A AMPERE

AAP ALARM ANNUNCIATOR PANEL

AC ABOVE COUNTER

AIR CONDITIONER

ALTERNATING CURRENT

ACC ACCESSIBLE

ACLG ABOVE CEILING

ADO AUTOMATIC DOOR OPENER

A/E ARCHITECT/ENGINEER

AF AMP FRAME

AFC AVAILABLE FAULT CURRENT (KILOAMPS)

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFI ARC FAULT CIRCUIT INTERRUPTER

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

AIC AMPERE INTERRUPTING CAPACITY

AL ALUMINUM

ALT ALTERNATE

AMP AMPERE

APPROX APPROXIMATELY

ARCH ARCHITECT, ARCHITECTURAL

AT AMP TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AWG AMERICAN WIRE GAUGE

BAS BUILDING AUTOMATION SYSTEM

BATT BATTERY

BC BARE COPPER

BD BOARD

BFF BELOW FINISHED FLOOR

BLDG BUILDING

BMS BUILDING MANAGEMENT SYSTEM

BYP BYPASS

C CONDUIT

CAB CABINET

CALC CALCULATED

CAP CAPACITY

CAT CATALOG, CATEGORY

CATV COMMUNITY ANTENNA TELEVISION

CB CIRCUIT BREAKER

CCR CONTROL CONTACTOR

CCTV CLOSED CIRCUIT TELEVISION

cd CANDELA

CD CONSTRUCTION DOCUMENTS

CF CONTRACTOR-FURNISHED

CKT CIRCUIT

CLG CEILING

CO CONTRACTING OFFICER

COAX COAXIAL CABLE

COMM COMMUNICATION

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUATION OR CONTINUOUS

CONTR CONTRACTOR

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CPT CONTROL POWER TRANSFORMER

CRI COLOR RENDERING INDEX

CT CURRENT TRANSFORMER

CTV CABLE TELEVISION

CTR CENTER

CU COPPER

CU FT CUBIC FEET

dB DECIBEL

DB DIRECT BURIAL

DC DIRECT CURRENT

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLISH/DEMOLITION

DEPT DEPARTMENT

DIA DIAMETER

DISC DISCONNECT

DIST DISTRIBUTION

DN DOWN

DS SAFETY DISCONNECT SWITCH

DT DOUBLE THROW

DWG DRAWING

EC ELECTRICAL CONTRACTOR

EG EQUIPMENT GROUND

ELEC ELECTRIC, ELECTRICAL

ELEV ELEVATOR

EM EMERGENCY

EMI ELECTROMAGNETIC INTERFERENCE

EMS ENERGY MANAGEMENT SYSTEM

EMT ELECTRICAL METALLIC TUBING

EPO EMERGENCY POWER OFF

EQUIP EQUIPMENT

ESMT EASEMENT

ETR EXISTING TO REMAIN

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WALL HEATER

ELECTRIC WATER HEATER

EX EXISTING

EXP EXPLOSION PROOF

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FC FOOTCANDLE

FCU FAN COIL UNIT

FIXT FIXTURE

FLR FLOOR

FLUOR FLUORESCENT

FU FUSE

FUDS FUSED SAFETY DISCONNECT SWITCH

FVR FULL VOLTAGE REVERSING

FVNR FULL VOLTAGE NON-REVERSING

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

GEN GENERATOR

GFI GROUND FAULT CIRCUIT INTERRUPTER

GND GROUND

GRS GALVANIZED RIGID STEEL (CONDUIT)

GYP BDGYPSUM BOARD

HID HIGH-INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HT HEIGHT

HTR HEATER

HV HIGH VOLTAGE

HVAC HEATING, VENTILATING AND AIR

CONDITIONING

IES ILLUMINATION ENGINEERING SOCIETY

IG ISOLATED GROUND

IMC INTERMEDIATE METAL CONDUIT

IR INFRARED

I/W INTERLOCK WITH

IWH INSTANTANEOUS WATER HEATER

J-BOX JUNCTION BOX

KV KILOVOLT

KVA KILOVOLT-AMPERE

KVAR KILOVOLT-AMPERE REACTIVE

KW KILOWATT

KWH KILOWATT HOUR

LED LIGHT-EMITTING DIODE

LF LINEAR FEET/FOOT

LM LUMEN

LRA LOCKED ROTOR AMPS

LT LIGHT

LTG LIGHTING

LTNG LIGHTNING

LV LOW VOLTAGE

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MC MECHANICAL CONTRACTOR

METAL-CLAD (CONDUIT)

MCA MINIMUM CIRCUIT AMPACITY

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MFR MANUFACTURER

MFS MAIN FUSED DISCONNECT SWITCH

MH MANHOLE

MIC MICROPHONE

MIN MINIMUM

MISC MISCELLANEOUS

MLO MAIN LUGS ONLY

MOA MULTIOUTLET ASSEMBLY

MSBD MAIN SWITCHBOARD

MT MOUNT

A1 b

E1 c d

T1

'LPN'

ELECTRICAL SYMBOL NOTES

THE LIGHTING FIXTURE TYPE IS INDICATED BY AN UPPER CASE LETTER OR AN UPPER

CASE LETTER AND NUMBER.

THE SWITCH DESIGNATION (IF NEEDED) IS INDICATED BY A LOWER CASE LETTER.

EXAMPLE: LIGHTING FIXTURE TYPE 'A1' IS CONTROLLED BY SWITCH 'b'.

EXIT SIGNS: STEM INDICATES WALL MOUNTING. NO STEM INDICATES CEILING

MOUNTING. SHADED AREA INDICATES ILLUMINATED FACE(S). ARROW INDICATES

DIRECTIONAL ARROW ON ILLUMINATED FACE(S).

DEVICES: THE SWITCH DESIGNATION IS INDICATED BY A LOWER CASE LETTER.

THE CONTROL DEVICE DESIGNATION IS INDICATED BY A LOWER CASE LETTER.

TRANSFORMERS: THE TRANSFORMER TYPE IS INDICATED BY A NUMBER

FOLLOWING THE UPPER CASE LETTER 'T'. SEE THE TRANSFORMER SCHEDULE OR

THE SINGLE LINE DIAGRAM FOR THE TRANSFORMER DESCRIPTION AND

REQUIREMENTS.

PANELBOARDS: PANELBOARD DOORS MAY BE SHOWN TO INDICATE OPENING

SIDE OF RECESSED PANELBOARDS. SEE PANELBOARD IDENTIFICATION FOR

DESIGNATION CODES.

SHEET KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE NOTE

NUMBER INDICATED IN THE HEXAGON.

HOME RUN TO BRANCH CIRCUIT PANEL: THE PANEL DESIGNATION AND CIRCUIT

DESIGNATION ARE SHOWN ADJACENT TO THE HOME RUN ARROW.

CIRCUIT BREAKER SIZES (AMPS/NUMBER OF POLES) ARE SHOWN IN THE PANEL

SCHEDULE WITH THE CORRESPONDING PANEL AND CIRCUIT DESIGNATION.

SYMBOL NOTATIONS: UPPER CASE LETTERS ADJACENT TO SYMBOLS INDICATE

A UNIT TYPE. SEE APPROPRIATE SCHEDULE OR SPECIFICATIONS.

'LPN'-1,3,5

EXAMPLE 1: WALL MOUNTED EXIT SIGN TYPE 'E1' WITH SINGLE FACE

AND DIRECTIONAL ARROW.

EXAMPLE 2: CEILING MOUNTED EXIT SIGN TYPE 'E2' WITH DOUBLE

FACE AND DIRECTIONAL ARROWS.

E2

EXAMPLE: SPLIT DUPLEX RECEPTACLE; ONE RECEPTACLE OUTLET IS

CONTROLLED BY SWITCH 'c'.

EXAMPLE: SINGLE POLE SWITCH 'd' TO CONTROL LIGHTING FIXTURES INDICATED BY 'd'.

EXAMPLE: TRANSFORMER TYPE 'T1'.

EXAMPLE: HOME RUN TO PANELBOARD 'LPN'; CIRCUITS 1, 3, 5.

# DEMOLITION KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE

NOTE NUMBER INDICATED IN THE SQUARE.

GENERAL ELECTRICAL NOTES

1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST EDITION OF THE NATIONAL

ELECTRICAL CODE AND VA STANDARDS.

2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE BUILDING

CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.

3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING REQUIREMENT AND THE APPLICABLE BUILDING CODES.

4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED MOUNTING

HARDWARE TO SUIT THE PARTICULAR INSTALLATION.

5. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.

6. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.

7. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO AVOID CONFLICT

DURING CONSTRUCTION.

8. ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR SPARE, OR SPACE.

9. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER.

PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE ACCEPTED. ALL PRODUCTS MUST

COMPLY WITH "BUY AMERICAN ACT".

10. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR PARTICULAR EQUIPMENT

MANUFACTURER'S SPECIFICATIONS.

11. CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE DEVICE'S

SCREW TERMINALS.

12. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT UNLESS NOTED

OTHERWISE.

13. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.

14. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.

15. ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR UNDERGROUND CONDUIT OR WHERE CONCRETE-ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE, LFMC CONDUIT SHALL BE USED

(MAXIMUM SIX FEET) FOR FINAL CONNECTIONS.

16. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN APPROVED

THIRD PARTY TESTING AGENCY.

17. FOR ALL LED FIXTURES, THE FIXTURE MUST BE CAPABLE OF SELF-RESETTING TO THE SWITCHED/CONTROLLED STATE DURING ANY FLUCTUATION IN POWER SUPPLY WHERE AUTOMATIC PROTECTIVE MEASURES DISABLE THE LED LAMPS. PROVIDE A LETTER OR STATEMENT FROM THE MANUFACTURER, OR OTHER ACCEPTABLE PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT BROWNOUT PROTECTION, WILL RETURN TO THE SWITCHED/CONTROLLED STATE AUTOMATICALLY. PROVIDE STATEMENT WITH THE FIXTURE SUBMITTALS.

18. IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK , AS DETERMINED BY THE COR, SHALL BE PROVIDED.

19. COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.

20. MINIMUM CONDUIT SIZE TO BE USED IS 3/4".

SHORT CIRCUIT CURRENT CALCULATIONS SHALL BE

PERFORMED ON THE ELECTRICAL SYSTEM USING A

BOLTED THREE PHASE FAULT CONDITION FOR

CALCULATIONS TO ACHIEVE MAXIMUM THERMAL AND

MECHANICAL STRESS TO THE SYSTEM FOR

CALCULATIONS PURPOSES. EXISTING SHORT CIRCUIT

VALUES WILL BE USED OUTSIDE THE WORK AREA, FOR

THE STARTING POINT OF THE CALCULATIONS.

METHOD OF SHORT CIRCUIT

CURRENT CALCULATIONS

USING OHM'S LAW AND THE KNOWN RESISTIVITY

CONSTANT OF CONDUCTOR METAL (CIRCULAR MIL-OHM

PER FOOT) FOR COPPER CONDUCTORS, CALCULATE THE

REQUIRED WIRE SIZE NECESSARY SO AS NOT TO EXCEED

THE RECOMMENDED VOLTAGE DROP OF 3% FOR BRANCH

CIRCUIT CONDUCTORS.

METHOD OF VOLTAGE DROP

CALCULATIONS

ELECTRICAL SYMBOL LEGEND

120V DUPLEX RECEPTACLE

RECEPTACLE MODIFIERS:

AC: 3" ABOVE COUNTERTOP/BACKSPLASH

GFI: GROUND FAULT CURRENT INTERRUPTER

WP: WEATHERPROOF ENCLOSURE

DD: DEDICATED CIRCUIT

EM: EMERGENCY

EX: EXISTING

120V DUPLEX RECEPTACLE EMERGENCY OUTLET

AND COVER PLATE SHALL BE RED IN COLOR

120V QUADRUPLEX RECEPTACLE

120V QUADRUPLEX RECEPTACLE EMERGENCY

OUTLET AND COVER PLATE SHALL BE RED IN COLOR

JUNCTION BOX, WALL MOUNTED, PURPOSE AS NOTED

DISCONNECT SWITCH NON-FUSED

DISCONNECT SWITCH FUSED

SINGLE POLE WALL SWITCH: 48" AFF STANDARD UNO

SYMBOL HEIGHT DESCRIPTION

18"*

18"*

18"*

18"*

AS

NOTED

72" TOP

72" TOP

SWITCH MODIFIERS:

M: MOTOR-RATED

48"

ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.

TOP: HEIGHT TO TOP OF DEVICE

ANY HEIGHTS INDICATED IN PLANS SHALL SUPERCEDE THOSE LISTED HERE.

*HEIGHTS FOR RECEPTACLES IN THE EXAM ROOMS WILL BE PER THE ARCH

ELEVATION DRAWINGS.

SPECIAL RECEPTACLE

EQUIPMENT CONNECTION

AS

NOTED

E

208V DUPLEX RECEPTACLE18"*

18"*

120V DUPLEX RECEPTACLE FLOOR BOX

120V DUPLEX RECEPTACLE EMERGENCY FLOOR BOX

OUTLET AND COVER PLATE SHALL BE RED IN COLOR

120V QUADUPLEX RECEPTACLE FLOOR BOX

120V QUADUPLEX RECEPTACLE EMERGENCY

FLOOR BOX OUTLET AND COVER PLATE SHALL BE

RED IN COLOR

CLNG

J

J

J

JUNCTION BOX, CEILING MOUNTED, PURPOSE AS

NOTED

JUNCTION BOX, FLOOR MOUNTED, PURPOSE AS

NOTED

LIGHTING SYMBOL LEGEND

2' X 2' RECESSED DIRECT/INDIRECT TROFFER

2' X 4' RECESSED DIRECT/INDIRECT TROFFER

SYMBOL

HEIGHT

AFF * DESCRIPTION

--- 2' X 4' RECESSED FLAT PRISMATIC LENS TROFFER

WALL SCONCE

6'-0"

CENTER

6" DIAMETER RECESSED DOWNLIGHT---

EXIT SIGN - WALL MOUNTED

EXIT SIGN - CEILING MOUNTED---

7'-5"

BOTTOM

SINGLE POLE WALL SWITCH

SWITCH MODIFIERS:

OS: OCCUPANCY SENSOR, DUAL TECHNOLOGY

VS: VACANCY SENSOR, DUAL TECHNOLOGY

LV: LOW VOLTAGE

LVD: LOW VOLTAGE DIMMER

D: LINE VOLTAGE DIMMER

T: DIGITAL TIMER

K: KEYED

3: 3 WAY

48"

CENTER

OCCUPANCY SENSOR, DUAL

TECHNOLOGY - CEILING MOUNTED

--- LOW VOLTAGE LIGHTING CONTROL DEVICE

OCCUPANCY SENSOR, DUAL

TECHNOLOGY - WALL/CORNER MOUNTED

2' LINEAR - WALL MOUNTED

7'-0"

CENTER

EMERGENCY LIGHT BATTERY

OPERATED - WALL MOUNTED

7'-6"

CENTER

RC

* - ANY HEIGHTS INDICATED IN PLANS SHALL SUPERCEDE THOSE

LISTED HERE.

LIGHT LEVEL SENSOR, SINGLE ZONE

DIMMING CLOSED LOOP - CEILING MOUNTED

--- LOW VOLTAGE LIGHTING CONTROL

DEVICE WITH 0-10V DIMMING

RCD

4' LINEAR - WALL MOUNTED

7'-0"

CENTER

OS

OS

LS

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/1

/2

:3

:0

P

M

E-001

ELECTRICAL GENERAL NOTES,

SYMBOL LEGENDS, AND

ABBREVIATIONS

1 14CNJ

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

DAS

DocuSign Envelope ID: 09F7B85F-F4C3-47B1-A14D-410983FE1DB5

8/23/2021

N 1

N 1

IC

CR

RXDC ES

J

J

J

S S

S S

S S

S S

S S

S

S

S

S S

S S

S S

S S

S SS

S S

S

S

2.3

4.4

4.8

6.2

6.5

7.3

8.7

9.5

9.9

K L L.1 L.2 M M.2 M.3 N.1 N.2 N.3 N.4 N.5 P P.1 P.2 P.3 P.4 Q Q.1 R S S.1M.1 M.4

EXISTING

PANEL H

EXISTING

PANEL L

X-RAY

PANEL

TREAT. RM.

2S05

EXAM

2S04

CHASE

CH-S-3

EXAM

2S01

STAIRWELL NO. 2

2S02

OFFICE

2N111 OFFICE

2S11A

OFFICE

2S11

HAC

2S10

ELEC. CLOSET

2S9

ELEVATOR LOBBY

2S57

ELEVATOR

E2

CORRIDOR

H204

OI&T

2S53

CONFERENCE RM

2S56

PAIN REHAB. CENTER

2S56A

ELEVATOR

E3

P.T. / O.T.

2N58

EXAM

2N118

CORRIDOR

H208

WAITING ROOM

2N112A

EXAM

2S12B

OFFICE

2N60

OFFICE

2N63

HAC

2N64

ELEVATOR

E4

CLOSET

2N59B

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/1

/2

:3

:1

P

M

ED101

SECOND FLOOR ELECTRICAL

DEMOLITION PLAN - PHASE 1

2 14CNJ

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

DAS

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 1

A. CONTRACTOR SHALL BE RESPONSIBLE FOR

TRACING AND IDENTIFYING ALL CIRCUITS

AND CONDUITS THAT ORIGINATE, PASS

THROUGH, OR TERMINATE IN THE AREA OF

WORK. DEMOLISH ALL CIRCUITS THAT ARE

NO LONGER IN USE. MAINTAIN CIRCUIT

CONTINUITY TO ALL CIRCUITS WHICH ARE

NOT COMPLETELY REMOVED.

B. CONTRACTOR TO DISCONNECT AND REMOVE

ELECTRICAL CONNECTION TO OUTLETS,

RECEPTACLES, HVAC EQUIPMENT AND

OTHER ELECTRICAL DEVICES. REMOVE

CONDUCTORS AND CONDUIT BACK TO

PANELBOARD SERVING EQUIPMENT OR TO

THE POINT WHERE OTHER REMAINING LOADS

ARE CONNECTED. MARK ANY ABANDONED

OVERCURRENT PROTECTION DEVICE AS

"SPARE(UNUSED)".

C. CONTRACTOR SHALL REMOVE ALL

ELECTRICAL CONDUIT, CABLE, WIRING

DEVICE, JUNCTION BOXES, FITTINGS, AND

RELATED ITEMS FROM ALL PORTIONS OF THE

AREA OF WORK INCLUDING WALL, CEILING

AND FLOORS. THIS SHALL BE FOR ALL WALLS,

EVEN WALLS NOT SUBJECT TO REMOVAL.

D. FOR ELECTRICAL CIRCUITS BEING

DEMOLISHED REMOVE BOXES, CONDUIT AND

CONDUCTORS BACK TO SOURCE, INCLUDING

THOSE CONCEALED WITHIN WALLS, LEAVING

NO ABANDONED ITEMS.

E. WHERE CONDUIT IS REMOVED FROM AN

EXISTING RATED ASSEMBLY NOT SUBJECT

TO DEMOLITION, THE REMAINING HOLE SHALL

BE PATCHED/REPAIRED TO MAINTAIN THE

RATING OF THE ASSEMBLY.

F. EACH PHASE OF THE CONSTRUCTION IS TO

BE PERFORMED WHILE LEAVING WORK

AREAS OF OTHER PHASES ACTIVE TO THE

GREATEST EXTENT POSSIBLE. NOTIFY COR IF

ANY WORK IS REQUIRED THAT WILL CROSS

MULTIPLE PHASES OF THE WORK AREA

PRIOR TO PERFORMING THE WORK.

G. PANEL SCHEDULES FOR PANELS H AND L ON

E-603.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

1 (TYP.) REMOVE EXISTING FIXTURES,

DOWNLIGHTS, EXIT SIGNS AND DISPOSE.

SEE SHEET NOTE "D". USE FOR LIGHT

FIXTURES.

2 TUNNEL AREA WORK SCHEDULES SHALL BE

COORDINATED WITH ARCHITECTURAL AND

MECHANICAL CONTRACTRORS.

3 EXISTING PANEL TO BE DEMOED IN PHASE 3.

4 EXISTING MECHANICAL UNIT WITH

DISCONNECT SWITCH TO BE DEMOED.

5 REMOVE EXISTING X-RAY POWER PANEL PER

SHEET NOTE "D".

AC

GFCI

DD

DD

GFCI

EM

AC

GFCI

G

FC

I

GFCI

EM

J

CR

RXDC ES

N Z

E

RXDCES

CR

J

J

J

N 1

OS

OS

O S

OS OS

OS

AC

GFCI

E

DD

AC

GFCI

+36"

CR

ES DC RX

M

N 1

J

DD

D

GFCI

S S

S

S S

S S

S

SS

S

S S

S S

S

S

S

2.3

4.4

4.8

6.2

6.5

7.3

8.7

9.5

9.9

K L L.1 L.2 M M.2 M.3 N.1 N.2 N.3 N.4 N.5 P P.1 P.2 P.3 P.4 Q Q.1 R S S.1M.1 M.4

EXISTING

PANEL H

EXISTING

PANEL L

EXAM 1

2S05

CORRIDOR

H205

WAITING

2N115

CORRIDOR

H208

TREAT. RM.

2S05

EXAM

2S04

ELEVATOR LOBBY

2S57

ELEVATOR

E2

CORRIDOR

H204

OI&T

2S53

CONFERENCE RM

2S56

PAIN REHAB. CENTER

2S56A

ELEVATOR

E3

P.T. / O.T.

2N58

ELEC. CLOSET

2S9

CLOSET

2N59A

ELEVATOR

E4

STAIR 2

S2

EXAM

2S12B

WHEELCHAIR STORAGE

2N110

HAC

2N64 OPEN OFFICE

2N59

RESTROOM

2N114

MEDS

2N113

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/1

/2

:3

:1

P

M

ED102

SECOND FLOOR ELECTRICAL

DEMOLITION PLAN - PHASE 2

3 14CNJ

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

DAS

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 2

A. CONTRACTOR SHALL BE RESPONSIBLE FOR

TRACING AND IDENTIFYING ALL CIRCUITS

AND CONDUITS THAT ORIGINATE, PASS

THROUGH, OR TERMINATE IN THE AREA OF

WORK. DEMOLISH ALL CIRCUITS THAT ARE

NO LONGER IN USE. MAINTAIN CIRCUIT

CONTINUITY TO ALL CIRCUITS WHICH ARE

NOT COMPLETELY REMOVED.

B. CONTRACTOR TO DISCONNECT AND REMOVE

ELECTRICAL CONNECTION TO OUTLETS,

RECEPTACLES, HVAC EQUIPMENT AND

OTHER ELECTRICAL DEVICES. REMOVE

CONDUCTORS AND CONDUIT BACK TO

PANELBOARD SERVING EQUIPMENT OR TO

THE POINT WHERE OTHER REMAINING LOADS

ARE CONNECTED. MARK ANY ABANDONED

OVERCURRENT PROTECTION DEVICE AS

"SPARE(UNUSED)".

C. CONTRACTOR SHALL REMOVE ALL

ELECTRICAL CONDUIT, CABLE, WIRING

DEVICE, JUNCTION BOXES, FITTINGS, AND

RELATED ITEMS FROM ALL PORTIONS OF THE

AREA OF WORK INCLUDING WALL, CEILING

AND FLOORS. THIS SHALL BE FOR ALL WALLS,

EVEN WALLS NOT SUBJECT TO REMOVAL.

D. FOR ELECTRICAL CIRCUITS BEING

DEMOLISHED REMOVE BOXES, CONDUIT AND

CONDUCTORS BACK TO SOURCE, INCLUDING

THOSE CONCEALED WITHIN WALLS, LEAVING

NO ABANDONED ITEMS.

E. WHERE CONDUIT IS REMOVED FROM AN

EXISTING RATED ASSEMBLY NOT SUBJECT

TO DEMOLITION, THE REMAINING HOLE SHALL

BE PATCHED/REPAIRED TO MAINTAIN THE

RATING OF THE ASSEMBLY.

F. EACH PHASE OF THE CONSTRUCTION IS TO

BE PERFORMED WHILE LEAVING WORK

AREAS OF OTHER PHASES ACTIVE TO THE

GREATEST EXTENT POSSIBLE. NOTIFY COR IF

ANY WORK IS REQUIRED THAT WILL CROSS

MULTIPLE PHASES OF THE WORK AREA

PRIOR TO PERFORMING THE WORK.

G. PANEL SCHEDULES FOR PANELS H AND L ON

E-603.

1 (TYP.) REMOVE EXISTING FIXTURES,

DOWNLIGHTS, EXIT SIGNS AND DISPOSE.

SEE SHEET NOTE "D". USE FOR LIGHT FIXTURES.

2 EXISTING PANEL TO BE DEMOED IN PHASE 3.

3 EXISTING MECHANICAL UNIT WITH MOTOR RATED

SWITCH TO BE DEMOED.

DD

GFCI

DD

DD

GFCI

EM

G

FC

I

AC

GFCI

G

FC

I

G

FI

G

FI

G

FC

I

GFCI

EM

DD

J

CR

RXDC ES

N 1

N1

N Z

N Z

EE

E

RXDCES

CR

N 1

E

J

J

N 1

OS

OS

O S

OS

OSOS OS

OS

O S

O S

O S

OS

O S

OS OS

OS OS

OS

OS

AC

GFCI

E

CR

ES DC RX

C R

DCES RX

C R

C R

ES

R

X D

C

D C

R X

ES

CRDCRXES

DD

AC

GFCI

+36"

CR

ES DC RX

CR

ES DC RX

J

M

N 1

DD

J J J

DD

D

D

D

A C

G

FC

I

DO

G

FC

I A

C G

FC

I

GFCI

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S

2.3

4.4

4.8

6.2

6.5

7.3

8.7

9.5

9.9

K L L.1 L.2 M M.2 M.3 N.1 N.2 N.3 N.4 N.5 P P.1 P.2 P.3 P.4 Q Q.1 R S S.1M.1 M.4

EXISTING

PANEL H

EXISTING

PANEL L

OPEN OFFICE

2N60

EQUIP STORAGE

2N111

RESTROOM

2N114

MEDS

2N113

TELEHEALTH

2N112

ELEVATOR LOBBY

H209

EXAM 6

2N118

RESTROOM

2N118A

EXAM 5

2S01

LOGISTICS STORAGE

2N117

SOILED UTILITY

2S10

OFFICE (PSYCH)

2S11

OFFICE (SW)

2S11A

OI&T_

2S53

WAITING

2N115

CHASE_

H208B

ELECT. CLOSET

H208A

ELEVATOR

E4

STAIR 2

S2

ELEVATOR

E3

ELEVATOR

E2

CLOSET

2N60A

EXAM 1

2S05

RECEPTION

2N115A

EXAM

2S12B

WHEELCHAIR STORAGE

2N110

HAC

2N64

EXAM

2S12A

BATH / SHOWER

2S12

HALLWAY

2S13

EXAM

2S13A

OFFICE

2S51

OFFICE

2S49

TOILET

2S50

OFFICE

2S65

STORAGE

2N119

ELEVATOR LOBBY

H205

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/1

/2

:3

:2

P

M

ED103

SECOND FLOOR ELECTRICAL

DEMOLITION PLAN - PHASE 3

4 14CNJ

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

DAS

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A. CONTRACTOR SHALL BE RESPONSIBLE FOR

TRACING AND IDENTIFYING ALL CIRCUITS

AND CONDUITS THAT ORIGINATE, PASS

THROUGH, OR TERMINATE IN THE AREA OF

WORK. DEMOLISH ALL CIRCUITS THAT ARE

NO LONGER IN USE. MAINTAIN CIRCUIT

CONTINUITY TO ALL CIRCUITS WHICH ARE

NOT COMPLETELY REMOVED.

B. CONTRACTOR TO DISCONNECT AND REMOVE

ELECTRICAL CONNECTION TO OUTLETS,

RECEPTACLES, HVAC EQUIPMENT AND

OTHER ELECTRICAL DEVICES. REMOVE

CONDUCTORS AND CONDUIT BACK TO

PANELBOARD SERVING EQUIPMENT OR TO

THE POINT WHERE OTHER REMAINING LOADS

ARE CONNECTED. MARK ANY ABANDONED

OVERCURRENT PROTECTION DEVICE AS

"SPARE(UNUSED)".

C. CONTRACTOR SHALL REMOVE ALL

ELECTRICAL CONDUIT, CABLE, WIRING

DEVICE, JUNCTION BOXES, FITTINGS, AND

RELATED ITEMS FROM ALL PORTIONS OF THE

AREA OF WORK INCLUDING WALL, CEILING

AND FLOORS. THIS SHALL BE FOR ALL WALLS,

EVEN WALLS NOT SUBJECT TO REMOVAL.

D. FOR ELECTRICAL CIRCUITS BEING

DEMOLISHED REMOVE BOXES, CONDUIT AND

CONDUCTORS BACK TO SOURCE, INCLUDING

THOSE CONCEALED WITHIN WALLS, LEAVING

NO ABANDONED ITEMS.

E. WHERE CONDUIT IS REMOVED FROM AN

EXISTING RATED ASSEMBLY NOT SUBJECT

TO DEMOLITION, THE REMAINING HOLE SHALL

BE PATCHED/REPAIRED TO MAINTAIN THE

RATING OF THE ASSEMBLY.

F. EACH PHASE OF THE CONSTRUCTION IS TO

BE PERFORMED WHILE LEAVING WORK

AREAS OF OTHER PHASES ACTIVE TO THE

GREATEST EXTENT POSSIBLE. NOTIFY COR IF

ANY WORK IS REQUIRED THAT WILL CROSS

MULTIPLE PHASES OF THE WORK AREA

PRIOR TO PERFORMING THE WORK.

G. PANEL SCHEDULES FOR PANELS H AND L ON

E-603.

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 3

1 (TYP.) REMOVE EXISTING FIXTURES,

DOWNLIGHTS, EXIT SIGNS AND DISPOSE.

SEE SHEET NOTE "D". USE FOR LIGHT FIXTURES.

2 REMOVE OLD PANELS HANDLE PER SHHET NOTE

"D".

3 EXISTING MECHANICAL UNIT WITH MOTOR

RATED SWITCH TO BE DEMOED.

GFCI

DD

DD

GFCI

EM

AC

GFCI

G

FC

I

GFCI

EM

J

J

J

J

AC

GFCI

DD

AC

GFCI

+36"

J

DD

GFCI

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S

OS

OS

O S

OS OS

OS

OS

DDDD

D D

DDD

D

2.3

4.4

4.8

6.2

6.5

7.3

8.7

9.5

9.9

K L L.1 L.2 M M.2 M.3 N.1 N.2 N.3 N.4 N.5 P P.1 P.2 P.3 P.4 Q Q.1 R S S.1M.1 M.4

PANEL 'HL'PANEL 'LL'

EXAM 1

2S05

TREAT. RM.

2S05

EXAM

2S04

CHASE

CH-S-3

EXAM

2S01

STAIRWELL NO. 2

2S02

OFFICE

2N111

OFFICE

2S11A

OFFICE

2S11

HAC

2S10

ELEC. CLOSET

2S9

ELEVATOR LOBBY

2S57

ELEVATOR

E2

CORRIDOR

H204

OI&T

2S53

CONFERENCE RM

2S56

PAIN REHAB. CENTER

2S56A

SCI SERVICE REHAB.

CENTER

2N117A

CORRIDOR

H205

ELEVATOR

E3

P.T. / O.T.

2N58

EXAM

2N118

CORRIDOR

H208

WAITING ROOM

2N112A

WAITING

2N115

OPEN OFFICE

2N59

EXAM

2S12B

OFFICE

2N60

OFFICE

2N63

HAC

2N64

WHEELCHAIR STORAGE

2N110

ELEVATOR

E4

CLOSET

2N59B

RESTROOM

2N114

MEDS

2N113

'LL'- 4

'LL'- 3

'HL'- 1

'HL'- 4

'HL'- 3

'HL'- 2

'LL'- 6

'HL'- 1

'LL'-9

'HL'- 1

'HL'- 33

'HL'- 34

'HL'- 7

(PIXIS)

'LL'- 5

'HL'- 47

'HL'- 5

'HL'- 13

'LL'- 23

FAC DATA RM

2S57A

EP101

2.3

4.4

4.8

6.2

6.5

7.3

8.7

9.5

9.9

K L L.1 L.2 M M.2 M.3 N.1 N.2 N.3 N.4 N.5 P P.1 P.2 P.3 P.4 Q Q.1 R S S.1M.1 M.4

E2

A1 A1

A1 A1

A1 A1

A1 A1

A1

A1

A1A1

OPEN OFFICE

2N59

WAITING

2N115

SCI SERVICE REHAB.

CENTER

2N117A

EXAM 1

2S05

PANEL 'HL'PANEL 'LL'

TREAT. RM.

2S05

EXAM

2S04

CHASE

CH-S-3

EXAM

2S01

STAIRWELL NO. 2

2S02

OFFICE

2N111

OFFICE

2S11A

OFFICE

2S11

HAC

2S10

ELEC. CLOSET

2S9

ELEVATOR LOBBY

2S57

ELEVATOR

E2

CORRIDOR

H204

OI&T

2S53

CONFERENCE RM

2S56PAIN REHAB. CENTER

2S56A

CORRIDOR

H205

ELEVATOR

E3

P.T. / O.T.

2N58

EXAM

2N118

CORRIDOR

H208

WAITING ROOM

2N112A

EXAM

2S12B

OFFICE

2N60

OFFICE

2N63

HAC

2N64

WHEELCHAIR STORAGE

2N110

ELEVATOR

E4

CLOSET

2N59B

RESTROOM

2N114

MEDS

2N113

A1

F

F

FAC DATA RM

2S57A

RECEPTION

2N115A

D1 D1

A1 A1 D1

A1

4.4

N.2 N.3

FAC DATA RM

2S57A

'LL'- 25

'LL'- 22

'LL'- 24

'LL'- 27

'LL'- 26 'LL'- 29

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/1

/2

:3

:3

P

M

EP101

SECOND FLOOR ELECTRICAL PLAN -

PHASE 1

5 14CNJ

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

DAS

N O

R T

H0 4 8 16

1 NEW POWER PANELS TO BE INSTALLED PER

E-602.

2 THE ELECTRICAL PANEL COVERS WILL BE

SENT OUT AND PROFESSIONALLY PAINTED

(POWDER PAINT AND BAKED). THE COLOR

WILL BE COORDINATED WITH THE

ARCHITECTURAL CONTRACTOR.

3 NEW TIMER SWITCH WILL BE CAPABLE OF

BEING SET FOR AN HOUR ON.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

SECOND FLOOR POWER PLAN - PHASE 1

A. ALL RECEPTACLE CONDUCTORS ARE 2-12

AWG, 1-12 AWG EG IN 3/4" CONDUIT MINIMUM

UNLESS NOTED OTHERWISE.

B. COORDINATE LOCATION AND ELECTRICAL

REQUIREMENTS OF ALL MECHANICAL AND

PLUMBING EQUIPMENT WITH MECHANICAL

AND PLUMBING CONTRACTORS.

C. COORDINATE EQUIPMENT WITH

ARCHITECTURAL EQUIPMENT PLANS AND

SCHEDULES.

D. ELECTRICAL CONTRACTOR SHALL FOLLOW

SITE LOCK-OUT/TAG-OUT GUIDELINES TO

DEENERGIZE EQUIPMENT.

E. ALL RECEPTACLES SHALL HAVE THEIR

SOURCE PANEL AND CIRCUIT NUMBER

INDICATED ON THEIR FACEPLATE.

F. ALL LIGHTING CONDUCTORS SHALL BE 2-12

AWG, 1-12 AWG EG IN 3/4" CONDUIT UNLESS

NOTED OTHERWISE:

a. RUNS LESS THAN 150' SHALL BE

MINUMUM 2-12 AWG, 1-12 AWG EG IN 3/4"

CONDUIT.

b. RUNS 150'-250' SHALL BE MINIMUM 2-10

AWG, 1-10 AWG EG IN 3/4" CONDUIT.

c. RUNS GREATER THAN 250' SHALL BE

MINIMUM 2-8 AWG, 1-8 AWG EG IN 3/4"

CONDUIT.

G. VERIFY COMPATIBILITY OF ALL LIGHTING

CONTROLS WITH THE LED DRIVERS TO BE

CONTROLLED.

H. PANEL SCHEDULES FOR LL AND HL ON E-603.

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR LIGHTING PLAN - Phase 1

Scale: 1/4" = 1'-0"

FAC DATA RM 2S57A POWER PLAN - PHASE 1

GFCI

DD

DD

GFCI

EM

G

FC

I

AC

GFCI

G

FC

I

G

FI

G

FI

G

FC

I

GFCI

EM

DD

J

J

J

AC

GFCI

DD

AC

GFCI

+36"

J

DD

J J J

DD

A C

G

FC

I

G

FC

I A

C G

FC

I

GFCI

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S

OS

OS

O S

OS

OSOS OS

OS

O S

O S

O S

OS

O S

OS OS

OS OS

OS

OS

2.3

4.4

4.8

6.2

6.5

7.3

8.7

9.5

9.9

K L L.1 L.2 M M.2 M.3 N.1 N.2 N.3 N.4 N.5 P P.1 P.2 P.3 P.4 Q Q.1 R S S.1M.1 M.4

EXAM 1

2S05

CORRIDOR

H205

WAITING

2N115

TELEHEALTH

2N112

EXAM 6

2N118

RESTROOM

2N118A

CORRIDOR

H208

OPEN OFFICE

2N60

EXAM 5

2S01

LOGISTICS STORAGE

2N117

CORRIDOR

2N116

EQUIP STORAGE

2N111

TREAT. RM.

2S05

EXAM

2S04

SOILED UTILITY

2S10 OFFICE (PSYCH)

2S11

OFFICE (SW)

2S11A

ELEVATOR LOBBY

2S57

ELEVATOR

E2

CORRIDOR

H204

OI&T

2S53

CONFERENCE RM

2S56

PAIN REHAB. CENTER

2S56A

ELEVATOR

E3

P.T. / O.T.

2N58

ELEC. CLOSET

2S9

CLOSET

2N59A

ELEVATOR

E4

STAIR 2

S2

EXAM

2S12B

WHEELCHAIR STORAGE

2N110

HAC

2N64

OPEN OFFICE

2N59

RESTROOM

2N114

MEDS

2N113

STORAGE

2N119

'HL'- 9 'HL'- 7

'LL'- 1

'LL'- 2

'HL'- 6

'HL'- 8

'HL'- 10

'LL'- 10

'HL'- 12 'HL'- 13

PANEL 'HL'PANEL 'LL'

'HL'- 35

'HL'- 36

'HL'- 37

'HL'- 39

'HL'- 40

(PIXIS)

'LL'- 7

'HL'- 11

'LL'- 23

RECEPTION

2N59D

2.3

4.4

4.8

6.2

6.5

7.3

8.7

9.5

9.9

K L L.1 L.2 M M.2 M.3 N.1 N.2 N.3 N.4 N.5 P P.1 P.2 P.3 P.4 Q Q.1 R S S.1M.1 M.4

E2

E2

A1 A1

A1 A1

A1 A1 A1

A1A1

A1

A1

A1 A1

A1

A1

A1

A1

A1

A1

A1 A1

A1

A1

A1

D1 D1

EXAM 1

2S05

CORRIDOR

H205

WAITING

2N115

TELEHEALTH

2N112

EXAM 6

2N118

RESTROOM

2N118A

CORRIDOR

H208

OPEN OFFICE

2N60

EXAM 5

2S01

CORRIDOR

2N116

EQUIP STORAGE

2N111

TREAT. RM.

2S05

EXAM

2S04

SOILED UTILITY

2S10

OFFICE (PSYCH)

2S11

OFFICE (SW)

2S11A

ELEVATOR LOBBY

2S57

ELEVATOR

E2

CORRIDOR

H204

OI&T

2S53

CONFERENCE RM

2S56

PAIN REHAB. CENTER

2S56A

ELEVATOR

E3

P.T. / O.T.

2N58

ELEC. CLOSET

2S9

CLOSET

2N59A

ELEVATOR

E4

STAIR 2

S2

EXAM

2S12B

WHEELCHAIR STORAGE

2N110

HAC

2N64

PANEL 'HL'PANEL 'LL'

A1

RECEPTION

2N59D

MEDS

2N113

RESTROOM

2N114

D1D1

D1

D1

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/1

/2

:3

:3

P

M

EP102

SECOND FLOOR ELECTRICAL PLAN -

PHASE 2

6 14CNJ

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

DAS

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

1 NEW TIMER SWITCH WILL BE CAPABLE OF

BEING SET FOR AN HOUR ON.

2 INSTALL 3/4" CONDUIT WITH 5#12 FROM EACH

PB TO JUNCTION BOX FOR HL-39 FOR

AUTOMATIC DOOR OPERATOR. SEE T-102 FOR

MORE INFORMATION.

A. ALL RECEPTACLE CONDUCTORS ARE 2-12

AWG, 1-12 AWG EG IN 3/4" CONDUIT MINIMUM

UNLESS NOTED OTHERWISE.

B. COORDINATE LOCATION AND ELECTRICAL

REQUIREMENTS OF ALL MECHANICAL AND

PLUMBING EQUIPMENT WITH MECHANICAL

AND PLUMBING CONTRACTORS.

C. COORDINATE EQUIPMENT WITH

ARCHITECTURAL EQUIPMENT PLANS AND

SCHEDULES.

D. ELECTRICAL CONTRACTOR SHALL FOLLOW

SITE LOCK-OUT/TAG-OUT GUIDELINES TO

DEENERGIZE EQUIPMENT.

E. ALL RECEPTACLES SHALL HAVE THEIR

SOURCE PANEL AND CIRCUIT NUMBER

INDICATED ON THEIR FACEPLATE.

F. ALL LIGHTING CONDUCTORS SHALL BE 2-12

AWG, 1-12 AWG EG IN 3/4" CONDUIT UNLESS

NOTED OTHERWISE:

a. RUNS LESS THAN 150' SHALL BE

MINUMUM 2-12 AWG, 1-12 AWG EG IN 3/4"

CONDUIT.

b. RUNS 150'-250' SHALL BE MINIMUM 2-10

AWG, 1-10 AWG EG IN 3/4" CONDUIT.

c. RUNS GREATER THAN 250' SHALL BE

MINIMUM 2-8 AWG, 1-8 AWG EG IN 3/4"

CONDUIT.

G. VERIFY COMPATIBILITY OF ALL LIGHTING

CONTROLS WITH THE LED DRIVERS TO BE

CONTROLLED.

H. PANEL SCHEDULES FOR LL AND HL ON E-603.

N O

R T

H0 4 8 16

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR POWER PLAN - PHASE 2

Scale: 1/8" = 1'-0"

SECOND FLOOR LIGHTING PLAN - Phase 2

GFCI

DD

DD

GFCI

EM

G

FC

I

G

FC

I

AC

GFCI

G

FC

I AC

GFCI

DD

G

FI

G

FI

G

FC

I

GFCI

EM

DD

J

AC

GFCI

AC

GFCI

DD

AC

GFCI

+36"

J

J

J

J

DD

J J J

DD

A C

G

FC

I

AC

GFCI

G

FC

I A

C G

FC

I

G

FC

I

G

FC

I

G

FC

I

GFCI

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S

OS

OS

O S

OS

OSOS OS

OS

O S

O S

O S

OS

O S

OS OS

OS OS OSOSOS

OS

O S

O S

O S

OSOS

OS

OS OS

OS

OS

OS

2.3

4.4

4.8

6.2

6.5

7.3

8.7

9.5

9.9

K L L.1 L.2 M M.2 M.3 N.1 N.2 N.3 N.4 N.5 P P.1 P.2 P.3 P.4 Q Q.1 R S S.1M.1 M.4

OPEN OFFICE

2N60

EQUIP STORAGE

2N111

RESTROOM

2N114

TELEHEALTH

2N112

CONSULT

2S56

ELEVATOR LOBBY

H209

EXAM 6

2N118

RESTROOM

2N118A

EXAM 3

2S03

EXAM 2

2S04

EXAM 4

2S02

EXAM 5

2S01

LOGISTICS STORAGE

2N117

SOILED LINEN

2N120

SOILED UTILITY

2S10

OFFICE (PSYCH)

2S11

OFFICE (SW)

2S11A

CORRIDOR

H204

OI&T_

2S53

CONFERENCE

2S54

GROUP ROOM

2S58

RECEPTION

2N115A

ELEVATOR

E4

EXAM 1

2S05

SCALE

2N116A

MEDS

2N113

'LL'- 9 'LL'- 13

'LL'- 8

'HL'- 15

CORRIDOR

H204

'HL'- 17

'HL'- 21

'HL'- 20

'HL'- 18

'HL'- 19

PANEL 'HL'PANEL 'LL'

'HL'- 29

'HL'- 30

'HL'- 14

'LL'- 20

'HL'- 31

'HL'- 16

'HL'- 38

'HL'- 45

CORRIDOR

H208

STORAGE

2N119

2.3

4.4

4.8

6.2

6.5

7.3

8.7

9.5

9.9

K L L.1 L.2 M M.2 M.3 N.1 N.2 N.3 N.4 N.5 P P.1 P.2 P.3 P.4 Q Q.1 R S S.1M.1 M.4

E2

E2

E2

E2

A1 A1 A1 A1 A1 A1 A1 A1 A1

A1 A1

A1 A1

A1

A1

A1 A1

A1

A1

A1

A1 A1 A1 A1

OPEN OFFICE

2N60

EQUIP STORAGE

2N111

TELEHEALTH

2N112

GROUP ROOM

2S58

CONSULT

2S56

ELEVATOR LOBBY

H209

EXAM 6

2N118

RESTROOM

2N118A

EXAM 3

2S03

EXAM 2

2S04

EXAM 4

2S02

EXAM 5

2S01

LOGISTICS STORAGE

2N117

SOILED LINEN

2N120

SOILED UTILITY

2S10

OFFICE (PSYCH)

2S11

OFFICE (SW)

2S11A

CORRIDOR

H204

OI&T_

2S53

CONFERENCE

2S54

CORRIDOR

2N116

WAITING

2N115

CORRIDOR

H208

CHASE_

H208B

ELECT. CLOSET

H208A

ELEVATOR

E4

STAIR 2

S2

ELEVATOR

E3

ELEVATOR

E2

D1

D1 A1

D1 D1

D1 D1

A1

PANEL 'HL'PANEL 'LL'

FAC DATA RM

2S57A

A1

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/1

/2

:3

:4

P

M

EP103

SECOND FLOOR ELECTRICAL PLAN -

PHASE 3

7 14CNJ

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

DAS

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A. ALL RECEPTACLE CONDUCTORS ARE 2-12

AWG, 1-12 AWG EG IN 3/4" CONDUIT MINIMUM

UNLESS NOTED OTHERWISE.

B. COORDINATE LOCATION AND ELECTRICAL

REQUIREMENTS OF ALL MECHANICAL AND

PLUMBING EQUIPMENT WITH MECHANICAL

AND PLUMBING CONTRACTORS.

C. COORDINATE EQUIPMENT WITH

ARCHITECTURAL EQUIPMENT PLANS AND

SCHEDULES.

D. ELECTRICAL CONTRACTOR SHALL FOLLOW

SITE LOCK-OUT/TAG-OUT GUIDELINES TO

DEENERGIZE EQUIPMENT.

E. ALL RECEPTACLES SHALL HAVE THEIR

SOURCE PANEL AND CIRCUIT NUMBER

INDICATED ON THEIR FACEPLATE.

F. ALL LIGHTING CONDUCTORS SHALL BE 2-12

AWG, 1-12 AWG EG IN 3/4" CONDUIT UNLESS

NOTED OTHERWISE:

a. RUNS LESS THAN 150' SHALL BE

MINUMUM 2-12 AWG, 1-12 AWG EG IN 3/4"

CONDUIT.

b. RUNS 150'-250' SHALL BE MINIMUM 2-10

AWG, 1-10 AWG EG IN 3/4" CONDUIT.

c. RUNS GREATER THAN 250' SHALL BE

MINIMUM 2-8 AWG, 1-8 AWG EG IN 3/4"

CONDUIT.

G. VERIFY COMPATIBILITY OF ALL LIGHTING

CONTROLS WITH THE LED DRIVERS TO BE

CONTROLLED.

H. PANEL SCHEDULES FOR LL AND HL ON E-603.

N O

R T

H0 4 8 16

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR POWER PLAN -PHASE 3

Scale: 1/8" = 1'-0"

SECOND FLOOR LIGHTING PLAN - Phase 3

1 FLOOR BOX WITH SINGLE DUPLEX

RECEPTACLE AND HDMI AND 2 X IT(CAT6

STYLE) CONNECTIONS.

2 POWER (A) FOR SCREEN IN CEILING.

3 POWER (B) FOR PROJECTOR IN CEILING.

4 INSTALL 3/4" CONDUIT WITH 5#12 FROM EACH

PB TO JUNCTION BOX FOR HL-38 FOR

AUTOMATIC DOOR OPERATOR. SEE T-103

FOR MORE INFORMATION.

5 INSTALL NEW COMBINATION MANUAL

DIMMER/OCCUPANCY SENSOR SWITCH.

J

M

M

J

M

J

M

J

M

J

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S

2.3

4.4

4.8

6.2

6.5

7.3

8.7

9.5

9.9

K L L.1 L.2 M M.2 M.3 N.1 N.2 N.3 N.4 N.5 P P.1 P.2 P.3 P.4 Q Q.1 R S S.1M.1 M.4

FCU-2N59S

FCU-2N59B

PANEL H

TYP

EXAM 1

2S05

TREAT. RM.

2S05

EXAM

2S04

CHASE

CH-S-3

EXAM

2S01

STAIRWELL NO. 2

2S02OFFICE

2N111

OFFICE

2S11A

OFFICE

2S11

HAC

2S10

ELEC. CLOSET

2S9

ELEVATOR LOBBY

2S57

ELEVATOR

E2

CORRIDOR

H204

OI&T

2S53

CONFERENCE RM

2S56

PAIN REHAB. CENTER

2S56A

SCI SERVICE REHAB.

CENTER

2N117A

CORRIDOR

H205

ELEVATOR

E3

P.T. / O.T.

2N58

EXAM

2N118

CORRIDOR

H208

WAITING ROOM

2N112A

WAITING

2N115

OPEN OFFICE

2N59

EXAM

2S12B

OFFICE

2N60

OFFICE

2N63

HAC

2N64

WHEELCHAIR STORAGE

2N110

ELEVATOR

E4

CLOSET

2N59B

RESTROOM

2N114

FCU-2N115

'HL'- 41

FAC DATA RM

2S57A

'HL'- 24

FCU-2S57A

FCU-2N113

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/1

/2

:3

:5

P

M

EM101

SECOND FLOOR MECHANICAL POWER

PLAN - PHASE 1

8 14CNJ

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

DAS

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

SECOND FLOOR MECHANICAL POWER PLAN - PHASE 1

A. ALL RECEPTACLE CONDUCTORS ARE 2-12

AWG, 1-12 AWG EG IN 3/4" CONDUIT MINIMUM

UNLESS NOTED OTHERWISE.

B. COORDINATE LOCATION AND ELECTRICAL

REQUIREMENTS OF ALL MECHANICAL AND

PLUMBING EQUIPMENT WITH MECHANICAL

AND PLUMBING CONTRACTORS.

C. COORDINATE EQUIPMENT WITH

ARCHITECTURAL EQUIPMENT PLANS AND

SCHEDULES.

D. ELECTRICAL CONTRACTOR SHALL FOLLOW

SITE LOCK-OUT/TAG-OUT GUIDELINES TO

DEENERGIZE EQUIPMENT.

1 MOUNT NEMA1 2 POLE 120V 1/4 HP NEXT TO

MOTOR SWITCH ECU UNIT SO IT IS

ACCESSIBLE.

2 120V POWER FOR SINK IN RESTROOM.

N O

R T

H0 4 8 16

M

M

J

J

J

J

J

J

J

JM

M

M

M M

M

M

M

J

J

M

J

M

J

JM

M

J

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S

2.3

4.4

4.8

6.2

6.5

7.3

8.7

9.5

9.9

K L L.1 L.2 M M.2 M.3 N.1 N.2 N.3 N.4 N.5 P P.1 P.2 P.3 P.4 Q Q.1 R S S.1M.1 M.4

FCU-2S11

FCU-2S11A

FCU-2N116

FCU-2N111

FCU-2N59B

FCU-2S01

PANEL H

TYP

'HL'- 23

FCU-2N117

'HL'- 26

EXAM 1

2S05

CORRIDOR

H205

WAITING

2N115

TELEHEALTH

2N112

EXAM 6

2N118

RESTROOM

2N118A

CORRIDOR

H208

OPEN OFFICE

2N60

EXAM 5

2S01

LOGISTICS STORAGE

2N117

CORRIDOR

2N116

EQUIP STORAGE

2N111

TREAT. RM.

2S05

EXAM

2S04

SOILED UTILITY

2S10 OFFICE (PSYCH)

2S11

OFFICE (SW)

2S11A

ELEVATOR LOBBY

2S57

ELEVATOR

E2

CORRIDOR

H204

OI&T

2S53

CONFERENCE RM

2S56

PAIN REHAB. CENTER

2S56A

ELEVATOR

E3

P.T. / O.T.

2N58

ELEC. CLOSET

2S9

CLOSET

2N59A

ELEVATOR

E4

STAIR 2

S2

EXAM

2S12B

WHEELCHAIR STORAGE

2N110

HAC

2N64

OPEN OFFICE

2N59

RESTROOM

2N114

MEDS

2N113

STORAGE

2N119

'HL'- 25

RECEPTION

2N59D

FCU-2N112

FCU-2N118

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/1

/2

:3

:5

P

M

EM102

SECOND FLOOR MECHANICAL POWER

PLAN - PHASE 2

9 14CNJ

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

DAS

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

SECOND FLOOR MECHANICAL POWER PLAN - PHASE 2

A. ALL RECEPTACLE CONDUCTORS ARE 2-12

AWG, 1-12 AWG EG IN 3/4" CONDUIT MINIMUM

UNLESS NOTED OTHERWISE.

B. COORDINATE LOCATION AND ELECTRICAL

REQUIREMENTS OF ALL MECHANICAL AND

PLUMBING EQUIPMENT WITH MECHANICAL

AND PLUMBING CONTRACTORS.

C. COORDINATE EQUIPMENT WITH

ARCHITECTURAL EQUIPMENT PLANS AND

SCHEDULES.

D. ELECTRICAL CONTRACTOR SHALL FOLLOW

SITE LOCK-OUT/TAG-OUT GUIDELINES TO

DEENERGIZE EQUIPMENT.

1 1 120V SINGLE PHASE POWER FOR 24 POWER

SOURCE FOR PLUMBING EQUIPMENT.

2 MOUNT NEMA1 2 POLE 120V 1/4 HP NEXT TO

MOTOR SWITCH ECU UNIT SO IT IS

ACCESSIBLE.

N O

R T

H0 4 8 16

M

M

J

J

J

J

J

J

J

JM

M

M

M M

M

M

M

J

J

J

J

J JJ

M

M M

M

M

M

M

J

J

M

J

M

J

J

JM

J

M

J

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S

2.3

4.4

4.8

6.2

6.5

7.3

8.7

9.5

9.9

K L L.1 L.2 M M.2 M.3 N.1 N.2 N.3 N.4 N.5 P P.1 P.2 P.3 P.4 Q Q.1 R S S.1M.1 M.4

FCU-2N58

FCU-2S56A

FCU-H204

FCU-2S04FCU-2S03FCU-2S02

FCU-2S56 1

TYP

OPEN OFFICE

2N60

EQUIP STORAGE

2N111

RESTROOM

2N114

MEDS

2N113TELEHEALTH

2N112

GROUP ROOM

2S58

CONSULT

2S56

ELEVATOR LOBBY

H209

EXAM 6

2N118

RESTROOM

2N118A

EXAM 3

2S03

EXAM 2

2S04

EXAM 4

2S02

EXAM 5

2S01

LOGISTICS STORAGE

2N117

SCALE

2N116A

SOILED LINEN

2N120

SOILED UTILITY

2S10

OFFICE (PSYCH)

2S11

OFFICE (SW)

2S11A

CORRIDOR

H204

OI&T_

2S53

CONFERENCE

2S54

CORRIDOR

2N116

WAITING

2N115

CORRIDOR

H208

CHASE_

H208B

ELECT. CLOSET

H208A

ELEVATOR

E4

STAIR 2

S2

ELEVATOR

E3

ELEVATOR

E2

CLOSET

2N60A

EXAM 1

2S05

RECEPTION

2N115A

EXAM

2S12B

WHEELCHAIR STORAGE

2N110

HAC

2N64

EXAM

2S12A

BATH / SHOWER

2S12

HALLWAY

2S13

EXAM

2S13A

OFFICE

2S51

OFFICE

2S49

TOILET

2S50

OFFICE

2S65

STORAGE

2N119

ELEVATOR LOBBY

H205

'HL'- 28

'HL'- 27

'HL'- 32

'HL'- 43

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/1

/2

:3

:0

P

M

EM103

SECOND FLOOR MECHANICAL POWER

PLAN - PHASE 3

10 14CNJ

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

DAS

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

SECOND FLOOR MECHANICAL POWER PLAN -PHASE 3

A. ALL RECEPTACLE CONDUCTORS ARE 2-12

AWG, 1-12 AWG EG IN 3/4" CONDUIT MINIMUM

UNLESS NOTED OTHERWISE.

B. COORDINATE LOCATION AND ELECTRICAL

REQUIREMENTS OF ALL MECHANICAL AND

PLUMBING EQUIPMENT WITH MECHANICAL

AND PLUMBING CONTRACTORS.

C. COORDINATE EQUIPMENT WITH

ARCHITECTURAL EQUIPMENT PLANS AND

SCHEDULES.

D. ELECTRICAL CONTRACTOR SHALL FOLLOW

SITE LOCK-OUT/TAG-OUT GUIDELINES TO

DEENERGIZE EQUIPMENT.

1 MOUNT NEMA1 2 POLE 120V 1/4 HP NEXT TO

MOTOR SWITCH ECU UNIT SO IT IS

ACCESSIBLE.

N O

R T

H0 4 8 16

1. WALL ASSEMBLY - THE 1, 2, 3 OR 4 HR FIRE-RATED GYPSUM WALLBOARD/STUD WALL ASSEMBLY SHALL BE CONSTRUCTED OF THE MATERIALS AND IN THE MANNER DESCRIBED IN THE INDIVIDUAL U300 OR U400 SERIES WALL OR PARTITION DESIGNS IN THE UL FIRE RESISTANCE DIRECTORY AND SHALL INCLUDE THE FOLLOWING CONSTRUCTION FEATURES:

A. STUDS - WALL FRAMING MAY CONSIST OF EITHER WOOD STUDS (MAX 2 HR FIRE RATED ASSEMBLIES) OR STEEL CHANNEL STUDS. WOOD STUDS TO CONSIST OF NOM 2 BY 4 IN. (51 BY 102 MM) LUMBER SPACED 16 IN. (406 MM) OC WITH NOM 2 BY 4 IN. (51 BY 102 MM) LUMBER END PLATES AND CROSS BRACES. STEEL STUDS TO BE MIN 3-5/8 IN. (92 MM)

WIDE BY 1-3/8 IN. (35 MM) DEEP CHANNELS SPACED MAX 24 IN. (610 MM) OC.

B. GYPSUM BOARD* - NOM 1/2 OR 5/8 IN. (13 OR 16 MM) THICK, 4 FT. (122 CM) WIDE WITH SQUARE OR TAPERED EDGES. THE GYPSUM WALLBOARD TYPE, THICKNESS, NUMBER OF LAYERS, FASTENER TYPE AND SHEET ORIENTATION SHALL BE AS SPECIFIED IN THE INDIVIDUAL U300 OR U400 SERIES DESIGN IN THE UL FIRE RESISTANCE DIRECTORY. MAX DIAM OF

OPENING IS 26 IN. (660 MM).

2. THROUGH PENETRANT - ONE METALLIC PIPE, CONDUIT OR TUBING INSTALLED EITHER CONCENTRICALLY OR ECCENTRICALLY WITHIN THE FIRESTOP SYSTEM. THE ANNULAR SPACE BETWEEN PIPE, CONDUIT OR TUBING AND PERIPHERY OF OPENING SHALL BE MIN OF 0 IN. (0 MM) (POINT CONTACT) TO MAX 2 IN. (51 MM). PIPE, CONDUIT OR TUBING TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF WALL ASSEMBLY. THE FOLLOWING TYPES AND SIZES OF METALLIC PIPES, CONDUITS OR TUBING MAY BE USED:

A. STEEL PIPE - NOM 24 IN. (610 MM) DIAM (OR SMALLER) SCHEDULE 10 (OR HEAVIER) STEEL PIPE.

B. IRON PIPE - NOM 24 IN. (610 MM) DIAM (OR SMALLER) SERVICE WEIGHT (OR HEAVIER) CAST IRON SOIL PIPE, NOM 12 IN.

(305 MM) DIAM (OR SMALLER) OR CLASS 50 (OR HEAVIER) DUCTILE IRON PRESSURE PIPE.

C. CONDUIT - NOM 6 IN. (152 MM) DIAM (OR SMALLER) STEEL CONDUIT OR NOM 4 IN. (102 MM) DIAM (OR SMALLER) STEEL

ELECTRICAL METALLIC TUBING

D. COPPER TUBING - NOM 6 IN. (152 MM) DIAM (OR SMALLER) TYPE L (OR HEAVIER) COPPER TUBING E. COPPER PIPE - NOM 6 IN. (152 MM) DIAM (OR SMALLER) REGULAR (OR HEAVIER) COPPER PIPE.

F. THROUGH PENETRATING PRODUCT* - FLEXIBLE METAL PIPING - THE FOLLOWING TYPES OF STEEL FLEXIBLE METAL GAS

PIPING MAY BE USED:

1. NOM 2 IN. (51 MM) DIAM (OR SMALLER) STEEL FLEXIBLE METAL GAS PIPING. PLASTIC COVERING ON PIPING MAY OR MAY

NOT BE REMOVED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.

OMEGA FLEX INC

2. NOM 1 IN. (25 MM) DIAM (OR SMALLER) STEEL FLEXIBLE METAL GAS PIPING. PLASTIC COVERING ON PIPING MAY OR MAY

NOT BE REMOVED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.

TITEFLEX CORP

A BUNDY CO

3. NOM 1 IN. (25 MM) DIAM (OR SMALLER) STEEL FLEXIBLE METAL GAS PIPING. PLASTIC COVERING ON PIPING MAY OR MAY

NOT BE REMOVED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.

WARD MFG INC

3. FILL,VOID OR CAVITY MATERIAL* - CAULK OR SEALANT - MIN 5/8. 1-1/4,1-7/8 AND 2-1/2 IN. (16, 32, 48 AND 64 MM) THICKNESS OF CAULK FOR 1, 2, 3 AND 4 HR RATED ASSEMBLIES, RESPECTIVELY, APPLIED WITHIN ANNULUS, FLUSH WITH BOTH SURFACES OF WALL. MIN 1/4 IN. (6 MM) DIAM BEAD OF CAULK APPLIED TO GYPSUM BOARD/PENETRANT INTERFACE AT POINT CONTACT

LOCATION ON BOTH SIDES OF WALL.

THE HOURLY F RATING OF THE FIRESTOP SYSTEM IS DEPENDENT UPON THE HOURLY FIRE RATING OF THE WALL ASSEMBLY IN

WHICH IT IS INSTALLED, AS SHOWN IN THE FOLLOWING TABLE.

THE HOURLY T RATING OF THE FIRESTOP SYSTEM IS DEPENDENT UPON THE TYPE OR SIZE OF THE PIPE OR CONDUIT AND THE HOURLY FIRE RATING OF THE WALL ASSEMBLY IN WHICH IT IS INSTALLED, AS TABULATED BELOW:

+WHEN COPPER PIPE IS USED, T RATING IS 0 HR.

3M COMPANY - CP 25WB+ CAULK OR FB-3000 WT SEALANT,

*BEARING THE UL CLASSIFICATION MARKING

SYSTEM NO.W-L-1001

JUNE 15, 2005

F RATINGS - 1, 2, 3 AND 4 HR (SEE ITEMS 2 AND 3)

T RATINGS - 0, 1, 2, 3, AND 4 HR (SEE ITEM 3)

L RATING AT AMBIENT - LESS THAN 1 CFM/SQ FT

L RATING AT 400 F - LESS THAN 1 CFM/SQ FT

MAX PIPE OR

CONDUIT DIAM

IN. (mm)

1 (25)

1 (25)

4 (102)

6 (152)

12 (305)

F RATING

HR

1 OR 2

3 OR 4

1 OR 2

3 OR 4

1 OR 2

T RATING

HR

0+, 1 OR 2

3 OR 4

SECTION A-A

1B

1A

3A

A

CEILING HANGER

WIRE, TYP.

WIRE TIE OR

SCREW BAR

HANGER TO

ARCHITECTURAL

CEILING GRID TYP.

ARCHITECTURAL

CEILING GRID RECESSED CAN

LUMINAIRE

RECESSED CAN

LUMINAIRE

ARCHITECTURAL CEILING GRID

ACOUSTICAL

CEILING TILE

(TYP)

LUMINAIRE

BAR HANGERS

LUMINAIRE SUSPENSION

WIRE REFER TO

SPECIFICATION SECTION 26

51 00

GENERAL NOTE:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING

INSTRUCTIONS AND USING THE RECOMMENDED MOUNTING

HARDWARE.

FIXTURE WHIP FROM

JUNCTION BOX (6'

[1829MM] LONG MAX

CEILING HANGER WIRE

ARCHITECTURAL

CEILING GRID

HANGER WIRE AND MOUNTING

CHANNEL ATTACHED TO

STRUCTURE. REFER TO

SPECIFICATION SECTION 26 51 00

INTEGRAL GALVANIZED LIPPED

STEEL MOUNTING CHANNEL

WIRE TIE THROUGH

MOUNTING CHANNEL

& CROSS BEAM, TYP.

ARCHITECTURAL

CEILING GRID

ACOUSTICAL CEILING

TILE, TYP.

ARCHITECTURAL

CEILING GRID

1/4" SCREW

JUNCTION BOX

LOCKING SQUARE

WASHER & NUT

FIXTURE WHIP FROM JUNCTION

BOX (6' [1829MM] LONG MAX)

GENERAL NOTE:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING

INSTRUCTIONS AND USING THE RECOMMENDED MOUNTING

HARDWARE.

LUMINAIRE MANUFACTURER'S

EARTHQUAKE CLIP, (4) PER

FIXTURE AT CORNERES. ATTACH

WITH SHEET METAL SCREW

FIXTURE WHIP

FROM JUNCTION

BOX

(6FT. LONG MAX.)

LUMINAIRE. REFER TO

SCHEDULE

ARCHITECTURAL

CEILING GRID

LUMINAIRE. REFER

TO SCHEDULE

ACOUSTICAL CEILING

TILE (TYP)

3 TWIST

MINIMUM (TYP)

LUMINAIRE

SUSPENSION WIRES

(#10 MIN)

ATTACHED TO

STRUCTURE

(TYP EA. CORNER)

SPRING NUT

CONDUIT FITTING

JUNCTION BOX

(SIZE AS

REQUIRED)

INTEGRAL GALVANIZED

LIPPED STEEL

MOUNTING CHANNEL

JUNCTION BOX, TYP

(SIZE AS REQUIRED)

BEAM

CLAMP,

TYP.

CONDUIT

TRAPEZE PER

SD260533-03, TYP. CONDUIT,

TYP.

STEEL

EXPANSION

ANCHOR

STRUCTURAL MEMBER

(BEAM , JOIST, ETC.), TYP.

SEISMIC OR

EXPANSION

JOINT. FIELD

VERIFY

ACTUAL

CONDITIONS &

LOCATIONS.

FLOOR OR ROOF

STRUCTURE. FIELD VERIFY

ACTUAL CONDITIONS, TYP.

PROVIDE 127MM (5") OF SLACK AT

MIDPOINT BETWEEN TWO END OF

FLEXIBLE GALVANIZED STEEL

CONDUIT. PROVIDE GREEN INSULATED

COPPER EQUIPMENT GROUNDING

CONDUCTOR WITH FLEXIBLE CONDUIT.

914mm

(3'-0") MAX

PROVIDE EXTRA

CABLE TO MAKE

COMPLETE LOOP

AROUND BOX

PERIMETER

G…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .