About this file

This notice describes a competitive total set-aside federal construction contract opportunity with the Department of Veterans Affairs to renovate approximately 7,200 gross square feet on the second floor center of Building 52 at the Jefferson Barracks VA Medical Center campus in St. Louis, Missouri. Work includes total renovation of former procedure rooms comprising 1,600 square feet, as well as light to medium renovation of administrative offices. The project aims to improve services for spinal cord injured Veterans. The contract value is estimated between $2-5 million, utilizing NAICS code 236220 with a 15% minimum veteran-owned small business subcontracting requirement. The solicitation will be issued on October 15, 2021 via SAM and proposals are due TBD. The completion period is 410 days.

View the file

Other files

File Type Posted
Scan_2021_11_02_14_28_13_296.pdf PDF
36C25522R0002 0001.docx DOCX document
36C25522R0002_1.docx DOCX document
3 Abate BD.pdf PDF
P09_S02 -20-028 Specifications 657-20-102JB (1448 pages) final.pdf PDF
2 Struct BD.pdf PDF
9 Elec BD.pdf PDF
7 Plumb BD.pdf PDF
4 Arch BD.pdf PDF
5 IntD BD.pdf PDF
Past Performance Questionnaire 36C25522R0002 (Project 657-20-102JB).pdf PDF
1 Gen BD.pdf PDF
6 FP BD.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR-COOLED CONDENSER

ACCH AIR-COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL DAMPER,

MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER,TWO

POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERAGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT

EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BSC BIOLOGICAL SAFETY CABINETS

BT BUFFER TANK

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CENTIGRADE (CELSIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CENT CENTRIFICAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CH CHILLER

CHWP CHILLED WATER PUMP

CHW CHILLER WATER

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CHWCC CHILLED WATER COOLING COIL

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

D-4 ECONOMIZER OUTDOOR AIR

DAMPER

dB DECIBELS Db DRY-BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE

ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECC ENGINEERING CONTROL CENTER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FM FLOW METER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GS GALVANIZED STEEL

H HUMIDIFIER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HHW HEATING HOT WATER

HHWC HEATING HOT WATER COIL

HHWP HEATING HOT WATER PUMP

HHWR HEATING HOT WATER RETURN

HHWS HEATING HOT WATER SUPPLY

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM

CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWUH HOT WATER UNIT HEATER

HX HEAT EXCHANGER

Hz HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

IRH INFRARED HEATER

IS INSECT SCREEN

IV INLET VANES

kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

L LITER

L/s LITERS PER SECOND

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LH LATENT HEAT

LPR LOW PRESSURE RETURN (STEAM

CONDENSATE)

LPS LOW PRESSURE SUPPLY (STEAM)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL

PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/s METERS PER SECOND (OR

METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT

AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM

CONDENSATE)

MPS MEDIUM PRESSURE SUPPLY (STEAM)

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC

ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OR OPERATING ROOM

OSA OUTSIDE SUPPLY AIR

(CONDITIONED)

P PUMP

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PF PRE-FILTER

PG PRESSURE GAGE

PHC PREHEAT COIL

PHCP PREHEAT COIL PUMP

PPM PARTS PER MILLION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH –

ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

R/E RETURN OR EXHAUST

RA RETURN AIR

RAT RETURN AIR TEMPERATURE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND

DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSR SOLID SEPARATOR

ST STEAM TRAP

SV STEAM SAFETY VALVE

SVS STEAM VENT SILENCER

T & PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TP TRAP

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

UC UNDER CUT

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL

OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE)

RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

Wb WET-BULB (TEMPERATURE)

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

XT EXPANSION TANK

YR YEAR

MECHANICAL ABBREVIATIONS

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.

5. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE

REQUIRED.

6. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

7. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).

8. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

9. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.

10. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.

11. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.

12. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.

13. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.

14. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND

PIPING IN THE FIELD.

15. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.

16. NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.

17. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.

18. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.

19. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.

20. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.

21. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

22. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH

COR.

23. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.

24. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS

ARE NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.

25. INSTALL PIPING FREE OF SAGS AND BENDS.

26. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.

27. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.

28. PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.

A. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.

B. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.

C. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS

GIVEN.

D. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.

29. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING

COORDINATION AT NO ADDITIONAL COST

MECHANICAL GENERAL NOTES

MECHANICAL LEGEND

CO2 CARBON DIOXIDE SENSOR

HUMIDISTAT OR HUMIDITY SENSOR

SUPPLY DIFFUSER

RETURN GRILLE

EXHAUST GRILLE

ROUND FLEX DUCT

EQUIPMENT TAG

LINEAR SLOT DIFFUSER

BALANCING DAMPER

FIRE DAMPER

SMOKE DAMPER

D

R INCLINED RISE, IN

DIRECTION OF AIRFLOW

INCLINED DROP, IN DIRECTION

OF AIRFLOW

CONNECT NEW DUCT

TO EXISTING

LIMIT OF DEMOLITION

VANED ELBOW (PROVIDE ALL

SQUARE OR RECTANGULAR

ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

STANDARD RADIUS ELBOW

(LONG RADIUS)

10x8 NEW DUCT (INSIDE

DIMENSIONS: WIDTH X DEPTH)

EXISTING DUCT TO REMAIN

EXISTING DUCT TO BE

DEMOLISHED

DUCT TRANSITION

END MOUNTED OR SIDEWALL GRILLE

SUPPLY

RETURN45°

45°

DN

DN

UP

UP

DNUP

STANDARD BRANCH SUPPLY OR

RETURN, NO SPLITTER (45° TAP)

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

RETURN DUCT (UP & DOWN)

S-60

S-8

CR-8

CHWS

CHWR

HIGH PRESSURE STEAM

PIPING (60 PSI)

LOW PRESSURE STEAM PIPING

(15 PSI AND BELOW)

LOW PRESSURE STEAM

CONDENSATE RETURN

CHILLED WATER SUPPLY PIPING

CHILLED WATER RETURN PIPING

PIPE UP

PIPE DOWN

BOTTOM CONNECTION

TOP CONNECTION

CAPPED OR PLUGGED PIPE

GLOBE VALVE

GATE VALVE

BALL VALVE

STEAM SAFETY VALVE

PRESSURE REGULATING VALVE

WYE STRAINER VALVE

BALANCING VALVE

MODULATING TWO-WAY CONTROL

VALVE

STEAM TRAP

COND CONDENSATE DRAIN LINE

CR-60 HIGH PRESSURE STEAM

CONDENSATE RETURN

HWS

HWR

HEATING HOT WATER SUPPLY

PIPING

HEATING HOT WATER RETURN PIPING

RLS REFRIGERANT LINE SET (LIQUID

AND SUCTION)

CONNECT TO EXISTING PIPE

LIMIT OF DEMOLITION

INLINE CENTRIFUGAL PUMP

STEAM PRESSURE REDUCING

VALVE

DRAIN VALVE

TEST PLUG

SUPPLY

TERMINAL UNIT SUPPLY

DUCT BRANCH (CONICAL

TAP)

CHECK VALVE

FIRE / SMOKE DAMPER

VANED ELBOW (SHORT RADIUS)

S-30

CR-30

MEDIUM PRESSURE STEAM

PIPING (16 PSI AND 59 PSI)

MEDIUM PRESSURE STEAM

CONDENSATE RETURN

THERMOSTAT OR TEMPERATURE SENSOR

TWO POSITION CONTROL VALVE

DIFFUSER TAG | DIFFUSER CFM

32-CU-4

EG-8 2000

MODULATING THREE-WAY

CONTROL VALVE

T

H

F

SD

FS

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:0

A

M

M-001

MECHANICAL GENERAL INFORMATION

1 10AD

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

DocuSign Envelope ID: B8644306-ADB8-4CEB-AD48-10D682ACDDAF

8/23/2021

S

S

S S

S S

S

SS

S S

S S

S

S

S

S

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S 4 x1

18x10 x4

1x

30x24

1x

16x8 x8 x1

K L L.1 L.2

M M.1 M.4

M.3 N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

6.5

7.3

9.9 x1

P.2

CORRIDOR

H204

OI&T

2S53

CONFERENCE RM

2S56

PAIN REHAB. CENTER

2S56A

P.T. / O.T.

2N58

ELEVATOR

E3

ELEVATOR LOBBY

2S57

OPEN OFFICE

2N59

OPEN OFFICE

2N59

OFFICE

2N60

OFFICE

2N63

HAC

2N64

WHEELCHAIR STORAGE

2N110

OFFICE

2N111

WAITING ROOM

2N112A

EXAM

2N118

EXAM

2S01

TREAT. RM.

2S05

EXAM

2S04

SCI SERVICE REHAB.

CENTER

2N117A

EXAM 1

2S05

STAIRWELL NO. 2

2S02

HAC

2S10

OFFICE

2S11

OFFICE

2S11A

EXAM

2S12B

ELEVATOR

E4

CORRIDOR

H205

RESTROOM

2N114

MEDS

2N113

K L L.1 L.2

M M.1 M.4

M.3 N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

6.5

7.3

9.9

P.2

4" CHS

4" CHR

2" D

4" CHS

4" CHR

2" CHS

2" CHR

2" D

2" CHR

2" CHR

2" CHR

3/4" D

3/4" CHR

2" CHS

EXAM

2S04

TREAT. RM.

2S05

EXAM

2S01

EXAM

2N118

WAITING

2N115WAITING

2N115

EXAM 1

2S05

CORRIDOR

H205

CORRIDOR

H208

OFFICE

2S11

OFFICE

2S11A

HAC

2S10

EXAM

2S12B

CORRIDOR

H204

OI&T

2S53

CONFERENCE RM

2S56

PAIN REHAB. CENTER

2S56A

P.T. / O.T.

2N58

ELEVATOR LOBBY

2S57

ELEVATOR

E3

OPEN OFFICE

2N59

OPEN OFFICE

2N59

OFFICE

2N60

OFFICE

2N63

HAC

2N64

CORRIDOR

H208

WAITING ROOM

2N112A

OFFICE

2N111

WHEELCHAIR STORAGE

2N110

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:1

A

M

MD101

SECOND FLOOR MECHANICAL

DEMOLITION PLAN - PHASE 1

2 10AD

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

Scale: 1/8" = 1'-0"

SECOND FLOOR MECHANICAL DEMOLITION PLAN - PHASE 1

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R T

H0 4 8 16

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN - PHASE 1

1 REMOVE FCU AND ASSOCIATED

VENTILATION DUCT, CHS, CHR, AND DRAIN

AND CAP WHERE INDICATED.

2 REMOVE DUCT SHOWN DASHED AND MAKE

READY FOR NEW CONNECTION.

3 REMOVE CONVECTOR CONTROL VALVE

AND TRAP. MAKE READY FOR

REPLACEMENT AS SHOWN ON MH101.

4 REMOVE INSULATION FROM CHS, CHR, AND

DRAIN PIPING AND MAKE READY FOR NEW

INSULATION. PROTECT SURROUNDINGS

FROM POSSIBLE CONDENSATION DRIPS.

CONSIDER PERFORMING THIS WORK IN

PHASES TO LIMIT EXPOSED UNINSULATED

PIPING.

5 REMOVE FCU AND ASSOCIATED

VENTILATION DUCT, CHS, CHR, AND DRAIN

TO LIMITS OF DEMOLITION AND PREPARE

FOR NEW WORK.

6 WORK IN CORRIDOR H205 FROM ELEVATOR

BACK TO EXAM ROOMS SHALL OCCUR ON

NIGHTS AND WEEKENDS ONLY. ACCESS

SHALL BE MAINTAINED DURING OCCUPIED

HOURS. SEE ARCHITECTURAL PLANS FOR

PHASING AND ICRA BARRIERS.

7 EXISTING TO REMAIN.

8 CONNECT EXISTING UNITS TO NEW

CONDENSATE LINE BEFORE DEMOLISHING.

1. COORDINATE WORKING HOURS ALLOWED WITH

THE VA COR.

2. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL

INCLUDE A BALANCING DAMPER.

3. COORDINATE THERMOSTAT LOCATION WITH

ALL OTHER WALL MOUNTED OBJECTS.

4. COORDINATE FINAL CEILING DIFFUSER

LOCATIONS WITH ALL OTHER CEILING MOUNTED

EQUIPMENT AND/OR DEVICES.

5. ALL CHS/R RUNOUTS TO FAN COIL UNITS SHALL

BE 3/4" UNLESS NOTED OTHERWISE. ALL FAN COIL

UNIT DRAIN PIPING SHALL BE 3/4".

S

S S

S S

S

SS

S S

S S

S

S

S

S

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S

S S

S

S S

K L L.1 L.2

M M.1 M.4

M.3 N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

6.5

7.3

9.9 x1 x4

1x

30x24

1x

16x8 x8

P.2

EXAM 5

2S01

TREAT. RM.

2S05

EXAM

2S04

EXAM 1

2S05

EXAM 6

2N118

EQUIP STORAGE

2N111

TELEHEALTH

2N112

WAITING

2N115

CORRIDOR

H205

OI&T

2S53

CONFERENCE RM

2S56

PAIN REHAB. CENTER

2S56A

P.T. / O.T.

2N58

OPEN OFFICE

2N59

OPEN OFFICE

2N60

OPEN OFFICE

2N60

HAC

2N64

WHEELCHAIR STORAGE

2N110

CORRIDOR

H208

ELEVATOR

E4

ELEVATOR

E3

ELEVATOR LOBBY

2S57

SOILED UTILITY

2S10

OFFICE (PSYCH)

2S11

OFFICE (SW)

2S11A

EXAM

2S12B

RESTROOM

2N114

MEDS

2N113

FAC DATA RM

2S57A

CLOSET

2N59A

RECEPTION

2N59D

S S

S

S S

K L L.1 L.2

M M.1 M.4

M.3 N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

6.5

7.3

9.9

3/4" CHS

3/4" CHR

2" CHR

2" CHR

2" CHS

2" CHR

2" D

4" CHS

4" CHR

2" D

4" CHS

4" CHR

P.2

5 5

OPEN OFFICE

2N60

OPEN OFFICE

2N59

ELEVATOR

E3 ELEVATOR LOBBY

2S57

P.T. / O.T.

2N58

PAIN REHAB. CENTER

2S56A

CONFERENCE RM

2S56

OI&T

2S53

EXAM

2S12B

OFFICE (SW)

2S11A

OFFICE (PSYCH)

2S11

SOILED UTILITY

2S10

CORRIDOR

H205

ELEVATOR

E4

WAITING

2N115

EXAM 6

2N118

EXAM 5

2S01

TREAT. RM.

2S05

EXAM

2S04

EXAM 1

2S05

CORRIDOR

2N116

STAIR 2

S2

CORRIDOR

H208

WHEELCHAIR STORAGE

2N110

HAC

2N64

3 3

3 3

EQUIP STORAGE

2N111

OPEN OFFICE

2N60

TELEHEALTH

2N112

MEDS

2N113

RESTROOM

2N114

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:2

A

M

MD102

SECOND FLOOR MECHANICAL

DEMOLITION PLAN - PHASE 2

3 10AD

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

1 REMOVE FCU AND ASSOCIATED

VENTILATION DUCT, CHS, CHR, AND DRAIN

AND CAP WHERE INDICATED.

2 REMOVE DUCT SHOWN DASHED AND MAKE

READY FOR NEW CONNECTION.

3 REMOVE CONVECTOR CONTROL VALVE

AND TRAP. MAKE READY FOR

REPLACEMENT AS SHOWN ON MH102.

4 REMOVE INSULATION FROM CHS, CHR, AND

DRAIN PIPING AND MAKE READY FOR NEW

INSULATION. PROTECT SURROUNDINGS

FROM POSSIBLE CONDENSATION DRIPS.

CONSIDER PERFORMING THIS WORK IN

PHASES TO LIMIT EXPOSED UNINSULATED

PIPING.

5 REMOVE FCU AND ASSOCIATED

VENTILATION DUCT, CHS, CHR, AND DRAIN

TO LIMITS OF DEMOLITION AND PREPARE

FOR NEW WORK.

6 WORK IN CORRIDOR H205 FROM ELEVATOR

BACK TO EXAM ROOMS SHALL OCCUR ON

NIGHTS AND WEEKENDS ONLY. ACCESS

SHALL BE MAINTAINED DURING OCCUPIED

HOURS. SEE ARCHITECTURAL PLANS FOR

PHASING AND ICRA BARRIERS.

7 EXISTING TO REMAIN.

N O

R T

H0 4 8 16

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR MECHANICAL DEMOLITION PLAN - PHASE 2

Scale: 1/8" = 1'-0"

SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN - PHASE 2

1. COORDINATE WORKING HOURS ALLOWED WITH

THE VA COR.

2. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL

INCLUDE A BALANCING DAMPER.

3. COORDINATE THERMOSTAT LOCATION WITH

ALL OTHER WALL MOUNTED OBJECTS.

4. COORDINATE FINAL CEILING DIFFUSER

LOCATIONS WITH ALL OTHER CEILING MOUNTED

EQUIPMENT AND/OR DEVICES.

5. ALL CHS/R RUNOUTS TO FAN COIL UNITS SHALL

BE 3/4" UNLESS NOTED OTHERWISE. ALL FAN COIL

UNIT DRAIN PIPING SHALL BE 3/4".

S

S S

S S

S

SS

S S

S S

S

S

S

S

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S

S S

S

S S

K L L.1 L.2

M M.1 M.4

M.3 N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

6.5

7.3

9.9 x1 x4

1x

30x24

1x x8

2 2

1 8

P.2

EXAM 2

2S04

EXAM 3

2S03EXAM 4

2S02

SOILED LINEN

2N120

EXAM 5

2S01

STORAGE

2N119

LOGISTICS STORAGE

2N117

EXAM 6

2N118

EXAM 1

2S05

SCALE

2N116A

RESTROOM

2N118A

CORRIDOR

2N116

OFFICE (PSYCH)

2S11

OFFICE (SW)

2S11A

SOILED UTILITY

2S10

EXAM

2S12B

CORRIDOR

H204

OI&T_

2S53

CONFERENCE

2S54CONSULT

2S56

GROUP ROOM

2S58

ELEVATOR

E2

ELEVATOR

E3

OPEN OFFICE

2N60

HAC

2N64

WHEELCHAIR STORAGE

2N110

EQUIP STORAGE

2N111

TELEHEALTH

2N112

MEDS

2N113

RESTROOM

2N114

WAITING

2N115

RECEPTION

2N115A

FAC DATA RM

2S57A

S S

S

S S

K L L.1 L.2

M M.1 M.4

M.3 N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

6.5

7.3

9.9

3/4" CHS

3/4" CHR

2" CHR

2" CHR 2" CHS

2" CHR

2" D

2" D

4" CHS

4" CHR

P.2

OPEN OFFICE

2N60

GROUP ROOM

2S58

CONSULT

2S56

CONFERENCE

2S54

OI&T_

2S53

CORRIDOR

H204

ELEVATOR LOBBY

H209

ELEVATOR

E3

RECEPTION

2N115A

ELEVATOR

E4

WAITING

2N115

STAIR 2

S2

SOILED UTILITY

2S10

OFFICE (PSYCH)

2S11

OFFICE (SW)

2S11A EXAM

2S12B

EXAM 1

2S05

EXAM 2

2S04

EXAM 3

2S03

EXAM 4

2S02

EXAM 5

2S01

CORRIDOR

2N116

RESTROOM

2N118A

EXAM 6

2N118

EQUIP STORAGE

2N111

WHEELCHAIR STORAGE

2N110

TELEHEALTH

2N112

HAC

2N64

3 3

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:3

A

M

MD103

SECOND FLOOR MECHANICAL

DEMOLITION PLAN - PHASE 3

4 10AD

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R T

H0 4 8 16

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR MECHANICAL DEMOLITION PLAN - PHASE 3

Scale: 1/8" = 1'-0"

SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN - PHASE 3

1. COORDINATE WORKING HOURS ALLOWED WITH

THE VA COR.

2. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL

INCLUDE A BALANCING DAMPER.

3. COORDINATE THERMOSTAT LOCATION WITH

ALL OTHER WALL MOUNTED OBJECTS.

4. COORDINATE FINAL CEILING DIFFUSER

LOCATIONS WITH ALL OTHER CEILING MOUNTED

EQUIPMENT AND/OR DEVICES.

5. ALL CHS/R RUNOUTS TO FAN COIL UNITS SHALL

BE 3/4" UNLESS NOTED OTHERWISE. ALL FAN COIL

UNIT DRAIN PIPING SHALL BE 3/4".

1 REMOVE FCU AND ASSOCIATED

VENTILATION DUCT, CHS, CHR, AND DRAIN

AND CAP WHERE INDICATED.

2 REMOVE DUCT BACK TO LIMITS OF

DEMOLITION AND MAKE READY FOR NEW

CONNECTION.

3 REMOVE CONVECTOR CONTROL VALVE

AND TRAP. MAKE READY FOR

REPLACEMENT AS SHOWN ON MH103.

4 REMOVE INSULATION FROM CHS, CHR, AND

DRAIN PIPING AND MAKE READY FOR NEW

INSULATION. PROTECT SURROUNDINGS

FROM POSSIBLE CONDENSATION DRIPS.

CONSIDER PERFORMING THIS WORK IN

PHASES TO LIMIT EXPOSED UNINSULATED

PIPING.

5 REMOVE FCU AND ASSOCIATED

VENTILATION DUCT, CHS, CHR, AND DRAIN

TO LIMITS OF DEMOLITION AND PREPARE

FOR NEW WORK.

6 REMOVE STEAM CONVECTOR, CONTROLS,

AND COVER COMPLETE. REMOVE PIPING

DOWN TO FIRST FLOOR CEILING AND CAP

WHERE PIPING IS SHOWN TO BE

EXTENDED. PREPARE FOR NEW

CONNECTION.

7 EXISTING TO REMAIN.

8 EXISTING UNIT IN OIT ROOM TO REMAIN.

9 RELOCATE DIFFUSER TO NEW GRID AS

SEEN IN MH103.

S

S S

S S

S

SS

S S

S S

S

S

S

S

S S

S

S S

K L L.1 L.2

M M.1 M.4

M.3 N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

6.5

7.3

9.9 x1 x4

1x

16x8 x8 21x10 x2

P.2

14x10

6x8 10x10

8x8

8x8

FCU-2N59S

FCU-2N59B

150SD-1

150SD-1

P.T. / O.T.

2N58

ELEVATOR LOBBY

2S57

ELEVATOR

E3

PAIN REHAB. CENTER

2S56A

CONFERENCE RM

2S56

OI&T

2S53

CORRIDOR

H204

ELEVATOR

E4

STAIRWELL NO. 2

2S02

ELEC. CLOSET

2S9

HAC

2S10

OFFICE

2S11

OFFICE

2S11A

EXAM

2S12B

EXAM

2S01

TREAT. RM.

2S05

EXAM

2S04

EXAM

2N118

WAITING ROOM

2N112A

OFFICE

2N111

WHEELCHAIR STORAGE

2N110

OFFICE

2N60

OFFICE

2N63

HAC

2N64

OPEN OFFICE

2N59

ELEVATOR

E2

180SD-2

180SD-3

180SD-3

EXAM 1

2S05

100EG-1

125RG-1

60RG-1

8x8

255RG-1

100EG-1

MEDS

2N113

RESTROOM

2N114

CORRIDOR

H205

SCI SERVICE REHAB.

CENTER

2N117A

WAITING

2N115

FCU-2N115

52-DH-2S05

60SD-1

55 CFM

30RG-1

8x10

145 CFM

30 CFM

100 CFM

6x8

8x10

8x8 8x8

FAC DATA RM

2S57A

365RG-2

400SG-1

35 CFM

12x8

12x8

6x4

FCU-2S57A

8x8

6ø

8x10

8x8 6x8

8x8

S S

S

S S

K L L.1 L.2

M M.1 M.4

M.3 N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

6.5

7.3

9.9

2" D

2" CHR

2" CHS

2" D

2" CHS

4" CHS

2" D

2" CHR

3/4" CHS

3/4" CHR

2" CHR

P.2

2" CHS

3/4" CHR

3/4" D

3/4" CHR

3/4" CHS

FCU-2N59S

FCU-2N59B

3/4" CHS

3/4" CHR

3/4" D

2" CHR

2" CHR

OPEN OFFICE

2N59

OFFICE

2N60

OFFICE

2N63

ELEVATOR

E3

ELEVATOR LOBBY

2S57

P.T. / O.T.

2N58

PAIN REHAB. CENTER

2S56A

CONFERENCE RM

2S56

CORRIDOR

H204

OI&T

2S53

OFFICE

2S11A

EXAM

2S12B

OFFICE

2S11

HAC

2S10

WAITING

2N115

WAITING ROOM

2N112A

EXAM

2N118

EXAM

2S01

TREAT. RM.

2S05

EXAM

2S04

SCI SERVICE REHAB.

CENTER

2N117A

OFFICE

2N111

EXAM 1

2S05

3/4" CHS

3/4" CHR

52-SC-2N59B

3/4" CR-8

3/4" S-8

52-DH-2S05

MEDS

2N113

ELEVATOR

E4

RESTROOM

2N114

T

T

T

STAIRWELL NO. 2

2S02

ELEC. CLOSET

2S9

FCU-2N115FCU-2N113

TFCU-2S57A

3/4" CHR

3/4" CHS

3/4" D

3/4" D

3/4" CHR3/4" CHS

FAC DATA RM

2S57A

T

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:3

A

M

MH101

SECOND FLOOR MECHANICAL PLAN -

PHASE 1

5 10AD

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R T

H0 4 8 16

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR MECHANICAL PLAN - PHASE 1

Scale: 1/8" = 1'-0"

SECOND FLOOR MECHANICAL PIPING PLAN - PHASE 1

1. COORDINATE WORKING HOURS ALLOWED WITH

THE VA COR.

2. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL

INCLUDE A BALANCING DAMPER.

3. COORDINATE THERMOSTAT LOCATION WITH

ALL OTHER WALL MOUNTED OBJECTS.

4. COORDINATE FINAL CEILING DIFFUSER

LOCATIONS WITH ALL OTHER CEILING MOUNTED

EQUIPMENT AND/OR DEVICES.

5. ALL CHS/R RUNOUTS TO FAN COIL UNITS SHALL

BE 3/4" UNLESS NOTED OTHERWISE. ALL FAN COIL

UNIT DRAIN PIPING SHALL BE 3/4".

1 INSTALL NEW STEAM CONVECTOR

CONNECTED TO EXISTING STEAM PIPING.

SEE DETAIL 1/M-502.

2 INSTALL NEW DUCT AND CAP FOR FUTURE

INSTALLATION.

3 INSTALL NEW DUCT HEATER AND CONNECT

TO NEW STEAM PIPING. SEE DETAIL 8 / M-501

FOR COIL TRIM.

4 EXHAUST WILL BE BALANCED TO 200 CFM IN

PHASE 2.

5 CONNECT RISERS TO STEAM PIPING FEEDING

CONVECTOR BELOW ON FIRST FLOOR.

PENETRATE FLOOR WITHIN THE WALL

CAVITY. EXTEND TO THE COIL CONNECTIONS

AS SHOWN.

6 EXTEND NEW 3/4" CHR, CHS, AND D FROM

EXISTING PIPING TO NEW FCU.

7 WORK IN CORRIDOR H205 FROM ELEVATOR

BACK TO EXAM ROOMS SHALL OCCUR ON

NIGHTS AND WEEKENDS ONLY. ACCESS

SHALL BE MAINTAINED DURING OCCUPIED

HOURS. SEE ARCHITECTURAL PLANS FOR

PHASING AND ICRA BARRIERS.

8 1" DRAIN DOWN TO AIR GAP FITTING WITHIN

WALL AT 18"AFF. PROVIDE A 12"x12" ACCESS

DOOR TO ACCESS AND VIEW AIR GAP FITTING

IN CORRIDOR WALL. CONNECT 1” DRAIN

FROM AIR GAP FITTING TO DRAIN FROM

PLUMBING FIXTURE.

S

S S

S S

S

SS

S S

S S

S

S

S

S

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S

S S

S

S S

K L L.1 L.2

M M.1 M.4

M.3 N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

6.5

7.3

9.9 x1 x4 x2

FCU-2N59B

P.2

8ø

8x4

6x8

10ø 8x8

6ø

FCU-2N111

FCU-2N116

FCU-2S01

FCU-2S11

FCU-2S11A

140SD-2140SD-2

100SD-1

240SD-1

100SD-2

150SD-2

70SD-1

210SD-3

95SD-1

95SD-1

200SD-3

6x46x4

8x8 8x8

6ø 8x8

6x8

6x8

OPEN OFFICE

2N59

P.T. / O.T.

2N58

PAIN REHAB. CENTER

2S56A

CONFERENCE RM

2S56

OI&T

2S53

CORRIDOR

H204

CORRIDOR

H208

CORRIDOR

H208

CORRIDOR

H205

ELEVATOR

E4

EQUIP STORAGE

2N111

WHEELCHAIR STORAGE

2N110

HAC

2N64

WAITING

2N115

EXAM 1

2S05

EXAM

2S04

TREAT. RM.

2S05

EXAM 5

2S01

EXAM 6

2N118

RESTROOM

2N118A

SOILED UTILITY

2S10

OFFICE (PSYCH)

2S11

OFFICE (SW)

2S11A

EXAM

2S12B

OPEN OFFICE

2N60

ELEVATOR LOBBY

2S57

ELEVATOR

E3

10x10

8ø

150RG-1

180RG-1

110EG-1

50RG-1

50RG-1

50RG-1

160RG-1

8x8

FCU-2N112

65SD-1

150SD-1

STORAGE

2N119

CORRIDOR

2N116

TELEHEALTH

2N112

MEDS

2N113

RESTROOM

2N114

LOGISTICS STORAGE

2N117

52-DH-2S01

52-DH-2N118

8ø 8ø

8x6

50 CFM

30RG-1

100 CFM

150 CFM

190RG-1

50 CFM

170 CFM

20 CFM

45 CFM

8x8

175SD-1

FCU-2N118

6x6

8x8

FCU-2N117

52-DH-2N117

10x10

STAIR 2

S2

25 CFM

S S

S

S S

K L L.1 L.2

M M.1 M.4

M.3 N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

6.5

7.3

9.9

2" D

2" CHS

4" CHS

2" D

2" CHR

3/4" CHS

3/4" CHR

3/4" CHS

3/4" CHR

3/4" D

P.2

FCU-2N59B

FCU-2N111

FCU-2S11 FCU-2S11A

FCU-2N116

FCU-2S01

EXAM 6

2N118

CORRIDOR

2N116

EXAM 5

2S01

TREAT. RM.

2S05

EXAM

2S04

EXAM 1

2S05

WAITING

2N115

EQUIP STORAGE

2N111

TELEHEALTH

2N112

ELEVATOR

E3

ELEVATOR LOBBY

2S57

CORRIDOR

H208

CORRIDOR

H208

CORRIDOR

H204

OI&T

2S53

CONFERENCE RM

2S56

PAIN REHAB. CENTER

2S56A

P.T. / O.T.

2N58

OFFICE (PSYCH)

2S11

OFFICE (SW)

2S11A

SOILED UTILITY

2S10

ELEVATOR

E4

RESTROOM

2N118A

OPEN OFFICE

2N59

OPEN OFFICE

2N60

HAC

2N64

WHEELCHAIR STORAGE

2N110

2" CHR

3/4" CHS

3/4" CHR

3/4" D

3/4" CHS

3/4" CHR

3/4" D

3/4" CHR

3/4" CHS

3/4" D

3/4" CHS

3/4" CHR

3/4" CHS

3/4" CHR

3/4" D

3/4" D

3/4" CHR

3/4" CHS

3/4" CHS

3/4" CHR

3/4" D

52-SC-2N59A

STORAGE

2N119

RESTROOM

2N114

MEDS

2N113

52-SC-2N111 52-SC-2N112

52-SC-2N115

1 1

1 1

52-SC-2S11 52-SC-2S11A

52-DH-2N118

52-DH-2S01

3/4" S-8

3/4" CR-8

FCU-2N112

3/4" D

3/4" CHS

3/4" CHR

T

T T

T

T

T

T

T T

52-DH-2N117

FCU-2N117

FCU-2N118

1" CR-8

1" S-8

3/4" S-8

3/4" CR-8

T

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:5

A

M

MH102

SECOND FLOOR MECHANICAL PLAN -

PHASE 2

6 10AD

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R T

H0 4 8 16

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR MECHANICAL PLAN - PHASE 2

Scale: 1/8" = 1'-0"

SECOND FLOOR MECHANICAL PIPING PLAN - PHASE 2

1. COORDINATE WORKING HOURS ALLOWED WITH

THE VA COR.

2. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL

INCLUDE A BALANCING DAMPER.

3. COORDINATE THERMOSTAT LOCATION WITH

ALL OTHER WALL MOUNTED OBJECTS.

4. COORDINATE FINAL CEILING DIFFUSER

LOCATIONS WITH ALL OTHER CEILING MOUNTED

EQUIPMENT AND/OR DEVICES.

5. ALL CHS/R RUNOUTS TO FAN COIL UNITS SHALL

BE 3/4" UNLESS NOTED OTHERWISE. ALL FAN COIL

UNIT DRAIN PIPING SHALL BE 3/4".

1 INSTALL NEW STEAM CONVECTOR

CONNECTED TO EXISTING STEAM PIPING.

SEE DETAIL 1/M-502.

2 INSTALL NEW DUCT HEATER AND CONNECT

TO NEW STEAM PIPING. SEE DETAIL 8/ M-501

FOR COIL TRIM.

3 EXTEND 3/4" CHR, CHS, AND D FROM

EXISTING PIPING TO NEW FCU.

4 BALANCE EXHAUST AIR TO 200 CFM.

5 CONNECT RISERS TO STEAM PIPING FEEDING

CONVECTOR BELOW ON FIRST FLOOR.

PENETRATE FLOOR WITHIN THE WALL

CAVITY. EXTEND TO THE COIL CONNECTIONS

AS SHOWN.

6 BALANCE EXHAUST AIR TO 30 CFM.

7 INSTALL NEW DUCT AND CAP FOR FUTURE

INSTALLATION.

8 WORK IN CORRIDOR H205 FROM ELEVATOR

BACK TO EXAM ROOMS SHALL OCCUR ON

NIGHTS AND WEEKENDS ONLY. ACCESS

SHALL BE MAINTAINED DURING OCCUPIED

HOURS. SEE ARCHITECTURAL PLANS FOR

PHASING AND ICRA BARRIERS.

9 CONNECT 3/4" CONDENSATE DRAIN TO NEW

FCU.

S

S S

S S

S

SS

S S

S S

S

S

S

S

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S

S S

S

S S

K L L.1 L.2

M M.1 M.4

M.3 N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

6.5

7.3

9.9

EXAM 5

2S01

EXAM 4

2S02

EXAM 3

2S03

EXAM 2

2S04

CORRIDOR

2N116

RESTROOM

2N118A

EXAM 6

2N118

WAITING

2N115

TELEHEALTH

2N112EQUIP STORAGE

2N111

ELEVATOR

E3

ELEVATOR LOBBY

H209

GROUP ROOM

2S58

CONSULT

2S56

CONFERENCE

2S54

OI&T_

2S53

CORRIDOR

H204

SOILED UTILITY

2S10

OFFICE (PSYCH)

2S11

OFFICE (SW)

2S11A

STAIR 2

S2

ELEVATOR

E4

CORRIDOR

H208

ELEVATOR

E2 x1 x4 x2

EXAM 1

2S05

P.2

160SD-2 160SD-2

150SD-2

190SD-3

190SD-3

440SD-1

FCU-H204

FCU-2S56

FCU-2S56A

100SD-1

FCU-2N58

FCU-2S02

140SD-2

FCU-2S03

FCU-2S04

200SD-3

95EG-1

8x8

6x8

6x4

6x4

6x6

8x8

6ø 8x6

8ø

6ø

OPEN OFFICE

2N60 8ø

150SD-2

440RG-1

230RG-1

175RG-1

225RG-1

8x8

MEDS

2N113

RESTROOM

2N114

LOGISTICS STORAGE

2N117

SOILED LINEN

2N120

SCALE

2N116A

STORAGE

2N119

52-DH-2S02

52-DH-2S03 52-DH-2S04

150RG-1

50 CFM

95RG-1

100RG-1

RECEPTION

2N115A

ELEVATOR LOBBY

H205

45 CFM

50 CFM

75 CFM

150 CFM

8x8

95 CFM

55EG-2

10x10

8x8

200SD-1

S S

S

S S

K L L.1 L.2

M M.1 M.4

M.3 N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

6.5

7.3

9.9

OPEN OFFICE

2N60

TELEHEALTH

2N112

ELEVATOR

E4

CORRIDOR

H208

ELEVATOR LOBBY

H209

ELEVATOR

E3

GROUP ROOM

2S58

CONFERENCE

2S54

CONSULT

2S56

OI&T_

2S53

CORRIDOR

H204

ELEVATOR

E2

OFFICE (SW)

2S11A

OFFICE (PSYCH)

2S11

SOILED UTILITY

2S10

WAITING

2N115

STAIR 2

S2

ELECT. CLOSET

H208A

CHASE_

H208B

EQUIP STORAGE

2N111

EXAM 5

2S01

EXAM 4

2S02

EXAM 3

2S03

EXAM 2

2S04

CORRIDOR

2N116

RESTROOM

2N118A

2" D

2" CHR

2" CHS

2" D

2" CHS

4" CHS

2" D

2" CHR

3/4" CHS

3/4" CHR

3/4" CHS

3/4" CHR

3/4" D

2" CHR

EXAM 1

2S05

P.2

3/4" CHR

2" CHS

3/4" CHS

3/4" CHR

3/4" D3/4" CHR

3/4" CHS

3/4" D

3/4" CHR

3/4" CHS

3/4" D

2" CHR

FCU-2N58

FCU-2S56A

FCU-2S56

FCU-H204

FCU-2S03 FCU-2S04FCU-2S02

EXAM

2S12B

SOILED LINEN

2N120STORAGE

2N119

LOGISTICS STORAGE

2N117

RECEPTION

2N115A

3/4" S-8

3/4" CR-8

52-SC-2N58B

52-SC-2N58A

52-SC-2N58C

52-SC-2S56A 52-SC-2S56

52-DH-2S02

52-DH-2S03

52-DH-2S04

1 1

3/4" S-8

3/4" CR-8

3/4" S-8

3/4" CR-8

3/4" D

3/4" CHR

3/4" CHS

3/4" D

3/4" CHR

3/4" CHS

3/4" CHR

3/4" CHS

3/4" D

T T

T

TTT

T

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:0

A

M

MH103

SECOND FLOOR MECHANICAL PLAN -

PHASE 3

7 10AD

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

1 INSTALL NEW STEAM CONVECTOR

CONNECTED TO EXISTING STEAM PIPING.

SEE DETAIL 1/M-502.

2 INSTALL NEW DUCT HEATER AND CONNECT

TO NEW STEAM PIPING. SEE DETAIL 8/ M-501

FOR COIL TRIM.

3 CONNECT RISERS TO STEAM PIPING FEEDING

CONVECTOR BELOW ON FIRST FLOOR.

PENETRATE FLOOR WITHIN THE WALL

CAVITY. EXTEND TO THE COIL CONNECTIONS

AS SHOWN.

N O

R T

H0 4 8 16

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR MECHANICAL PLAN - PHASE 3

Scale: 1/8" = 1'-0"

SECOND FLOOR MECHANICAL PIPING PLAN - PHASE 3

1. COORDINATE WORKING HOURS ALLOWED WITH

THE VA COR.

2. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL

INCLUDE A BALANCING DAMPER.

3. COORDINATE THERMOSTAT LOCATION WITH

ALL OTHER WALL MOUNTED OBJECTS.

4. COORDINATE FINAL CEILING DIFFUSER

LOCATIONS WITH ALL OTHER CEILING MOUNTED

EQUIPMENT AND/OR DEVICES.

5. ALL CHS/R RUNOUTS TO FAN COIL UNITS SHALL

BE 3/4" UNLESS NOTED OTHERWISE. ALL FAN COIL

UNIT DRAIN PIPING SHALL BE 3/4".

NOTES:

1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.

2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE

REGARDLESS OF W DIMENSION.

3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1-1/2" MAXIMUM SPACE BETWEEN

VANES AND A 3/4" TRAILING EDGE.

4. WHEN W EQUAL W2 AND W1 IS GREATER THAN 20" VANES SHALL BE DOUBLE VANE TYPE.

W1

W

NOTES:

1. THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.

2. ALL STANDARD ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS

ELBOWS. ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE

CONSTRUCTED , SUPPORTED AND FASTENED AS RECOMMENDED BY

SMACNA.

STANDARD RADIUS OR

LONG RADIUS ELBOW

SHORT RADIUS ELBOW

WITH ONE VANE

SHORT RADIUS ELBOW

WITH TWO VANES

R

SHALL

EQUAL OR

BE

GREATER

THAN 1/6 W

R

SHALL

EQUAL OR

BE

GREATER

THAN 1/3 W

R

SHALL

EQUAL OR

BE

GREATER

THAN W

R

W

W

2/3W

R

/3

W

/3

W

1/2W

VAN

E

VAN

E R

W

1/6W

NOM. SIZE (IN.)

PIPE (FT.)

TUBING (FT.)

5 FT

THRU 3/4

1 1 1/4

1 1/2

HANGER ROD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR

LOW TEMPERATURE

PIPE)

PROVIDE HIGH

COMPRESSIVE

STRENGHT

INSULATION (9 PSF

MIN. DENSITY) UNDER

INSULATION SHIELD

INSULATION SHIELD AT

HANGER

WELD

SADDLE

ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE

SPECIFICATIONS

ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE

SPECIFICATIONS

1/2" DIA. HANGER RODS

WITH 36" MAX. SPACING

ON EACH CHANNEL

BAND

1-5/8" 12 GAUGE CHANNEL

OR 2" x 2" x 1/4" ANGLE

NOTES:

SEE SPECIFICATIONS FOR DETAILED

HANGER REQUIREMENTS.

SIDE VIEW TRAPEZE HANGER

FOR UP TO 1000 LB. UNIFORM

LOAD

1" MAX.

PROVIDE INSULATION SHIELD &

INSERT FOR ALL PIPING (8" MIN.)

2 2 1/2 3 4 5 6 8 10 12

11 12 14 16 17 19 22 23

9 10 12 13 14 16 - -

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE

MAXIMUM PIPE/TUBING SUPPORT SPACING

MAIN SUPPLY

DUCT

PROVIDE VOLUME

DAMPER

PROVIDE VOLUME DAMPER

ON BRANCHES (TYP)

1/4 W OR

4" MIN.

SUPPLY REGISTER OR

BRANCH DUCT

MAIN

SUPPLY

DUCT

SEE FLOOR PLAN FOR

SPLIT DIMENSION

TURNING VANES

AIR FLOW

AIR FLOW

A

IR

F L O

W

AIR SPLIT DUCT TAKE-

OFF PLAN VIEW

BRANCH DUCT TAKE-OFF

PLAN VIEW

AIR FLOW

A

IR

F

LO

W

W

MAIN SUPPLY

DUCT

CONICAL TAP

TERMINAL UNIT DUCT TAKE-

OFF PLAN VIEW

AIR FLOW

A

IR

F

LO

W

W

SEE SPECIFICATIONS FOR CLAMPS

AND SEALANT (TYP.)

SUPPORT SADDLE

FROM STRUCTURE

FLEXIBLE DUCT SIZE

SAME AS DIFFUSER

INLET: 5'-0" MAX

LENGTH

USE RIGID ELBOWS

FOR CHANGE OF

DIRECTION GREATER

THAN 45°

TYPICAL DIFFUSER

OR REGISTER IN

LAY-IN CLG.

THERMAL INSULATION

SEE SPECIFICATIONS

CONICAL OUTLET

BRANCH DUCT

12"

SHEET METAL SADDLE

VOLUME DAMPER WITH

LOCKING QUAD

CEILING

NOTE:

THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR

THE DEDICATED AHU SERVING THE SURGICAL SUITE

FAN COIL

UNIT

FLEXIBLE CONNECTION

DISCHARGE PLENUM

OR DUCT

VOLUME DAMPER

TYPICAL

FLEXIBLE DUCT

SUPPLY DIFFUSER

DUCT TRANSITION FROM

FCU OUTLET

CEILING

FILTER RETURN

GRILLE WITH MERV ll FILTER

VIBRATION ISOLATOR

HANGERS

OA VENTILATION

DUCT SEE PLANS

FOR CONTINUATION

FLEXIBLE CONNECTION

(TYPICAL)

HANGERS UP

AND SECURE TO

STRUCTURE

PLENUM

SEE PLANS FOR

FOR DUCT SIZE

RETURN

SUPPLY

COIL

3/4" DRAIN WITH

HOSE END AND CAP

DRAIN VALVE AT LOW POINT STRAINER WITH BLOW-DOWN

VALVE, HOSE END AND CAP

ISOLATION VALVE (TYP.)

SEE DRAWINGS

FOR SIZE

UNION (TYP.)

MANUAL AIR VENT

AT HIGH POINT

FIRE-RATED HOSE OR

FLEX PIPE CONNECTION

KIT (TYP.)

AUTOMATIC FLOW

CONTROL VALVE

TEMPERATURE CONTROL VALVE

PRESSURE AND TEMPERATURE PLUG (TYP.)

NOTES:

1. PIPE COILS TO ALLOW COIL PULL BY

REMOVING UNIONS ADJACENT TO COIL.

2. THIS DETAIL APPLIES TO ALL EQUIPMENT

COIL CONNECTIONS, EXCEPT AIR

HANDLING UNITS, INCLUDING FAN COIL

UNITS, TERMINAL UNITS, ETC. THAT ARE

DESIGNATED FOR TWO-WAY CONTROL.

3. REFER TO SPECIFICATIONS FOR OPTIONS

INVOLVING ACCESSORY COMBINATION.

NOTES:

1. WHEN COIL IS INCLUDED IN CASING MOUNTED ON

VIBRATION ISOLATOR UNITS, THE RUNOUT PIPING

FOR CONNECTIONS TO COIL SHALL BE INSTALLED

WITH SWING JOINTS TO ALLOW FOR THE

VIBRATION.

2. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT

IT WILL NOT BLOCK THE SWING OR USE OF

ACCESS DOORS OR PANELS; NEITHER SHALL IT

BLOCK THE SERVICING OF FILTERS, VALVES, OR

EQUIPMENT.

3. TRAP EACH COIL SEPARATELY WHEN INSTALLED IN

A BANK OF TWO OR MORE HIGH. ALSO PROVIDE A

SEPARATE VACUUM BREAKER FOR EACH COIL.

4. SUPPLY & RETURN PIPES ARE SHOWN FROM SAME

END. REHEAT COIL MAY HAVE SUPPLY & RETURN

PIPES FROM OPPOSITE ENDS.

M

IN

M

IN SCALE POCKET

FULL SIZE

TAPPING

PITCH COIL DOWN

1/4" PER FOOT TO

CONDENSATE

OUTLET

PIPE HANGER SHALL SUPPORT

PIPPING INDEPENDENT OF COIL

(TYP.)

PRESSURE

GAUGE

INCREASER, IF

REQUIRED

DECREASER, IF

REQUIRED

1/2" CHECK VALVE

VACUUM

BREAKER

STEAM SUPPLY

STEAM C

ONDENSATE

RETURN

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:0

A

M

M-501

MECHANICAL DETAILS

8 10AD

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

Scale: No Scale

DUCTWORK SQUARE VANE ELBOWS

Scale: No Scale

DUCTWORK RADIUS ELBOW

Scale: No Scale

PIPE HANGER

Scale: No Scale

DUCT BRANCH TAKE-OFFS

Scale: No Scale

FLEX AIR DUCT CONNECTOR DETAIL

Scale: No Scale

FAN COIL UNIT SECTION

Scale: No Scale

TWO WAY COIL PIPING DETAIL

Scale: No Scale

STEAM COIL - PIPING CONNECTIONS

CHR

CHS

HS

SST

PC

T

V-1

RA

FILTER

COOLING COIL

FAN

SA

T-1

ROOM TEMPERATURE SENSOR, WALL MOUNTED 48" AFF.

NEW STEAM

CONVECTOR

NEW TRAP

T

V-2

FINISHED FLOOR

T

SEQUENCE OF OPERATION OCCUPIED CYCLE - 6:00 AM TO 5:00 PM (M-F)

DURING OCCUPIED CYCLE

1. FAN SHALL OPERATE CONTINUOUSLY.

2. ON CALL FOR COOLING, V-2 SHALL BE CLOSED AND VALVE V-1

SHALL MODULATE TO MAINTAIN SETPOINT OF 75° F (ADJ)

3. ON CALL FOR HEATING, VALVE V-1 SHALL BE CLOSED AND STEAM

VALVE V-2 SHALL CYCLE OPEN TO MAINTAIN SETPOINT OF 70° F

(ADJ).

4. ALARM BAS IF ROOM TEMPERATURE IS 5 DEGREES F OR MORE

FROM SETPOINT.

5. INCLUDE ROOM TEMPERATURE AND HUMIDITY MONITORING.

SEQUENCE OF OPERATION UNOCCUPIED CYCLE

1. ON CALL FOR COOLING FAN COIL UNIT SHALL OPERATE AND VALVE

V-1 SHALL MODULATE TO MAINTAIN ROOM TEMPERATURE SETBACK

TEMPERATURE OF 78° F (ADJ). WHEN SETPOINT IS SATISFIED FAN

COIL UNIT SHALL STOP AND VALVE V-1 SHALL CLOSE.

2. ON CALL FOR HEATING, FAN COIL UNIT SHALL REMAIN OFF AND

VALVE V-1 SHALL BE CLOSED. STEAM RADIATOR VALVE V-2 SHALL

CYCLE TO MAINTAIN ROOM TEMPERATURE SETBACK SETPOINT OF

68° F (ADJ). WHEN SETPOINT IS SATISFIED VALVE V-2 SHALL CLOSE.

POINT NAME:

ROOM TEMPERATURE

ROOM TEMPERATURE SETPOINT

DISCHARGE AIR TEMPERATURE

FAN STATUS

FAN ON/OFF

COOLING COIL CONTROL VALVE

ROOM HUMIDITY

ROOM HUMIDITY SETPOINT

HIGH DISCHARGE AIR TEMPERATURE

HARDWARE POINTS

AI AO

X

X

X

BI BO

SOFTWARE POINTS

AV BV SCHED TREND ALARM

SHOW ON

GRAPHIC

X

X

X

X

X

X

X

X

X

X

X

LOW DISCHARGE AIR TEMPERATURE X

NOTES

X

X

X

X

X

X

X X X X

X

X

X

X

X

7 1 1 2 1 6 3 11

TOTAL HARDWARE (11) TOTAL SOFTWARE (10)

STEAM VALVE X X

CHR

CHS

HS

SST

PC

V-1

RA

FILTER

COOLING COIL

FAN

SA

T

DUCT HEATER

LPS LPR

V-2

T T-1

ROOM TEMPERATURE SENSOR, WALL MOUNTED 48" AFF.

SEQUENCE OF OPERATION OCCUPIED CYCLE - 6:00 AM TO 5:00 PM (M-F)

DURING OCCUPIED CYCLE

1. FAN SHALL OPERATE CONTINUOUSLY.

2. ON CALL FOR COOLING, V-2 SHALL BE CLOSED AND VALVE V-1

SHALL MODULATE TO MAINTAIN SETPOINT OF 75° F (ADJ)

3. ON CALL FOR HEATING, VALVE V-1 SHALL BE CLOSED AND STEAM

VALVE V-2 SHALL MODULATE TO MAINTAIN SETPOINT OF 70°F (ADJ.)

4. ALARM BAS IF ROOM TEMPERATURE IS 5 DEGREES F OR MORE

FROM SETPOINT.

SEQUENCE OF OPERATION UNOCCUPIED CYCLE

1. ON CALL FOR COOLING FAN COIL UNIT SHALL OPERATE AND VALVE

V-1 SHALL MODULATE TO MAINTAIN ROOM TEMPERATURE SETBACK

TEMPERATURE OF 78° F (ADJ). WHEN SETPOINT IS SATISFIED FAN

COIL UNIT SHALL STOP AND VALVE V-1 SHALL CLOSE.

2. ON CALL FOR HEATING, FAN COIL UNIT SHALL REMAIN OFF AND

VALVE V-1 SHALL BE CLOSED. STEAM VALVE V-2 SHALL MODULATE

TO MAINTAIN ROOM TEMPERATURE SETBACK SETPOINT OF 68° F

(ADJ). WHEN SETPOINT IS SATISFIED VALVE V-2 SHALL CLOSE.

POINT NAME:

ROOM TEMPERATURE

ROOM TEMPERATURE SETPOINT

DISCHARGE AIR TEMPERATURE

FAN STATUS

FAN ON/OFF

COOLING COIL CONTROL VALVE

ROOM HUMIDITY

ROOM HUMIDITY SETPOINT

HIGH DISCHARGE AIR TEMPERATURE

HARDWARE POINTS

AI AO

X

X

X

BI BO

SOFTWARE POINTS

AV BV SCHED TREND ALARM

SHOW ON

GRAPHIC

X

X

X

X

X

X

X

X

X

X

X

LOW DISCHARGE AIR TEMPERATURE X

NOTES

X

X

X

X

X

X

X X X X

X

X

X

X

X

7 2 1 1 1 6 3 11

TOTAL HARDWARE (11) TOTAL SOFTWARE (10)

STEAM VALVE X X

CHR

CHS

HS

SST

PC

T

V-1

RA

FILTER

COOLING COIL

FAN

SA

T-1

ROOM TEMPERATURE SENSOR, WALL MOUNTED 48" AFF.

T

POINT NAME:

ROOM TEMPERATURE

ROOM TEMPERATURE SETPOINT

DISCHARGE AIR TEMPERATURE

FAN STATUS

FAN ON/OFF

COOLING COIL CONTROL VALVE

HIGH DISCHARGE AIR TEMPERATURE

HARDWARE POINTS

AI AO

X

X

X

BI BO

SOFTWARE POINTS

AV BV SCHED TREND ALARM

SHOW ON

GRAPHIC

X

X

X

X

X

X

X

X

X

X

LOW DISCHARGE AIR TEMPERATURE X

NOTES

X

X

X

X

X X X X

X

X

5 1 1 1 1 5 3 8

TOTAL HARDWARE (8) TOTAL SOFTWARE (9)

X

SEQUENCE OF OPERATION OCCUPIED CYCLE - 6:00 AM TO 5:00 PM (M-F)

DURING OCCUPIED CYCLE

1. FAN SHALL OPERATE CONTINUOUSLY.

2. ON CALL FOR COOLING, VALVE V-1 SHALL MODULATE TO MAINTAIN

SETPOINT OF 75° F (ADJ)

3. ALARM BAS IF ROOM TEMPERATURE IS 5 DEGREES F OR MORE

FROM SETPOINT.

SEQUENCE OF OPERATION UNOCCUPIED CYCLE

1. ON CALL FOR COOLING FAN COIL UNIT SHALL OPERATE AND VALVE

V-1 SHALL MODULATE TO MAINTAIN ROOM TEMPERATURE SETBACK

TEMPERATURE OF 78° F (ADJ). WHEN SETPOINT IS SATISFIED FAN

COIL UNIT SHALL STOP AND VALVE V-1 SHALL CLOSE.

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:0

A

M

M-502

MECHANICAL CONTROLS

9 10AD

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

Scale: No Scale

FAN COIL UNIT CONTROLS SCHEMATIC - WITH CONVECTION

Scale: No Scale

FAN COIL UNIT SEQUENCE OF OPERATION

Scale: No Scale

FAN COIL UNIT POINTS LIST

Scale: No Scale

FAN COIL UNIT CONTROLS SCHEMATIC - WITH STEAM COIL

Scale: No Scale

FAN COIL UNIT SEQUENCE OF OPERATION - WITH STEAM COIL

Scale: No Scale

FAN COIL UNIT POINTS LIST - WITH STEAM COIL

Scale: No Scale

FAN COIL UNIT CONTROLS SCHEMATIC - COOLING ONLY

Scale: No Scale

FAN COIL UNIT POINTS LIST - COOLING ONLY

Scale: No Scale

FAN COIL UNIT SEQUENCE OF OPERATION - COOLING ONLY

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:0

A

M

M-601

MECHANICAL SCHEDULES

10 10AD

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

NOTES:

1. AUTOMATIC FAN SPEED CONTROL WITH OVERRIDE SELECTOR. ADJUST FAN SPEED TO DELIVER THE COOLING SUPPLY AIRFLOW QUANTITY SHOWN ON THE PLAN DRAWING.

2. PROVIDE 120V TO 24V TRANSFORMER, TWO WAY CONTROL VALVE FOR CHILLED WATER, BACNET COMPATIBLE CONTROLLER.

FCU SCHEDULE

+ LOCATION TYPE

FAN AIR FLOW

EXTERNAL

APD COOLING REQUIREMENTS FAN MOTOR

REMARKSCFM IN WG

MIN SENS

CAPACITY

MIN TOTAL

CAPACITY Db Wb FLOW EWT WPD POWER

PHASE VOLT

SPEED

CONTROLMBTUH MBTUH °F °F GPM °F FT HP

FCU-2N58 GROUP ROOM 2N58 HORIZONTAL

RECESSED

380 0.4 7.8 9.6 75 62 2.9 48 12.6 .15 1 115 ECM MOTOR 1, 2

FCU-2N59B EXAM ROOM 2N59B HORIZONTAL

RECESSED

282 0.4 5.7 7.1 75 63 1.6 48 12.8 .12 1 115 ECM MOTOR 1, 2

FCU-2N59B OPEN OFFICE 2N59

NORTH

HORIZONTAL

RECESSED

280 0.4 5.7 7.1 75 63 1.6 48 12.8 .12 1 115 ECM MOTOR 1, 2

FCU-2N59S OPEN OFFICE 2N59

SOUTH

HORIZONTAL

RECESSED

360 0.4 7.8 9.2 75 63 2.9 48 12.6 .15 1 115 ECM MOTOR 1, 2

FCU-2N111 EQUIP STORAGE 2N111 HORIZONTAL

RECESSED

300 0.4 5.3 7.0 75 61 1.6 48 12.8 .12 1 115 ECM MOTOR 1, 2

FCU-2N112 TELEHEALTH 2N112 HORIZONTAL

RECESSED

100 0.4 1.8 3.0 75 60 1.6 48 10.8 .11 1 115 ECM MOTOR 1, 2

FCU-2N113 MEDS 2N113 HORIZONTAL

RECESSED

100 0.4 1.8 3.0 75 60 1.4 48 10.8 .11 1 115 ECM MOTOR 1, 2

FCU-2N115 WAITING 2N115 HORIZONTAL

RECESSED

485 0.4 8.1 10.2 75 63 3.3 48 14.2 .22 1 115 ECM MOTOR 1, 2

FCU-2N116 EXAM ROOM 2N116 HORIZONTAL

RECESSED

203 0.4 3.4 5.2 75 62 1.4 48 10.8 .11 1 115 ECM MOTOR 1, 2

FCU-2N117 LOGISTICS STORAGE

2…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .