About this file

This pre-solicitation notice provides details for a competitive total set-aside solicitation for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to renovate the second floor center of Building 52 at the Jefferson Barracks Division VA Medical Center in St. Louis, Missouri. The project involves renovating approximately 7,200 square feet of former procedure rooms and administrative offices to improve services provided to Spinal Cord Injury Veterans. The project cost range is $2-5 million. The NAICS code is 236220 for general construction with a small business size standard of $39.5 million. The prime contractor must perform at least 15% of general construction labor. The solicitation will be posted to beta.SAM.gov on or about October 15, 2021. A site visit will be scheduled and attendance is encouraged. Questions regarding the solicitation should be emailed to the point of contact listed.

View the file

Other files

File Type Posted
Scan_2021_11_02_14_28_13_296.pdf PDF
36C25522R0002 0001.docx DOCX document
36C25522R0002_1.docx DOCX document
3 Abate BD.pdf PDF
P09_S02 -20-028 Specifications 657-20-102JB (1448 pages) final.pdf PDF
2 Struct BD.pdf PDF
9 Elec BD.pdf PDF
4 Arch BD.pdf PDF
5 IntD BD.pdf PDF
8 Mech BD.pdf PDF
Past Performance Questionnaire 36C25522R0002 (Project 657-20-102JB).pdf PDF
1 Gen BD.pdf PDF
6 FP BD.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLUMBING GENERAL NOTES

PLUMBING DEMOLITION GENERAL NOTES

1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE

PROCEEDING WITH WORK.

2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF

THIS WORK.

3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND

ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.

5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND

APPROVAL.

7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES

DAMAGED AT NO ADDITIONAL COST.

8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW

PLUMBING AND WORK OF OTHER TRADES.

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA

STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE

GRADE FOR THE PURPOSES INTENDED.

5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY

AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR

EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

7. AT EACH PLUMBING FIXTURE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO

MANUFACTURER'S RECOMMENDATIONS.

8. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE. SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED

OTHERWISE.

9. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH

SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.

10. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF

WALLS AND FLOORS.

11. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND

APPLICABLE VA STANDARDS.

12. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.

13. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL

CODES AND APPLICABLE VA STANDARDS.

14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.

15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING

OF PIPING WITH EXISTING CONDITIONS.

16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND

ARRANGEMENT OF PIPING SYSTEMS.

17. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE COR 1 WEEK IN

ADVANCE.

18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS

CONTRACT, UNLESS NOTED OTHERWISE.

19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF

PROJECT.

20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

21. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.

ANNOTATION ABBREVIATIONS

PLUMBING SYMBOLS & ABBREVIATIONS

3-WAY CONTROL VALVE

ANGLE GATE VALVE

ANGLE GLOBE VALVE

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

CONTROL VALVE

GATE VALVE

GLOBE VALVE

SAFETY RELIEF VALVE

TWO POSITION CONTROL VALVE

BACKFLOW PREVENTER

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLOW ARROW

HOSE BIBB / SILLCOCK

PLUG VALVE

PLUMBING SYMBOLS

PRESSURE REDUCING VALVE (WATER)

PRESSURE REGULATOR (GAS)

PIPE ANCHOR

PIPE GUIDES

WALL CLEANOUT

SUSPENDED CLEANOUT

WCO

WYE STRAINER

WYE STRAINER W/DRAIN VALVE

FLOOR DRAIN - ROUND OR SQUARE

FLOOR CLEANOUT - ROUND OR SQUARE

PIPE CAP

PIPE TURNING DOWN

PIPE TURNING UP

TEE UP

TEE DOWN

DROP AND RUN

DROP AND TURN

TEE OFF TOP

TEE OFF BOTTOM

CROSS AND RISER

PLAN 90° ELBOW

PIPE TEE

PIPE UNION

FLEXIBLE PIPE CONNECTOR

WATER METER

PUMP

AUTOMATIC AIR VENT

PRESSURE SWITCH

PRESSURE GAUGE

THERMOMETER

FLOW SWITCH

TEMPERATURE SWITCH

OR

OR

CO

PIPE SLOPE ARROW

AV

F

P

T

M

A/E ARCHITECT/ENGINEER

AC ABOVE CEILING

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

AFG ABOVE FINISHED GRADE

ASD ADJUSTABLE SPEED DRIVE

ASHRAE AMERICAN SOCIETY HEATING,

REFRIGERATING, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

BAS BUILDING AUTOMATION SYSTEM

BF BELOW FLOOR

BFP BACKFLOW PREVENTER

BG BELOW GRADE

BH BOOSTER HEATER

BHP BREAK HORSEPOWER

BJ BETWEEN JOISTS

BOP BOTTOM OF PIPE

BSP BLACK STEEL PIPE

BT BATHTUB

BTUH BRITISH THERMAL UNITS PER HOUR

C CELSIUS

CF COMBINATION FIXTURE

CGA COMPRESSED GAS ASSOCIATION

CI CAST IRON

CO CLEANOUT

COND CONDENSATE

CP CONDENSATE PUMP

CS CLINICAL SINK

CV CONTROL VALVE

DA DENTAL COMPRESSED AIR

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DF DRINKING FOUNTAIN

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DV DENTAL VACUUM

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

EC ELECTRICAL CONTRACTOR

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL

SYSTEM

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWS EYEWASH STATION

EX EXISTING

F FAHRENHEIT

FA FROM ABOVE

FB FROM BELOW

FBO FURNISHED BY OTHERS

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE)

CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FU FIXTURE UNITS

G GALLON

GC GENERAL CONTRACTOR

GCO GRADE CLEANOUTS

GD GARBAGE DISPOSAL

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H&CW HOT AND COLD WATER

HB HOSE BIBB (INTERIOR)

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK

(DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

ICW INDUSTRIAL COLD WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

KW KILOWATT

KWHR KILOWATT-HOUR

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH THOUSANDS OF BTU PER HOUR

MC MECHANICAL CONTRACTOR

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTANDING

MSB MOP SINK BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N2O NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

PA PACAL

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAUGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH

ATMOSPHERE

PSIG POUNDS PER SQUARE INCH GAUGE

PTRV PRESSURE TEMPERATURE RELIEF

VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RO REVERSE OSMOSIS

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SCFM STANDARD CUBIC FOOT/MIN

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT SQUARE FOOT

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TDL TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

UPC UNIFORM PLUMBING CODE

V SANITARY VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WH WATER HEATER

WHA WATER HAMMER ARRESTOR

WHD WALL HYDRANT

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

YCO YARD CLEANOUT

YH YARD HYDRANT

DCWR

DHW

PIPING SYSTEM

NG NATURAL GAS

ST STORM

PD PUMP DISCHARGE

OFD OVERFLOW STORM DRAIN

GW GREASE WASTE

OW OIL WASTE

SAN SANITARY WASTE

CD CONDENSATE DRAIN

CA COMPRESSED AIR

AW ACID WASTE

N2 NITROGEN

N2O NITROUS OXIDE

MA MEDICAL AIR

O2 OXYGEN

WAGD WASTE ANESTHETIC GAS DISPOSAL

VAC VACUUM

V SANITARY VENT

OV OIL VENT

AV ACID VENT

NPCW NONPOTABLE COLD WATER

DI DE-IONIZED WATER

SCW SOFTENED COLD WATER

DCW DOMESTIC COLD WATER

RO REVERSE OSMOSIS WATER

DOMESTIC CW RECIRCULATION

DOMESTIC HOT WATER

CO2 CARBON DIOXIDE

DHW 140 DOMESTIC HOT WATER (OTHER TEMP)

PG PROPANE GAS

PLUMBING SYMBOLS

ANNOTATION SYMBOLS

EXISTING

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

ITALICIZED TEXT INDICATES EXISTING ITEM

NEW PLUMBING EQUIPMENT MARK

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMIT OF DEMOLITION

P-###

DHWR DOMESTIC HW RECIRCULATION

NG

ST

PD

OFD

GW

OW

SAN

CD

CA

AW

N2

N2O

MA

O2

WAGD

VAC

CO2

PG

V

OV

AV

HW 140

SCW

NPCW

DI

RO

EXISTING PLUMBING EQUIPMENT MARKP-###

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:4

A

M

P-001

PLUMBING GENERAL INFORMATION

1 14JT

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

DocuSign Envelope ID: B8644306-ADB8-4CEB-AD48-10D682ACDDAF

8/23/2021

S

S

SS

S S

S

S S

S S

S S

S

S

S

S

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S

K L L.1 L.2

M M.1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

1 1/2" SAN

2" SAN

3/4" DHW

3/4" DCW

2" SAN

3/4" DHW

3/4" DCW

2" SAN

2" SAN

3" SAN

2" SAN

3/4" DHW

3/4" DCW

1 1/2" DCW

3/4" DHW

3/4" DHWR

1 1/2" SAN 3/4" DHWR

3/4" DCW

3/4" DHW

3/4" DHWR 3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DHWR

3/4" DHW

3/4" DCW

2" SAN

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DHWR

3/4" DCW

1" DHWR

3/4" DHWR

3/4" DCW

3/4" DHW

2" SAN

4" SAN DN

2" UP

3" SAN UP 3" SAN UP WITH

TRAP PRIMER

3" SAN UP

3" SAN DN

4" V UP,

4" SAN DN

2" V UP

4" SAN UP

2" SAN

1 1/2" DCW

3/4" DHW

4" CO

3/4" DCW

3/4" DHW

3/4" DHWR

2" SAN

7.3

6.5

9.9

P.2

3/4" DHW

4" SAN

S S

S

S S

K L L.1 L.2

M M.1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

4 5

3" SAN

2" SAN

3/4" DCW

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DHW

1 1/2" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

3" DCW

2" DHW

1" DHWR

3" SAN

3/4" DHWR

2" SAN

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

3" V DN

4" V DN

3" SAN DN

4" VTR

3" SAN UP

2" V DN

3" VTR

3" VTR

3" V DN

2" V DN

3" V DN

2" V DN

3" VTR

1" DCW DN

4" FP

4" SAN UP

4" V DN

4" SAN

4" SAN DN

3" VTR

3" SAN DN

3" SAN UP

4" SAN DN

3" VTR

3" SAN DN

3" SAN UP

3" SAN

4" VTR

4" V DN

4" VTR

4'' VTR

2" SAN DN

2" V

4" V DN

4" SAN UP

4" SAN DN

3" VTR

7.3

6.5

9.9

P.2

ELEVATOR LOBBY

2S57

ELEVATOR

E3

P.T. / O.T.

2N58

OPEN OFFICE

2N59

PAIN REHAB. CENTER

2S56A

CONFERENCE RM

2S56

OI&T

2S53

CORRIDOR

H204

EXAM

2S12B

OFFICE

2S11A

OFFICE

2S11

HAC

2S10

STAIRWELL NO. 2

2S02

CORRIDOR

H205

WAITING

2N115

EXAM 1

2S05

SCI SERVICE REHAB.

CENTER

2N117A

EXAM

2S01

EXAM

2N118

TREAT. RM.

2S05

EXAM

2S04

3/4" DHW

3/4" DCW

1/2" LV

1" O 1" O

4 5

WAITING ROOM

2N112A

OFFICE

2N111

WHEELCHAIR STORAGE

2N110

OFFICE

2N60

OFFICE

2N63

HAC

2N64

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:5

A

M

PD101

FIRST AND SECOND FLOOR PLUMBING

DEMOLITION PLAN - PHASE 1

2 14AD

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

Scale: 1/8" = 1'-0"

FIRST FLOOR PLUMBING DEMOLITION PLAN - PHASE 1

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A. DEMOLITION WORK SHALL BE PERFORMED

SUCH THAT ALL PIPES, HANGERS,

SUPPORTS, AND VALVES IN SCOPE ARE

REMOVED COMPLETELY TO MAINS.

REMOVE ALL ITEMS TO ENSURE NOTHING

IS ABANDONED IN PLACE.

B. NO DEAD ENDS SHALL REMAIN. THE

MAXIMUM LENGTH OF DEAD ENDS SHALL

BE TWO PIPE DIAMETERS FROM THE

BRANCH, RISER, OR MAIN.

1 REMOVE SANITARY UP TO FIXTURE ON

FLOOR ABOVE. SEE 2/PD101 FOR

CONTINUATION.

2 RE ON FLOOR ABOVE. SEE 2/PD101 FOR

CONTINUATION.

3 REMOVE 3" SAN UP AND CAP.

4 REMOVE LAVATORY AND ASSOCIATED

DOMESTIC HOT AND COLD WATER DOWN TO

FIRST FLOOR CEILING AND CAP AT MAIN.

5 REMOVE 1 1/2" SANITARY FROM LAVATORY

DOWN THROUGH FLOOR AND CAP SANITARY

AT MAIN.

6 REMOVE WATER CLOSET AND ASSOCIATED

DOMESTIC COLD WATER AND SANITARY AND

VENT PIPING.

7 REMOVE DCW, DHW AND SANITARY PIPING

BACK TO RISER IN CHASE AND CAP.

8 REMOVE 3/4" DCW AND DHW OVERHEAD AND

DOWN TO SHOWER VALVE. REMOVE

SHOWER, DRAIN AND WATER PIPING

COMPLETE.

9 REMOVE DCW AND DHW PIPING OVERHEAD

ASSOCIATED WITH DEMOLISHED FIXTURE.

10 WORK IN CORRIDOR H205 FROM ELEVATOR

BACK TO EXAM ROOMS SHALL OCCUR ON

NIGHTS AND WEEKENDS ONLY. ACCESS

SHALL BE MAINTAINED DURING OCCUPIED

HOURS. SEE ARCHITECTURAL PLANS FOR

PHASING AND ICRA BARRIERS.

11 REMOVE WATER PIPING UP TO FIXTURE ON

FLOOR ABOVE. SEE 2/PD101 FOR

CONTINUATION. PREPARE TO CONNECT TO

NEW WATER PIPING AT LIMITS OF

DEMOLITION.

12 EXISTING 4'' SANITARY DOWN AND VENT

UPTO REMAIN.

N O

R T

H0 4 8 16

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR PLUMBING DEMOLITION PLAN - PHASE 1

S

SS

S S

S

S S

S S

S S

S

S

S

S

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S

K L L.1 L.2

M M.1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

1 1/2" SAN

2" SAN

2" SAN

2" SAN

2" SAN

3" SAN

2" SAN

3/4" DHW

3/4" DCW

1 1/2" DCW

3/4" DHW

3/4" DHWR

3/4" DHWR

3/4" DCW

3/4" DHW

3/4" DHWR 3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DHWR

3/4" DCW

1" DHWR

4" SAN DN

2" UP

3" SAN UP 3" SAN UP WITH

TRAP PRIMER

2" SAN UP

3" SAN UP

3" SAN DN

4" V UP

4" SAN DN

2" SAN1 1/2" DCW

3/4" DHW

3/4" DCW

3/4" DHW

3/4" DHWR

2" SAN

7.3

6.5

9.9

P.2

2" SAN UP

S S

S

S S

K L L.1 L.2

M M.1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DHWR

3/4" DHW

1 1/2" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

3" DCW

2" DHW

1" DHWR

3" SAN

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

3" V DN4" V DN

3" SAN DN

4" VTR

3" SAN UP

2" V DN

3" VTR

3" VTR

3" V DN

2" V DN

3" V DN

2" V DN

3" VTR

1" DCW DN

4" FP

4" SAN UP

4" V DN

4" SAN

4" SAN DN

3" VTR

3" SAN DN

3" SAN UP

4" SAN DN

3" VTR

3" SAN DN

3" SAN UP

3" SAN

4" VTR 4" V DN

4" VTR

4" VTR

2" SAN DN

4" V DN

4" SAN UP

4" SAN DN

3" VTR

7.3

6.5

9.9

P.2

SOILED UTILITY

2S10

OFFICE (PSYCH)

2S11

OFFICE (SW)

2S11A

OPEN OFFICE

2N60

OPEN OFFICE

2N60

EQUIP STORAGE

2N111

TELEHEALTH

2N112

EXAM 6

2N118

RESTROOM

2N118A

CORRIDOR

2N116

CORRIDOR

2N116

EXAM 5

2S01

TREAT. RM.

2S05

EXAM

2S04

EXAM 1

2S05

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:0

A

M

PD102

FIRST AND SECOND FLOOR PLUMBING

DEMOLITION PLAN - PHASE 2

3 14AD

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

1 REMOVE LAVATORY AND ASSOCIATED

DOMESTIC HOT AND COLD WATER DOWN TO

FIRST FLOOR CEILING AND CAP AT MAIN.

2 REMOVE 1 1/2" SAN FROM LAVATORY DOWN

THROUGH FLOOR AND CAP SANITARY AT

MAIN. SEE 2/PD102.

3 EXISTING TO REMAIN.

4 REMOVE SANITARY UP TO FIXTURE ON

FLOOR ABOVE. SEE 2/PD102. FOR

CONTINUATION.

5 REMOVE WATER PIPING UP TO FIXTURE ON

FLOOR ABOVE. SEE 2/PD102 FOR

CONTINUATION.

6 WORK IN CORRIDOR H205 FROM ELEVATOR

BACK TO EXAM ROOMS SHALL OFFUR ON

NIGHTS AND WEEKENDS ONLY. ACCESS

SHALL BE MAINTAINED DURING OCCUPIED

HOURS. SEE ARCHITECTURAL PLANS FOR

PHASING AND ICRA BARRIERS.

Scale: 1/8" = 1'-0"

FIRST FLOOR PLUMBING DEMOLITION PLAN - PHASE 2

Scale: 1/8" = 1'-0"

SECOND FLOOR PLUMBING DEMOLITION PLAN - PHASE 2

N O

R T

H0 4 8 16

N O

R T

H0 4 8 16

S

SS

S S

S

S S

S S

S S

S

S

S

S

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S

K L L.1 L.2

M M.1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

1 1/2" SAN

2" SAN

2" SAN

2" SAN

2" SAN

3" SAN

1 1/2" DCW

3/4" DHW

3/4" DHWR

3/4" DHWR

3/4" DCW

3/4" DHW

3/4" DHWR 3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DHWR

3/4" DCW

1" DHWR

4" SAN DN

2" UP

3" SAN UP 3" SAN UP WITH

TRAP PRIMER

2" SAN UP

3" SAN DN

3" V UP

4" SAN DN

2" SAN1 1/2" DCW

3/4" DHW

3/4" DCW

3/4" DHW

3/4" DHWR

7.3

6.5

9.9

P.2

S S

S

S S

K L L.1 L.2

M M.1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

1 2

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DHWR

3/4" DHW

1 1/2" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

3" DCW

2" DHW

1" DHWR

3" SAN

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

3" V DN4" V DN

3" SAN DN

4" VTR

3" SAN UP

2" V DN

3" VTR

3" VTR

3" V DN

2" V DN

3" V DN

2" V DN

3" VTR

1" DCW DN

4" FP

4" SAN UP

4" V DN

4" SAN

4" SAN DN

3" VTR

3" SAN DN

3" SAN UP

4" SAN DN

3" VTR

3" SAN DN

3" SAN UP

3" SAN

4" VTR

4" V DN

4" VTR5

4" VTR

2" SAN DN

4" V DN

4" SAN UP

4" SAN DN

3" VTR

7.3

6.5

9.9

P.2

GROUP ROOM

2S58

ELEVATOR LOBBY

H209

ELEVATOR

E3

CONSULT

2S56

CONFERENCE

2S54

OI&T_

2S53

CORRIDOR

H204

CORRIDOR

H208

OFFICE (PSYCH)

2S11

OFFICE (SW)

2S11A

SOILED UTILITY

2S10

WAITING

2N115

CORRIDOR

2N116

EXAM 1

2S05

RESTROOM

2N118A

EXAM 6

2N118

EXAM 4

2S02

EXAM 3

2S03 EXAM 2

2S04

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:1

A

M

PD103

FIRST AND SECOND FLOOR PLUMBING

DEMOLITION PLAN - PHASE 3

4 14JT

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

1 1 REMOVE LAVATORY AND ASSOCIATED

DOMESTIC HOT AND COLD WATER DOWN TO

FIRST FLOOR CEILING AND CAP AT MAIN.

2 REMOVE 1 1/2" SAN FROM LAVATORY DOWN

THROUGH FLOOR AND CAP SANITARY AT

MAIN. SEE PD101.

3 REMOVE DCW, DHW AND SAN. PIPING BACK

TO RISER IN CHASE AND CAP.

4 REMOVE DRINKING FOUNTAIN AND RETAIN

FOR REINSTALLATION AT THIS LOCATION.

COORDINATE REMOVAL WITH NEW WALL

FINISHES AT THIS LOCATION SEE 'A' AND 'I'

SERIES DRAWINGS.

5 REMOVE DCW AND DHW PIPING OVERHEAD

ASSOCIATED WITH DEMOLISHED FIXTURE.

6 EXISTING TO REMAIN.

7 REMOVE LAVATORY AND ASSOCIATED

SANITARY, DCW AND DHW PIPING BACK TO

INSIDE WALL AND CAP.

8 REMOVE FLUSH VALVE COMPLETE.

9 REMOVE SANITARY UP TO FIXTURE ON

FLOOR ABOVE. SEE 2/PD101. FOR

CONTINUATION.

10 REMOVE 3" SAN, TRAP PRIMER, AND DCW

ASSOCIATED WITH TRAP PRIMER COMPLETE.

11 WORK AT MAIN ENTRY SHALL OCCUR ON

NIGHTS AND WEEKENDS ONLY. ACCESS

SHALL BE MAINTAINED DURING OCCUPIED

HOURS. SEE ARCHITECTURAL PLANS FOR

PHASING AND ICRA BARRIERS. COORDINATE

SHUTDOWNS WITH THE COR..

12 REMOVE EXISTING SAN. PIPING BACK TO

LIMIT AND CAP AT RISER.

N O

R T

H0 4 8 16

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

FIRST FLOOR PLUMBING DEMOLITION PLAN - PHASE 3

Scale: 1/8" = 1'-0"

SECOND FLOOR PLUMBING DEMOLITION PLAN - PHASE 3

S

S S

S S

S

SS

S S

S S

S

S

S

S

S S

S

S S

K L L.1 L.2

M M.1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

7.3

6.5

9.9

P.2

EXAM 1

2S05

CORRIDOR

H205

OPEN OFFICE

2N59

WAITING

2N115

SCI SERVICE REHAB.

CENTER

2N117A

EXAM

2S04

TREAT. RM.

2S05

EXAM

2S01

EXAM

2N118

3/4" LV

1" O

3/4" LV

1" O

3/4" LV

1" O

1" O

3/4" LV

ZVB-2S

MEDS

2N113

RESTROOM

2N114

ELEVATOR

E4

STAIRWELL NO. 2

2S02

ELEVATOR

E3 ELEVATOR LOBBY

2S57

PAIN REHAB. CENTER

2S56A

HAC

2S10

OFFICE

2S11

OFFICE

2S11A

EXAM

2S12B

CONFERENCE RM

2S56

OI&T

2S53

WAITING ROOM

2N112A

OFFICE

2N111

OFFICE

2N60

OFFICE

2N63

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:2

A

M

PG101

SECOND FLOOR MED GAS PLAN -

PHASE 1

5 14AD

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

SECOND FLOOR MED GAS PLAN - PHASE 1

1 1/2" O2 AND 3/4" VA DOWN IN WALL TO EXAM

ROOM OUTLET BOXES AT 42" ABOVE

FINISHED FLOOR. SEE 8/P-501

2 ZONE VALVE BOX IN WALL. EXTEND 3/4" VAC

AND 3/4" O2 DOWN IN WALL TO ZONE VALVE

BOX. SEE 9/P-501.

3 INSTALL BRANCHES OFF MAINS AND VALVE

AND CAP TO PREPARE FOR FUTURE

CONNECTION.

4 CAP TO PREPARE FOR FUTURE

CONNECTIONS.

5 CAP 1" OXYGEN.

6 LOCAL ALARM PANEL LOCATION FOR ZVB-2S

IN OFFICE 2N59. PROVIDE INTERCONNECTION

WIRING FROM THE ALARMS TO THE LOCAL

ALARM PANEL PER THE MANUFACTURERS

RECOMMENDATIONS AND PER

SPECIFICATION SECTIONS 22 6200 AND 22

6300.

N O

R T

H0 4 8 16

S

S S

S S

S

SS

S S

S S

S

S

S

S

S S

S

S S

K L L.1 L.2

M M.1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

7.3

6.5

9.9

P.2

OFFICE (PSYCH)

2S11

OFFICE (SW)

2S11A

OPEN OFFICE

2N60

TELEHEALTH

2N112

EQUIP STORAGE

2N111

EXAM 6

2N118

RESTROOM

2N118A

CORRIDOR

2N116

EXAM 5

2S01

1" O

3/4" LV

3/4" LV

1" O

3/4" LV

1" O

SOILED UTILITY

2S10

LOGISTICS STORAGE

2N117

STORAGE

2N119

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:2

A

M

PG102

SECOND FLOOR MED GAS PLAN -

PHASE 2

6 14AD

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

SECOND FLOOR MED GAS PLAN - PHASE 2

1 1/2" O2 AND 3/4" VA DOWN IN WALL TO EXAM

ROOM OUTLET BOXES AT 42" ABOVE

FINISHED FLOOR. SEE 8/P-501

N O

R T

H0 4 8 16

S

S S

S S

S

SS

S S

S S

S

S

S

S

S S

S

S S

K L L.1 L.2

M M.1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

7.3

6.5

9.9

P.2

CORRIDOR

2N116

EXAM 2

2S04

EXAM 3

2S03

EXAM 4

2S02

CORRIDOR

H204

CONFERENCE

2S54

CONSULT

2S56

ELEVATOR LOBBY

H209

GROUP ROOM

2S58

1 1

3/4" LV

1" O

3/4" LV

1" O

1" O

3/4" LV

3/4" LV

1" O

1" O

3/4" LV

1" O 1" O

3/4" LV

3/4" LV

1" O 1" O

3/4" LV

1" O

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:3

A

M

PG103

SECOND FLOOR MED GAS PLAN -

PHASE 3

7 14AD

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

SECOND FLOOR MED GAS PLAN - PHASE 3

1 1/2" O2 AND 3/4" VA DOWN IN WALL TO EXAM

ROOM OUTLET BOXES AT 42" ABOVE

FINISHED FLOOR. SEE 8/P-501.

N O

R T

H0 4 8 16

S

SS

S S

S

S S

S S

S S

S

S

S

S

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S

K L L.1 L.2

M M.1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

7.3

6.5

9.9

P.2

4" SAN DN

2" SAN UP

3" SAN UP 3" SAN UP WITH

TRAP PRIMER

2" SAN UP

3" SAN DN

4" V UP

4" SAN DN7

2" SAN

3/4" DHW

1 1/2" DCW

1 1/2" SAN

2" SAN

2" SAN

2" SAN

4" SAN

3/4" DHW

1 1/2" DCW

3/4" DCW

3/4" DHW

4" SAN

1 1/2" DCW

3/4" DHW 4" SAN

S S

S

S S

K L L.1 L.2

M M.1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

7.3

6.5

9.9

P.2

3" V DN4" V DN

3" SAN DN

4" VTR

3" SAN UP

2" V DN

3" VTR

3" VTR

3" V DN

2" V DN

3" V DN

2" V DN

3" VTR

1" DCW DN

4" FP 4" SAN UP

4" V DN

4" SAN DN

3" VTR

3" SAN DN

3" SAN UP

4" SAN DN

3" VTR

3" SAN DN

3" SAN UP

4" VTR

4" V DN

4" VTR

4" VTR

2" SAN DN

4" V & 4'' SAN

4" SAN UP

4" SAN DN

3" VTR

OPEN OFFICE

2N59

WAITING

2N115

CORRIDOR

H205

SCI SERVICE REHAB.

CENTER

2N117A EXAM 1

2S05

EXAM

2S04

TREAT. RM.

2S05

EXAM

2S01

EXAM

2N118

CONFERENCE RM

2S56

PAIN REHAB. CENTER

2S56A

OI&T

2S53

OFFICE

2S11A

OFFICE

2S11

HAC

2S10

EXAM

2S12B

ELEVATOR LOBBY

2S57

ELEVATOR

E3

P.T. / O.T.

2N58

WAITING ROOM

2N112A

OFFICE

2N111

OFFICE

2N63

OFFICE

2N60

STAIRWELL NO. 2

2S02

MEDS

2N113

RESTROOM

2N114P-101

P-418 P-528

P-432

1/2" DHW

FCO

FCO

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DHWR

3/4" DHW

3/4" DCW

1 1/2" V

3" SAN

3" SAN

3" FL

4" SAN

3" V

3" FL3" FL

1 1/2" V

1 1/2" V

WHA-B

1 1/2'' DCW & 1/2'' DHW

FROM FLR BELOW

1/2" DCW

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:3

A

M

PP101

FIRST AND SECOND FLOOR PLUMBING

PLAN - PHASE 1

8 14JT

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

1 1/2" DCW, 1/2" DHW, AND 1 1/2" VENT DOWN

TO FIXTURE.

2 2" SAN. DOWN FROM FIXTURE TO FLOOR

BELOW. CONTINUED ON 1/PP101.

3 INSTALL NEW PIPE CAP WITHIN TWO PIPE

DIAMETERS FROM THE MAIN.

5 1/2" DCW, 1/2" DHW, AND 2" SAN FROM

FIXTURE OFFSET IN CHASE AND CONNECT TO

SANITARY PIPING FROM FLOOR BELOW. SEE

1/PP101.

6 1" DCW IN CHASE, 2" V UP AND 4" SAN FROM

WATER CLOSET TO FLOOR BELOW.

7 2" SAN UP.

8 4" SAN UP.

9 2" UP TO FLOOR CLEANOUT.

11 CONNECT 1 1/2" V TO EXISTING VENT IN

CHASE.

12 WORK IN CORRIDOR H205 FROM ELEVATOR

BACK TO EXAM ROOMS SHALL OCCUR ON

NIGHTS AND WEEKENDS ONLY. ACCESS

SHALL BE MAINTAINED DURING OCCUPIED

HOURS. SEE ARCHITECTURAL PLANS FOR

PHASING AND ICRA BARRIERS.

13 1/2" DCW AND 1/2" DHW UP IN WALL TO

PLUMBING FIXTURE ABOVE.

14 CONNECT 2" V TO EXISTING VENT IN CHASE.

15 2" VENT UP INTO THE CHASE.

16 CONNECT NEW 4'' SAN TO EXISTING STACK.

17 1 1/2" DCW AND 1/2" DHW UP IN CHASE TO

PLUMBING FIXTURES ABOVE AND PROVIDE

SHUTOFF VALVES IN DCW AND DHW UP.

18 CAP TO PREPARE FOR FUTURE

CONNECTIONS.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R T

H0 4 8 16

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

FIRST FLOOR PLUMBING PLAN - PHASE 1

Scale: 1/8" = 1'-0"

SECOND FLOOR PLUMBING PLAN - PHASE 1

S

SS

S S

S

S S

S S

S S

S

S

S

S

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S

K L L.1 L.2

M M.1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

7.3

6.5

1 1/2" DCW

1" DCW

1/2" DCW

9.9

P.2

4" SAN DN

2"

UP3" SAN UP 3" SAN UP WITH

TRAP PRIMER

3" SAN UP

3" SAN DN

3" V UP

4" SAN DN

1" DCW

3/4" DHW

3/4" DCW

2" SAN

1 1/2" SAN

3/4" DHW

1 1/2" DCW

2" SAN

3/4" DHWR

3/4" DHW

1 1/2" DCW

2" SAN

3/4" DHW

1 1/2" DCW

2" SAN

3/4" DHW

3/4" DHW

3/4" DCW

2" SAN

S S

S

S S

K L L.1 L.2

M M.1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

7.3

6.5

2" V

2" V

1 1/2" V

9.9

P.2

P-112*

3" V DN4" V DN

3" SAN DN

4" VTR

3" SAN UP

2" V DN

3" VTR

3" VTR

3" V DN

2" V DN

3" V DN

2" V DN

3" VTR

1" DCW DN

4" FP

4" SAN UP

4" V DN

4" SAN DN

3" VTR

3" SAN DN

3" SAN UP

4" SAN DN

3" VTR

3" SAN DN

3" SAN UP

4" V DN

4" VTR

4" VTR

2" SAN DN

4" V DN

4" SAN UP

4" SAN DN

3" VTR

1 2

3 4

OFFICE (SW)

2S11A

OFFICE (PSYCH)

2S11

EXAM

2S12B

SOILED UTILITY

2S10

STAIR 2

S2

OI&T

2S53

CONFERENCE RM

2S56

PAIN REHAB. CENTER

2S56A

P.T. / O.T.

2N58

OPEN OFFICE

2N59

OPEN OFFICE

2N60

ELEVATOR

E3

ELEVATOR LOBBY

2S57

EQUIP STORAGE

2N111

TELEHEALTH

2N112

EXAM 6

2N118

WAITING

2N115

CORRIDOR

H205

EXAM 1

2S05

EXAM

2S04

TREAT. RM.

2S05

EXAM 5

2S01

CORRIDOR

2N116

RESTROOM

2N118A

P-432*

P-408

1 1/2" V

STORAGE

2N119

2" V

1 1/2" V

P-432

RESTROOM

2N114

MEDS

2N113

LOGISTICS STORAGE

2N117

ELEVATOR

E2

CORRIDOR

H208

WHEELCHAIR STORAGE

2N110

HAC

2N64

3" SAN

3" SAN

3" FL

3" FL

3" FL

FCO

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:4

A

M

PP102

FIRST AND SECOND FLOOR PLUMBING

PLAN - PHASE 2

9 14JT

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

1 2" VENT FROM ABOVE DOWN TO FIXTURE.

2 1" DCW AND 4" SAN DOWN FROM FIXTURE TO

FLOOR BELOW.

3 1 1/2" VENT FROM ABOVE DOWN TO FIXTURE.

4 1/2" DCW, 1/2" DHW, AND 4" SAN DOWN FROM

FIXTURE TO FLOOR BELOW.

5 1/2" DCW, 1/2" DHW, AND 2" SAN UP TO

FIXTURE ON FLOOR ABOVE. SEE 2/PP102.

6 1" DCW, 4" SAN UP TO FIXTURE ON FLOOR

ABOVE. SEE 2/PP102.

7 2" UP TO FCO.

8 INSTALL WATER HAMMER ARRESTOR WH-B

ON 1" DCW.

9 INSTALL NEW 1/2" GLOBE VALVES AND 1/2"

BALANCING VALVE ON DHWR PIPE. BALANCE

TO 0.5 GPM.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R T

H0 4 8 16

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

FIRST FLOOR PLUMBING PLAN PHASE 2

Scale: 1/8" = 1'-0"

SECOND FLOOR PLUMBING PLAN - PHASE 2

SEE 2/P-501.

S

SS

S S

S

S S

S S

S S

S

S

S

S

S S

S

S S

S S

S

SS

S S

S S

S

S

S

S

K L L.1 L.2

M M.1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

7.3

6.5

2" SAN

2" SAN

9.9

P.2

1/2" DCW

3/4" DHW

3/4" DHW

1 1/2" DCW

2" SAN

2" SAN

1/2" DCW

S S

S

S S

K L L.1 L.2

M M.1

M.3

M.4

N.1 N.3 N.5

P

P.1

P.4

Q Q.1 R S

4.4

9.5

7.3

6.5

1/2" DHW

1/2" DHWR

1/2" DCW

3/4" DCW

1 1/2" V

3/4" DHW 1 1/2" V

9.9

P.2

P-418*

3" V DN4" V DN

3" SAN DN

4" VTR

3" SAN UP

2" V DN

3" VTR

3" VTR

3" V DN

2" V DN

3" V DN

2" V DN

3" VTR

1" DCW DN

4" FP

4" SAN UP

4" V DN

4" SAN DN

3" VTR

3" SAN DN

3" SAN UP

4" SAN DN

3" VTR

3" SAN DN

3" SAN UP

4" VTR 4" V DN

4" VTR

4" VTR

2" SAN DN

4" V DN

4" SAN UP

4" SAN DN

3" VTR

P-408

P-432*

P-432* P-432*

3" DCW

2" DHW

3" SAN

4" V

3 2

3 2

OFFICE (SW)

2S11A

EXAM

2S12B

OFFICE (PSYCH)

2S11

SOILED UTILITY

2S10

CORRIDOR

H204

CORRIDOR

H208

CONFERENCE

2S54

OI&T_

2S53

CONSULT

2S56

ELEVATOR LOBBY

H209

ELEVATOR

E3

GROUP ROOM

2S58

OPEN OFFICE

2N60

EQUIP STORAGE

2N111

TELEHEALTH

2N112 ELEVATOR

E4

RESTROOM

2N118A

EXAM 6

2N118

EXAM 1

2S05

CORRIDOR

2N116

EXAM 2

2S04EXAM 3

2S03

EXAM 4

2S02

CORRIDOR

2N116

EXAM 5

2S01

1/2" DHW

1/2" DCW

RESTROOM

2N114

MEDS

2N113

OPEN OFFICE

2N60

STORAGE

2N119

SOILED LINEN

2N120

SCALE

2N116A

WAITING

2N115

ELEVATOR LOBBY

H205

RECEPTION

2N115A

LOGISTICS STORAGE

2N117

P-432*

2" SAN

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:4

A

M

PP103

FIRST AND SECOND FLOOR PLUMBING

PLAN - PHASE 3

10 14JT

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

1 3/4" DCW, 3/4" DHW, AND 1 1/2" V DOWN TO

FIXTURE.

2 2" SAN DOWN FROM FIXTURE TO FLOOR

BELOW. CONTINUED IN 1/PP103.

3 1/2" DCW, 1/2" DHW, AND 1 1/2" VENT DOWN

TO FIXTURE.

5 INSTALL NEW 1/2" GLOBE VALVES AND 1/2"

BALANCING VALVE ON DHWR PIPE. BALANCE

TO 0.5 GPM.

6 2" SAN. UP TO FIXTURE ON FLOOR ABOVE.

CONTINUED ON 2/PP103

7 CONNECT 1 1/2" VENT TO EXISTING 3" VENT

IN CHASE.

8 INSTALL RELOCATED DRINKING FOUNTAIN

WITH BOTTLE FILLER. ALSO SEE PD103.

9 RECONNECT 1/2" DCW TO DCW RISER.

10 WORK AT MAIN ENTRY SHALL OCCUR ON

NIGHTS AND WEEKENDS ONLY. ACCESS

SHALL BE MAINTAINED DURING OCCUPIED

HOURS. SEE ARCHITECTURAL PLANS FOR

PHASING AND ICRA BARRIERS. COORDINATE

SHUTDOWNS WITH THE COR..

11 1/2" DCW UP TO FIXTURE ON FLOOR ABOVE.

12 CONNECT 2" SAN. TO EXISTING 3" VENT AT

SAME LOCATION AS PREVIOUS CONNECTION.

13 CONNECT NEW 1 1/2" VENT TO EXISTING 2"

VENT RISER AT SAME LOCATION AS

PREVIOUS CONNECTION.

14 CONNECT NEW 1 1/2" SAN. TO EXISTING SAN.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R T

H0 4 8 16

N O

R T

H0 4 8 16

Scale: 1/8" = 1'-0"

FIRST FLOOR PLUMBING PLAN -PHASE 3

Scale: 1/8" = 1'-0"

SECOND FLOOR PLUMBING PLAN - PHASE 3

N O

R T

H0 4 8 16

SEE 2/P-501.

INSTALL PER PDI STANDARDS AND

MANUFACTURER'S INSTRUCTIONS.

PROVIDE WHA AT ALL QUICK

CLOSING VALVES.

IF BRANCH IS GREATER THAN

20' LONG, PROVIDE ANOTHER

WHA IN MIDDLE, EACH SIZED

FOR HALF THE FIXTURE UNITS

IF HORIZONTAL BRANCH IS LESS

THAN 20' LONG, PROVIDE ONE

WHA AT END OF LINE

HOT OR COLD WATER SUPPLY

WATER HAMMER

ARRESTER (TYP)

WHA-A

WHA-B

WHA-C

WHA-D

WHA-E

WHA-F

1/2"

3/4"

1"

1-1/4"

1-1/2"

2"

1-11

12-32

33-60

61-113

114-154

154-330 FIXTURE WITH QUICK

CLOSING VALVE (TYP)

PDI

SIZE

PIPE

SIZE

FIXTURE

UNIT LOAD

ACCESSIBLE

MAINTENANCE

SHUTOFF (TYP)

NOM. SIZE (IN.)

PIPE (FT.)

TUBING (FT.)

5 FT

THRU 3/4

1 1 1/4

1 1/2

HANGER ROD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR

LOW TEMPERATURE

PIPE)

PROVIDE HIGH

COMPRESSIVE

STRENGTH

INSULATION (9 PSF

MIN. DENSITY) UNDER

INSULATION SHIELD

INSULATION SHIELD AT

HANGER

WELD

SADDLE

ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE

SPECIFICATIONS

ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE

SPECIFICATIONS

1/2" DIA. HANGER RODS WITH 36"

MAX. SPACING ON EACH CHANNEL

BAND

1-5/8" 12 GAUGE CHANNEL

OR 2" x 2" x 1/4" ANGLE

NOTES:

SEE SPECIFICATIONS FOR

DETAILED HANGER

REQUIREMENTS. SIDE VIEW TRAPEZE HANGER

FOR UP TO 1000 LB. UNIFORM

LOAD

1" MAX.

PROVIDE INSULATION SHIELD &

INSERT FOR ALL PIPING (8" MIN.)

2 2 1/2 3 4 5 6 8 10 12

11 12 14 16 17 19 22 23

9 10 12 13 14 16 - -

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE

MAXIMUM PIPE/TUBING SUPPORT SPACING

FAUCET SEE

SPECIFICATIONS

LAMINAR FLOW

CONTROL DEVICE

TRAP PARALLEL TO WALL

FINISHED

FLOOR

ESCUTCHEON

LOOSE

KEY STOP

F O

R F

IX

T

U R

E H

E

IG

H T

S S

E E

A

R C

H

IT

E C

T U

R A

L D

R A

W

IN

G S 1

/4

8"

WALL MOUNTED

THERMOSTATIC

MIXING VALVE

3/8" FLEX TO FAUCET

OFFSET WASTE

J-BOX WITH TRANSFORMER OR

PLUG-IN ON DUPLEX RECEPTACLE

2" WALL CLEANOUT

WITH CHROME

PAINTED COVER

1 1/2" VENT. SEE PLANS FOR

CONTINUATION.

2" SAN. SEE PLANS

FOR CONTINUATION.

2" SAN

FINISHED FLOOR

FINISHED WALL

SOLENOID OPERATED

FLUSH VALVE

BACK CHECK

ANGLE STOP

SEE INTERIOR

ELEVATIONS FOR

GRAB BARS IF

APPLICABLE

TRANSFORMER IN

JUNCTION BOX

MOUNT ELECTRONIC

SENSOR IN 12"x16"

PANEL

12"x16" STAINLESS STEEL

ACCESS DOOR WITH

OPERATED CYLINDER

LOCK

FOR FIXTURE

HEIGHTS SEE

PLUMBING

SPECIFICATIONS

BOTTLE FILLER

LOW DRINKING

FOUNTAIN

S P

O U

T

A F

F

SENSOR OPERATED

PUSH BAR

FINISHED FLOOR

FINISHED WALL

MANUALLY

OPERATED

FLUSH VALVE

BACK CHECK

ANGLE STOP

FOR FIXTURE

HEIGHTS SEE

PLUMBING

SPECIFICATIONS

SEE INTERIOR

ELEVATIONS FOR

GRAB BARS IF

APPLICABLE

OXYGENVACUUM

SLIDE

42" OR AS SHOWN ON

ARCHITECTURAL

ELEVATION

FLOOR

ALARMS MOUNTED HIGH.

COORDINATE LOCATION WITH

PLUMBING AND

ARCHITECTURAL PLANS AND

ELEVATIONS.

ZONE VALVE BOX

(RECESSED)

BALL VALVE (TYPICAL)

MEDICAL

VACUUM

PRESSURE

GAUGES

OF VALVE

BOX

OXYGEN

CEILING

DRAIN PIPE

FIXED AIR GAP

NO HUB COUPLING

SANITARY PIPE2" HUB INLET - SPIGOT

OUTLET DEEP SEAL

P-TRAP

1/2 DRAIN PIPE

DIAMETER

SET SCREW

1-1/4" CONDENSATE

DRAIN

SWING TYPE

CHECK VALVE

THERMOSTATIC

BALANCING

VALVE

HOT WATER

RETURN

TO WATER

HEATER

HOT WATER

SUPPLY

FROM SYSTEM

BALL VALVE

(TYP OF 2)

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:5

A

M

P-501

PLUMBING DETAILS

11 14AD

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

Scale: No Scale

WATER HAMMER ARRESTOR DETAIL

Scale: No Scale

PIPE HANGER DETAIL

Scale: No Scale

LAVATORY WALL HUNG - SENSOR OPERATED FAUCET DETAIL

Scale: No Scale

WATER CLOSET WALL HUNG - SENSOR OPERATED DETAIL

Scale: No Scale

DRINKING FOUNTAIN WITH BOTTLE FILLER DETAIL

Scale: No Scale

WATER CLOSET FLOOR MOUNTED - MANUAL DETAIL

Scale: No Scale

MEDICAL GAS OUTLET DETAIL

Scale: No Scale

MEDICAL GAS ZONE VALVE AND REMOTE ALARMS DETAIL

Scale: No Scale

FIXED AIR GAP DETAIL

Scale: 1/8" = 1'-0"

HOT WATER BALANCING VALVE STATION DETAIL

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:5

A

M

P-601

PLUMBING SCHEDULES

12 14AD

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

* - PRIVATE FIXTURESPLUMBING LOAD SUMMARY PHASE 1

MARK DESCRIPTION QUANTITY DFU EACH DFU

CW WSFU

EACH

CW WSFU

HW WSFU

EACH HW WSFU

TOTAL WSFU

EACH TOTAL WSFU

P-112* WATER CLOSET, CONCEALED FLUSH VALVE, WALL MOUNT,

PRIVATE

1 4 4 10

0 0 10 6

P-408 LAVATORY, WALL MOUNT, PUBLIC 1 1 1 1.5 1.5 1.5 1.5 2 2

P-432* LAVATORY, INTEGRAL, SENSOR, PRIVATE 2 1 2 0.5 1 0.5 1 0.7 1.4

TOTAL 4 7 8.5 2.5 9.4

PLUMBING FIXTURE PHASE 1 SCHEDULE

MARK DESCRIPTION QUANTITY WASTE PIPE VENT PIPE

COLD

WATER HOT WATER

WRIST BLADE

HANDLES

ELECTRIC

SENSOR REMARKS

P-101 WATER CLOSET, FLUSH VALVE, FLOOR MOUNT, PUBLIC 1 4" 2" 1" - - YES WATER CLOSET, FLUSH VALVE, FLOOR MOUNT, PUBLIC

P-418 LAVATORY, WALL MOUNT, SENSOR, PUBLIC 1 2'' 1 1/2" 3/8" 3/8" NO YES LAVATORY, WALL MOUNT, SENSOR, PUBLIC

P-432* LAVATORY, INTEGRAL, SENSOR, PRIVATE 1 2" 1 1/2" 3/8" 3/8" NO YES LAVATORY, INTEGRAL, SENSOR, PRIVATE

P-528 SINK, COUNTER MOUNT, SINGLE COMPARTMENT 1 2'' 1 1/2" 3/8" 3/8" NO NO SINK, COUNTER MOUNT, SINGLE COMPARTMENT

PLUMBING FIXTURE PHASE 2 SCHEDULE

MARK DESCRIPTION QUANTITY WASTE PIPE VENT PIPE

COLD

WATER HOT WATER

WRIST BLADE

HANDLES

ELECTRIC

SENSOR REMARKS

FCO FLOOR DRAIN, SQUARE, 2" OUTLET 1 2" - - - - - FLOOR DRAIN, SQUARE, 2" OUTLET

P-112* WATER CLOSET, CONCEALED FLUSH VALVE, WALL MOUNT,

PRIVATE

1 4" 2" 1" - - YES WATER CLOSET, CONCEALED FLUSH VALVE, WALL MOUNT, PRIVATE

P-408 LAVATORY, WALL MOUNT, PUBLIC 1 2" 1 1/2" 3/8" 3/8" YES NO LAVATORY, WALL MOUNT, PUBLIC

P-432* LAVATORY, INTEGRAL, SENSOR, PRIVATE 2 2" 1 1/2" 3/8" 3/8" NO YES LAVATORY, INTEGRAL, SENSOR, PRIVATE

PLUMBING FIXTURE PHASE 3 SCHEDULE

MARK DESCRIPTION QUANTITY WASTE PIPE VENT PIPE

COLD

WATER HOT WATER

WRIST BLADE

HANDLES

ELECTRIC

SENSOR REMARKS

P-418* LAVATORY, WALL MOUNT, SENSOR, PRIVATE 1 2" 1 1/2" 3/8" 3/8" NO YES LAVATORY, WALL MOUNT, SENSOR, PRIVATE

P-432* LAVATORY, INTEGRAL, SENSOR, PRIVATE 3 2" 1 1/2" 3/8" 3/8" NO YES LAVATORY, INTEGRAL, SENSOR, PRIVATE

P-608 ELECTRIC WATER COOLER, BOTTLE FILLER 1 2" 1 1/2" 3/8" - - YES ELECTRIC WATER COOLER, BOTTLE FILLER

PLUMBING LOAD SUMMARY PHASE 3

MARK DESCRIPTION QUANTITY DFU EACH DFU

CW WSFU

EACH

CW WSFU

HW WSFU

EACH HW WSFU

TOTAL WSFU

EACH TOTAL WSFU

P-418* LAVATORY, WALL MOUNT, SENSOR, PRIVATE 1 1 1 0.5 0.5 0.5 0.5 0.7 0.7

P-432* LAVATORY, INTEGRAL, SENSOR, PRIVATE 3 1 3 0.5 1.5 0.5 1.5 0.7 2.1

P-608 ELECTRIC WATER COOLER, BOTTLE FILLER 1 4 0.5 10 0.25 0 0 10 0.25

TOTAL 5 4.5 2.25 2 3.05

PLUMBING LOAD SUMMARY PHASE 2

MARK DESCRIPTION QUANTITY DFU EACH DFU

CW WSFU

EACH

CW WSFU

HW WSFU

EACH HW WSFU

TOTAL WSFU

EACH TOTAL WSFU

P-112* WATER CLOSET, CONCEALED FLUSH VALVE, WALL MOUNT,

PRIVATE

1 4 4 10

0 0 10 6

P-408 LAVATORY, WALL MOUNT, PUBLIC 1 1 1 1.5 1.5 1.5 1.5 2 2

P-432* LAVATORY, INTEGRAL, SENSOR, PRIVATE 2 1 2 0.5 1 0.5 1 0.7 1.4

TOTAL 4 7 8.5 2.5 9.4

2" SAN

1 1/2" V

2" SAN

4" SAN

2" SAN

2" V

1 1/2" V 3" V

P-608

P-418*

P-432*

FCO

P-432*

P-408

P-112*

3" SAN

4" SAN

2" V

3" V 4" V

3" SAN

4" SAN

4" V

1 1/2" SAN

3" SAN

P-418

P-101

2" SAN

P-432* P-432*

3" V

3" V

3" V

3" V

3" SAN

4" V

4" SAN

4" SAN

1 1/2" V

3" V

3" SAN

1 1/2" V

1 1/2" V

1 1/2" V

1 1/2" V

1 1/2" V

P-432*

1 1/2" V P-528

2" SAN 3" SAN

4" SAN

3" V

3" V

3" V

4" SAN

3" V

3" SAN

P-432*

3" SAN

2" SAN

2" SAN

2" SAN

4" SAN

3" SAN

2" SAN

4" V

2" V

4" V

4" V

2" V

2" SAN

4" SAN

4" SAN

4" V

4" V

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:5

A

M

P-901

SANITARY RISER DIAGRAM

13 14WRS

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

Scale:

SANITARY RISER DIAGRAM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

FCO

FCO

3/4" DHWR

3/4" DHW

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DCW

3/4" DHW

3" DCW

2" DHW

1" DHWR

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

1/2" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DHW

1 1/2" DCW

1 1/2" DCW

3/4" DHW

3/4" DHWR

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

1" DCW

1/2" DHW 3/4" DCW

1/2" DCW

1/2" DHWR

1/2" DHW

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DHW

P-528

P-418

P-112*P-408

P-101

P-432*

P-432*

P-432*

P-432*

P-432*

P-432*

P-608

P-418*

1/2" DCW

1/2" DHW

1" DCW

1/2" DCW

1/2" DHW

3/4" DCW

3/4" DHW

3/4" DHWR

3/4" DCW

3/4" DHW

3/4" DHW

1 1/2" DCW

1 1/2" DCW

3/4" DHW

1/2" DHW

P-418

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:5

A

M

P-902

DOMESTIC WATER RISER DIAGRAM

14 14WRS

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR,

ST. LOUIS, MO 63125

AUGUST 25, 2021

BID DOCUMENTS

657-20-102JB20-028

RCM

Scale:

DOMESTIC WATER RISER DIAGRAM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Sheets
P-001 - PLUMBING GENERAL INFORMATION
PD101 - FIRST AND SECOND FLOOR PLUMBING DEMOLITION PLAN - PHASE 1
PD102 - FIRST AND SECOND FLOOR PLUMBING DEMOLITION PLAN - PHASE 2
PD103 - FIRST AND SECOND FLOOR PLUMBING DEMOLITION PLAN - PHASE 3
PG101 - SECOND FLOOR MED GAS PLAN - PHASE 1
PG102 - SECOND FLOOR MED GAS PLAN - PHASE 2
PG103 - SECOND FLOOR MED GAS PLAN - PHASE 3
PP101 - FIRST AND SECOND FLOOR PLUMBING PLAN - PHASE 1
PP102 - FIRST AND SECOND FLOOR PLUMBING PLAN - PHASE 2
PP103 - FIRST AND SECOND FLOOR PLUMBING PLAN - PHASE 3
P-501 - PLUMBING DETAILS
P-601 - PLUMBING SCHEDULES
P-901 - SANITARY RISER DIAGRAM
P-902 - DOMESTIC WATER RISER DIAGRAM
2021-08-23T12:08:31-0700
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .