1 Gen BD.pdf
PDF 5 MB Posted
- Solicitation number
- 36C25522R0002
About this file
This pre-solicitation notice announces a forthcoming competitive total set-aside solicitation for a construction project to renovate the second floor center of Building 52 at the Jefferson Barracks Division of the VA Saint Louis Health Care System in St. Louis, Missouri. The project scope includes renovating approximately 7,200 gross square feet of former procedure rooms and administrative offices to improve services for spinal cord injury veterans. The construction costs are estimated between $2 million and $5 million. The NAICS code is 236220 with a small business size standard of $39.5 million. The base period of performance is 410 calendar days from notice to proceed. The solicitation will be posted to SAM on or about October 15, 2021. Only one organized site visit will be scheduled. Questions must be emailed to Kevin.Knight2@va.gov by the response due date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Scan_2021_11_02_14_28_13_296.pdf | ||
| 36C25522R0002 0001.docx | DOCX document | |
| 36C25522R0002_1.docx | DOCX document | |
| 3 Abate BD.pdf | ||
| P09_S02 -20-028 Specifications 657-20-102JB (1448 pages) final.pdf | ||
| 2 Struct BD.pdf | ||
| 9 Elec BD.pdf | ||
| 7 Plumb BD.pdf | ||
| 4 Arch BD.pdf | ||
| 5 IntD BD.pdf | ||
| 8 Mech BD.pdf | ||
| Past Performance Questionnaire 36C25522R0002 (Project 657-20-102JB).pdf | ||
| 6 FP BD.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/1
/2
:2
:4
P
M
G-001
TITLE SHEET AND INDEX OF
DRAWINGS
1 5EJD
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
RENOVATE SECOND FLOOR CENTER,
JB BLDG 52
1 JEFFERSON BARRACKS DR, ST. LOUIS, MO 63125
VA PROJECT #: 657-20-102JB
TJS
DRAWING LIST
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 10
MD101 SECOND FLOOR MECHANICAL DEMOLITION PLAN - PHASE 1 2 10
MD102 SECOND FLOOR MECHANICAL DEMOLITION PLAN - PHASE 2 3 10
MD103 SECOND FLOOR MECHANICAL DEMOLITION PLAN - PHASE 3 4 10
MH101 SECOND FLOOR MECHANICAL PLAN - PHASE 1 5 10
MH102 SECOND FLOOR MECHANICAL PLAN - PHASE 2 6 10
MH103 SECOND FLOOR MECHANICAL PLAN - PHASE 3 7 10
M-501 MECHANICAL DETAILS 8 10
M-502 MECHANICAL CONTROLS 9 10
M-601 MECHANICAL SCHEDULES 10 10
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 14
ED101 SECOND FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 1 2 14
ED102 SECOND FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 2 3 14
ED103 SECOND FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 3 4 14
EP101 SECOND FLOOR ELECTRICAL PLAN - PHASE 1 5 14
EP102 SECOND FLOOR ELECTRICAL PLAN - PHASE 2 6 14
EP103 SECOND FLOOR ELECTRICAL PLAN - PHASE 3 7 14
EM101 SECOND FLOOR MECHANICAL POWER PLAN - PHASE 1 8 14
EM102 SECOND FLOOR MECHANICAL POWER PLAN - PHASE 2 9 14
EM103 SECOND FLOOR MECHANICAL POWER PLAN - PHASE 3 10 14
E-501 ELECTRICAL DETAILS 11 14
E-601 EXISTING ONE-LINE DIAGRAM 12 14
E-602 NEW WORK ONE LINE DIAGRAM 13 14
E-603 SCHEDULES 14 14
TECHNOLOGY
T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 8
TD101 SECOND FLOOR TECHNOLOGY DEMOLITION PLAN - PHASE 1 2 8
TD102 SECOND FLOOR TECHNOLOGY DEMOLITION PLAN - PHASE 2 3 8
TD103 SECOND FLOOR TECHNOLOGY DEMOLITION PLAN - PHASE 3 4 8
T-101 SECOND FLOOR TECHNOLOGY PLAN - PHASE 1 5 8
T-102 SECOND FLOOR TECHNOLOGY PLAN - PHASE 2 6 8
T-103 SECOND FLOOR TECHNOLOGY PLAN - PHASE 3 7 8
T-501 TECHNOLOGY DETAILS 8 8
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 4
FA101 SECOND FLOOR FIRE ALARM PLAN - PHASE 1 2 4
FA102 SECOND FLOOR FIRE ALARM PLAN - PHASE 2 3 4
FA103 SECOND FLOOR FIRE ALARM PLAN - PHASE 3 4 4
DRAWING LIST
GENERAL
G-001 TITLE SHEET AND INDEX OF DRAWINGS 1 5
G-100 GENERAL INFORMATION AND ICRA EVALUATION 2 5
G-101 ICRA DETAILS 3 5
LS101 SECOND FLOOR OVERALL LIFE SAFETY PLAN 4 5
LS102 SECOND FLOOR LIFE SAFETY PLAN 5 5
STRUCTURAL
S-001 GENERAL NOTES AND DESIGN LOADS 1 4
SD101 SECOND FLOOR DEMOLITION FRAMING PLAN 2 4
S-101 SECOND FLOOR FRAMING PLAN 3 4
S-301 SECTIONS AND DETAILS 4 4
ABATEMENT
HA100 FIRST FLOOR ABATEMENT PLAN - PHASE 2 AND 3 1 4
HA101 SECOND FLOOR ABATEMENT PLANS - PHASE 1 2 4
HA102 SECOND FLOOR ABATEMENT PLANS - PHASE 2 3 4
HA103 SECOND FLOOR ABATEMENT PLANS - PHASE 3 4 4
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 13
A-002 LOGISTICS SITE PLAN 2 13
A-003 GROUND FLOOR CONSTRUCTION ACCESS PLAN 3 13
AD101 SECOND FLOOR DEMOLITION PLANS - PHASE 1 4 13
AD102 SECOND FLOOR DEMOLITION PLANS - PHASE 2 5 13
AD103 SECOND FLOOR DEMOLITION PLANS - PHASE 3 6 13
A-101 OVERALL SECOND FLOOR PLAN - COMPLETE 7 13
A-102 SECOND FLOOR PLANS - PHASE 1 8 13
A-103 SECOND FLOOR PLANS - PHASE 2 9 13
A-104 SECOND FLOOR PLANS - PHASE 3 10 13
A-401 ENLARGED PLANS AND DETAILS 11 13
A-402 PLAN DETAILS 12 13
A-601 DOOR SCHEDULE, TYPES, DETAILS 13 13
INTERIORS
I-001 FINISH SCHEDULE 1 15
I-101 SECOND FLOOR FINISH AND WALL PROTECTION PLAN 2 15
I-121 SECOND FLOOR FLOOR PATTERN PLAN 3 15
I-141 SECOND FLOOR SIGNAGE PLAN AND SCHEDULE 4 15
I-201 CASEWORK ELEVATIONS 5 15
I-202 CASEWORK DETAILS 6 15
I-401 INTERIOR ELEVATIONS - WALL PROTECTION 7 15
I-402 INTERIOR ELEVATIONS - EQUIPMENT 8 15
I-411 OVERALL SECOND FLOOR EQUIPMENT FLOOR PLAN 9 15
I-421 ENLARGED EQUIPMENT PLAN - AREA A 10 15
I-422 ENLARGED EQUIPMENT PLAN - AREA B 11 15
I-423 ENLARGED EQUIPMENT PLANS 12 15
I-431 ENLARGED RESTROOMS AND ELEVATIONS 13 15
I-601 EQUIPMENT SCHEDULE 14 15
I-602 EQUIPMENT SCHEDULE 15 15
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 7
FD101 SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 1 2 7
FD102 SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 2 3 7
FD103 SECOND FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 3 4 7
FX101 SECOND FLOOR FIRE SUPPRESSION PLAN - PHASE 1 5 7
FX102 SECOND FLOOR FIRE SUPPRESSION PLAN - PHASE 2 6 7
FX103 SECOND FLOOR FIRE SUPPRESSION PLAN - PHASE 3 7 7
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 14
PD101 FIRST AND SECOND FLOOR PLUMBING DEMOLITION PLAN - PHASE 1 2 14
PD102 FIRST AND SECOND FLOOR PLUMBING DEMOLITION PLAN - PHASE 2 3 14
PD103 FIRST AND SECOND FLOOR PLUMBING DEMOLITION PLAN - PHASE 3 4 14
PG101 SECOND FLOOR MED GAS PLAN - PHASE 1 5 14
PG102 SECOND FLOOR MED GAS PLAN - PHASE 2 6 14
PG103 SECOND FLOOR MED GAS PLAN - PHASE 3 7 14
PP101 FIRST AND SECOND FLOOR PLUMBING PLAN - PHASE 1 8 14
PP102 FIRST AND SECOND FLOOR PLUMBING PLAN - PHASE 2 9 14
PP103 FIRST AND SECOND FLOOR PLUMBING PLAN - PHASE 3 10 14
P-501 PLUMBING DETAILS 11 14
P-601 PLUMBING SCHEDULES 12 14
P-901 SANITARY RISER DIAGRAM 13 14
P-902 DOMESTIC WATER RISER DIAGRAM 14 14
PROJECT LOCATION
N
BUILDING 52, SECOND
FLOOR CENTER
BUILDING 52
N
DocuSign Envelope ID: 888B11FB-E4E1-443E-953F-123DFA36EAA4
8/23/2021
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
TRUE NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTH
0 4 8 16
THE FOLLOWING SYSTEMS ARE A DESIGN/BUILD RESPONSIBILITY OF THE CONTRACTOR
OR PRODUCT MANUFACTURER AND WILL REQUIRE THE DEFERRED SUBMITTAL OF
DESIGN WORK TO THE CITY OF MELHVILLE FOR PLAN REVIEW AND PERMITTING:
1. FIRE SPRINKLER SYSTEMS
2. FIRE ALARM SYSTEMS
1-1/2"
DIAMETER
GRAB BAR
TOILET
TISSUE
DISPENSER
SANITARY
NAPKIN
DISPOSAL
TOILET
FIXTURE
TOILET
FIXTURE
TOILET
TISSUE
DISPENSER
1-1/2"
DIAMETER
GRAB BAR
EXPOSED
PLUMBING AT
BARRIER
FREE
LAVATORIES
SHALL BE
INSULATED.
SEE PLUMBING
SHEETS FOR
LEVER OR AUTO
OPERATOR TYPE
SOAP DISPENSER
NOTE: SINKS IN COUNTERS TO BE
MOUNTED WITH RIM NO MORE
THAN 2'-10" HIGH AND WITH AT
LEAST 2'-3" KNEE CLEARANCE.
CLEAR
ACCESSIBLE TOILET TYPICAL ACCESSIBLE
CLEARANCE AT LAVATORY
TYPICAL ACCESSIBLE
LAVATORY AND MIRROR
1'-3" 1'-3"
M
IN
M A
X
M
A X
M
A X6
A
.F .F
1'-6"
5'-0" CLEAR
3'-0" 6"
3'-0"
" 3
1'-0" 3'-6"
2'-4"
5'-0" CLEAR
MIN
8"
MAX
6"
M
IN9
M
IN
M
IN
M A
X
17" MIN
FIRE ALARM
CHIME WITH
VISUAL
ALARM LIGHT
FIRE ALARM
PULL STATION
FIRE ALARM
ANNUNCIATOR
FIRE ALARM
INTERCOM
STATION
INTERCOM
MASTER
STATION
INTERCOM
WALL
OUTLET
INTERCOM STATION
DRINKING FOUNTAIN
WHEELCHAIR ACCESSIBLE
(CANTILEVERED STYLE)
17" - 19"
8" MIN
9" MIN 6" MAX
M
IN
T O
P O
F S
P O
U T
' M
A X
/4
T O
B O
T T
O M
O F
R
E F
L E
C T
IV
E
S
U R
F A
C E
O F
M
IR
R
O R
4'-0" MAX TO
HIGHEST OPERABLE
POINT - IF FIRE
EXTINGUISHER
OVER 40 LBS
3'-6" MAX HT.
FIRE EXTINGUISHER
CABINET
ELECTRICAL CABINET
WALL MOUNTED TACKBOARD
AND MARKERBOARD
ACCESSIBLE
ROBE/COAT HOOK
ROBE/COAT
HOOK
TOILET ACCESSORIES
6"
O .C
O.C.
39" - 41"
3'-6" 1'-0"
9" O.C.
2'-0"
/2
M
IN
T O
T O
P
6" 3'-0"
ACCESSIBLE TOILET
WALL MOUNTED
1-1/2"
DIAMETER
GRAB BAR
SANITARY NAPKIN
DISPOSAL
TOILET TISSUE
DISPENSER
TOILET SEAT
COVER
DISPENSER
DUPLEX
OUTLET
SWITCH
THERMOSTAT
TELEPHONE
OR DATA
OUTLET
FIRE ALARM
PULL
INTERCOM
STATION
DUPLEX
OUTLET
COMPUTER
TERMINAL
MISC. WALL DEVICES
PAPER TOWEL DISPENSER/
WASTE RECEPTICLE
PAPER TOWEL
DISPENSER
2'-0" AT SIDEWALLS
AT COUNTER SINKS
1'-6" AT SIDEWALLS
AT LAVATORY
CLOCK
NURSE
CALL
DOME
LIGHT
CLOCK OUTLET
CLOCK & NURSE CALL DEVICES
TELEVISION
OUTLET
WALL MOUNTED TV
F O
R S
T A
N D
IN
G
O
.C
TELEVISION
OUTLET
F O
R S
E A
T E
D
O
.C
NOTE: SEE INTERIOR ELEVATIONS ON "I"
SHEETS FOR DEVICE HEIGHTS THAT
ARE NOT TYPICAL.
2'-0" MAX, 6" MIN
BETWEEN DEVICES (TYP.)
Infection Control Risk Assessment (ICRA)
Project Title:
Description:
Drawing Link:
COR/Frm/PM: Phone:
Ctr Rep: Phone:
Type Construction Activities Risk Service Area
Type A
Inspection and Non-Invasive Activities.
Include, but are not limited to:
☐ Removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet.
☐ Painting (but not sanding).
☐ Wall covering, electrical trim work, minor plumbing, and activities that do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
Low Risk
Office areas; Out Doors; Electrical or Mechanical Rooms;
Social Work; Retail Store; Stage, Recreation, Theater;
Stairwells; Conference Rooms; Other
Medium Risk
Physical and Occupational Therapy; Outpatient Clinics;
Waiting Rooms; Sleep Lab; Mental Health (outpatient only); Prosthetics / Orthotics; Domiciliary; Other
Type B
Small scale, short duration activities that create minimal dust.
Include, but are not limited to:
☐ Installation of telephone and computer cabling.
☐ Access to chase spaces using doors or hatches
(not cutting).
High Risk
Emergency Room; Kitchen or Food Preparation / Dining /
Canteen; Echocardiography; Radiology/MRI; Respiratory
Therapy; Nuclear Medicine; Senior Mental Health (In
Patient or Senior); Community Living Center (CLC); Clean
Supply; Other
Type C
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies.
Includes, but is not limited to:
☐ Sanding or cutting of walls or ceilings.
☐ Removal of floor coverings, ceiling tiles, and casework.
☐ New wall construction.
☐ Minor duct work or electrical work above ceilings.
☐ Major cabling activities.
☐ Any activity that cannot be completed within a single work shift.
Highest Risk
Cardiac Cath, EP Lab or Cardiology; Sterile Processing
Service (SPS); All inpatient medical or surgical units; Care
Units: PACU, MICU, SICU, TCU; Spinal Cord Injury (SCI);
Negative pressure isolation rooms; Outpatient chemotherapy or Oncology areas; Operating Rooms;
Endoscopy; Dialysis; Bronchoscopy; Pharmacy; Clinical
Laboratories; Other
Type D
Major demolition and construction projects.
Includes, but is not limited to:
☐ Activities that require consecutive work shifts.
☐ Requires heavy demolition or removal of a complete cabling system.
☐ New construction.
Risk Group
Const Type
ICRA Classification
Low Med High Highest
Type A I I I II
Type B II II II III/IV
Type C II III III/IV III/IV
Type D III/IV IV IV IV
During construction, perform following daily: Upon completion, performed the following:
1. Execute work by methods to minimize dust dispersal from minor flooring or surface disruptions.
2. For visual inspection only, dampen ceiling tile with water spray before removing. Replace a ceiling tile immediately after inspection; do not leave unattended.
1. Clean up ceiling tile and flooring surfaces below with HEPA filtered vacuum or damp mop.
Class I
3. Provide active means to prevent dust from dispersing. Dust left on the floors, clothing and/or body is not allowed in order to prevent spreading and tracking.
“Active means” are:
a. Vacuum attachments on tools with HEPA vacuum when generating dust, or
b. HEPA vacuuming immediately as the dust is generated.
c. Remove or isolate HVAC system in areas where work is being performed.
d. Water mist work surfaces to control dust while cutting.
e. Seal unused doors with duct tape.
f. Block off and seal all HVAC air vents.
g. Place +tacky mat at inside of entrance of work area and change frequently or when ineffective.
h. Wet mop and/or vacuum with +HEPA-filtered vacuum the work area before leaving the site. Brooming is not sufficient.
4. Whenever transporting outside of construction site, wipe materials, equipment and work surfaces with EPA registered, unscented +disinfectant, which has manufacturer’s labeling as a bactericide, tuberculocide, virucide, and fungicide.
5. There shall be no standing, uncovered water during construction. This includes water in equipment drip pans and open containers within the construction areas. All accidental spills must be cleaned up and dried within 12 hours. Remove and dispose of porous materials that remain damp for more than 72 hours.
2. Wet mop and/or vacuum with
HEPA-filtered vacuum before leaving work area and wipe work surfaces with disinfectant.
3. Contain construction waste before transport in tightly covered containers.
Tape may be used to ensure a tight cover.
4. Remove isolation of HVAC system in areas when work and area cleanup has been completed.
Class II
6. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method before construction begins.
7. Maintain Negative Pressure Ventilation (NPV) at 0.01” Water Column (WC) within the work site utilizing NPV machine.
8. NPV monitoring devices should be visible from outside the worksite and readings shall be documented daily or more often as needed. Keep tracking monitoring device and tracking log at outside of entrance at the site.
9. Contain construction waste before transport in tightly covered containers. Tape covering, unless using form-fitting solid lid.
5. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
6. Do not remove barriers from work area until completed project is thoroughly and inspected by COR, Safety and Infection Control.
Class III
10. Seal holes, pipes, conduits, and punctures. All above
Class IV
11. Construct anteroom and require all personnel to pass through this room to be vacuumed using a HEPA vacuum cleaner before leaving work site OR they can wear cloth or paper coveralls that are removed each time they leave the work site.
12. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
ICRA - Operations Steps Project Title: RENOVATE BUILDING 52 SECOND FLOOR CENTER Project/WO # 657-20-102JB
Identify the areas surrounding the project area, assessing potential impact.
Unit Below Risk Group:
Unit Above Risk Group:
East Risk Group:
West Risk Group:
North Risk Group:
South Risk Group:
-isolation/negative airflow rooms?
-hand hygiene sinks?
-clean or soiled utility rooms ?
Identify containment issues with the project team: traffic flow, housekeeping, and debris removal (if not on dwg).
Also, Insert any EXCEPTIONS or ADDITIONS to above items here.
Interim Life Safety Measures (ILSM) Project Title: Project/WO #
A. EXITS: Does the project/repair have the potential of affecting an exit or other means of egress?
Yes / No
Will the affected exit be used by other than the contractor’s/maintenance personnel? /
Required Actions: An alternate exit must be designated and training is required for those persons affected. Safety office will conduct/coordinate training. Means of exiting construction/repair areas must be inspected and documented by contractor/shop designee on a daily basis to prevent blockages due to debris.
Specific Actions (confirm with Safety Dept):
B. EMERGENCY ACCESS: Does the project/repair have the potential of obstructing access for fire department vehicles, fire fighters, suppression connections, hydrants, or fire lanes?
Required Actions: An alternate means of access must be designated and the St. Louis City (JC)/St. Louis
County (JB) Fire Department and VA Police must be notified by the Safety Office of the alternative.
Specific Actions (confirm with Safety Dept):
C. FIRE PROTECTION: Does the project/repair have the potential of impairing existing fire alarm, detection, or suppression systems?
Will temporary fire protection systems be required as part this project/repair?
Required Actions: If a fire protection or alarm system is to be rendered non-operational for more than 4 hours out of a 24-hour period, either a substitute system or a fire watch must be initiated. If neither of these methods can be implemented, the area must be closed down and evacuated. All of these measures must be coordinated with the Safety Office, VA Police, and the affected staff.
Specific Actions (confirm with Safety Dept):
D. TEMPORARY PARTITIONS: Will construction involve the use of temporary fire or smoke partitions or barriers?
Required Actions: If construction/repair involves major breaches in fire or smoke barriers, the contractor must erect temporary walls around the construction area to have fire and smoke ratings equal, or better, to the barrier rating that has been compromised.
Specific Actions (confirm with Safety Dept):
E. ADDITIONAL FIRE FIGHTING EQUIPMENT AND TRAINING: Does the area affected by the project warrant placement of additional fire protection equipment?
Will additional firefighting training be required by affected personal?
Required Actions: If the fire load of a particular area is significantly increased over normal due to construction, additional firefighting equipment (such as fire extinguishers) will be required. If any of this additional firefighting equipment is of a different type than that already available in the affected area, training in the use of this equipment for staff or contractor personnel is required.
Specific Actions (confirm with Safety Dept):
Identify impact issues (probable disruptions/outages, and describe their corresponding corrective actions).
Noise:
Is the work area in or adjacent to an isolation room?
Identify containment measures:
Note: Renovation/construction area
- shall be isolated from the occupied areas during const. and shall be negative with respect to surrounding areas.
- boundary shared with public or patient care areas must have hard walls.
- using hard walls must use door with door closer and lock; otherwise, plastic walls may use zipper door.
Is there a risk of compromising structural integrity (e.g., wall, ceiling, etc.) due to potential of water damage?
Does the work need to be performed during patient-care hours?
Does this work remove any of the following from service?
F. SMOKING POLICY: Will variance to existing medical center smoking policy be permitted?
Required Actions: If designated smoking areas are impacted or closed due to construction, temporary areas may need to be established.
Specific Actions (confirm with Safety Dept):
G. COMBUSTIBLE LOAD LEVELS: Does the project involve the storage of flammable or combustible materials?
Does the project have the potential for creating flammable or combustible debris?
Required Actions: Surveillance of construction sites will need to be increased to prevent the accumulation of excess flammable or combustible debris. The fire load of the construction area must be kept to a minimum.
Specific Actions (confirm with Safety Dept):
H. FIRE DRILLS: Does the project warrant additional fire drills within the affected areas?
Required Actions: If the life safety features of a particular area are adversely impacted by construction, then the frequency of fire drills must be increased to two per shift per quarter for healthcare/lodger occupancies. Adverse impacts would include blocked fire exits, impaired fire alarm or sprinkler systems, or major compromises in fire or smoke barriers or compartments.
Specific Actions (confirm with Safety Dept):
L. FACILITY-WIDE TRAINING: Does the project present life safety code deficiencies or construction hazards which warrant facility-wide education of personnel concerning the interim life safety measures?
Does the project present occupational health deficiencies which warrant facility-wide education of personnel concerning those procedures?
Required Actions: Training must be provided facility wide to educate staff, patients and visitors to any life safety system that is impaired throughout the entire building. In addition, the St. Louis City (JC)/St. Louis
County (JB) Fire Department and VA Police will be notified.
Specific Actions (confirm with Safety Dept):
Interim Life Safety Measures (ILSM) (con't) Project Title: Project/WO #
I. HAZARD SURVEILLANCE: Does the project present additional hazards, such as excavations, construction storage or field offices, crane work, high voltage, confined spaces, scaffolding, etc., which warrant increased hazard surveillance?
Required Actions: If yes, then a Qualified Person as defined by OSHA must perform the work and additional project surveillance is warranted to identify potential life safety issues.
Specific Actions (confirm with Safety Dept):
J. OCCUPATIONAL HEALTH ISSUES: Do construction workers need to be restricted to dedicated corridors, elevators, or exits?
Is special ventilation required for the area during construction?
Will any disruptions of the water/plumbing system affect the purity of potable water?
Will the construction activities be hazardous to immune-compromised patients?
Required Actions: Any construction activities that adversely affect occupational health issues must be reviewed to minimize the effects. If negative pressurization is required for “special ventilation”, then include a daily reporting of the pressure measurement as part of the the daily ILSM log.
Specific Actions (confirm with Safety Dept):
K. ADDITIONAL PERSONNEL TRAINING: Does the project have the potential of affecting structural features of the fire safety systems?
Does the project have the potential of affecting compartmentalization features of the fire safety systems?
Does the project have the potential for negatively affecting infection control procedures?
Required Actions: Affected personnel must be notified when fire safety systems or infection control procedures are compromised and trained in temporary changes in procedures to compensate for the impaired systems. Examples are the need for alternate fire exits, alarm or sprinkler systems or to evacuate behind secondary fire barriers or compartments due to fire or smoke partition compromises.
Specific Actions (confirm with Safety Dept):
RENOVATE BUILDING 52 SECOND FLOOR CENTER 657-20-102JB
RENOVATION OF THE CENTER PORTION OF BUILDING 52 FOR A NEW SPINAL CORD INJURY TREATMENT CENTER
G-100
RANDY GOFFIN / APOGEE CONSULTING GROUP / ALEX KRAMER
DR. STENSON
Kitchen or Food Preparation / Dining / Canteen
Mechanical Rooms
Office Areas
Office Areas
Out Doors
Out Doors
High Risk
Low Risk
Low Risk
Low Risk
Low Risk
Low Risk
Adjacent Area(s) are a Higher Risk than Work Area; Consider Additional Protective Measures
NO
NO
NO
The contractor will be working behind the construction barriers for the most part. There will be portions of work that must be done after hours due to the impact on the egress passageways. Any work will have access to both stairs and elevators for purpose of removing debris and bring in new material. There will be some overlap of patient and contractor foot traffic, but proper coordination can minimize the interaction.
HAC is available in several locations on the floor and the GC will be responsible for cleaning on a daily and hourly basis to maintain the cleaniness and safety of the facility.
Significant noise will be produced at times during construction. This work will be done at a time that it's impact will be minimal to the occupants below.
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
RENOVATE BUILDING 52 SECOND FLOOR CENTER 657-20-102JB RENOVATE BUILDING 52 SECOND FLOOR CENTER 657-20-102JB
Yes / No
Yes / No
Yes / No
Yes / No
Work will be done to HVAC in the affected area. Valving will provide most controls over the piping, but some shut offs will be required on this floor. Those times will be coordinated by the
GC with the COR and staff to minimize any impact to patients and staff.
Work will be done to the plumbing in the affected area. Some work will be required in the area below. Some temporary shut downs will be required for tie ins and pipe removal. That work will be done off hours to minimize the impact to the patients and staff.
HVAC:
Potable
Water:
No changes to the building water supply will be made. Some fixtures are being replaced (sinks, water coolers) that will not affect the quality of the potable water.
Work will be done to the Electrical system. Some shut downs will be required. The GC will coordinate with the COR to determine times of shut downs to minimize any impact to staff and patients.
Electrical:
X PM/COR/Shopr Representative Infection Prevention Representative
X
Safety Dept. Representative X
Plumbing:
New system to be installed replacing old system.
No major breeches in rated assemblies.
Fire alarms and suppression systems to remain active, GC to have additional fire exiting areas of construction.
Ventilation required per infection control details and layout for each phase.
1. ALL EXISTING CONDITIONS AND SYSTEMS IN THE FOLLOWING ROOMS TO REMAIN:
A. 2S10 B. 2S11 C. 2S11A D. 2S54 E. 2S56
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/1
/2
:2
:4
P
M
G-100
GENERAL INFORMATION AND ICRA
EVALUATION
2 5EJD
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
TJS
GENERAL SYMBOL LEGEND
DEFERRED SUBMITTALS
Scale: No Scale
STANDARD MOUNTING HEIGHTS
DEDUCT ALTERNATES
OUTSIDE OF BUILDING
DAILY CHANGED HEPA
FILTER
HEPA NEGATIVE
AIR UNIT
DAILY CHANGED (OR MORE AS NEEDED)
PRE FILTER
FIRE RATED PLYWOOD
F L E
X D
U C
T
SUPPLY DUCTS EITHER KEEP
RUNNING OR COVER WHEN
RUNNING TO KEEP DUST OUT.
TAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION
A
O
V
FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE
MORE THAN ONE)
TYPE P PLASTIC ZIPPER
WALL CURTAIN BARRIER
6 MIL PLASTIC, SEE PLANS
FOR LOCATION
INDICATOR SHALL BE AT -0.01 OR
GREATER (VERIFY DAILY). IF NOT,
VERIFY ALL OPENINGS SUCH AS
DOORS ARE CLOSED AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER
PROVIDE STICKY MAT, DRY MAT, WET MAT
(CHANGED END OF SHIFT
OR MORE IF NECESSARY
TO MAINTAIN CLEANLINESS)
PROVIDE WIPES AND SPRAY FOR WET MAT
POST ICRA ILSM FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES AND THE DIFFUSERS)
A
E
A
DOOR OPENING
VENT TO OUTSIDE
ROUTE TO BE
APPROVED BY OWNER
TYPE R, N, OR T HARD WALL
ICRA BARRIER WITH SCWD
ACCESS. SEE PLANS FOR
TYPE AND LOCATIONS
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
ICRA, ILSM, FIRE WATCH
AND MISC. FORMS
ILSM SIGNAGE
RENOVATE SECOND FLOOR CENTER, BUILDING 52
THIS EXIT IS CLOSED AND LEADS TO A CONSTRUCTION AREA
FORMS CONTAINER
TO BE CLEAR
PLASTIC
1'-5"
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE
PLEASE USE ALTERNATE EXITS AS MARKED
HEATED DETECTOR CUT-OFF
BASIS OF DESIGN: HEPA
NEGATIVE AIR UNIT INTEGRAL
WITH EDGEGUARD BARRIER
SYSTEM. WEEKLY CHANGED
(OR MORE AS NEEDED) PRE
FILTER
FIRE RATED PLYWOOD (TEMP.
REMOVE GLASS PANEL)
EXISTING WINDOW FRAME
ICRA BARRIER ICRA BARRIER SEE
PLANS FOR TYPE
AND LOCATION
EXISTING CEILING
EXISTING CONCRETE SLAB FLOORING
ROSIN PAPER OR FIRE RATED
PLYWOOD
CEILING CAVITY DUST
CONTAINMENT BARRIER TO BE
USED ABOVE CEILING WHERE
BARRIER STOPS AT CEILING
A. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE COR AND THE MEDICAL CENTER.
B. ACTIVITY HAZARD RISK CLASSIFICATIONS OF CLASS
I OR CLASS II SHALL REQUIRE APPROVAL BY THE
FACILITY SAFETY MANAGER AND CONTRACTING
OFFICER REPRESENTATIVE BEFORE BEGINNING
ANY CONSTRUCTION WORK. HAZARD RISK
CLASSIFICATIONS OF CLASS III OR IV SHALL
REQUIRE A PERMIT BEFORE BEGINNING ANY
CONSTRUCTION WORK. INFECTION CONTROL
PERMITS WILL BE ISSUED BY THE FACILITY SAFETY
MANAGER AND CONTRACTING OFFICER
REPRESENTATIVE.
C. INFECTION CONTROL PERMITS SHALL BE POSTED
OUTSIDE THE APPROPRIATE CONSTRUCTION AREA.
MORE THAN ONE PERMIT MAY BE ISSUED, AS WORK
IS LOCATED IN MULTIPLE AREAS.
D. THE REQUIRED INFECTION CONTROL PRECAUTIONS
ARE AS FOLLOWS:
CLASS 1:
• NOTIFY THE COR.
• EXECUTE WORK USING METHODS TO MINIMIZE
RAISING DUST FROM CONSTRUCTION OPERATIONS.
• CEILING TILES: IMMEDIATELY REPLACE ANY CEILING
TILES DISPLACED FOR VISUAL INSPECTION.
• UPON COMPLETION: CLEAN WORK AREA, AND
NOTIFY COR.
CLASS 2:
• NOTIFY THE COR.
• PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE
DUST FROM DISPERSING INTO ATMOSPHERE SUCH
AS WET METHODS OR TOOL MOUNTED DUST
COLLECTORS.
• WATER MIST WORK SURFACES TO CONTROL DUST
WHILE CUTTING.
• SEAL UNUSED DOORS WITH PAINTERS TAPE.
• BLOCK OFF AND SEAL AIR VENTS.
• REMOVE OR ISOLATE HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
• UPON COMPLETION: WIPE WORK SURFACES WITH
CLEANER/ DISINFECTANT. CONTAIN CONSTRUCTION
WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
CLASS 3:
DURING CONSTRUCTION WORK:
• OBTAIN PERMIT FROM THE COR.
• REMOVE OR ISOLATE HVAC SYSTEM IN AREA
WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL
CUBE METHOD (CART WITH PLASTIC COVERING AND
SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS. INSTALL CONSTRUCTION
BARRIERS AND CEILING PROTECTION CAREFULLY,
OUTSIDE OF NORMAL WORK HOURS.
• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF
WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS AND
CONTINUOUSLY MONITORED WITH A DIGITAL
DISPLAY, RECORDING AND ALARM INSTRUMENT,
WHICH MUST BE CALIBRATED ON INSTALLATION,
MAINTAINED WITH PERIODIC CALIBRATION AND
MONITORED BY THE CONTRACTOR.
• CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED CONTAINERS.
• COVER TRANSPORT RECEPTACLES OR CARTS.
TAPE COVERING UNLESS SOLID LID.
UPON COMPLETION:
• DO NOT REMOVE BARRIERS FROM WORK AREA
UNTIL COMPLETED PROJECT THOROUGHLY
CLEANED, AND IS INSPECTED BY THE CONTRACTING
OFFICER REPRESENTATIVE AND BY THE VA
ENVIRONMENTAL SERVICES DEPARTMENT.
• REMOVE CONSTRUCTION BARRIERS AND CEILING
PROTECTION CAREFULLY TO MINIMIZE SPREADING
OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION, OUTSIDE OF NORMAL WORK
HOURS.
• VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
• WET MOP AREA WITH CLEANER/DISINFECTANT.
• UPON COMPLETION, RESTORE HVAC SYSTEM
WHERE WORK WAS PERFORMED.
• RETURN PERMIT TO THE COR.
CLASS 4:
DURING CONSTRUCTION WORK:
• OBTAIN PERMIT FROM THE COR.
• ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS
BEING DONE TO PREVENT CONTAMINATION OF
DUCT SYSTEM.
• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL
CUBE METHOD (CART WITH PLASTIC COVERING AND
SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS. INSTALL CONSTRUCTION
BARRIERS AND CEILING PROTECTION CAREFULLY,
OUTSIDE OF NORMAL WORK HOURS.
• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF
WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS AND
CONTINUOUSLY MONITORED WITH A DIGITAL
DISPLAY, RECORDING AND ALARM INSTRUMENT,
WHICH MUST BE CALIBRATED ON INSTALLATION,
MAINTAINED WITH PERIODIC CALIBRATION AND
MONITORED BY THE CONTRACTOR.
• SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.
• CONSTRUCT ANTEROOM AND REQUIRE ALL
PERSONNEL TO PASS THROUGH THIS ROOM SO
THEY CAN BE VACUUMED USING A HEPA VACUUM
CLEANER BEFORE LEAVING WORK SITE OR THEY
CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE
REMOVED EACH TIME THEY LEAVE WORK SITE.
• ALL PERSONNEL ENTERING WORK SITE ARE
REQUIRED TO WEAR SHOE COVERS. SHOE COVERS
MUST BE CHANGED EACH TIME THE WORKER EXITS
THE WORK AREA.
UPON COMPLETION:
• DO NOT REMOVE BARRIERS FROM WORK AREA
UNTIL COMPLETED PROJECT THOROUGHLY
CLEANED, AND IS INSPECTED BY THE CONTRACTING
OFFICER REPRESENTATIVE AND BY THE VA
ENVIRONMENTAL SERVICES DEPARTMENT.
• REMOVE CONSTRUCTION BARRIERS AND CEILING
PROTECTION CAREFULLY TO MINIMIZE SPREADING
OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION, OUTSIDE OF NORMAL WORK
HOURS.
• CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED CONTAINERS.
• COVER TRANSPORT RECEPTACLES OR CARTS.
TAPE COVERING UNLESS SOLID LID.
• VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
• WET MOP AREA WITH CLEANER/DISINFECTANT.
• UPON COMPLETION, RESTORE HVAC SYSTEM
WHERE WORK WAS PERFORMED.
• RETURN PERMIT TO THE COR.
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
5"
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
5"
3 5/8" 16 GAUGE METAL
STUDS @ 16" O.C. WALL TO
EXTEND TO UNDERSIDE OF
DECK
A B
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. (2) LAYERS 5/8"
GYPSUM BOARD EACH SIDE.
WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
6 1/4"
C
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
SMOKE RATED 2-HR RATED AND
SMOKE RATED
U.L. DESIGN NO. U404 D
PLASTIC SHEET BARRIER
NON RATED
PLASTIC SHEET
BARRIER
EXISTING WALL
ASSEMBLY
EXISTING CEILING
BOTTOM SEALING
RUNNER
TOP SEALING
RUNNER
SUPPORT POLES,
QUANTITY PER
MANUF.
RECOMMENDATIONS
REQU.
AS
INFECTION CONTROL RISK ASSESSMENT (ICRA) (GENERAL)
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THEDESIGNATION FOR THIS PROJECT AS INDICATED IN ICRA MATRIX FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.
2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND LOCATE A STAGING AREA FOR TYVEK SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE TIGHT SEALS SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.
3. A DWYER GAUGE SHALL BE USED AT CONSTRUCTION ENTRY TO VALIDATE NEGATIVE AIR FLOWS.
4. AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 16.
5. PROVIDE STICKY MATS AT THE PLASTIC BARRIER ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
6. USE CORRIDORS AS INDICATED ON CONSTRUCTION ACCESS PLANS AS PRIMARY CONSTRUCTION ACCESS.
7. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN
TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
8. CONTRACTOR SHALL USE ISOLATION CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND THE
CONSTRUCTION STAGING/PREP AREA.
9. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, DESIGNATED TRAFFIC ROUTES SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.
10. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION FROM ANY ADJACENT EXCAVATION
DEBRIS.
VENTILATION AND ENVIRONMENTAL CONTROLS
11. AIR SYSTEM FLOW: THE COR SHALL VERIFY AND NOTIFY CONTRACTOR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS COVERED AS NEEDED WITH
FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY AREAS.
12. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST INTO A ROOM, A PRE-FILTER AND HEPA FILTER
SHALL BE USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.
13. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL BE VERIFIED DAILY.
14. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT
THE PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES EQUIPMENT AND RELATED AREAS
15. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA..
16. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS
INSPECTED AND APPROVED THE CLEANING.
17. AIR BALANCING AND AHU STARTUP ARE NOT PERMISSABLE PRIOR TO REVIEW AND APPROVAL OF EXTENSIVE
"CONSTRUCTION CLEAN" BY THE CONTRACTOR.
PHASING AND EGRESS
18. THE VA RESERVES THE RIGHT TO ADJUST THE PHASING LIMITS AND WORK HOURS OR ENTIRE CONSTRUCTION
DURATION AS NECESSARY FOR THE BENEFIT OF THE OPERATION OF THE HOSPITAL.
19. ALTHOUGH EGRESS IN THE CONSTRUCTION PHASES IS RESTRICTED DURING CONSTRUCTION HOURS, EMERGENCY EGRESS IN CORRIDORS MUST BE MAINTAINED WHEN POSSIBLE. WHEN EMERGENCY EGRESS CANNOT BE PROVIDED, THE CONTRACTOR SHALL DEVELOP AN INTERIM LIFE SAFETY PLAN, WITH ALL APPLICABLE TEMPORARY SIGNAGE, TO
BE APPROVED BY THE VA SAFETY DEPARTMENT, SIGNAGE BY CONTRACTOR.
20. DRILLING INTO EXISTING LEAD CONTAINING YELLOW GLAZED TILE AND HAZARDOUS MATERIALS IN ADDITION AND RENOVATION PROJECTS: ACTIVITIES WILL BE PERFORMED IN ICRA APPLICABLE PLASTIC TENT/ ENCLOSURE USING AN
IMPACT DRILL WITH INTEGRAL HEPA FILTERED VACUUM.
TYPE "A" DOOR -
WHERE INDICATED ON PLANS, IN ALL TYPE "A" INFECTION CONTROL
BARRIERS, USE A FLUSH 3'-0"x7'-0" SOLID CORE WOOD DOOR WITH 45 MINUTE
RATING. DOORS TO BE IN HOLLOW METAL DOOR FRAME AND USE DOOR
HARDWARE SET HW-4A. SEE SPECIFICATIONS FOR DOOR HARDWARE.
TYPE "D" DOOR -
WHERE INDICATED ON PLANS, IN ALL TYPE "D" INFECTION CONTROL
BARRIERS, USE A FLUSH 3'-0"x7'-0" SOLID CORE WOOD DOOR . DOORS TO BE
IN HOLLOW METAL DOOR FRAME AND USE DOOR HARDWARE SET HW-4. SEE
SPECIFICATIONS FOR DOOR HARDWARE.
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/1
/2
:2
:5
P
M
G-101
ICRA DETAILS
3 5EJD
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
TJS
Scale: 1/2" = 1'-0"
TYPICAL ICRA CONSTRUCTION PLAN LAYOUT
Scale: 1/2" = 1'-0"
ICRA MOBILE CONTAINMENT CART
Scale: 3" = 1'-0"
ILSM SIGNAGE
Scale: 1/2" = 1'-0"
CROSS SECTION A
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPES
ICRA DOOR TYPES
UP
UP
S S
S
S S
S S
S
SS
S S
S S
S S
S
S
316 SF S
HEALTHCARE
OPEN OFFICE
385 SF P
HEALTHCARE
GROUP ROOM
168 SF P
HEALTHCARE
TELEHEALTH
88 SF S
HEALTHCARE
MEDS
233 SF P
HEALTHCARE
WAITING
227 SF P
HEALTHCARE
EXAM 6
155 SF P
HEALTHCARE
EXAM 5
2 159 SF P
HEALTHCARE
EXAM 4
2 150 SF P
HEALTHCARE
EXAM 3
2 152 SF P
HEALTHCARE
EXAM 2
262 SF C
HEALTHCARE
LOGISTICS STORAGE
152 SF P
HEALTHCARE
CONSULT
308 SF S
HEALTHCARE
CONFERENCE
11 146 SF IT
HEALTHCARE
OI&T_
99 SF C
HEALTHCARE
SOILED UTILITY
144 SF S
HEALTHCARE
OFFICE (PSYCH)
142 SF S
HEALTHCARE
OFFICE (SW)
S
S S
S
S
167 SF C
HEALTHCARE
EQUIP STORAGE
N2
N1
N4
N3
CAPACITYCLR
STAIR
EXIT
38" 127
CAPACITYCLR
STAIR
EXIT
42" 140
CAPACITYCLR
STAIR
EXIT
38" 127
CAPACITYCLR
HORIZONTAL
EXIT
82" 410
CAPACITYCLR
HORIZONTAL
EXIT
82" 410
FEC
FEC
FEC
121 SF S
HEALTHCARE
RECEPTION
39 SF C
HEALTHCARE
SOILED LINEN
182 SF P
HEALTHCARE
EXAM 1
36 SF C
HEALTHCARE
STORAGE
EGRESS WIDTH
(per IBC 1005.3.1)
COMMON PATH OF TRAVEL
(per IBC Table 1006.2.1)
EXIT ACCESS TRAVEL
(per IBC TABLE 1017.2)
DEAD-END CORRIDOR
(per IBC 1020.4)
STAIR 1 EXIT DOORS =
38"/(0.30) = 127 PPL
STAIR 2 EXIT DOORS =
38"/(0.30) = 127 PPL
STAIR 3 EXIT DOOR =
42"/(0.30) = 140 PPL
62'-0" MAXIMUM
100'-0" ALLOWED
118'-6" MAXIMUM DISTANCE
200'-0" ALLOWED
22'-6" MAXIMUM
50'-0" ALLOWED
OCCUPANT LOAD
(per IBC TABLE 1004.1 and NFPA 7.3.1.2)
TOTAL BUILDING
77,972 GSF/150 = 520 PPL
SECOND FLOOR -
28,574 GSF/150 = 191 PPL
GROSS BUILDING AREA
(OUTSIDE FACE WALLS)
77,972 SF
GROSS MEASURED AREA
(INTERIOR FACE WALLS)
75,774 SF
REQUIRED # OF EXITS
(per IBC 1015.1)
2 REQUIRED, 3 PROVIDED
REQUIRED DISTANCE
BETWEEN EXITS
36'-6" MINIMUM,
111'-6" PROVIDED
FLOOR
FLOOR AREAS (per TABLE 506.2):
EXISTING NEW TOTAL
0 SF
AREA TOTAL = 77,972 SF
AREA ALLOWED = 112,500 SF
FIRST 31,818 SF
EGRESS INFORMATION
BUILDING HEIGHT = 2 STORIES + BASEMENT - < 85'-0"
EXSTING BUILDING
ALLOWABLE HEIGHT = 6 STORIES - 85'-0"
AREA AND HEIGHT REQUIREMENTS:
SERVICE SINKS
X
PLUMBING CODE REVIEW
MALEFIXTURE FEMALE
X
DRINKING FOUNTAINS
LAVATORIES
URINALS
WATER CLOSETS
X X
X
X
31,818 SF
0 SFSECOND 28,574 SF28,574 SF
0 SFBASEMENT 17,580 SF17,580 SF
RENOVATED AREA = 6,292 SF
SCOPE OF WORK LEGEND
AREA NOT IN SCOPE
SCOPE OF WORK BOUNDARY
EGRESS PATH
XXX
XXX
FEC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS
CAPACITY
EGRESS PATH TAG
EGRESS PATH TAG -
COMMON PATH
EXIT
IDENTIFICATION
FIRE EXTINGUISHER CABINET
HAZARDOUS AREA
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/1
/2
:2
:5
P
M
LS101
SECOND FLOOR OVERALL LIFE SAFETY
PLAN
4 5EJD
RENOVATE SECOND FLOOR
CENTER, JB BLDG 52
1 JEFFERSON BARRACKS DR,
ST. LOUIS, MO 63125
AUGUST 25, 2021
BID DOCUMENTS
657-20-102JB20-028
TJS
N O
R T
H0 8 16 32
Scale: 1/16" = 1'-0"
OVERALL SECOND FLOOR PLAN - LIFE SAFETY
CODE INFORMATION
EGRESS PATH "N1"
PATH ID LENGTH
N1 (COMMON) 60' - 1 9/32"
TOTAL PATH LENGTH 60' - 1 9/32"
EGRESS PATH "N2"
PATH ID LENGTH
N2 56' - 6"
TOTAL PATH LENGTH 56' - 6"
EGRESS PATH "N3"
PATH ID LENGTH
N3 53' - 7 13/32"
TOTAL PATH LENGTH 53' - 7 13/32"
EGRESS PATH "N4"
PATH ID LENGTH
N4 (COMMON) 44' - 7 15/16"
TOTAL PATH LENGTH 44' - 7 15/16"
PROPOSED USE:
OWNED BY: PRIVATE
LOCAL GOVERNMENT
CITY/COUNTY
STATE
CODE ENFORCEMENT JURISDICTION: CITY
COUNTY
APPLICABLE CODES:
GENERAL CODE INFORMATION:
NEW CONSTRUCTION
RENOVATION (EXISTING BUILDING)
CONSTRUCTION TYPE:
MIXED CONSTRUCTION
SPRINKLERED
MEZZANINE
MIXED OCCUPANCY
PRIMARY OCCUPANCY:
SECONDARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
OUTPATIENT TREATMENT
TYPE II-B
BUSINESS
2018 International Building Code
2018 International Plumbing Code
2018 International Energy Conservation Code 2018 International Mechanical Code 2018 NFPA 101 Life Safety Code 2017 NFPA 70 National Electrical Code
2010 ADA Code 2018 NFPA 101 Life Safety Code
VA Design Guide Architectural Manual 2014 August 01
ASHRAE 90.1-2016
2010 ADA Standards for Accessible Design
RENOVATE SECOND FLOOR CENTER, JB
BLDG 52
1 JEFFERSON BARRACKS DR, ST.
LOUIS, MO 63125
ST. LOUIS VA MEDICAL CENTER
JEFFERSON BARRACKS
RENOVATED AREA
Level Gross Area
SECOND FLOOR 7275 SF
RENOVATED AREA
Level Net Area
SECOND FLOOR 6832 SF
LIFE SAFETY LEGEND
S
S S
S S
S
SS
S S
S S
S
S
S
S
316 SF S
HEALTHCARE
OPEN OFFICE
168 SF P
HEALTHCARE
TELEHEALTH
88 SF S
HEALTHCARE
MEDS
233 SF P
HEALTHCARE
WAITING
227 SF P
HEALTHCARE
EXAM 6
155 SF P
HEALTHCARE
EXAM 5
2 159 SF P
HEALTHCARE
EXAM 4
2 150 SF P
HEALTHCARE
EXAM 3
2 152 SF P
HEALTHCARE
EXAM 2
62 SF C
HEALTHCARE
LOGISTICS STORAGE
152 SF P
HEALTHCARE
CONSULT
2 308 SF S
HEALTHCARE
CONFERENCE
11 146 SF IT
HEALTHCARE
OI&T_
S S
S
S S
N2
N1
N4
N3
CAPACITYCLR
STAIR
EXIT
38" 127
CAPACITYCLR
HORIZONTAL
EXIT
82" 410
CAPACITYCLR
HORIZONTAL
EXIT
82" 410
385 SF P
HEALTHCARE
GROUP ROOM
167 SF C
HEALTHCARE
EQUIP STORAGE
121 SF S
HEALTHCARE
RECEPTION
99 SF C
HEALTHCARE
SOILED UTILITY
1 144 SF S
HEALTHCARE
OFFICE (PSYCH)
2 142 SF S
HEALTHCARE
OFFICE (SW)
FEC FEC
FEC
36 SF C
HEALTHCARE
STORAGE
1 39 SF C
HEALTHCARE
SOILED LINEN
182 SF P
HEALTHCARE
EXAM 1
36 SF IT
HEALTHCARE
FAC DATA RM
EGRESS WIDTH
(per IBC 1005.3.1)
COMMON PATH OF TRAVEL
(per IBC Table 1006.2.1)
EXIT ACCESS TRAVEL
(per IBC TABLE 1017.2)
DEAD-END CORRIDOR
(per IBC 1020.4)
STAIR 1 EXIT DOORS =
38"/(0.30) = 127 PPL
STAIR 2 EXIT DOORS =
38"/(0.30) = 127 PPL
STAIR 3 EXIT DOOR =
42"/(0.30) = 140 PPL
62'-0" MAXIMUM
100'-0" ALLOWED
118'-6" MAXIMUM DISTANCE
200'-0" ALLOWED
22'-6" MAXIMUM
50'-0" ALLOWED
OCCUPANT LOAD
(per IBC TABLE 1004.1 and NFPA 7.3.1.2)
TOTAL BUILDING
77,972 GSF/150 = 520 PPL
SECOND FLOOR -
28,574 GSF/150 = 191 PPL
GROSS BUILDING AREA
(OUTSIDE FACE WALLS)
77,972 SF
GROSS MEASURED AREA
(INTERIOR FACE WALLS)
75,774 SF
REQUIRED # OF EXITS
(per IBC 1015.1)
2 REQUIRED, 3 PROVIDED
REQUIRED DISTANCE
BETWEEN EXITS
36'-6" MINIMUM,
111'-6" PROVIDED
FLOOR
FLOOR AREAS (per TABLE 506.2):
EXISTING NEW TOTAL
0 SF
AREA TOTAL = 77,972 SF
AREA ALLOWED = 112,500 SF
FIRST 31,818 SF
EGRESS INFORMATION
BUILDING HEIGHT = 2 STORIES + BASEMENT - < 85'-0"
EXSTING BUILDING
ALLOWABLE HEIGHT = 6 STORIES - 85'-0"
AREA AND HEIGHT REQUIREMENTS:
SERVICE SINKS
X
PLUMBING CODE REVIEW
MALEFIXTURE FEMALE
X
DRINKING FOUNTAINS
LAVATORIES
URINALS
WATER CLOSETS
X X
X
X
31,818 SF
0 SFSECOND 28,574 SF28,574 SF
0 SFBASEMENT 17,580 SF17,580 SF
RENOVATED AREA = 6,292 SF
SCOPE OF WORK LEGEND
AREA NOT IN SCOPE
SCOPE OF WORK BOUNDARY
EGRESS PATH
XXX
XXX
FEC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS
CAPACITY
EGRESS PATH TAG
EGRESS PATH TAG -
COMMON PATH
EXIT
IDENTIFICATION
FIRE EXTINGUISHER CABINET
HAZARDOUS AREA
A. SEE SHEETS G0.1 & A0.1 FOR SYMBOLS AND
ABBREVIATIONS.
B. SEE CIVIL DRAWINGS FOR INFORMATION INCLUDING
CONCRETE SIDEWALKS, CONCRETE PADS, AND
PARKING CONFIGURATIONS. CIVIL BACKGROUND
DRAWING INFORMATION IS FOR REFERENCE ONLY.
C. SEE STRUCTURAL DRAWINGS FOR FRAMING
INFORMATION & FRAMING DIMENSIONS. ALL
DIMENSIONS ARE FOR REFERENCE ONLY- VERIFY ALL
FRAMING WITH STRUCTURAL DRAWINGS.
D. REFER TO PLUMBING DRAWINGS FOR INFORMATION
CONCERNING PLUMBING FIXTURES AND PIPING
SYSTEM(S).
E. REFER TO MECHANICAL DRAWINGS FOR
INFORMATION CONCERNING HVAC SYSTEM(S).
F. REFER TO ELECTRICAL DRAWINGS FOR INFORMATION
CONCERNING POWER, LIGHTING AND
COMMUNICATION SYSTEM(S).
G. REFER TO ELECTRICAL DRAWING FOR FIRE ALARM
NOTIFICATION AND EMERGENCY EGRESS LIGHTING
LOCATIONS.
H. REFER TO PARTITION TYPES FOR FURTHER FIRE
SEPARATION REQUIREMENTS.
I. CONTRACTOR TO PROVIDE ALL ADDITIONAL FRAMING
NECESSARY FOR ALL OPENINGS AND SUPPLEMENTAL
FRAMING ABOVE PARTITIONS.
J. ALL FIRE RATED ASSEMBLIES SHALL BE INSTALLED IN
STRICT ACCORDANCE WITH TESTED ASSEMBLIES
INDICATED.
K. EXTEND EXTEND FIRE RATED PARTITIONS, BARRIERS,
AND OTHER SEPARATIONS TO BOTTOM OF
ROOF/FLOOR DECK ABOVE (OR AS DIRECTED BY UL
ASSEMBLY) AND TO EXTERIOR WALL. SEAL JOINT
BETWEEN EDGES OF PARTITION WITH FIRE RATED
SEALANT AND/OR INTUMESCENT ASSEMBLY.
L. ALL PENETRATIONS OF FIRE-RATED ASSEMBLIES
SHALL BE FIRE-SEALED IN ACCORDANCE WITH
APPROVED MANUFACTURER'S DETAIL FOR LOCATION,
TYPE OF CONSTRUCTION, PENETRATING ITEM AND
RATING REQUIRED.
M. ALL DUCTWORK, DIFFUSERS AND GRILLES
PENETRATING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .