This pre-solicitation notice is for a competitive total set-aside solicitation to renovate approximately 7,200 square feet on the second floor of Building 52 at the Jefferson Barracks Division VA Medical Center in St. Louis, Missouri. The project scope includes total renovation of former procedure rooms comprising 1,600 square feet, as well as light to medium renovation of administrative offices. The work will improve services for spinal cord injury veterans and address facility condition deficiencies. The NAICS code is 236220 for construction of commercial and institutional buildings with a project cost between $2-5 million. The performance period is 410 calendar days. The solicitation will be posted to beta.SAM.gov on October 15, 2021. Responses are required from service-disabled veteran-owned small businesses only.

View the file

Other files

File Type Posted
Scan_2021_11_02_14_28_13_296.pdf PDF
36C25522R0002 0001.docx DOCX document
36C25522R0002_1.docx DOCX document
3 Abate BD.pdf PDF
P09_S02 -20-028 Specifications 657-20-102JB (1448 pages) final.pdf PDF
2 Struct BD.pdf PDF
9 Elec BD.pdf PDF
7 Plumb BD.pdf PDF
4 Arch BD.pdf PDF
5 IntD BD.pdf PDF
8 Mech BD.pdf PDF
Past Performance Questionnaire 36C25522R0002 (Project 657-20-102JB).pdf PDF
1 Gen BD.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE SUPPRESSION GENERAL NOTES

A. THE FIRE PROTECTION CONTRACTOR SHOULD USE NFPA-13 (CURRENT EDITION), CHAPTER 27, “PLANS AND CALCULATIONS” AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW. DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR THE INSTALLATION OF AUTOMATIC SPRINKLER

SYSTEM.

B. THE FIRE PROTECTION CONTRACTOR SHALL COMPLY WITH THE INTERNATIONAL BUILDING CODE (LATEST ADOPTED

EDITION). INSTALLATION SHALL MEET THE REQUIREMENTS OF THE VA.

C. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS. COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR PROPOSED LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS. LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY NFPA AND VA REQUIREMENTS

FOR THE APPROPRIATE HAZARD CLASSIFICATION.

D. THIS FACILITY SHALL BE A TOTALLY SPRINKLERED BUILDING. FIRE SUPPRESSION SYSTEM SHALL BE WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS

REQUIRED BY NFPA AND VA REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.

E. SPRINKLER HEAD LAYOUTS INDICATED ARE BASED ON OCCUPANCY HAZARD CLASSIFICATIONS OUTLINED IN NFPA-13

AND VA STANDARDS.

F. IT IS THE CONTRACTOR'S RESPONSIBILITY TO HYDRAULICALLY CALCULATE SPRINKLER REQUIREMENTS PER THE APPROPRIATE HAZARD OCCUPANCY AND PROVIDE ACTUAL NUMBER OF HEADS, REQUIRED SPACING AND PIPE ROUTING AS REQUIRED FOR CLEARANCE WITH STRUCTURAL CONDITIONS AND OTHER TRADES TO PROVIDE A COMPLETE AND

OPERABLE SYSTEM IN ACCORDANCE WITH NFPA AND VA REQUIREMENTS.

G. FIRE PROTECTION CONTRACTOR SHOULD OBTAIN FLOW TEST DATA INDICATING THE WATER FLOW AND PRESSURE AVAILABLE TO THE FACILITY OR MAKE ARRANGEMENTS TO HAVE A FLOW TEST PERFORMED. FIRE PROTECTION CONTRACTOR TO INCLUDE IN THEIR BID, ALL COSTS ASSOCIATED WITH FLOW TEST. SUBMIT HYDRAULIC CALCULATIONS

AND PLANS RELATED TO A MINIMUM OF 1 REMOTE AREA FOR REVIEW.

H. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING.

SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES

TO AVOID CONFLICT.

I. REFER TO SPECIFICATION SECTIONS IN DIVISION 21 FOR ADDITIONAL INFORMATION PERTAINING TO THE FIRE

PROTECTION SYSTEM.

J. SUPPORT ALL NEW PIPING AND EQUIPMENT FROM STRUCTURE ABOVE AS REQUIRED. CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE DESIGN OF SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS AT

PRIMARY BUILDING STRUCTURAL MEMBERS.

K. PROVIDE SPRINKLER HEADS IN CONCEALED LOCATIONS PER NFPA REQUIREMENTS.

L. DURING CONSTRUCTION PROCEDURES, THE ENTIRE WORK AREA SHALL BE CLEAN OF ALL DUST, DIRT, AND OTHER

DEBRIS BEFORE APPLICATION OF ANY NEW MATERIALS.

M. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF THE WORK AND ARE NOT INTENDED TO SHOW OR DESCRIBE ALL

WORK REQUIRED FOR THE FULL PERFORMANCE AND COMPLETION OF CONTRACT DOCUMENTS.

N. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS

SPECIFIED AND INDICATED ON THE DRAWINGS.

O. INCLUDE IN BID PERMIT, INSPECTION, AND OTHER FEES REQUIRED BY LOCAL MUNICIPALITY OR VA REQUIRED FOR

COMPLETION OF WORK SO NO ADDITIONAL EXPENSES ARE INTRODUCED TO VA.

P. PROMPTLY INFORM THE VA, IN WRITING, OF ANY DEVIATIONS IN THE CONTRACT DOCUMENTS FROM REQUIREMENTS OF LOCAL LAWS AND REGULATIONS. PERFORM WORK IN ACCORDANCE WITH SUCH REQUIREMENTS AT NO ADDITIONAL

COST TO THE VA.

Q. FIRE PROTECTION CONTRACTOR SHALL SUBMIT ONE COMPLETE SET OF AUTOMATIC SPRINKLER SYSTEM DRAWINGS, HYDRAULIC CALCULATIONS, CURRENT WATER FLOW TEST, AND THE EQUIPMENT DATA BROCHURES PREPARED BY OR UNDER THE SUPERVISION OF, AND SEALED BY A PROFESSIONAL ENGINEER. THE SUBMITTAL SHALL BE SENT TO THE VA FOR REVIEW AND APPROVAL. SYSTEM SHALL ALSO BE IN COMPLIANCE WITH ALL REQUIRED PLUMBING CODES.

R. ALL EXPENSES CARRIED BY THE A/E IN TROUBLESHOOTING SYSTEM(S) PROBLEMS CAUSED BY INADEQUATE WORKMANSHIP, LACK OF TECHNICAL EXPERTISE OR OTHER FORMS OF POOR PERFORMANCE ON THE PART OF A

CONTRACTOR, SHALL BE BORN BY THAT CONTRACTOR.

S. PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.

T. ELECTRONIC FLOW AND TAMPER SWITCHES ARE TO BE PURCHASED AND INSTALLED BY SPRINKLER CONTRACTOR, WIRED BY ELECTRICAL CONTRACTOR.

U. WATER SERVICE AND DETECTOR TYPE REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER TO BE PROVIDED, INSTALLED AND TESTED BY PLUMBING CONTRACTOR. INCORPORATE ASSOCIATED PRESSURE DROP OF SELECTED

BACKFLOW PREVENTER DEVICE IN HYDRAULIC CALCULATIONS.

V. FIRE PROTECTION CONTRACTOR SHALL FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH

LINES PER NFPA-13.

W. ALL DROPS TO SPRINKLER HEADS SHALL TEE / ELBOW OFF TOP OF BRANCH PIPE, EXCEPT WHERE STRUCTURAL, ARCHITECTURAL OR MECHANICAL EQUIPMENT CONDITIONS PRECLUDE CONVENTIONAL INSTALLATION.

X. SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS, CORRIDORS

OR CEILING TILE.

Y. THE FIRE PROTECTION CONTRACTOR SHALL LOCATE THE INSPECTOR'S TEST CONNECTION AND MAIN DRAIN LOCATIONS

IN ACCORDANCE WITH NFPA-13.

Z. FIRE DEPARTMENT CONNECTION SHALL BE LOCATED NOT MORE THAN 100 FEET AWAY FROM THE NEAREST FIRE HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY AND SHALL BE LOCATED NOT LESS THAN 18 INCHES, NOR

MORE THAN 48 INCHES ABOVE ADJACENT SURFACE.

AA. STANDPIPES SHALL BE PROVIDED IN EACH REQUIRED EGRESS STAIRWAY, WITH 4 INCH DIAMETER MINIMUM SIZE.

BB. CLASS 1 SYSTEM SHALL BE PROVIDED WITH 2 1/2 INCH HOSE CONNECTIONS AT EACH INTERMEDIATE LANDING BETWEEN FLOORS IN EACH REQUIRED EGRESS EXIT STAIRWAY. COORDINATE TYPE OF HOSE CONNECTIONS WITH THE

AUTHORITY HAVING JURISDICTION.

FIRE SUPPRESSION DEMOLITION GENERAL NOTES

A. LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. THE CONTRACTOR IS TO FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS

AND VALVES PRIOR TO THE START OF WORK.

B. COORDINATE WITH VA FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE. THE CONTRACTOR SHALL GIVE THE VA THREE (3) DAYS NOTICE PRIOR TO THE PLANNED SHUTDOWN OR INTERRUPTION.

C. COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED. PROTECT

OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.

D. ALL FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING IS TO BE TAKEN

OFFSITE AND DISPOSED OF.

BUILDING AND OCCUPANT SAFETY -

INTERRUPTION OF FIRE PROTECTION SERVICE

A. DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS DOWN AND OUT OF COMMISSION, THE FIRE PROTECTION CONTRACTOR SHALL HAVE SUFFICIENT

PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY PER VA REQUIREMENTS.

B. A FIRE PROTECTION WATCH IS IMPLEMENTED TO ENSURE THE FIRE SAFETY OF A BUILDING IN THE EVENT OF ANY ACT, OR SITUATION INSTIGATING AN INCREASED RISK TO PERSONS OR PROPERTY. THE TERM “FIRE WATCH” IS USED TO DESCRIBE A DEDICATED PERSON OR PERSONS WHO’S SOLE RESPONSIBILITY IS TO LOOK FOR FIRES WITHIN AN

ESTABLISHED AREA.

C. IN THE OPINION OF THE FIRE AND LIFE-SAFETY GROUP (FLS) OF FACTORY MUTUAL (FM), ANY REQUIRED FIRE PROTECTION SYSTEM THAT IS OUT OF SERVICE FOR MORE THAN 4 HOURS AND OCCUPIED IS REQUIRED TO ESTABLISH A FIRE WATCH. FOR THE PERSON OR PERSONS ASSIGNED TO THE FIRE WATCH, THIS MUST BE THEIR ONLY JOB DUTY

DURING THE TIME PERIOD OF THE FIRE PROTECTION RENOVATION WORK.

D. IN ADDITION THE BUILDING OWNER IS REQUIRED TO HAVE AN IMPAIRMENT COORDINATOR. THE OUT OF SERVICE EQUIPMENT MUST BE TAGGED “OUT OF SERVICE”. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION (REFERENCE INTERNATIONAL FIRE CODE- CHAPTER 9, SECTION 901.7).

E. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE PERSONS

PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.

F. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED IN ITS

USE.

G. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND

ROOM OF THE FIRE AREA IS COVERED.

H. IN GENERAL, A FIRE WATCH IS TO FULFILL THE INTENT OF NFPA-72 AS FOLLOWS: 1. NOTIFY OCCUPANTS TO EVACUATE WHEN THERE IS A FIRE IN THE BUILDING; 2. NOTIFY THE CENTRAL MONITORING STATION TO INITIATE EMERGENCY PERSONNEL RESPONSE; 3. ACTIVATE FIRE PROTECTION SYSTEMS IN ORDER TO RELEASE DOOR HOLDERS, CLOSE

SMOKE DAMPERS, AND SHUT DOWN FANS.

FLOW TEST INFORMATION

STATIC PSI RESIDUAL PSI FLOW GPM DATE LOCATION FLOW TEST PERFORMED BY

THE FLOW TEST INFORMATION LISTED ABOVE IS INTENDED AS A REFERENCE FOR THE FIRE PROTECTION

CONTRACTOR. THE FIRE PROTECTION CONTRACTOR SHALL PERFORM A HYDRAULIC FLOW TEST NEAR THE

PROJECT SITE TO VERIFY ACTUAL FLOW CONDITIONS ON WHICH TO BASE THE FIRE PROTECTION DESIGN.

INFECTION CONTROL MEASURES

A. CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN

DUST CONTROL PLAN.

B. EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE

MAINTAINED.

C. RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS.

PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY MEASURES.

D. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBORNE OPPORTUNISTIC

PATHOGENS.

E. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE OWNER'S

ACCEPTANCE.

FIRE PROTECTION CONTRACTOR

SEMI-RECESSED SPRINKLER HEAD

UPRIGHT SPRINKLER HEAD

FIRE LINE FPCFL

TAMPER SWITCH

FLOW SWITCH

CONCEALED SPRINKLER HEAD

PENDANT SPRINKLER HEAD

CHECK VALVE

GATE VALVE

EXTERIOR ALARM GONG (WATER ACTIVATED)

TEST AND DRAIN ASSEMBLY

SIDEWALL SPRINKLER HEAD

FIRE DEPARTMENT CONNECTION (FDC)

NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT

FIRE SUPPRESSION SYMBOLS AND ABBREVIATIONS

BACKFLOW PREVENTER

T&D

TS

FS

FIRE DRAINDRAIN

POINT OF NEW CONNECTION

LIMIT OF DEMOLITION

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

ORDINARY HAZARD

GROUP 1 OCCUPANCY

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

ORDINARY HAZARD

GROUP 2 OCCUPANCY

LIGHT HAZARD

THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA

13. IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE

PROTECTION WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS

DRAWING IS “FOR INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE

PROTECTION CONTRACTOR TO BASE THE DESIGN OF THE FIRE PROTECTION

SYSTEM ON. THE CONTRACTOR SHALL VERIFY THE EXACT CONDITIONS THAT THIS

DRAWING REPRESENTS, INCLUDING ANY PERCEIVED CONCEALED SPACES, AND THE

BUILDING TYPE AND CONSTRUCTION AS OUTLINED IN THE INTERNATIONAL BUILDING

CODE, PRIOR TO THE START OF WORK. REFER TO THE INTERNATIONAL BUILDING

CODE, NFPA 13, AND THE PROJECT SPECIFICATIONS FOR OTHER FIRE PROTECTION

REQUIREMENTS.

FLUSHING CONNECTION

FEED OR CROSS MAIN.

TYPICAL TEE WITH

CROSS MAIN PITCH

TOWARDS FEED MAIN.

NOTE: INSTALL FLUSHING

CONNECTION AT END OF

CROSS MAINS.

2" NIPPLE 4" LONG

WITH CAP.

MECHANICAL TEE

NEW PIPING

MECHANICAL TEE

SCREWED END

NOTE: SEE FLOOR

PLAN FOR EXISTING

AND NEW PIPE SIZES.

STEEL BEAM

RETAINING STRAP

C-CLAMP

THREADED HANGER ROD

ADJUSTABLE RING HANGER

NOTE: HANGING DETAILS SHOWN ARE SUBJECT

TO REQUIREMENTS OF SEISMIC DESIGN.

EXPANSION ANCHOR HILT QUIK

BOLT TZ OR APPROVED EQUAL.

EXPANSION ANCHOR SHALL BE

QUALIFIED FOR USE IN CRACKED

CONCRETE PER ACI 355.2

EXISTING CONCRETE SLAB

AUTO. SPRINKLER PIPE

SET SCREW

SURGE RESTRAINER

DUCTWORK OR OTHER

OBSTRUCTION OVER

48" IN WIDTH.

UPRIGHT HEAD

SPRINKLER BRANCH LINE

ALL EXPOSED

SPRINKLER PIPING

SHALL BE PAINTED RED.

UPRIGHT HEAD.

PROVIDE GAURD.

NOTES:

1. SPRINKLER CONTRACTOR SHALL PROVIDE SPRINKLER ABOVE AND BELOW DUCT OR

OTHER OBSTRUCTION OVER 48" IN WIDTH.

2. SPRINKLER CONTRACTOR SHALL COORDINATE WITH THE HVAC AND GENERAL

CONTRACTOR.

3. SPRINKLER CONTRACTOR SHALL INCLUDE COST OF ADDITIONAL SUPPORTS, AS

REQUIRED. ADDITIONAL SUPPORTS SHALL BE IN FULL CONFORMANCE WITH NFPA

REQUIREMENTS. ADDITIONAL SUPPORTS SHALL NOT BE HUNG FROM DUCT WORK.

INSTALL INSULATION AFTER

CAULKING SLEEVE, SEAL AS

REQUIRED.

FIRE RATED WALL AND OR SLAB.

STEEL PIPE SLEEVE TERMINATE

SLEEVE FLUSH WITH FINISHED

SURFACE.

FIRESTOPPING APPROVED

(BY LOCAL CODES)

FINISHED ESCUTCHEON PLATE

FLUSH AGAINST WALL AND OF

SIZE TO COMPLETELY COVER

OPENING.

APPROVED TYPE FIRE SAFE &

SMOKE TIGHT CAULKING SEALER

BETWEEN BARE PIPE AND SLEEVE.

NOTE: MINIMUM SIZE OF OPENINGS AROUND SPRINKLER PIPE PENETRATIONS OF

CONCRETE OR CMU WALLS SHALL BE IN ACCORDANCE WITH NFPA 13 SEISMIC

REQUIREMENTS.

1" X ARMOVER

1" 90 EL

1" X DROP

DROP NIPPLE

1" x 1/2" R.C. REDUCER

NOTE:

1. ALL SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE.

2. ALL EXPOSED PIPING SHALL BE PAINTED RED.

SUSPENDED CEILING

HANGERS SHALL

BE PROVIDED AS

REQUIRED BY

NFPA 13 TYPICAL

1" x 2" NIPPLE

BRANCH LINE

PENDENT SPRINKLER HEAD

SPRINKLER RISER.

INDICATING BUTTERFLY VALVE

WITH TAMPER SWITCH 7'-0" AFF -

IF GREATER THAN 7'-0" PROVIDE

LADDER.

WATER FLOW SWITCH.

PRESSURE GAUGE.

TO SPRINKLER SYSTEM.

AUXILIARY DRAIN VALVE.

1" INSPECTOR'S TEST VALVE.

SIGHT GLASS.

2" DRAIN CONNECTION. TIE IN TO EXISTING

DRAIN PIPING.

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:1

A

M

FX001

FIRE SUPPRESSION GENERAL

INFORMATION

1 7JT

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

Scale: No Scale

MECHANICAL TEE AND FLUSHING CONNECTION DETAIL

Scale: No Scale

PIPE HANGER SUPPORT DETAIL

Scale: No Scale

SPRINKLER ABOVE AND BELOW DUCT DETAIL

Scale: No Scale

SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL

Scale: No Scale

TYPICAL SEMI-RECESSED PENDENT SPRINKLER

Scale: No Scale

TYPICAL FLOOR CONTROL VALVE ASSEMBLY DETAIL

DELETE FROM SHEET (AND GROUP) IF NOT USED

(DELETE THIS NOTE AND RED BOX FROM SHEET

PRIOR TO ISSUANCE)

DocuSign Envelope ID: B8644306-ADB8-4CEB-AD48-10D682ACDDAF

8/23/2021

K L L.1 L.2

M M.1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

7.3

6.5

9.9

P.2

1 1

2 2

3" FL

3" FL

3" FL

OFFICE

2N63

OFFICE

2N60

OFFICE

2N59

OFFICE

2N59A

WHEELCHAIR

STORAGE

2N110

HAC

2N64

CONTROL RM.

2N110

VEST.

2N110

CHASE

CH-S-6

PAIN REHAB.

CENTER

2S56A

ELEVATOR LOBBY

2S57

P.T./O.T.

2N58

ELEVATOR

E3

CONFERENCE RM

2S56

OIT

2S53

OFFICE

2S11A

OFFICE

2S11

HAC

2S10

STAIRWELL NO. 2

2S02

CORRIDOR

H205

EXAM 1

2S05

EXAM

2S04

TREAT. RM.

2S05

EXAM

2S01

EXAM

2N118

SCI SERVICE

REHAB. CENTER

2N117A

WAITING

2N115

WAITING

2N112A

OFFICE

2N111

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:1

A

M

FD101

SECOND FLOOR FIRE SUPPRESSION

DEMOLITION PLAN - PHASE 1

2 7JT

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

1 TURN UP EXISTING SPRINKLER HEADS AND

PIPING DROPS AND MAKE READY FOR NEW

SPRINKLER HEAD LAYOUT.

2 EXISTING FIRE MAIN TO REMAIN.

3 EXISTING ZONE VALVE.

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

7.3

6.5

9.9

P.2

2 2

1 1

3" FP UP

4" FP UP

3" FL

3" FL

3" FL

OFFICE

2N63

OFFICE

2N60

OFFICE

2N59

OFFICE

2N59A

WHEELCHAIR

STORAGE

2N110

HAC

2N64

CONTROL RM.

2N110

VEST.

2N110

CHASE

CH-S-6

PAIN REHAB.

CENTER

2S56A

ELEVATOR LOBBY

2S57

P.T./O.T.

2N58

ELEVATOR

E3

CONFERENCE RM

2S56

OIT

2S53

OFFICE

2S11A

OFFICE

2S11

HAC

2S10

STAIRWELL NO. 2

2S02

CORRIDOR

H205

EXAM 1

2S05

EXAM

2S04

TREAT. RM.

2S05

EXAM

2S01

EXAM

2N118

SCI SERVICE

REHAB. CENTER

2N117A

WAITING

2N115

WAITING

2N112A

OFFICE

2N111

FAC/DATA RM

2S57A

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:1

A

M

FD102

SECOND FLOOR FIRE SUPPRESSION

DEMOLITION PLAN - PHASE 2

3 7JT

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 2

1 TURN UP EXISTING SPRINKLER HEADS AND

PIPING DROPS AND MAKE READY FOR NEW

SPRINKLER HEAD LAYOUT.

2 EXISTING FIRE MAIN TO REMAIN.

3 EXISTING ZONE VALVE.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

7.3

6.5

9.9

P.2

1 1

1 1

22 2

3" FL 3" FL

3" FL

3" FP UP

4" FP UP

OFFICE

2N63

OFFICE

2N60

OFFICE

2N59

OFFICE

2N59A

WHEELCHAIR

STORAGE

2N110

HAC

2N64

CONTROL RM.

2N110

VEST.

2N110

CHASE

CH-S-6

PAIN REHAB.

CENTER

2S56A

ELEVATOR LOBBY

2S57

P.T./O.T.

2N58

ELEVATOR

E3

CONFERENCE RM

2S56

OIT

2S53

OFFICE

2S11A

OFFICE

2S11

HAC

2S10

STAIRWELL NO. 2

2S02

CORRIDOR

H205

EXAM 1

2S05

EXAM

2S04

TREAT. RM.

2S05

EXAM

2S01

EXAM

2N118

SCI SERVICE

REHAB. CENTER

2N117A

WAITING

2N115

WAITING

2N112A

OFFICE

2N111

FAC/DATA RM

2S57A

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:1

A

M

FD103

SECOND FLOOR FIRE SUPPRESSION

DEMOLITION PLAN - PHASE 3

4 7JT

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 3

1 TURN UP EXISTING SPRINKLER HEADS AND

PIPING DROPS AND MAKE READY FOR NEW

SPRINKLER HEAD LAYOUT.

2 EXISTING FIRE MAIN TO REMAIN.

3 EXISTING ZONE VALVE.

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

7.3

6.5

9.9

P.2

3" FL

3" FL

3" FL

3" FP UP

4" FP UP

OFFICE

2N63

OFFICE

2N60

OPEN OFFICE

2N59

WHEELCHAIR

STORAGE

2N110

HAC

2N64

CONTROL RM.

2N110

CHASE

CH-S-6

PAIN REHAB.

CENTER

2S56A

ELEVATOR LOBBY

2S57

P.T./O.T.

2N58

ELEVATOR

E3

CONFERENCE RM

2S56

OIT

2S53

OFFICE

2S11A

OFFICE

2S11

HAC

2S10

STAIRWELL NO. 2

2S02

CORRIDOR

H205

EXAM 1

2S05

EXAM

2S04

TREAT. RM.

2S05

EXAM

2S01

EXAM

2N118

SCI SERVICE

REHAB. CENTER

2N117A

WAITING

2N115WAITING

2N112A

OFFICE

2N111

FAC/DATA RM

2S57A

MEDS

2N113

RESTROOM

2N114

RECEPTION

2N115A

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:2

A

M

FX101

SECOND FLOOR FIRE SUPPRESSION

PLAN - PHASE 1

5 7JT

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

1 PROVIDE LIGHT HAZARD COVERAGE IN

ACCORDANCE WITH NFPA13.

2 PROVIDE ORDINARY HAZARD COVERAGE IN

ACCORDANCE WITH NFPA13.

3 PROVIDE ORDINARY HAZARD COVERAGE IN

ACCORDANCE WITH NFPA13. PROVIDE STANDARD

RESPONSE HEAD.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR FIRE SUPPRESSION PLAN - PHASE 1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

7.3

6.5

9.9

P.2

1 1

3" FP UP

4" FP UP

3" FL

3" FL

3" FL

OPEN OFFICE

2N60

OPEN OFFICE

2N59

WHEELCHAIR

STORAGE

2N110

HAC

2N64

CONTROL RM.

2N110

VEST.

2N110

CHASE

CH-S-6

PAIN REHAB.

CENTER

2S56A

ELEVATOR LOBBY

2S57

P.T./O.T.

2N58

ELEVATOR

E3

CONFERENCE RM

2S56

OIT

2S53

OFFICE (SW)

2S11A

OFFICE (PSYCH)

2S11

SOILED UTILITY

2S10

STAIRWELL NO. 2

2S02

CORRIDOR

H205

EXAM 1

2S05

EXAM

2S04

TREAT. RM.

2S05

EXAM

2S01

EXAM

2N118

RESTROOM

2N118A

WAITING

2N115

WAITING

2N112A

OFFICE

2N111

FAC/DATA RM

2S57A

LOGISTICS

STORAGE

2N117

CORRIDOR

2N116

STORAGE

2N119

RESTROOM

2N114

MEDS

2N113

RECEPTION

2N115A

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:2

A

M

FX102

SECOND FLOOR FIRE SUPPRESSION

PLAN - PHASE 2

6 7JT

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

1 PROVIDE LIGHT HAZARD COVERAGE IN

ACCORDANCE WITH NFPA13.

2 PROVIDE ORDINARY HAZARD COVERAGE IN

ACCORDANCE WITH NFPA13DE LIGHT HAZARD

COVERAGE IN ACCORDANCE WITH NFPA13.

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR FIRE SUPPRESSION PLAN - PHASE 2

1 PROVIDE LIGHT HAZARD COVERAGE IN

ACCORDANCE WITH NFPA13.

2 PROVIDE ORDINARY HAZARD COVERAGE IN

ACCORDANCE WITH NFPA13DE LIGHT HAZARD

COVERAGE IN ACCORDANCE WITH NFPA13.

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

7.3

6.5

9.9

P.2

1 1

3" FP UP

4" FP UP

3" FL

3" FL

3" FL

OPEN OFFICE

2N59

WHEELCHAIR

STORAGE

2N110

HAC

2N64

PAIN REHAB.

CENTER

2S56A

ELEVATOR LOBBY

2S57

P.T./O.T.

2N58

ELEVATOR

E3

CONFERENCE RM

2S56

OIT

2S53

OFFICE

2S11A

OFFICE

2S11

HAC

2S10

STAIRWELL NO. 2

2S02CORRIDOR

H205

EXAM 1

2S05

EXAM 2

2S04

EXAM

2N118

SCI SERVICE

REHAB. CENTER

2N117A

WAITING

2N115

WAITING

2N112A

OFFICE

2N111

FAC/DATA RM

2S57A

OPEN OFFICE

2N60

OFFICE (SW)

2S11A

OFFICE (PSYCH)

2S11

SOILED UTILITY

2S10

EXAM 5

2S01

EXAM

2N118

RESTROOM

2N118A

CORRIDOR

2N116

STORAGE

2N119

RESTROOM

2N114

MEDS

2N113

RECEPTION

2N115A

SCALE

2N116A

SOILED LINEN

2N120

EXAM 4

2S02

EXAM 3

2S03

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:2

A

M

FX103

SECOND FLOOR FIRE SUPPRESSION

PLAN - PHASE 3

7 7JT

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR FIRE SUPPRESSION PLAN - PHASE 3

1 PROVIDE LIGHT HAZARD COVERAGE IN

ACCORDANCE WITH NFPA13.

2 PROVIDE ORDINARY HAZARD COVERAGE IN

ACCORDANCE WITH NFPA13DE LIGHT HAZARD

COVERAGE IN ACCORDANCE WITH NFPA13.

Sheets
FX001 - FIRE SUPPRESSION GENERAL INFORMATION
FD101 - SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 1
FD102 - SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 2
FD103 - SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 3
FX101 - SECOND FLOOR FIRE SUPPRESSION PLAN - PHASE 1
FX102 - SECOND FLOOR FIRE SUPPRESSION PLAN - PHASE 2
FX103 - SECOND FLOOR FIRE SUPPRESSION PLAN - PHASE 3