8 Mech BD.pdf
PDF 3 MB Posted
- Solicitation number
- 36C25522R0002
About this file
This notice describes a competitive total set-aside federal construction contract opportunity with the Department of Veterans Affairs to renovate approximately 7,200 gross square feet on the second floor center of Building 52 at the Jefferson Barracks VA Medical Center campus in St. Louis, Missouri. Work includes total renovation of former procedure rooms comprising 1,600 square feet, as well as light to medium renovation of administrative offices. The project aims to improve services for spinal cord injured Veterans. The contract value is estimated between $2-5 million, utilizing NAICS code 236220 with a 15% minimum veteran-owned small business subcontracting requirement. The solicitation will be issued on October 15, 2021 via SAM and proposals are due TBD. The completion period is 410 days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Scan_2021_11_02_14_28_13_296.pdf | ||
| 36C25522R0002 0001.docx | DOCX document | |
| 36C25522R0002_1.docx | DOCX document | |
| 3 Abate BD.pdf | ||
| P09_S02 -20-028 Specifications 657-20-102JB (1448 pages) final.pdf | ||
| 2 Struct BD.pdf | ||
| 9 Elec BD.pdf | ||
| 7 Plumb BD.pdf | ||
| 4 Arch BD.pdf | ||
| 5 IntD BD.pdf | ||
| Past Performance Questionnaire 36C25522R0002 (Project 657-20-102JB).pdf | ||
| 1 Gen BD.pdf | ||
| 6 FP BD.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT
EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BUFFER TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHWP CHILLED WATER PUMP
CHW CHILLER WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CHWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
D-4 ECONOMIZER OUTDOOR AIR
DAMPER
dB DECIBELS Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE
ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFIER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HHW HEATING HOT WATER
HHWC HEATING HOT WATER COIL
HHWP HEATING HOT WATER PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
IV INLET VANES
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPS LOW PRESSURE SUPPLY (STEAM)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT
AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OR OPERATING ROOM
OSA OUTSIDE SUPPLY AIR
(CONDITIONED)
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PHCP PREHEAT COIL PUMP
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND
DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSR SOLID SEPARATOR
ST STEAM TRAP
SV STEAM SAFETY VALVE
SVS STEAM VENT SILENCER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
XT EXPANSION TANK
YR YEAR
MECHANICAL ABBREVIATIONS
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.
5. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE
REQUIRED.
6. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
7. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
8. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
9. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.
10. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.
11. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.
12. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
13. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.
14. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND
PIPING IN THE FIELD.
15. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.
16. NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.
17. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.
18. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.
19. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
20. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
21. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
22. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH
COR.
23. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.
24. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS
ARE NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.
25. INSTALL PIPING FREE OF SAGS AND BENDS.
26. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
27. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.
28. PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.
A. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.
B. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.
C. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS
GIVEN.
D. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.
29. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING
COORDINATION AT NO ADDITIONAL COST
MECHANICAL GENERAL NOTES
MECHANICAL LEGEND
CO2 CARBON DIOXIDE SENSOR
HUMIDISTAT OR HUMIDITY SENSOR
SUPPLY DIFFUSER
RETURN GRILLE
EXHAUST GRILLE
ROUND FLEX DUCT
EQUIPMENT TAG
LINEAR SLOT DIFFUSER
BALANCING DAMPER
FIRE DAMPER
SMOKE DAMPER
D
R INCLINED RISE, IN
DIRECTION OF AIRFLOW
INCLINED DROP, IN DIRECTION
OF AIRFLOW
CONNECT NEW DUCT
TO EXISTING
LIMIT OF DEMOLITION
VANED ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW
(LONG RADIUS)
10x8 NEW DUCT (INSIDE
DIMENSIONS: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE
DEMOLISHED
DUCT TRANSITION
END MOUNTED OR SIDEWALL GRILLE
SUPPLY
RETURN45°
45°
DN
DN
UP
UP
DNUP
STANDARD BRANCH SUPPLY OR
RETURN, NO SPLITTER (45° TAP)
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
S-60
S-8
CR-8
CHWS
CHWR
HIGH PRESSURE STEAM
PIPING (60 PSI)
LOW PRESSURE STEAM PIPING
(15 PSI AND BELOW)
LOW PRESSURE STEAM
CONDENSATE RETURN
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
PIPE UP
PIPE DOWN
BOTTOM CONNECTION
TOP CONNECTION
CAPPED OR PLUGGED PIPE
GLOBE VALVE
GATE VALVE
BALL VALVE
STEAM SAFETY VALVE
PRESSURE REGULATING VALVE
WYE STRAINER VALVE
BALANCING VALVE
MODULATING TWO-WAY CONTROL
VALVE
STEAM TRAP
COND CONDENSATE DRAIN LINE
CR-60 HIGH PRESSURE STEAM
CONDENSATE RETURN
HWS
HWR
HEATING HOT WATER SUPPLY
PIPING
HEATING HOT WATER RETURN PIPING
RLS REFRIGERANT LINE SET (LIQUID
AND SUCTION)
CONNECT TO EXISTING PIPE
LIMIT OF DEMOLITION
INLINE CENTRIFUGAL PUMP
STEAM PRESSURE REDUCING
VALVE
DRAIN VALVE
TEST PLUG
SUPPLY
TERMINAL UNIT SUPPLY
DUCT BRANCH (CONICAL
TAP)
CHECK VALVE
FIRE / SMOKE DAMPER
VANED ELBOW (SHORT RADIUS)
S-30
CR-30
MEDIUM PRESSURE STEAM
PIPING (16 PSI AND 59 PSI)
MEDIUM PRESSURE STEAM
CONDENSATE RETURN
THERMOSTAT OR TEMPERATURE SENSOR
TWO POSITION CONTROL VALVE
DIFFUSER TAG | DIFFUSER CFM
32-CU-4
EG-8 2000
MODULATING THREE-WAY
CONTROL VALVE
T
H
F
SD
FS
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:0
A
M
M-001
MECHANICAL GENERAL INFORMATION
1 10AD
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RCM
DocuSign Envelope ID: B8644306-ADB8-4CEB-AD48-10D682ACDDAF
8/23/2021
S
S
S S
S S
S
SS
S S
S S
S
S
S
S
S S
S
S S
S S
S
SS
S S
S S
S
S
S
S 4 x1
18x10 x4
1x
30x24
1x
16x8 x8 x1
K L L.1 L.2
M M.1 M.4
M.3 N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
6.5
7.3
9.9 x1
P.2
CORRIDOR
H204
OI&T
2S53
CONFERENCE RM
2S56
PAIN REHAB. CENTER
2S56A
P.T. / O.T.
2N58
ELEVATOR
E3
ELEVATOR LOBBY
2S57
OPEN OFFICE
2N59
OPEN OFFICE
2N59
OFFICE
2N60
OFFICE
2N63
HAC
2N64
WHEELCHAIR STORAGE
2N110
OFFICE
2N111
WAITING ROOM
2N112A
EXAM
2N118
EXAM
2S01
TREAT. RM.
2S05
EXAM
2S04
SCI SERVICE REHAB.
CENTER
2N117A
EXAM 1
2S05
STAIRWELL NO. 2
2S02
HAC
2S10
OFFICE
2S11
OFFICE
2S11A
EXAM
2S12B
ELEVATOR
E4
CORRIDOR
H205
RESTROOM
2N114
MEDS
2N113
K L L.1 L.2
M M.1 M.4
M.3 N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
6.5
7.3
9.9
P.2
4" CHS
4" CHR
2" D
4" CHS
4" CHR
2" CHS
2" CHR
2" D
2" CHR
2" CHR
2" CHR
3/4" D
3/4" CHR
2" CHS
EXAM
2S04
TREAT. RM.
2S05
EXAM
2S01
EXAM
2N118
WAITING
2N115WAITING
2N115
EXAM 1
2S05
CORRIDOR
H205
CORRIDOR
H208
OFFICE
2S11
OFFICE
2S11A
HAC
2S10
EXAM
2S12B
CORRIDOR
H204
OI&T
2S53
CONFERENCE RM
2S56
PAIN REHAB. CENTER
2S56A
P.T. / O.T.
2N58
ELEVATOR LOBBY
2S57
ELEVATOR
E3
OPEN OFFICE
2N59
OPEN OFFICE
2N59
OFFICE
2N60
OFFICE
2N63
HAC
2N64
CORRIDOR
H208
WAITING ROOM
2N112A
OFFICE
2N111
WHEELCHAIR STORAGE
2N110
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:1
A
M
MD101
SECOND FLOOR MECHANICAL
DEMOLITION PLAN - PHASE 1
2 10AD
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RCM
Scale: 1/8" = 1'-0"
SECOND FLOOR MECHANICAL DEMOLITION PLAN - PHASE 1
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
N O
R T
H0 4 8 16
N O
R T
H0 4 8 16
Scale: 1/8" = 1'-0"
SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN - PHASE 1
1 REMOVE FCU AND ASSOCIATED
VENTILATION DUCT, CHS, CHR, AND DRAIN
AND CAP WHERE INDICATED.
2 REMOVE DUCT SHOWN DASHED AND MAKE
READY FOR NEW CONNECTION.
3 REMOVE CONVECTOR CONTROL VALVE
AND TRAP. MAKE READY FOR
REPLACEMENT AS SHOWN ON MH101.
4 REMOVE INSULATION FROM CHS, CHR, AND
DRAIN PIPING AND MAKE READY FOR NEW
INSULATION. PROTECT SURROUNDINGS
FROM POSSIBLE CONDENSATION DRIPS.
CONSIDER PERFORMING THIS WORK IN
PHASES TO LIMIT EXPOSED UNINSULATED
PIPING.
5 REMOVE FCU AND ASSOCIATED
VENTILATION DUCT, CHS, CHR, AND DRAIN
TO LIMITS OF DEMOLITION AND PREPARE
FOR NEW WORK.
6 WORK IN CORRIDOR H205 FROM ELEVATOR
BACK TO EXAM ROOMS SHALL OCCUR ON
NIGHTS AND WEEKENDS ONLY. ACCESS
SHALL BE MAINTAINED DURING OCCUPIED
HOURS. SEE ARCHITECTURAL PLANS FOR
PHASING AND ICRA BARRIERS.
7 EXISTING TO REMAIN.
8 CONNECT EXISTING UNITS TO NEW
CONDENSATE LINE BEFORE DEMOLISHING.
1. COORDINATE WORKING HOURS ALLOWED WITH
THE VA COR.
2. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL
INCLUDE A BALANCING DAMPER.
3. COORDINATE THERMOSTAT LOCATION WITH
ALL OTHER WALL MOUNTED OBJECTS.
4. COORDINATE FINAL CEILING DIFFUSER
LOCATIONS WITH ALL OTHER CEILING MOUNTED
EQUIPMENT AND/OR DEVICES.
5. ALL CHS/R RUNOUTS TO FAN COIL UNITS SHALL
BE 3/4" UNLESS NOTED OTHERWISE. ALL FAN COIL
UNIT DRAIN PIPING SHALL BE 3/4".
S
S S
S S
S
SS
S S
S S
S
S
S
S
S S
S
S S
S S
S
SS
S S
S S
S
S
S
S
S S
S
S S
K L L.1 L.2
M M.1 M.4
M.3 N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
6.5
7.3
9.9 x1 x4
1x
30x24
1x
16x8 x8
P.2
EXAM 5
2S01
TREAT. RM.
2S05
EXAM
2S04
EXAM 1
2S05
EXAM 6
2N118
EQUIP STORAGE
2N111
TELEHEALTH
2N112
WAITING
2N115
CORRIDOR
H205
OI&T
2S53
CONFERENCE RM
2S56
PAIN REHAB. CENTER
2S56A
P.T. / O.T.
2N58
OPEN OFFICE
2N59
OPEN OFFICE
2N60
OPEN OFFICE
2N60
HAC
2N64
WHEELCHAIR STORAGE
2N110
CORRIDOR
H208
ELEVATOR
E4
ELEVATOR
E3
ELEVATOR LOBBY
2S57
SOILED UTILITY
2S10
OFFICE (PSYCH)
2S11
OFFICE (SW)
2S11A
EXAM
2S12B
RESTROOM
2N114
MEDS
2N113
FAC DATA RM
2S57A
CLOSET
2N59A
RECEPTION
2N59D
S S
S
S S
K L L.1 L.2
M M.1 M.4
M.3 N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
6.5
7.3
9.9
3/4" CHS
3/4" CHR
2" CHR
2" CHR
2" CHS
2" CHR
2" D
4" CHS
4" CHR
2" D
4" CHS
4" CHR
P.2
5 5
OPEN OFFICE
2N60
OPEN OFFICE
2N59
ELEVATOR
E3 ELEVATOR LOBBY
2S57
P.T. / O.T.
2N58
PAIN REHAB. CENTER
2S56A
CONFERENCE RM
2S56
OI&T
2S53
EXAM
2S12B
OFFICE (SW)
2S11A
OFFICE (PSYCH)
2S11
SOILED UTILITY
2S10
CORRIDOR
H205
ELEVATOR
E4
WAITING
2N115
EXAM 6
2N118
EXAM 5
2S01
TREAT. RM.
2S05
EXAM
2S04
EXAM 1
2S05
CORRIDOR
2N116
STAIR 2
S2
CORRIDOR
H208
WHEELCHAIR STORAGE
2N110
HAC
2N64
3 3
3 3
EQUIP STORAGE
2N111
OPEN OFFICE
2N60
TELEHEALTH
2N112
MEDS
2N113
RESTROOM
2N114
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:2
A
M
MD102
SECOND FLOOR MECHANICAL
DEMOLITION PLAN - PHASE 2
3 10AD
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RCM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 REMOVE FCU AND ASSOCIATED
VENTILATION DUCT, CHS, CHR, AND DRAIN
AND CAP WHERE INDICATED.
2 REMOVE DUCT SHOWN DASHED AND MAKE
READY FOR NEW CONNECTION.
3 REMOVE CONVECTOR CONTROL VALVE
AND TRAP. MAKE READY FOR
REPLACEMENT AS SHOWN ON MH102.
4 REMOVE INSULATION FROM CHS, CHR, AND
DRAIN PIPING AND MAKE READY FOR NEW
INSULATION. PROTECT SURROUNDINGS
FROM POSSIBLE CONDENSATION DRIPS.
CONSIDER PERFORMING THIS WORK IN
PHASES TO LIMIT EXPOSED UNINSULATED
PIPING.
5 REMOVE FCU AND ASSOCIATED
VENTILATION DUCT, CHS, CHR, AND DRAIN
TO LIMITS OF DEMOLITION AND PREPARE
FOR NEW WORK.
6 WORK IN CORRIDOR H205 FROM ELEVATOR
BACK TO EXAM ROOMS SHALL OCCUR ON
NIGHTS AND WEEKENDS ONLY. ACCESS
SHALL BE MAINTAINED DURING OCCUPIED
HOURS. SEE ARCHITECTURAL PLANS FOR
PHASING AND ICRA BARRIERS.
7 EXISTING TO REMAIN.
N O
R T
H0 4 8 16
N O
R T
H0 4 8 16
Scale: 1/8" = 1'-0"
SECOND FLOOR MECHANICAL DEMOLITION PLAN - PHASE 2
Scale: 1/8" = 1'-0"
SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN - PHASE 2
1. COORDINATE WORKING HOURS ALLOWED WITH
THE VA COR.
2. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL
INCLUDE A BALANCING DAMPER.
3. COORDINATE THERMOSTAT LOCATION WITH
ALL OTHER WALL MOUNTED OBJECTS.
4. COORDINATE FINAL CEILING DIFFUSER
LOCATIONS WITH ALL OTHER CEILING MOUNTED
EQUIPMENT AND/OR DEVICES.
5. ALL CHS/R RUNOUTS TO FAN COIL UNITS SHALL
BE 3/4" UNLESS NOTED OTHERWISE. ALL FAN COIL
UNIT DRAIN PIPING SHALL BE 3/4".
S
S S
S S
S
SS
S S
S S
S
S
S
S
S S
S
S S
S S
S
SS
S S
S S
S
S
S
S
S S
S
S S
K L L.1 L.2
M M.1 M.4
M.3 N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
6.5
7.3
9.9 x1 x4
1x
30x24
1x x8
2 2
1 8
P.2
EXAM 2
2S04
EXAM 3
2S03EXAM 4
2S02
SOILED LINEN
2N120
EXAM 5
2S01
STORAGE
2N119
LOGISTICS STORAGE
2N117
EXAM 6
2N118
EXAM 1
2S05
SCALE
2N116A
RESTROOM
2N118A
CORRIDOR
2N116
OFFICE (PSYCH)
2S11
OFFICE (SW)
2S11A
SOILED UTILITY
2S10
EXAM
2S12B
CORRIDOR
H204
OI&T_
2S53
CONFERENCE
2S54CONSULT
2S56
GROUP ROOM
2S58
ELEVATOR
E2
ELEVATOR
E3
OPEN OFFICE
2N60
HAC
2N64
WHEELCHAIR STORAGE
2N110
EQUIP STORAGE
2N111
TELEHEALTH
2N112
MEDS
2N113
RESTROOM
2N114
WAITING
2N115
RECEPTION
2N115A
FAC DATA RM
2S57A
S S
S
S S
K L L.1 L.2
M M.1 M.4
M.3 N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
6.5
7.3
9.9
3/4" CHS
3/4" CHR
2" CHR
2" CHR 2" CHS
2" CHR
2" D
2" D
4" CHS
4" CHR
P.2
OPEN OFFICE
2N60
GROUP ROOM
2S58
CONSULT
2S56
CONFERENCE
2S54
OI&T_
2S53
CORRIDOR
H204
ELEVATOR LOBBY
H209
ELEVATOR
E3
RECEPTION
2N115A
ELEVATOR
E4
WAITING
2N115
STAIR 2
S2
SOILED UTILITY
2S10
OFFICE (PSYCH)
2S11
OFFICE (SW)
2S11A EXAM
2S12B
EXAM 1
2S05
EXAM 2
2S04
EXAM 3
2S03
EXAM 4
2S02
EXAM 5
2S01
CORRIDOR
2N116
RESTROOM
2N118A
EXAM 6
2N118
EQUIP STORAGE
2N111
WHEELCHAIR STORAGE
2N110
TELEHEALTH
2N112
HAC
2N64
3 3
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:3
A
M
MD103
SECOND FLOOR MECHANICAL
DEMOLITION PLAN - PHASE 3
4 10AD
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RCM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
N O
R T
H0 4 8 16
N O
R T
H0 4 8 16
Scale: 1/8" = 1'-0"
SECOND FLOOR MECHANICAL DEMOLITION PLAN - PHASE 3
Scale: 1/8" = 1'-0"
SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN - PHASE 3
1. COORDINATE WORKING HOURS ALLOWED WITH
THE VA COR.
2. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL
INCLUDE A BALANCING DAMPER.
3. COORDINATE THERMOSTAT LOCATION WITH
ALL OTHER WALL MOUNTED OBJECTS.
4. COORDINATE FINAL CEILING DIFFUSER
LOCATIONS WITH ALL OTHER CEILING MOUNTED
EQUIPMENT AND/OR DEVICES.
5. ALL CHS/R RUNOUTS TO FAN COIL UNITS SHALL
BE 3/4" UNLESS NOTED OTHERWISE. ALL FAN COIL
UNIT DRAIN PIPING SHALL BE 3/4".
1 REMOVE FCU AND ASSOCIATED
VENTILATION DUCT, CHS, CHR, AND DRAIN
AND CAP WHERE INDICATED.
2 REMOVE DUCT BACK TO LIMITS OF
DEMOLITION AND MAKE READY FOR NEW
CONNECTION.
3 REMOVE CONVECTOR CONTROL VALVE
AND TRAP. MAKE READY FOR
REPLACEMENT AS SHOWN ON MH103.
4 REMOVE INSULATION FROM CHS, CHR, AND
DRAIN PIPING AND MAKE READY FOR NEW
INSULATION. PROTECT SURROUNDINGS
FROM POSSIBLE CONDENSATION DRIPS.
CONSIDER PERFORMING THIS WORK IN
PHASES TO LIMIT EXPOSED UNINSULATED
PIPING.
5 REMOVE FCU AND ASSOCIATED
VENTILATION DUCT, CHS, CHR, AND DRAIN
TO LIMITS OF DEMOLITION AND PREPARE
FOR NEW WORK.
6 REMOVE STEAM CONVECTOR, CONTROLS,
AND COVER COMPLETE. REMOVE PIPING
DOWN TO FIRST FLOOR CEILING AND CAP
WHERE PIPING IS SHOWN TO BE
EXTENDED. PREPARE FOR NEW
CONNECTION.
7 EXISTING TO REMAIN.
8 EXISTING UNIT IN OIT ROOM TO REMAIN.
9 RELOCATE DIFFUSER TO NEW GRID AS
SEEN IN MH103.
S
S S
S S
S
SS
S S
S S
S
S
S
S
S S
S
S S
K L L.1 L.2
M M.1 M.4
M.3 N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
6.5
7.3
9.9 x1 x4
1x
16x8 x8 21x10 x2
P.2
14x10
6x8 10x10
8x8
8x8
FCU-2N59S
FCU-2N59B
150SD-1
150SD-1
P.T. / O.T.
2N58
ELEVATOR LOBBY
2S57
ELEVATOR
E3
PAIN REHAB. CENTER
2S56A
CONFERENCE RM
2S56
OI&T
2S53
CORRIDOR
H204
ELEVATOR
E4
STAIRWELL NO. 2
2S02
ELEC. CLOSET
2S9
HAC
2S10
OFFICE
2S11
OFFICE
2S11A
EXAM
2S12B
EXAM
2S01
TREAT. RM.
2S05
EXAM
2S04
EXAM
2N118
WAITING ROOM
2N112A
OFFICE
2N111
WHEELCHAIR STORAGE
2N110
OFFICE
2N60
OFFICE
2N63
HAC
2N64
OPEN OFFICE
2N59
ELEVATOR
E2
180SD-2
180SD-3
180SD-3
EXAM 1
2S05
100EG-1
125RG-1
60RG-1
8x8
255RG-1
100EG-1
MEDS
2N113
RESTROOM
2N114
CORRIDOR
H205
SCI SERVICE REHAB.
CENTER
2N117A
WAITING
2N115
FCU-2N115
52-DH-2S05
60SD-1
55 CFM
30RG-1
8x10
145 CFM
30 CFM
100 CFM
6x8
8x10
8x8 8x8
FAC DATA RM
2S57A
365RG-2
400SG-1
35 CFM
12x8
12x8
6x4
FCU-2S57A
8x8
6ø
8x10
8x8 6x8
8x8
S S
S
S S
K L L.1 L.2
M M.1 M.4
M.3 N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
6.5
7.3
9.9
2" D
2" CHR
2" CHS
2" D
2" CHS
4" CHS
2" D
2" CHR
3/4" CHS
3/4" CHR
2" CHR
P.2
2" CHS
3/4" CHR
3/4" D
3/4" CHR
3/4" CHS
FCU-2N59S
FCU-2N59B
3/4" CHS
3/4" CHR
3/4" D
2" CHR
2" CHR
OPEN OFFICE
2N59
OFFICE
2N60
OFFICE
2N63
ELEVATOR
E3
ELEVATOR LOBBY
2S57
P.T. / O.T.
2N58
PAIN REHAB. CENTER
2S56A
CONFERENCE RM
2S56
CORRIDOR
H204
OI&T
2S53
OFFICE
2S11A
EXAM
2S12B
OFFICE
2S11
HAC
2S10
WAITING
2N115
WAITING ROOM
2N112A
EXAM
2N118
EXAM
2S01
TREAT. RM.
2S05
EXAM
2S04
SCI SERVICE REHAB.
CENTER
2N117A
OFFICE
2N111
EXAM 1
2S05
3/4" CHS
3/4" CHR
52-SC-2N59B
3/4" CR-8
3/4" S-8
52-DH-2S05
MEDS
2N113
ELEVATOR
E4
RESTROOM
2N114
T
T
T
STAIRWELL NO. 2
2S02
ELEC. CLOSET
2S9
FCU-2N115FCU-2N113
TFCU-2S57A
3/4" CHR
3/4" CHS
3/4" D
3/4" D
3/4" CHR3/4" CHS
FAC DATA RM
2S57A
T
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:3
A
M
MH101
SECOND FLOOR MECHANICAL PLAN -
PHASE 1
5 10AD
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RCM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
N O
R T
H0 4 8 16
N O
R T
H0 4 8 16
Scale: 1/8" = 1'-0"
SECOND FLOOR MECHANICAL PLAN - PHASE 1
Scale: 1/8" = 1'-0"
SECOND FLOOR MECHANICAL PIPING PLAN - PHASE 1
1. COORDINATE WORKING HOURS ALLOWED WITH
THE VA COR.
2. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL
INCLUDE A BALANCING DAMPER.
3. COORDINATE THERMOSTAT LOCATION WITH
ALL OTHER WALL MOUNTED OBJECTS.
4. COORDINATE FINAL CEILING DIFFUSER
LOCATIONS WITH ALL OTHER CEILING MOUNTED
EQUIPMENT AND/OR DEVICES.
5. ALL CHS/R RUNOUTS TO FAN COIL UNITS SHALL
BE 3/4" UNLESS NOTED OTHERWISE. ALL FAN COIL
UNIT DRAIN PIPING SHALL BE 3/4".
1 INSTALL NEW STEAM CONVECTOR
CONNECTED TO EXISTING STEAM PIPING.
SEE DETAIL 1/M-502.
2 INSTALL NEW DUCT AND CAP FOR FUTURE
INSTALLATION.
3 INSTALL NEW DUCT HEATER AND CONNECT
TO NEW STEAM PIPING. SEE DETAIL 8 / M-501
FOR COIL TRIM.
4 EXHAUST WILL BE BALANCED TO 200 CFM IN
PHASE 2.
5 CONNECT RISERS TO STEAM PIPING FEEDING
CONVECTOR BELOW ON FIRST FLOOR.
PENETRATE FLOOR WITHIN THE WALL
CAVITY. EXTEND TO THE COIL CONNECTIONS
AS SHOWN.
6 EXTEND NEW 3/4" CHR, CHS, AND D FROM
EXISTING PIPING TO NEW FCU.
7 WORK IN CORRIDOR H205 FROM ELEVATOR
BACK TO EXAM ROOMS SHALL OCCUR ON
NIGHTS AND WEEKENDS ONLY. ACCESS
SHALL BE MAINTAINED DURING OCCUPIED
HOURS. SEE ARCHITECTURAL PLANS FOR
PHASING AND ICRA BARRIERS.
8 1" DRAIN DOWN TO AIR GAP FITTING WITHIN
WALL AT 18"AFF. PROVIDE A 12"x12" ACCESS
DOOR TO ACCESS AND VIEW AIR GAP FITTING
IN CORRIDOR WALL. CONNECT 1” DRAIN
FROM AIR GAP FITTING TO DRAIN FROM
PLUMBING FIXTURE.
S
S S
S S
S
SS
S S
S S
S
S
S
S
S S
S
S S
S S
S
SS
S S
S S
S
S
S
S
S S
S
S S
K L L.1 L.2
M M.1 M.4
M.3 N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
6.5
7.3
9.9 x1 x4 x2
FCU-2N59B
P.2
8ø
8x4
6x8
10ø 8x8
6ø
FCU-2N111
FCU-2N116
FCU-2S01
FCU-2S11
FCU-2S11A
140SD-2140SD-2
100SD-1
240SD-1
100SD-2
150SD-2
70SD-1
210SD-3
95SD-1
95SD-1
200SD-3
6x46x4
8x8 8x8
6ø 8x8
6x8
6x8
OPEN OFFICE
2N59
P.T. / O.T.
2N58
PAIN REHAB. CENTER
2S56A
CONFERENCE RM
2S56
OI&T
2S53
CORRIDOR
H204
CORRIDOR
H208
CORRIDOR
H208
CORRIDOR
H205
ELEVATOR
E4
EQUIP STORAGE
2N111
WHEELCHAIR STORAGE
2N110
HAC
2N64
WAITING
2N115
EXAM 1
2S05
EXAM
2S04
TREAT. RM.
2S05
EXAM 5
2S01
EXAM 6
2N118
RESTROOM
2N118A
SOILED UTILITY
2S10
OFFICE (PSYCH)
2S11
OFFICE (SW)
2S11A
EXAM
2S12B
OPEN OFFICE
2N60
ELEVATOR LOBBY
2S57
ELEVATOR
E3
10x10
8ø
150RG-1
180RG-1
110EG-1
50RG-1
50RG-1
50RG-1
160RG-1
8x8
FCU-2N112
65SD-1
150SD-1
STORAGE
2N119
CORRIDOR
2N116
TELEHEALTH
2N112
MEDS
2N113
RESTROOM
2N114
LOGISTICS STORAGE
2N117
52-DH-2S01
52-DH-2N118
8ø 8ø
8x6
50 CFM
30RG-1
100 CFM
150 CFM
190RG-1
50 CFM
170 CFM
20 CFM
45 CFM
8x8
175SD-1
FCU-2N118
6x6
8x8
FCU-2N117
52-DH-2N117
10x10
STAIR 2
S2
25 CFM
S S
S
S S
K L L.1 L.2
M M.1 M.4
M.3 N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
6.5
7.3
9.9
2" D
2" CHS
4" CHS
2" D
2" CHR
3/4" CHS
3/4" CHR
3/4" CHS
3/4" CHR
3/4" D
P.2
FCU-2N59B
FCU-2N111
FCU-2S11 FCU-2S11A
FCU-2N116
FCU-2S01
EXAM 6
2N118
CORRIDOR
2N116
EXAM 5
2S01
TREAT. RM.
2S05
EXAM
2S04
EXAM 1
2S05
WAITING
2N115
EQUIP STORAGE
2N111
TELEHEALTH
2N112
ELEVATOR
E3
ELEVATOR LOBBY
2S57
CORRIDOR
H208
CORRIDOR
H208
CORRIDOR
H204
OI&T
2S53
CONFERENCE RM
2S56
PAIN REHAB. CENTER
2S56A
P.T. / O.T.
2N58
OFFICE (PSYCH)
2S11
OFFICE (SW)
2S11A
SOILED UTILITY
2S10
ELEVATOR
E4
RESTROOM
2N118A
OPEN OFFICE
2N59
OPEN OFFICE
2N60
HAC
2N64
WHEELCHAIR STORAGE
2N110
2" CHR
3/4" CHS
3/4" CHR
3/4" D
3/4" CHS
3/4" CHR
3/4" D
3/4" CHR
3/4" CHS
3/4" D
3/4" CHS
3/4" CHR
3/4" CHS
3/4" CHR
3/4" D
3/4" D
3/4" CHR
3/4" CHS
3/4" CHS
3/4" CHR
3/4" D
52-SC-2N59A
STORAGE
2N119
RESTROOM
2N114
MEDS
2N113
52-SC-2N111 52-SC-2N112
52-SC-2N115
1 1
1 1
52-SC-2S11 52-SC-2S11A
52-DH-2N118
52-DH-2S01
3/4" S-8
3/4" CR-8
FCU-2N112
3/4" D
3/4" CHS
3/4" CHR
T
T T
T
T
T
T
T T
52-DH-2N117
FCU-2N117
FCU-2N118
1" CR-8
1" S-8
3/4" S-8
3/4" CR-8
T
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:5
A
M
MH102
SECOND FLOOR MECHANICAL PLAN -
PHASE 2
6 10AD
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RCM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
N O
R T
H0 4 8 16
N O
R T
H0 4 8 16
Scale: 1/8" = 1'-0"
SECOND FLOOR MECHANICAL PLAN - PHASE 2
Scale: 1/8" = 1'-0"
SECOND FLOOR MECHANICAL PIPING PLAN - PHASE 2
1. COORDINATE WORKING HOURS ALLOWED WITH
THE VA COR.
2. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL
INCLUDE A BALANCING DAMPER.
3. COORDINATE THERMOSTAT LOCATION WITH
ALL OTHER WALL MOUNTED OBJECTS.
4. COORDINATE FINAL CEILING DIFFUSER
LOCATIONS WITH ALL OTHER CEILING MOUNTED
EQUIPMENT AND/OR DEVICES.
5. ALL CHS/R RUNOUTS TO FAN COIL UNITS SHALL
BE 3/4" UNLESS NOTED OTHERWISE. ALL FAN COIL
UNIT DRAIN PIPING SHALL BE 3/4".
1 INSTALL NEW STEAM CONVECTOR
CONNECTED TO EXISTING STEAM PIPING.
SEE DETAIL 1/M-502.
2 INSTALL NEW DUCT HEATER AND CONNECT
TO NEW STEAM PIPING. SEE DETAIL 8/ M-501
FOR COIL TRIM.
3 EXTEND 3/4" CHR, CHS, AND D FROM
EXISTING PIPING TO NEW FCU.
4 BALANCE EXHAUST AIR TO 200 CFM.
5 CONNECT RISERS TO STEAM PIPING FEEDING
CONVECTOR BELOW ON FIRST FLOOR.
PENETRATE FLOOR WITHIN THE WALL
CAVITY. EXTEND TO THE COIL CONNECTIONS
AS SHOWN.
6 BALANCE EXHAUST AIR TO 30 CFM.
7 INSTALL NEW DUCT AND CAP FOR FUTURE
INSTALLATION.
8 WORK IN CORRIDOR H205 FROM ELEVATOR
BACK TO EXAM ROOMS SHALL OCCUR ON
NIGHTS AND WEEKENDS ONLY. ACCESS
SHALL BE MAINTAINED DURING OCCUPIED
HOURS. SEE ARCHITECTURAL PLANS FOR
PHASING AND ICRA BARRIERS.
9 CONNECT 3/4" CONDENSATE DRAIN TO NEW
FCU.
S
S S
S S
S
SS
S S
S S
S
S
S
S
S S
S
S S
S S
S
SS
S S
S S
S
S
S
S
S S
S
S S
K L L.1 L.2
M M.1 M.4
M.3 N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
6.5
7.3
9.9
EXAM 5
2S01
EXAM 4
2S02
EXAM 3
2S03
EXAM 2
2S04
CORRIDOR
2N116
RESTROOM
2N118A
EXAM 6
2N118
WAITING
2N115
TELEHEALTH
2N112EQUIP STORAGE
2N111
ELEVATOR
E3
ELEVATOR LOBBY
H209
GROUP ROOM
2S58
CONSULT
2S56
CONFERENCE
2S54
OI&T_
2S53
CORRIDOR
H204
SOILED UTILITY
2S10
OFFICE (PSYCH)
2S11
OFFICE (SW)
2S11A
STAIR 2
S2
ELEVATOR
E4
CORRIDOR
H208
ELEVATOR
E2 x1 x4 x2
EXAM 1
2S05
P.2
160SD-2 160SD-2
150SD-2
190SD-3
190SD-3
440SD-1
FCU-H204
FCU-2S56
FCU-2S56A
100SD-1
FCU-2N58
FCU-2S02
140SD-2
FCU-2S03
FCU-2S04
200SD-3
95EG-1
8x8
6x8
6x4
6x4
6x6
8x8
6ø 8x6
8ø
6ø
OPEN OFFICE
2N60 8ø
150SD-2
440RG-1
230RG-1
175RG-1
225RG-1
8x8
MEDS
2N113
RESTROOM
2N114
LOGISTICS STORAGE
2N117
SOILED LINEN
2N120
SCALE
2N116A
STORAGE
2N119
52-DH-2S02
52-DH-2S03 52-DH-2S04
150RG-1
50 CFM
95RG-1
100RG-1
RECEPTION
2N115A
ELEVATOR LOBBY
H205
45 CFM
50 CFM
75 CFM
150 CFM
8x8
95 CFM
55EG-2
10x10
8x8
200SD-1
S S
S
S S
K L L.1 L.2
M M.1 M.4
M.3 N.1 N.3 N.5
P
P.1
P.4
Q Q.1 R S
4.4
6.5
7.3
9.9
OPEN OFFICE
2N60
TELEHEALTH
2N112
ELEVATOR
E4
CORRIDOR
H208
ELEVATOR LOBBY
H209
ELEVATOR
E3
GROUP ROOM
2S58
CONFERENCE
2S54
CONSULT
2S56
OI&T_
2S53
CORRIDOR
H204
ELEVATOR
E2
OFFICE (SW)
2S11A
OFFICE (PSYCH)
2S11
SOILED UTILITY
2S10
WAITING
2N115
STAIR 2
S2
ELECT. CLOSET
H208A
CHASE_
H208B
EQUIP STORAGE
2N111
EXAM 5
2S01
EXAM 4
2S02
EXAM 3
2S03
EXAM 2
2S04
CORRIDOR
2N116
RESTROOM
2N118A
2" D
2" CHR
2" CHS
2" D
2" CHS
4" CHS
2" D
2" CHR
3/4" CHS
3/4" CHR
3/4" CHS
3/4" CHR
3/4" D
2" CHR
EXAM 1
2S05
P.2
3/4" CHR
2" CHS
3/4" CHS
3/4" CHR
3/4" D3/4" CHR
3/4" CHS
3/4" D
3/4" CHR
3/4" CHS
3/4" D
2" CHR
FCU-2N58
FCU-2S56A
FCU-2S56
FCU-H204
FCU-2S03 FCU-2S04FCU-2S02
EXAM
2S12B
SOILED LINEN
2N120STORAGE
2N119
LOGISTICS STORAGE
2N117
RECEPTION
2N115A
3/4" S-8
3/4" CR-8
52-SC-2N58B
52-SC-2N58A
52-SC-2N58C
52-SC-2S56A 52-SC-2S56
52-DH-2S02
52-DH-2S03
52-DH-2S04
1 1
3/4" S-8
3/4" CR-8
3/4" S-8
3/4" CR-8
3/4" D
3/4" CHR
3/4" CHS
3/4" D
3/4" CHR
3/4" CHS
3/4" CHR
3/4" CHS
3/4" D
T T
T
TTT
T
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:0
A
M
MH103
SECOND FLOOR MECHANICAL PLAN -
PHASE 3
7 10AD
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RCM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 INSTALL NEW STEAM CONVECTOR
CONNECTED TO EXISTING STEAM PIPING.
SEE DETAIL 1/M-502.
2 INSTALL NEW DUCT HEATER AND CONNECT
TO NEW STEAM PIPING. SEE DETAIL 8/ M-501
FOR COIL TRIM.
3 CONNECT RISERS TO STEAM PIPING FEEDING
CONVECTOR BELOW ON FIRST FLOOR.
PENETRATE FLOOR WITHIN THE WALL
CAVITY. EXTEND TO THE COIL CONNECTIONS
AS SHOWN.
N O
R T
H0 4 8 16
N O
R T
H0 4 8 16
Scale: 1/8" = 1'-0"
SECOND FLOOR MECHANICAL PLAN - PHASE 3
Scale: 1/8" = 1'-0"
SECOND FLOOR MECHANICAL PIPING PLAN - PHASE 3
1. COORDINATE WORKING HOURS ALLOWED WITH
THE VA COR.
2. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL
INCLUDE A BALANCING DAMPER.
3. COORDINATE THERMOSTAT LOCATION WITH
ALL OTHER WALL MOUNTED OBJECTS.
4. COORDINATE FINAL CEILING DIFFUSER
LOCATIONS WITH ALL OTHER CEILING MOUNTED
EQUIPMENT AND/OR DEVICES.
5. ALL CHS/R RUNOUTS TO FAN COIL UNITS SHALL
BE 3/4" UNLESS NOTED OTHERWISE. ALL FAN COIL
UNIT DRAIN PIPING SHALL BE 3/4".
NOTES:
1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.
2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE
REGARDLESS OF W DIMENSION.
3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1-1/2" MAXIMUM SPACE BETWEEN
VANES AND A 3/4" TRAILING EDGE.
4. WHEN W EQUAL W2 AND W1 IS GREATER THAN 20" VANES SHALL BE DOUBLE VANE TYPE.
W1
W
NOTES:
1. THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
2. ALL STANDARD ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS
ELBOWS. ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE
CONSTRUCTED , SUPPORTED AND FASTENED AS RECOMMENDED BY
SMACNA.
STANDARD RADIUS OR
LONG RADIUS ELBOW
SHORT RADIUS ELBOW
WITH ONE VANE
SHORT RADIUS ELBOW
WITH TWO VANES
R
SHALL
EQUAL OR
BE
GREATER
THAN 1/6 W
R
SHALL
EQUAL OR
BE
GREATER
THAN 1/3 W
R
SHALL
EQUAL OR
BE
GREATER
THAN W
R
W
W
2/3W
R
/3
W
/3
W
1/2W
VAN
E
VAN
E R
W
1/6W
NOM. SIZE (IN.)
PIPE (FT.)
TUBING (FT.)
5 FT
THRU 3/4
1 1 1/4
1 1/2
HANGER ROD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR
LOW TEMPERATURE
PIPE)
PROVIDE HIGH
COMPRESSIVE
STRENGHT
INSULATION (9 PSF
MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION SHIELD AT
HANGER
WELD
SADDLE
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE
SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE
SPECIFICATIONS
1/2" DIA. HANGER RODS
WITH 36" MAX. SPACING
ON EACH CHANNEL
BAND
1-5/8" 12 GAUGE CHANNEL
OR 2" x 2" x 1/4" ANGLE
NOTES:
SEE SPECIFICATIONS FOR DETAILED
HANGER REQUIREMENTS.
SIDE VIEW TRAPEZE HANGER
FOR UP TO 1000 LB. UNIFORM
LOAD
1" MAX.
PROVIDE INSULATION SHIELD &
INSERT FOR ALL PIPING (8" MIN.)
2 2 1/2 3 4 5 6 8 10 12
11 12 14 16 17 19 22 23
9 10 12 13 14 16 - -
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE
MAXIMUM PIPE/TUBING SUPPORT SPACING
MAIN SUPPLY
DUCT
PROVIDE VOLUME
DAMPER
PROVIDE VOLUME DAMPER
ON BRANCHES (TYP)
1/4 W OR
4" MIN.
SUPPLY REGISTER OR
BRANCH DUCT
MAIN
SUPPLY
DUCT
SEE FLOOR PLAN FOR
SPLIT DIMENSION
TURNING VANES
AIR FLOW
AIR FLOW
A
IR
F L O
W
AIR SPLIT DUCT TAKE-
OFF PLAN VIEW
BRANCH DUCT TAKE-OFF
PLAN VIEW
AIR FLOW
A
IR
F
LO
W
W
MAIN SUPPLY
DUCT
CONICAL TAP
TERMINAL UNIT DUCT TAKE-
OFF PLAN VIEW
AIR FLOW
A
IR
F
LO
W
W
SEE SPECIFICATIONS FOR CLAMPS
AND SEALANT (TYP.)
SUPPORT SADDLE
FROM STRUCTURE
FLEXIBLE DUCT SIZE
SAME AS DIFFUSER
INLET: 5'-0" MAX
LENGTH
USE RIGID ELBOWS
FOR CHANGE OF
DIRECTION GREATER
THAN 45°
TYPICAL DIFFUSER
OR REGISTER IN
LAY-IN CLG.
THERMAL INSULATION
SEE SPECIFICATIONS
CONICAL OUTLET
BRANCH DUCT
12"
SHEET METAL SADDLE
VOLUME DAMPER WITH
LOCKING QUAD
CEILING
NOTE:
THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR
THE DEDICATED AHU SERVING THE SURGICAL SUITE
FAN COIL
UNIT
FLEXIBLE CONNECTION
DISCHARGE PLENUM
OR DUCT
VOLUME DAMPER
TYPICAL
FLEXIBLE DUCT
SUPPLY DIFFUSER
DUCT TRANSITION FROM
FCU OUTLET
CEILING
FILTER RETURN
GRILLE WITH MERV ll FILTER
VIBRATION ISOLATOR
HANGERS
OA VENTILATION
DUCT SEE PLANS
FOR CONTINUATION
FLEXIBLE CONNECTION
(TYPICAL)
HANGERS UP
AND SECURE TO
STRUCTURE
PLENUM
SEE PLANS FOR
FOR DUCT SIZE
RETURN
SUPPLY
COIL
3/4" DRAIN WITH
HOSE END AND CAP
DRAIN VALVE AT LOW POINT STRAINER WITH BLOW-DOWN
VALVE, HOSE END AND CAP
ISOLATION VALVE (TYP.)
SEE DRAWINGS
FOR SIZE
UNION (TYP.)
MANUAL AIR VENT
AT HIGH POINT
FIRE-RATED HOSE OR
FLEX PIPE CONNECTION
KIT (TYP.)
AUTOMATIC FLOW
CONTROL VALVE
TEMPERATURE CONTROL VALVE
PRESSURE AND TEMPERATURE PLUG (TYP.)
NOTES:
1. PIPE COILS TO ALLOW COIL PULL BY
REMOVING UNIONS ADJACENT TO COIL.
2. THIS DETAIL APPLIES TO ALL EQUIPMENT
COIL CONNECTIONS, EXCEPT AIR
HANDLING UNITS, INCLUDING FAN COIL
UNITS, TERMINAL UNITS, ETC. THAT ARE
DESIGNATED FOR TWO-WAY CONTROL.
3. REFER TO SPECIFICATIONS FOR OPTIONS
INVOLVING ACCESSORY COMBINATION.
NOTES:
1. WHEN COIL IS INCLUDED IN CASING MOUNTED ON
VIBRATION ISOLATOR UNITS, THE RUNOUT PIPING
FOR CONNECTIONS TO COIL SHALL BE INSTALLED
WITH SWING JOINTS TO ALLOW FOR THE
VIBRATION.
2. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT
IT WILL NOT BLOCK THE SWING OR USE OF
ACCESS DOORS OR PANELS; NEITHER SHALL IT
BLOCK THE SERVICING OF FILTERS, VALVES, OR
EQUIPMENT.
3. TRAP EACH COIL SEPARATELY WHEN INSTALLED IN
A BANK OF TWO OR MORE HIGH. ALSO PROVIDE A
SEPARATE VACUUM BREAKER FOR EACH COIL.
4. SUPPLY & RETURN PIPES ARE SHOWN FROM SAME
END. REHEAT COIL MAY HAVE SUPPLY & RETURN
PIPES FROM OPPOSITE ENDS.
M
IN
M
IN SCALE POCKET
FULL SIZE
TAPPING
PITCH COIL DOWN
1/4" PER FOOT TO
CONDENSATE
OUTLET
PIPE HANGER SHALL SUPPORT
PIPPING INDEPENDENT OF COIL
(TYP.)
PRESSURE
GAUGE
INCREASER, IF
REQUIRED
DECREASER, IF
REQUIRED
1/2" CHECK VALVE
VACUUM
BREAKER
STEAM SUPPLY
STEAM C
ONDENSATE
RETURN
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:0
A
M
M-501
MECHANICAL DETAILS
8 10AD
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RCM
Scale: No Scale
DUCTWORK SQUARE VANE ELBOWS
Scale: No Scale
DUCTWORK RADIUS ELBOW
Scale: No Scale
PIPE HANGER
Scale: No Scale
DUCT BRANCH TAKE-OFFS
Scale: No Scale
FLEX AIR DUCT CONNECTOR DETAIL
Scale: No Scale
FAN COIL UNIT SECTION
Scale: No Scale
TWO WAY COIL PIPING DETAIL
Scale: No Scale
STEAM COIL - PIPING CONNECTIONS
CHR
CHS
HS
SST
PC
T
V-1
RA
FILTER
COOLING COIL
FAN
SA
T-1
ROOM TEMPERATURE SENSOR, WALL MOUNTED 48" AFF.
NEW STEAM
CONVECTOR
NEW TRAP
T
V-2
FINISHED FLOOR
T
SEQUENCE OF OPERATION OCCUPIED CYCLE - 6:00 AM TO 5:00 PM (M-F)
DURING OCCUPIED CYCLE
1. FAN SHALL OPERATE CONTINUOUSLY.
2. ON CALL FOR COOLING, V-2 SHALL BE CLOSED AND VALVE V-1
SHALL MODULATE TO MAINTAIN SETPOINT OF 75° F (ADJ)
3. ON CALL FOR HEATING, VALVE V-1 SHALL BE CLOSED AND STEAM
VALVE V-2 SHALL CYCLE OPEN TO MAINTAIN SETPOINT OF 70° F
(ADJ).
4. ALARM BAS IF ROOM TEMPERATURE IS 5 DEGREES F OR MORE
FROM SETPOINT.
5. INCLUDE ROOM TEMPERATURE AND HUMIDITY MONITORING.
SEQUENCE OF OPERATION UNOCCUPIED CYCLE
1. ON CALL FOR COOLING FAN COIL UNIT SHALL OPERATE AND VALVE
V-1 SHALL MODULATE TO MAINTAIN ROOM TEMPERATURE SETBACK
TEMPERATURE OF 78° F (ADJ). WHEN SETPOINT IS SATISFIED FAN
COIL UNIT SHALL STOP AND VALVE V-1 SHALL CLOSE.
2. ON CALL FOR HEATING, FAN COIL UNIT SHALL REMAIN OFF AND
VALVE V-1 SHALL BE CLOSED. STEAM RADIATOR VALVE V-2 SHALL
CYCLE TO MAINTAIN ROOM TEMPERATURE SETBACK SETPOINT OF
68° F (ADJ). WHEN SETPOINT IS SATISFIED VALVE V-2 SHALL CLOSE.
POINT NAME:
ROOM TEMPERATURE
ROOM TEMPERATURE SETPOINT
DISCHARGE AIR TEMPERATURE
FAN STATUS
FAN ON/OFF
COOLING COIL CONTROL VALVE
ROOM HUMIDITY
ROOM HUMIDITY SETPOINT
HIGH DISCHARGE AIR TEMPERATURE
HARDWARE POINTS
AI AO
X
X
X
BI BO
SOFTWARE POINTS
AV BV SCHED TREND ALARM
SHOW ON
GRAPHIC
X
X
X
X
X
X
X
X
X
X
X
LOW DISCHARGE AIR TEMPERATURE X
NOTES
X
X
X
X
X
X
X X X X
X
X
X
X
X
7 1 1 2 1 6 3 11
TOTAL HARDWARE (11) TOTAL SOFTWARE (10)
STEAM VALVE X X
CHR
CHS
HS
SST
PC
V-1
RA
FILTER
COOLING COIL
FAN
SA
T
DUCT HEATER
LPS LPR
V-2
T T-1
ROOM TEMPERATURE SENSOR, WALL MOUNTED 48" AFF.
SEQUENCE OF OPERATION OCCUPIED CYCLE - 6:00 AM TO 5:00 PM (M-F)
DURING OCCUPIED CYCLE
1. FAN SHALL OPERATE CONTINUOUSLY.
2. ON CALL FOR COOLING, V-2 SHALL BE CLOSED AND VALVE V-1
SHALL MODULATE TO MAINTAIN SETPOINT OF 75° F (ADJ)
3. ON CALL FOR HEATING, VALVE V-1 SHALL BE CLOSED AND STEAM
VALVE V-2 SHALL MODULATE TO MAINTAIN SETPOINT OF 70°F (ADJ.)
4. ALARM BAS IF ROOM TEMPERATURE IS 5 DEGREES F OR MORE
FROM SETPOINT.
SEQUENCE OF OPERATION UNOCCUPIED CYCLE
1. ON CALL FOR COOLING FAN COIL UNIT SHALL OPERATE AND VALVE
V-1 SHALL MODULATE TO MAINTAIN ROOM TEMPERATURE SETBACK
TEMPERATURE OF 78° F (ADJ). WHEN SETPOINT IS SATISFIED FAN
COIL UNIT SHALL STOP AND VALVE V-1 SHALL CLOSE.
2. ON CALL FOR HEATING, FAN COIL UNIT SHALL REMAIN OFF AND
VALVE V-1 SHALL BE CLOSED. STEAM VALVE V-2 SHALL MODULATE
TO MAINTAIN ROOM TEMPERATURE SETBACK SETPOINT OF 68° F
(ADJ). WHEN SETPOINT IS SATISFIED VALVE V-2 SHALL CLOSE.
POINT NAME:
ROOM TEMPERATURE
ROOM TEMPERATURE SETPOINT
DISCHARGE AIR TEMPERATURE
FAN STATUS
FAN ON/OFF
COOLING COIL CONTROL VALVE
ROOM HUMIDITY
ROOM HUMIDITY SETPOINT
HIGH DISCHARGE AIR TEMPERATURE
HARDWARE POINTS
AI AO
X
X
X
BI BO
SOFTWARE POINTS
AV BV SCHED TREND ALARM
SHOW ON
GRAPHIC
X
X
X
X
X
X
X
X
X
X
X
LOW DISCHARGE AIR TEMPERATURE X
NOTES
X
X
X
X
X
X
X X X X
X
X
X
X
X
7 2 1 1 1 6 3 11
TOTAL HARDWARE (11) TOTAL SOFTWARE (10)
STEAM VALVE X X
CHR
CHS
HS
SST
PC
T
V-1
RA
FILTER
COOLING COIL
FAN
SA
T-1
ROOM TEMPERATURE SENSOR, WALL MOUNTED 48" AFF.
T
POINT NAME:
ROOM TEMPERATURE
ROOM TEMPERATURE SETPOINT
DISCHARGE AIR TEMPERATURE
FAN STATUS
FAN ON/OFF
COOLING COIL CONTROL VALVE
HIGH DISCHARGE AIR TEMPERATURE
HARDWARE POINTS
AI AO
X
X
X
BI BO
SOFTWARE POINTS
AV BV SCHED TREND ALARM
SHOW ON
GRAPHIC
X
X
X
X
X
X
X
X
X
X
LOW DISCHARGE AIR TEMPERATURE X
NOTES
X
X
X
X
X X X X
X
X
5 1 1 1 1 5 3 8
TOTAL HARDWARE (8) TOTAL SOFTWARE (9)
X
SEQUENCE OF OPERATION OCCUPIED CYCLE - 6:00 AM TO 5:00 PM (M-F)
DURING OCCUPIED CYCLE
1. FAN SHALL OPERATE CONTINUOUSLY.
2. ON CALL FOR COOLING, VALVE V-1 SHALL MODULATE TO MAINTAIN
SETPOINT OF 75° F (ADJ)
3. ALARM BAS IF ROOM TEMPERATURE IS 5 DEGREES F OR MORE
FROM SETPOINT.
SEQUENCE OF OPERATION UNOCCUPIED CYCLE
1. ON CALL FOR COOLING FAN COIL UNIT SHALL OPERATE AND VALVE
V-1 SHALL MODULATE TO MAINTAIN ROOM TEMPERATURE SETBACK
TEMPERATURE OF 78° F (ADJ). WHEN SETPOINT IS SATISFIED FAN
COIL UNIT SHALL STOP AND VALVE V-1 SHALL CLOSE.
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:0
A
M
M-502
MECHANICAL CONTROLS
9 10AD
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RCM
Scale: No Scale
FAN COIL UNIT CONTROLS SCHEMATIC - WITH CONVECTION
Scale: No Scale
FAN COIL UNIT SEQUENCE OF OPERATION
Scale: No Scale
FAN COIL UNIT POINTS LIST
Scale: No Scale
FAN COIL UNIT CONTROLS SCHEMATIC - WITH STEAM COIL
Scale: No Scale
FAN COIL UNIT SEQUENCE OF OPERATION - WITH STEAM COIL
Scale: No Scale
FAN COIL UNIT POINTS LIST - WITH STEAM COIL
Scale: No Scale
FAN COIL UNIT CONTROLS SCHEMATIC - COOLING ONLY
Scale: No Scale
FAN COIL UNIT POINTS LIST - COOLING ONLY
Scale: No Scale
FAN COIL UNIT SEQUENCE OF OPERATION - COOLING ONLY
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:0
A
M
M-601
MECHANICAL SCHEDULES
10 10AD
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RCM
NOTES:
1. AUTOMATIC FAN SPEED CONTROL WITH OVERRIDE SELECTOR. ADJUST FAN SPEED TO DELIVER THE COOLING SUPPLY AIRFLOW QUANTITY SHOWN ON THE PLAN DRAWING.
2. PROVIDE 120V TO 24V TRANSFORMER, TWO WAY CONTROL VALVE FOR CHILLED WATER, BACNET COMPATIBLE CONTROLLER.
FCU SCHEDULE
+ LOCATION TYPE
FAN AIR FLOW
EXTERNAL
APD COOLING REQUIREMENTS FAN MOTOR
REMARKSCFM IN WG
MIN SENS
CAPACITY
MIN TOTAL
CAPACITY Db Wb FLOW EWT WPD POWER
PHASE VOLT
SPEED
CONTROLMBTUH MBTUH °F °F GPM °F FT HP
FCU-2N58 GROUP ROOM 2N58 HORIZONTAL
RECESSED
380 0.4 7.8 9.6 75 62 2.9 48 12.6 .15 1 115 ECM MOTOR 1, 2
FCU-2N59B EXAM ROOM 2N59B HORIZONTAL
RECESSED
282 0.4 5.7 7.1 75 63 1.6 48 12.8 .12 1 115 ECM MOTOR 1, 2
FCU-2N59B OPEN OFFICE 2N59
NORTH
HORIZONTAL
RECESSED
280 0.4 5.7 7.1 75 63 1.6 48 12.8 .12 1 115 ECM MOTOR 1, 2
FCU-2N59S OPEN OFFICE 2N59
SOUTH
HORIZONTAL
RECESSED
360 0.4 7.8 9.2 75 63 2.9 48 12.6 .15 1 115 ECM MOTOR 1, 2
FCU-2N111 EQUIP STORAGE 2N111 HORIZONTAL
RECESSED
300 0.4 5.3 7.0 75 61 1.6 48 12.8 .12 1 115 ECM MOTOR 1, 2
FCU-2N112 TELEHEALTH 2N112 HORIZONTAL
RECESSED
100 0.4 1.8 3.0 75 60 1.6 48 10.8 .11 1 115 ECM MOTOR 1, 2
FCU-2N113 MEDS 2N113 HORIZONTAL
RECESSED
100 0.4 1.8 3.0 75 60 1.4 48 10.8 .11 1 115 ECM MOTOR 1, 2
FCU-2N115 WAITING 2N115 HORIZONTAL
RECESSED
485 0.4 8.1 10.2 75 63 3.3 48 14.2 .22 1 115 ECM MOTOR 1, 2
FCU-2N116 EXAM ROOM 2N116 HORIZONTAL
RECESSED
203 0.4 3.4 5.2 75 62 1.4 48 10.8 .11 1 115 ECM MOTOR 1, 2
FCU-2N117 LOGISTICS STORAGE
2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .