This pre-solicitation notice is for a competitive total set-aside solicitation to renovate approximately 7,200 square feet on the second floor of Building 52 at the Jefferson Barracks Division VA Medical Center in St. Louis, Missouri. The project scope includes total renovation of former procedure rooms comprising 1,600 square feet, as well as light to medium renovation of administrative offices. The work will improve services for spinal cord injury veterans and address facility condition deficiencies. The NAICS code is 236220 for construction of commercial and institutional buildings with a project cost between $2-5 million. The performance period is 410 calendar days. The solicitation will be posted to beta.SAM.gov on October 15, 2021. Responses are required from service-disabled veteran-owned small businesses only.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Scan_2021_11_02_14_28_13_296.pdf | ||
| 36C25522R0002 0001.docx | DOCX document | |
| 36C25522R0002_1.docx | DOCX document | |
| 3 Abate BD.pdf | ||
| P09_S02 -20-028 Specifications 657-20-102JB (1448 pages) final.pdf | ||
| 2 Struct BD.pdf | ||
| 9 Elec BD.pdf | ||
| 7 Plumb BD.pdf | ||
| 4 Arch BD.pdf | ||
| 5 IntD BD.pdf | ||
| 8 Mech BD.pdf | ||
| Past Performance Questionnaire 36C25522R0002 (Project 657-20-102JB).pdf | ||
| 1 Gen BD.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE SUPPRESSION GENERAL NOTES
A. THE FIRE PROTECTION CONTRACTOR SHOULD USE NFPA-13 (CURRENT EDITION), CHAPTER 27, “PLANS AND CALCULATIONS” AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW. DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR THE INSTALLATION OF AUTOMATIC SPRINKLER
SYSTEM.
B. THE FIRE PROTECTION CONTRACTOR SHALL COMPLY WITH THE INTERNATIONAL BUILDING CODE (LATEST ADOPTED
EDITION). INSTALLATION SHALL MEET THE REQUIREMENTS OF THE VA.
C. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS. COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR PROPOSED LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS. LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY NFPA AND VA REQUIREMENTS
FOR THE APPROPRIATE HAZARD CLASSIFICATION.
D. THIS FACILITY SHALL BE A TOTALLY SPRINKLERED BUILDING. FIRE SUPPRESSION SYSTEM SHALL BE WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS
REQUIRED BY NFPA AND VA REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.
E. SPRINKLER HEAD LAYOUTS INDICATED ARE BASED ON OCCUPANCY HAZARD CLASSIFICATIONS OUTLINED IN NFPA-13
AND VA STANDARDS.
F. IT IS THE CONTRACTOR'S RESPONSIBILITY TO HYDRAULICALLY CALCULATE SPRINKLER REQUIREMENTS PER THE APPROPRIATE HAZARD OCCUPANCY AND PROVIDE ACTUAL NUMBER OF HEADS, REQUIRED SPACING AND PIPE ROUTING AS REQUIRED FOR CLEARANCE WITH STRUCTURAL CONDITIONS AND OTHER TRADES TO PROVIDE A COMPLETE AND
OPERABLE SYSTEM IN ACCORDANCE WITH NFPA AND VA REQUIREMENTS.
G. FIRE PROTECTION CONTRACTOR SHOULD OBTAIN FLOW TEST DATA INDICATING THE WATER FLOW AND PRESSURE AVAILABLE TO THE FACILITY OR MAKE ARRANGEMENTS TO HAVE A FLOW TEST PERFORMED. FIRE PROTECTION CONTRACTOR TO INCLUDE IN THEIR BID, ALL COSTS ASSOCIATED WITH FLOW TEST. SUBMIT HYDRAULIC CALCULATIONS
AND PLANS RELATED TO A MINIMUM OF 1 REMOTE AREA FOR REVIEW.
H. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING.
SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES
TO AVOID CONFLICT.
I. REFER TO SPECIFICATION SECTIONS IN DIVISION 21 FOR ADDITIONAL INFORMATION PERTAINING TO THE FIRE
PROTECTION SYSTEM.
J. SUPPORT ALL NEW PIPING AND EQUIPMENT FROM STRUCTURE ABOVE AS REQUIRED. CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE DESIGN OF SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS AT
PRIMARY BUILDING STRUCTURAL MEMBERS.
K. PROVIDE SPRINKLER HEADS IN CONCEALED LOCATIONS PER NFPA REQUIREMENTS.
L. DURING CONSTRUCTION PROCEDURES, THE ENTIRE WORK AREA SHALL BE CLEAN OF ALL DUST, DIRT, AND OTHER
DEBRIS BEFORE APPLICATION OF ANY NEW MATERIALS.
M. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF THE WORK AND ARE NOT INTENDED TO SHOW OR DESCRIBE ALL
WORK REQUIRED FOR THE FULL PERFORMANCE AND COMPLETION OF CONTRACT DOCUMENTS.
N. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS
SPECIFIED AND INDICATED ON THE DRAWINGS.
O. INCLUDE IN BID PERMIT, INSPECTION, AND OTHER FEES REQUIRED BY LOCAL MUNICIPALITY OR VA REQUIRED FOR
COMPLETION OF WORK SO NO ADDITIONAL EXPENSES ARE INTRODUCED TO VA.
P. PROMPTLY INFORM THE VA, IN WRITING, OF ANY DEVIATIONS IN THE CONTRACT DOCUMENTS FROM REQUIREMENTS OF LOCAL LAWS AND REGULATIONS. PERFORM WORK IN ACCORDANCE WITH SUCH REQUIREMENTS AT NO ADDITIONAL
COST TO THE VA.
Q. FIRE PROTECTION CONTRACTOR SHALL SUBMIT ONE COMPLETE SET OF AUTOMATIC SPRINKLER SYSTEM DRAWINGS, HYDRAULIC CALCULATIONS, CURRENT WATER FLOW TEST, AND THE EQUIPMENT DATA BROCHURES PREPARED BY OR UNDER THE SUPERVISION OF, AND SEALED BY A PROFESSIONAL ENGINEER. THE SUBMITTAL SHALL BE SENT TO THE VA FOR REVIEW AND APPROVAL. SYSTEM SHALL ALSO BE IN COMPLIANCE WITH ALL REQUIRED PLUMBING CODES.
R. ALL EXPENSES CARRIED BY THE A/E IN TROUBLESHOOTING SYSTEM(S) PROBLEMS CAUSED BY INADEQUATE WORKMANSHIP, LACK OF TECHNICAL EXPERTISE OR OTHER FORMS OF POOR PERFORMANCE ON THE PART OF A
CONTRACTOR, SHALL BE BORN BY THAT CONTRACTOR.
S. PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.
T. ELECTRONIC FLOW AND TAMPER SWITCHES ARE TO BE PURCHASED AND INSTALLED BY SPRINKLER CONTRACTOR, WIRED BY ELECTRICAL CONTRACTOR.
U. WATER SERVICE AND DETECTOR TYPE REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER TO BE PROVIDED, INSTALLED AND TESTED BY PLUMBING CONTRACTOR. INCORPORATE ASSOCIATED PRESSURE DROP OF SELECTED
BACKFLOW PREVENTER DEVICE IN HYDRAULIC CALCULATIONS.
V. FIRE PROTECTION CONTRACTOR SHALL FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH
LINES PER NFPA-13.
W. ALL DROPS TO SPRINKLER HEADS SHALL TEE / ELBOW OFF TOP OF BRANCH PIPE, EXCEPT WHERE STRUCTURAL, ARCHITECTURAL OR MECHANICAL EQUIPMENT CONDITIONS PRECLUDE CONVENTIONAL INSTALLATION.
X. SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS, CORRIDORS
OR CEILING TILE.
Y. THE FIRE PROTECTION CONTRACTOR SHALL LOCATE THE INSPECTOR'S TEST CONNECTION AND MAIN DRAIN LOCATIONS
IN ACCORDANCE WITH NFPA-13.
Z. FIRE DEPARTMENT CONNECTION SHALL BE LOCATED NOT MORE THAN 100 FEET AWAY FROM THE NEAREST FIRE HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY AND SHALL BE LOCATED NOT LESS THAN 18 INCHES, NOR
MORE THAN 48 INCHES ABOVE ADJACENT SURFACE.
AA. STANDPIPES SHALL BE PROVIDED IN EACH REQUIRED EGRESS STAIRWAY, WITH 4 INCH DIAMETER MINIMUM SIZE.
BB. CLASS 1 SYSTEM SHALL BE PROVIDED WITH 2 1/2 INCH HOSE CONNECTIONS AT EACH INTERMEDIATE LANDING BETWEEN FLOORS IN EACH REQUIRED EGRESS EXIT STAIRWAY. COORDINATE TYPE OF HOSE CONNECTIONS WITH THE
AUTHORITY HAVING JURISDICTION.
FIRE SUPPRESSION DEMOLITION GENERAL NOTES
A. LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. THE CONTRACTOR IS TO FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS
AND VALVES PRIOR TO THE START OF WORK.
B. COORDINATE WITH VA FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE. THE CONTRACTOR SHALL GIVE THE VA THREE (3) DAYS NOTICE PRIOR TO THE PLANNED SHUTDOWN OR INTERRUPTION.
C. COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED. PROTECT
OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.
D. ALL FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING IS TO BE TAKEN
OFFSITE AND DISPOSED OF.
BUILDING AND OCCUPANT SAFETY -
INTERRUPTION OF FIRE PROTECTION SERVICE
A. DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS DOWN AND OUT OF COMMISSION, THE FIRE PROTECTION CONTRACTOR SHALL HAVE SUFFICIENT
PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY PER VA REQUIREMENTS.
B. A FIRE PROTECTION WATCH IS IMPLEMENTED TO ENSURE THE FIRE SAFETY OF A BUILDING IN THE EVENT OF ANY ACT, OR SITUATION INSTIGATING AN INCREASED RISK TO PERSONS OR PROPERTY. THE TERM “FIRE WATCH” IS USED TO DESCRIBE A DEDICATED PERSON OR PERSONS WHO’S SOLE RESPONSIBILITY IS TO LOOK FOR FIRES WITHIN AN
ESTABLISHED AREA.
C. IN THE OPINION OF THE FIRE AND LIFE-SAFETY GROUP (FLS) OF FACTORY MUTUAL (FM), ANY REQUIRED FIRE PROTECTION SYSTEM THAT IS OUT OF SERVICE FOR MORE THAN 4 HOURS AND OCCUPIED IS REQUIRED TO ESTABLISH A FIRE WATCH. FOR THE PERSON OR PERSONS ASSIGNED TO THE FIRE WATCH, THIS MUST BE THEIR ONLY JOB DUTY
DURING THE TIME PERIOD OF THE FIRE PROTECTION RENOVATION WORK.
D. IN ADDITION THE BUILDING OWNER IS REQUIRED TO HAVE AN IMPAIRMENT COORDINATOR. THE OUT OF SERVICE EQUIPMENT MUST BE TAGGED “OUT OF SERVICE”. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION (REFERENCE INTERNATIONAL FIRE CODE- CHAPTER 9, SECTION 901.7).
E. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE PERSONS
PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.
F. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED IN ITS
USE.
G. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND
ROOM OF THE FIRE AREA IS COVERED.
H. IN GENERAL, A FIRE WATCH IS TO FULFILL THE INTENT OF NFPA-72 AS FOLLOWS: 1. NOTIFY OCCUPANTS TO EVACUATE WHEN THERE IS A FIRE IN THE BUILDING; 2. NOTIFY THE CENTRAL MONITORING STATION TO INITIATE EMERGENCY PERSONNEL RESPONSE; 3. ACTIVATE FIRE PROTECTION SYSTEMS IN ORDER TO RELEASE DOOR HOLDERS, CLOSE
SMOKE DAMPERS, AND SHUT DOWN FANS.
FLOW TEST INFORMATION
STATIC PSI RESIDUAL PSI FLOW GPM DATE LOCATION FLOW TEST PERFORMED BY
THE FLOW TEST INFORMATION LISTED ABOVE IS INTENDED AS A REFERENCE FOR THE FIRE PROTECTION
CONTRACTOR. THE FIRE PROTECTION CONTRACTOR SHALL PERFORM A HYDRAULIC FLOW TEST NEAR THE
PROJECT SITE TO VERIFY ACTUAL FLOW CONDITIONS ON WHICH TO BASE THE FIRE PROTECTION DESIGN.
INFECTION CONTROL MEASURES
A. CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN
DUST CONTROL PLAN.
B. EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE
MAINTAINED.
C. RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS.
PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY MEASURES.
D. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBORNE OPPORTUNISTIC
PATHOGENS.
E. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE OWNER'S
ACCEPTANCE.
FIRE PROTECTION CONTRACTOR
SEMI-RECESSED SPRINKLER HEAD
UPRIGHT SPRINKLER HEAD
FIRE LINE FPCFL
TAMPER SWITCH
FLOW SWITCH
CONCEALED SPRINKLER HEAD
PENDANT SPRINKLER HEAD
CHECK VALVE
GATE VALVE
EXTERIOR ALARM GONG (WATER ACTIVATED)
TEST AND DRAIN ASSEMBLY
SIDEWALL SPRINKLER HEAD
FIRE DEPARTMENT CONNECTION (FDC)
NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT
FIRE SUPPRESSION SYMBOLS AND ABBREVIATIONS
BACKFLOW PREVENTER
T&D
TS
FS
FIRE DRAINDRAIN
POINT OF NEW CONNECTION
LIMIT OF DEMOLITION
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
ORDINARY HAZARD
GROUP 1 OCCUPANCY
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
ORDINARY HAZARD
GROUP 2 OCCUPANCY
LIGHT HAZARD
THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA
13. IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE
PROTECTION WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS
DRAWING IS “FOR INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE
PROTECTION CONTRACTOR TO BASE THE DESIGN OF THE FIRE PROTECTION
SYSTEM ON. THE CONTRACTOR SHALL VERIFY THE EXACT CONDITIONS THAT THIS
DRAWING REPRESENTS, INCLUDING ANY PERCEIVED CONCEALED SPACES, AND THE
BUILDING TYPE AND CONSTRUCTION AS OUTLINED IN THE INTERNATIONAL BUILDING
CODE, PRIOR TO THE START OF WORK. REFER TO THE INTERNATIONAL BUILDING
CODE, NFPA 13, AND THE PROJECT SPECIFICATIONS FOR OTHER FIRE PROTECTION
REQUIREMENTS.
FLUSHING CONNECTION
FEED OR CROSS MAIN.
TYPICAL TEE WITH
CROSS MAIN PITCH
TOWARDS FEED MAIN.
NOTE: INSTALL FLUSHING
CONNECTION AT END OF
CROSS MAINS.
2" NIPPLE 4" LONG
WITH CAP.
MECHANICAL TEE
NEW PIPING
MECHANICAL TEE
SCREWED END
NOTE: SEE FLOOR
PLAN FOR EXISTING
AND NEW PIPE SIZES.
STEEL BEAM
RETAINING STRAP
C-CLAMP
THREADED HANGER ROD
ADJUSTABLE RING HANGER
NOTE: HANGING DETAILS SHOWN ARE SUBJECT
TO REQUIREMENTS OF SEISMIC DESIGN.
EXPANSION ANCHOR HILT QUIK
BOLT TZ OR APPROVED EQUAL.
EXPANSION ANCHOR SHALL BE
QUALIFIED FOR USE IN CRACKED
CONCRETE PER ACI 355.2
EXISTING CONCRETE SLAB
AUTO. SPRINKLER PIPE
SET SCREW
SURGE RESTRAINER
DUCTWORK OR OTHER
OBSTRUCTION OVER
48" IN WIDTH.
UPRIGHT HEAD
SPRINKLER BRANCH LINE
ALL EXPOSED
SPRINKLER PIPING
SHALL BE PAINTED RED.
UPRIGHT HEAD.
PROVIDE GAURD.
NOTES:
1. SPRINKLER CONTRACTOR SHALL PROVIDE SPRINKLER ABOVE AND BELOW DUCT OR
OTHER OBSTRUCTION OVER 48" IN WIDTH.
2. SPRINKLER CONTRACTOR SHALL COORDINATE WITH THE HVAC AND GENERAL
CONTRACTOR.
3. SPRINKLER CONTRACTOR SHALL INCLUDE COST OF ADDITIONAL SUPPORTS, AS
REQUIRED. ADDITIONAL SUPPORTS SHALL BE IN FULL CONFORMANCE WITH NFPA
REQUIREMENTS. ADDITIONAL SUPPORTS SHALL NOT BE HUNG FROM DUCT WORK.
INSTALL INSULATION AFTER
CAULKING SLEEVE, SEAL AS
REQUIRED.
FIRE RATED WALL AND OR SLAB.
STEEL PIPE SLEEVE TERMINATE
SLEEVE FLUSH WITH FINISHED
SURFACE.
FIRESTOPPING APPROVED
(BY LOCAL CODES)
FINISHED ESCUTCHEON PLATE
FLUSH AGAINST WALL AND OF
SIZE TO COMPLETELY COVER
OPENING.
APPROVED TYPE FIRE SAFE &
SMOKE TIGHT CAULKING SEALER
BETWEEN BARE PIPE AND SLEEVE.
NOTE: MINIMUM SIZE OF OPENINGS AROUND SPRINKLER PIPE PENETRATIONS OF
CONCRETE OR CMU WALLS SHALL BE IN ACCORDANCE WITH NFPA 13 SEISMIC
REQUIREMENTS.
1" X ARMOVER
1" 90 EL
1" X DROP
DROP NIPPLE
1" x 1/2" R.C. REDUCER
NOTE:
1. ALL SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE.
2. ALL EXPOSED PIPING SHALL BE PAINTED RED.
SUSPENDED CEILING
HANGERS SHALL
BE PROVIDED AS
REQUIRED BY
NFPA 13 TYPICAL
1" x 2" NIPPLE
BRANCH LINE
PENDENT SPRINKLER HEAD
SPRINKLER RISER.
INDICATING BUTTERFLY VALVE
WITH TAMPER SWITCH 7'-0" AFF -
IF GREATER THAN 7'-0" PROVIDE
LADDER.
WATER FLOW SWITCH.
PRESSURE GAUGE.
TO SPRINKLER SYSTEM.
AUXILIARY DRAIN VALVE.
1" INSPECTOR'S TEST VALVE.
SIGHT GLASS.
2" DRAIN CONNECTION. TIE IN TO EXISTING
DRAIN PIPING.
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:1
A
M
FX001
FIRE SUPPRESSION GENERAL
INFORMATION
1 7JT
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RCM
Scale: No Scale
MECHANICAL TEE AND FLUSHING CONNECTION DETAIL
Scale: No Scale
PIPE HANGER SUPPORT DETAIL
Scale: No Scale
SPRINKLER ABOVE AND BELOW DUCT DETAIL
Scale: No Scale
SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL
Scale: No Scale
TYPICAL SEMI-RECESSED PENDENT SPRINKLER
Scale: No Scale
TYPICAL FLOOR CONTROL VALVE ASSEMBLY DETAIL
DELETE FROM SHEET (AND GROUP) IF NOT USED
(DELETE THIS NOTE AND RED BOX FROM SHEET
PRIOR TO ISSUANCE)
DocuSign Envelope ID: B8644306-ADB8-4CEB-AD48-10D682ACDDAF
8/23/2021
K L L.1 L.2
M M.1
M.3
M.4
N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
9.5
7.3
6.5
9.9
P.2
1 1
2 2
3" FL
3" FL
3" FL
OFFICE
2N63
OFFICE
2N60
OFFICE
2N59
OFFICE
2N59A
WHEELCHAIR
STORAGE
2N110
HAC
2N64
CONTROL RM.
2N110
VEST.
2N110
CHASE
CH-S-6
PAIN REHAB.
CENTER
2S56A
ELEVATOR LOBBY
2S57
P.T./O.T.
2N58
ELEVATOR
E3
CONFERENCE RM
2S56
OIT
2S53
OFFICE
2S11A
OFFICE
2S11
HAC
2S10
STAIRWELL NO. 2
2S02
CORRIDOR
H205
EXAM 1
2S05
EXAM
2S04
TREAT. RM.
2S05
EXAM
2S01
EXAM
2N118
SCI SERVICE
REHAB. CENTER
2N117A
WAITING
2N115
WAITING
2N112A
OFFICE
2N111
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:1
A
M
FD101
SECOND FLOOR FIRE SUPPRESSION
DEMOLITION PLAN - PHASE 1
2 7JT
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RCM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 TURN UP EXISTING SPRINKLER HEADS AND
PIPING DROPS AND MAKE READY FOR NEW
SPRINKLER HEAD LAYOUT.
2 EXISTING FIRE MAIN TO REMAIN.
3 EXISTING ZONE VALVE.
N O
R T
H0 4 8 16
Scale: 1/8" = 1'-0"
SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 1
M.3
M.4
N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
9.5
7.3
6.5
9.9
P.2
2 2
1 1
3" FP UP
4" FP UP
3" FL
3" FL
3" FL
OFFICE
2N63
OFFICE
2N60
OFFICE
2N59
OFFICE
2N59A
WHEELCHAIR
STORAGE
2N110
HAC
2N64
CONTROL RM.
2N110
VEST.
2N110
CHASE
CH-S-6
PAIN REHAB.
CENTER
2S56A
ELEVATOR LOBBY
2S57
P.T./O.T.
2N58
ELEVATOR
E3
CONFERENCE RM
2S56
OIT
2S53
OFFICE
2S11A
OFFICE
2S11
HAC
2S10
STAIRWELL NO. 2
2S02
CORRIDOR
H205
EXAM 1
2S05
EXAM
2S04
TREAT. RM.
2S05
EXAM
2S01
EXAM
2N118
SCI SERVICE
REHAB. CENTER
2N117A
WAITING
2N115
WAITING
2N112A
OFFICE
2N111
FAC/DATA RM
2S57A
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:1
A
M
FD102
SECOND FLOOR FIRE SUPPRESSION
DEMOLITION PLAN - PHASE 2
3 7JT
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RCM
N O
R T
H0 4 8 16
Scale: 1/8" = 1'-0"
SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 2
1 TURN UP EXISTING SPRINKLER HEADS AND
PIPING DROPS AND MAKE READY FOR NEW
SPRINKLER HEAD LAYOUT.
2 EXISTING FIRE MAIN TO REMAIN.
3 EXISTING ZONE VALVE.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
M.3
M.4
N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
9.5
7.3
6.5
9.9
P.2
1 1
1 1
22 2
3" FL 3" FL
3" FL
3" FP UP
4" FP UP
OFFICE
2N63
OFFICE
2N60
OFFICE
2N59
OFFICE
2N59A
WHEELCHAIR
STORAGE
2N110
HAC
2N64
CONTROL RM.
2N110
VEST.
2N110
CHASE
CH-S-6
PAIN REHAB.
CENTER
2S56A
ELEVATOR LOBBY
2S57
P.T./O.T.
2N58
ELEVATOR
E3
CONFERENCE RM
2S56
OIT
2S53
OFFICE
2S11A
OFFICE
2S11
HAC
2S10
STAIRWELL NO. 2
2S02
CORRIDOR
H205
EXAM 1
2S05
EXAM
2S04
TREAT. RM.
2S05
EXAM
2S01
EXAM
2N118
SCI SERVICE
REHAB. CENTER
2N117A
WAITING
2N115
WAITING
2N112A
OFFICE
2N111
FAC/DATA RM
2S57A
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:1
A
M
FD103
SECOND FLOOR FIRE SUPPRESSION
DEMOLITION PLAN - PHASE 3
4 7JT
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RCM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
N O
R T
H0 4 8 16
Scale: 1/8" = 1'-0"
SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 3
1 TURN UP EXISTING SPRINKLER HEADS AND
PIPING DROPS AND MAKE READY FOR NEW
SPRINKLER HEAD LAYOUT.
2 EXISTING FIRE MAIN TO REMAIN.
3 EXISTING ZONE VALVE.
M.3
M.4
N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
9.5
7.3
6.5
9.9
P.2
3" FL
3" FL
3" FL
3" FP UP
4" FP UP
OFFICE
2N63
OFFICE
2N60
OPEN OFFICE
2N59
WHEELCHAIR
STORAGE
2N110
HAC
2N64
CONTROL RM.
2N110
CHASE
CH-S-6
PAIN REHAB.
CENTER
2S56A
ELEVATOR LOBBY
2S57
P.T./O.T.
2N58
ELEVATOR
E3
CONFERENCE RM
2S56
OIT
2S53
OFFICE
2S11A
OFFICE
2S11
HAC
2S10
STAIRWELL NO. 2
2S02
CORRIDOR
H205
EXAM 1
2S05
EXAM
2S04
TREAT. RM.
2S05
EXAM
2S01
EXAM
2N118
SCI SERVICE
REHAB. CENTER
2N117A
WAITING
2N115WAITING
2N112A
OFFICE
2N111
FAC/DATA RM
2S57A
MEDS
2N113
RESTROOM
2N114
RECEPTION
2N115A
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:2
A
M
FX101
SECOND FLOOR FIRE SUPPRESSION
PLAN - PHASE 1
5 7JT
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RCM
1 PROVIDE LIGHT HAZARD COVERAGE IN
ACCORDANCE WITH NFPA13.
2 PROVIDE ORDINARY HAZARD COVERAGE IN
ACCORDANCE WITH NFPA13.
3 PROVIDE ORDINARY HAZARD COVERAGE IN
ACCORDANCE WITH NFPA13. PROVIDE STANDARD
RESPONSE HEAD.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
N O
R T
H0 4 8 16
Scale: 1/8" = 1'-0"
SECOND FLOOR FIRE SUPPRESSION PLAN - PHASE 1
M.3
M.4
N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
9.5
7.3
6.5
9.9
P.2
1 1
3" FP UP
4" FP UP
3" FL
3" FL
3" FL
OPEN OFFICE
2N60
OPEN OFFICE
2N59
WHEELCHAIR
STORAGE
2N110
HAC
2N64
CONTROL RM.
2N110
VEST.
2N110
CHASE
CH-S-6
PAIN REHAB.
CENTER
2S56A
ELEVATOR LOBBY
2S57
P.T./O.T.
2N58
ELEVATOR
E3
CONFERENCE RM
2S56
OIT
2S53
OFFICE (SW)
2S11A
OFFICE (PSYCH)
2S11
SOILED UTILITY
2S10
STAIRWELL NO. 2
2S02
CORRIDOR
H205
EXAM 1
2S05
EXAM
2S04
TREAT. RM.
2S05
EXAM
2S01
EXAM
2N118
RESTROOM
2N118A
WAITING
2N115
WAITING
2N112A
OFFICE
2N111
FAC/DATA RM
2S57A
LOGISTICS
STORAGE
2N117
CORRIDOR
2N116
STORAGE
2N119
RESTROOM
2N114
MEDS
2N113
RECEPTION
2N115A
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:2
A
M
FX102
SECOND FLOOR FIRE SUPPRESSION
PLAN - PHASE 2
6 7JT
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RCM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 PROVIDE LIGHT HAZARD COVERAGE IN
ACCORDANCE WITH NFPA13.
2 PROVIDE ORDINARY HAZARD COVERAGE IN
ACCORDANCE WITH NFPA13DE LIGHT HAZARD
COVERAGE IN ACCORDANCE WITH NFPA13.
N O
R T
H0 4 8 16
Scale: 1/8" = 1'-0"
SECOND FLOOR FIRE SUPPRESSION PLAN - PHASE 2
1 PROVIDE LIGHT HAZARD COVERAGE IN
ACCORDANCE WITH NFPA13.
2 PROVIDE ORDINARY HAZARD COVERAGE IN
ACCORDANCE WITH NFPA13DE LIGHT HAZARD
COVERAGE IN ACCORDANCE WITH NFPA13.
M.3
M.4
N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
9.5
7.3
6.5
9.9
P.2
1 1
3" FP UP
4" FP UP
3" FL
3" FL
3" FL
OPEN OFFICE
2N59
WHEELCHAIR
STORAGE
2N110
HAC
2N64
PAIN REHAB.
CENTER
2S56A
ELEVATOR LOBBY
2S57
P.T./O.T.
2N58
ELEVATOR
E3
CONFERENCE RM
2S56
OIT
2S53
OFFICE
2S11A
OFFICE
2S11
HAC
2S10
STAIRWELL NO. 2
2S02CORRIDOR
H205
EXAM 1
2S05
EXAM 2
2S04
EXAM
2N118
SCI SERVICE
REHAB. CENTER
2N117A
WAITING
2N115
WAITING
2N112A
OFFICE
2N111
FAC/DATA RM
2S57A
OPEN OFFICE
2N60
OFFICE (SW)
2S11A
OFFICE (PSYCH)
2S11
SOILED UTILITY
2S10
EXAM 5
2S01
EXAM
2N118
RESTROOM
2N118A
CORRIDOR
2N116
STORAGE
2N119
RESTROOM
2N114
MEDS
2N113
RECEPTION
2N115A
SCALE
2N116A
SOILED LINEN
2N120
EXAM 4
2S02
EXAM 3
2S03
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:2
A
M
FX103
SECOND FLOOR FIRE SUPPRESSION
PLAN - PHASE 3
7 7JT
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RCM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
N O
R T
H0 4 8 16
Scale: 1/8" = 1'-0"
SECOND FLOOR FIRE SUPPRESSION PLAN - PHASE 3
1 PROVIDE LIGHT HAZARD COVERAGE IN
ACCORDANCE WITH NFPA13.
2 PROVIDE ORDINARY HAZARD COVERAGE IN
ACCORDANCE WITH NFPA13DE LIGHT HAZARD
COVERAGE IN ACCORDANCE WITH NFPA13.
| Sheets |
| FX001 - FIRE SUPPRESSION GENERAL INFORMATION |
| FD101 - SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 1 |
| FD102 - SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 2 |
| FD103 - SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 3 |
| FX101 - SECOND FLOOR FIRE SUPPRESSION PLAN - PHASE 1 |
| FX102 - SECOND FLOOR FIRE SUPPRESSION PLAN - PHASE 2 |
| FX103 - SECOND FLOOR FIRE SUPPRESSION PLAN - PHASE 3 |
| 2021-08-23T12:08:33-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .