About this file

This pre-solicitation notice is for a construction project to renovate approximately 7,200 gross square feet on the second floor center of Building 52 at the Jefferson Barracks Division VA Medical Center in St. Louis, Missouri. The project scope includes renovating former procedure rooms comprising approximately 1,600 square feet, as well as light to medium renovation of administrative offices. Facility deficiencies will be corrected not to exceed 75% of the total project cost, which is estimated between $2 million and $5 million. The NAICS code for this procurement is 236220 for general commercial and institutional building construction. The contract duration is estimated at 410 calendar days from notice to proceed. This opportunity is a total small business set-aside for Service-Disabled Veteran-Owned Small Businesses. The solicitation will be posted on beta.SAM.gov on or about October 15, 2021, and a site visit is scheduled. Proposals are due in accordance with instructions in the solicitation package.

View the file

Other files

File Type Posted
Scan_2021_11_02_14_28_13_296.pdf PDF
36C25522R0002 0001.docx DOCX document
36C25522R0002_1.docx DOCX document
P09_S02 -20-028 Specifications 657-20-102JB (1448 pages) final.pdf PDF
2 Struct BD.pdf PDF
9 Elec BD.pdf PDF
7 Plumb BD.pdf PDF
4 Arch BD.pdf PDF
5 IntD BD.pdf PDF
8 Mech BD.pdf PDF
Past Performance Questionnaire 36C25522R0002 (Project 657-20-102JB).pdf PDF
1 Gen BD.pdf PDF
6 FP BD.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS KEY NOTES:

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

CONSULTANTS: PROJECT MANAGER:

Date Checked Drawn U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

An Alliance for Success

HA100

FIRST FLOOR ABATEMENT PLAN -

PHASE 3

1 4GKY RAJ

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR, ST.

LOUIS, MO 63125

657-20-102JB20-028

RANDY GOFFIN

Scale: 1/8" = 1'-0"

FIRST FLOOR TSI ABATEMENT PLAN - PHASE 3

N O

R

TH

0 4 8 16

INSIDE A NEGATIVE PRESSURE MINI-CONTAINMENT REMOVE

ASBESTOS PIPE INSULATION AND ASBESTOS MUDDED

FITTINGS USING GLOVEBAG REMOVAL TECHNIQUES.

- 1 EACH MUDDED PIPE FITTING

A1.

ABATEMENT LEGEND

REMOVE ACM PIPE INSULATION AND FITTINGS AS

INDICATED IN KEYNOTES.

THE ABATEMENT SCOPE OF THE WORK IN BUILDING 52

CONSISTS OF REMOVING VARIOUS ASBESTOS AND LEAD

IMPACTED MATERIALS THROUGHOUT THE PROJECT LIMITS.

ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL

FEDERAL, STATE AND LOCAL REGULATIONS AND THE

CONTRACT SPECIFICATIONS.

IN BUILDING 52, ASBESTOS CONTAINING PIPE INSULATION IS

PRESENT THROUGHOUT THE WORK AREAS ON THE 1ST

FLOOR, BUT MAY NOT BE DIRECTLY IMPACTED UNLESS

INDICATED BY THE KEYNOTES. PROTECT AS REQUIRED TO

PREVENT ANY DAMAGE OR DISTURBANCE.

ASBESTOS TRANSITE PANELS SHOULD BE ASSUMED TO BE

PRESENT BEHIND RADIATORS. NO ABATEMENT OF THIS

MATERIAL IS ANTICIPATED AND SHALL BE PROTECTED AS

REQUIRED.

LEAD-CONTAINING GLAZED BLOCK WALLS ARE LOCATED

THROUGHOUT THE PROJECT LIMITS, BUT WILL ONLY BE

IMPACTED IN AREAS IDENTIFIED WITH SPECIFIC KEYNOTES.

REMAINING WALLS SHALL BE PROTECTED AS REQUIRED.

ALL ABATEMENT WORK SHALL BE CONDUCTED DURING

ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS; EXCEPT THE OUT OF

PHASE WORK WHICH SHALL BE ACCOMPLISHED AT NIGHT

(5:00 PM TO 5:00 AM) OR ON A WEEKEND (5:00 PM FRIDAY TO

6:00 PM SUNDAY). DUE TO THE EXTENTS OF ABATEMENT,

MULTIPLE PHASES (INCLUDING SUB-PHASES), MULTIPLE

MOBILIZATIONS, AND MULTIPLE WEEKENDS WILL BE

REQUIRED. PROPER COORDINATION WITH ALL PARTIES WILL

BE REQUIRED.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES,

CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO

THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED

BY THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL

AND EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED

WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS

ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH

THE VA COR.

ABATED PIPE INSULATION AND FITTINGS, EXCLUDING PIPING

THAT WILL BE DEMOLISHED, SHALL BE PROPERLY

RE-INSULATED WITH EQUIVALENT INSULATING PROPERTIES IN

ACCORDANCE WITH VA SPECIFICATION 23 07 11, HVAC AND

BOILER PLANT INSULATION.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS

AND WASTE DISPOSAL CONTAINERS SHALL BE FIELD

VERIFIED WITH THE VA COR AND VPIH. ALL LOADOUT

PROCEDURES SHALL BE COORDINATED WITH THE VA COR

AND VPIH. SEE DEMOLITION DRAWINGS FOR TEMPORARY

PARTITION AND INFECTION CONTROL DETAILS.

ALL PERIMETER AIR MONITORING, CLEARANCE SAMPLING,

AND WIPE SAMPLING WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR

RELOCATING ALL EQUIPMENT, COMPUTERS, SUPPLIES,

FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE

ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO,

HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN

DURING ALL ABATEMENT ACTIVITIES. ABATEMENT OF

ASBESTOS PIPE INSULATION AND FITTING INSULATION FROM

THE STEAM PIPING MUST BE ACCOMPLISHED WHEN THE

STEAM PIPES ARE LESS THAN 150 DEGREES FAHRENHEIT. ALL

REQUIRED STEAM SHUTDOWNS SHALL BE PROPERLY

COORDINATED WITH THE VA TO MINIMIZE IMPACT TO THE

HOSPITAL OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA

COR, VPIH, GENERAL CONTRACTOR AND ABATEMENT

CONTRACTOR SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION

OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT

AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT

RECOGNIZE THE HUD DEFINITION AS A THRESHOLD VALUE

FOR LEAD EXPOSURE. ALTHOUGH THE POTENTIAL LEAD

HAZARD FOR NORMAL DEMOLITION OR CONSTRUCTION

ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY

SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK,

PROCEDURE AND OTHER WORK AREA CONDITIONS. PROPER

OSHA COMPLIANCE IS CONSIDERED PERFORMANCE BASED

AND INCLUDES EVALUATING POTENTIAL WORK EXPOSURES

WITH AIR MONITORING OR BIOLOGICAL EXPOSURE

MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS

THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

SHEET NOTES:

A1

PHASE 3 (NIGHTS & WEEKENDS):

LIMITS OF NEGATIVE PRESSURE MINI-CONTAINMENT

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREAS S S S

AUGUST 25, 2021

S

S S

S S

S S

S S

S

S

S

S S

S S

S S

S S

S SS

S S

S

S

S

S

EXAM 1

2S05

TREAT.

RM.

2S05

EXAM

2S04

CHASE

CH-S-3

HALLWAY

2N113

EXAM

2S01

STAIRWELL

NO. 2

2S02

OFFICE

2N111

OFFICE

2S11A

OFFICE

2S11

HAC

2S10

ELEC.

CLOSET

2S9

ELEVATOR

LOBBY

2S57

ELEVATOR

E2

CORRIDOR

H204

OI&T

2S53

CONFERENCE

RM

2S56

PAIN

REHAB.

CENTER

2S56A

SCI

SERVICE

REHAB.

CENTER

2N117A

CORRIDOR

H205

ELEVATOR

E3

P.T. / O.T.

2N58

EXAM

2N118

CORRIDOR

H208

WAITING

ROOM

2N112A

OFFICE

2N63

OFFICE

2N60

OFFICE

2N59

OFFICE

2N59A

WHEELCHAIR

STORAGE

2N110

HAC

2N64

CONTROL

RM.

2N110

VEST.

2N110

CHASE

CH-S-6

EXAM

2S12B

CLOSET

2N59B

S S

S S

S S

S S

S S

S

S

S

S S

S S

S S

S S

S SS

S S

S

S

S

S

EXAM 1

2S05

TREAT.

RM.

2S05

EXAM

2S04

CHASE

CH-S-3

HALLWAY

2N113

EXAM

2S01

STAIRWELL

NO. 2

2S02

OFFICE

2N111

OFFICE

2S11A

OFFICE

2S11

HAC

2S10

ELEC.

CLOSET

2S9

ELEVATOR

LOBBY

2S57

ELEVATOR

E2

CORRIDOR

H204

OI&T

2S53

CONFERENCE

RM

2S56

PAIN

REHAB.

CENTER

2S56A

SCI

SERVICE

REHAB.

CENTER

2N117A

CORRIDOR

H205

ELEVATOR

E3

P.T. / O.T.

2N58

EXAM

2N118

CORRIDOR

H208

WAITING

ROOM

2N112A

OFFICE

2N63

OFFICE

2N60

OFFICE

2N59

OFFICE

2N59A

WHEELCHAIR

STORAGE

2N110

HAC

2N64

CONTROL

RM.

2N110

VEST.

2N110

CHASE

CH-S-6

EXAM

2S12B

CLOSET

2N59B

ASBESTOS KEY NOTES: LEAD KEY NOTES:

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

CONSULTANTS: PROJECT MANAGER:

Date Checked Drawn U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

1151 Kildaire Farm Rd.

Suite 120

Raleigh, NC 27511 www.acg-pa.com

(919)858-7420

108 Benton Lodge Road Suite B

Summerville, SC 29485 www.cemsengineering.com

(843)875-3637

Project Mgr: Alex Kramer (APOGEE)

An Alliance for Success

HA101

SECOND FLOOR ABATEMENT PLANS -

PHASE 1

2 4GKY RAJ

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR, ST.

LOUIS, MO 63125

657-20-102JB

20-028

RANDY GOFFIN

N

O

R

T

H

0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR TSI AND LEAD ABATEMENT PLAN - PHASE 1

Scale: 1/8" = 1'-0"

SECOND FLOOR FLOORING ABATEMENT PLAN - PHASE 1

N

O

R

T

H

0 4 8 16

INSIDE A NEGATIVE PRESSURE CONTAINMENT, DEMOLISH

PLASTER WALLS AND CEILINGS, REMOVE LEAD SHIELDING,

LEAD SHIELDED DOORS, DOOR FRAMES AND VIEWING

WINDOWS USING HAND TOOLS AND DISMANTLING

TECHNIQUES.

- PHASE 1A: 1,650 SF OF PLASTER WALLS, CEILINGS AND

LEAD SHIELDING, 3 EACH LEAD SHIELDED

DOORS AND FRAMES, 1 EACH LEAD SHIELDED

VIEWING WINDOW

INSIDE A NEGATIVE PRESSURE CONTAINMENT DEMOLISH

LEAD-CONTAINING GLAZED BLOCK BATHROOM STALL WALL

USING HAND TOOLS.

- PHASE 1B: 20 SF OF LEAD-CONTAINING GLAZED BLOCK

STALL WALL

INSIDE A NEGATIVE PRESSURE CONTAINMENT SAW CUT

LEAD-CONTAINING GLAZED BLOCK WALL AS INDICATED ON

ARCHITECTURAL DEMOLITION DRAWINGS.

- PHASE 1B: 80 SF SAW CUTTING OF LEAD-CONTAINING

GLAZED BLOCK WALL

L1.

L2.

L3.

INSIDE A NEGATIVE PRESSURE CONTAINMENT REMOVE

SINGLE-LAYER ASBESTOS FLOOR TILE AND ASSOCIATED

ASBESTOS MASTIC.

- PHASE 1A: 360 SF OF ACM FLOOR TILE AND MASTIC

- PHASE 1B: 135 SF OF ACM FLOOR TILE AND MASTIC

- PHASE 1C: 160 SF OF ACM FLOOR TILE AND MASTIC

- PHASE 1D: 640 SF OF ACM FLOOR TILE AND MASTIC

(NIGHTS & WEEKENDS)

INSIDE A NEGATIVE PRESSURE CONTAINMENT REMOVE

CARPET, SINGLE-LAYER ASBESTOS FLOOR TILE AND

ASSOCIATED ASBESTOS MASTIC.

- PHASE 1C: 172 SF OF CARPET, ACM FLOOR TILE & MASTIC

INSIDE A NEGATIVE PRESSURE CONTAINMENT REMOVE

ASBESTOS INTERIOR DOOR CAULKING FROM METAL DOOR

FRAMES USING HAND TOOLS.

- PHASE 1A: 51 LF X ½ " OF ACM INTERIOR DOOR CAULKING

- PHASE 1B: 102 LF X ½" OF ACM INTERIOR DOOR CAULKING

- PHASE 1C: 34 LF X ½ " OF ACM INTERIOR DOOR CAULKING

- PHASE 1D: 34 LF X ½ " OF ACM INTERIOR DOOR CAULKING

(NIGHTS & WEEKENDS)

INSIDE A NEGATIVE PRESSURE CONTAINMENT DEMOLISH

PLASTER CHASES AS REQUIRED, CLEAN-UP ANY PIPE

INSULATION DEBRIS AND THOROUGHLY CLEAN ALL SURFACES,

REMOVE ASBESTOS PIPE INSULATION, ASBESTOS MUDDED

FITTINGS, ASBESTOS BLACK TAR PIPE FITTINGS AND

ASBESTOS PIPE SADDLE INSULATION USING GLOVEBAG

REMOVAL TECHNIQUES.

- PHASE 1A: 80 SF OF PLASTER PIPE CHASE DEMO AND

CLEANING, 20 LF OF ACM PIPE INSULATION, 5

EACH ACM MUDDED PIPE FITTINGS

- PHASE 1B: 100 SF OF PLASTER PIPE CHASE DEMO AND

CLEANING, 15 LF OF ACM PIPE INSULATION, 8

EACH ACM MUDDED PIPE FITTINGS

- PHASE 1D: 30 EACH ACM MUDDED PIPE FITTINGS

(NIGHTS & WEEKENDS)

A1.

A2.

A3.

A4.

ABATEMENT LEGEND

REMOVE ACM FLOOR TILE AND MASTIC AS INDICATED

IN KEYNOTES

REMOVE ACM PIPE INSULATION AND FITTINGS AS

INDICATED IN KEYNOTES.

REMOVE LEAD SHIELDING AS INDICATED IN

KEYNOTES.

REMOVE LEAD GLAZED BLOCK WALLS AS INDICATED

IN KEYNOTES.

SHEET NOTES:

A1

A2

A1

A1

A1

A1

A1

A1

A1

A3

A3

A3

A3

A3

A3

A3

A3

A3

A4

A4

A4

L1

L1

L1

L2

L3

A4

A3

PHASE 1C:

LIMITS OF NEGATIVE PRESSURE CONTAINMENT

PHASE 1B:

LIMITS OF NEGATIVE PRESSURE CONTAINMENT

PHASE 1D (NIGHTS & WEEKENDS):

LIMITS OF NEGATIVE PRESSURE CONTAINMENT

PHASE 1A:

LIMITS OF NEGATIVE PRESSURE CONTAINMENT

PHASE 1C:

LIMITS OF NEGATIVE PRESSURE CONTAINMENT

PHASE 1B:

LIMITS OF NEGATIVE PRESSURE CONTAINMENT

PHASE 1D (NIGHTS & WEEKENDS):

LIMITS OF NEGATIVE PRESSURE CONTAINMENT

PHASE 1A:

LIMITS OF NEGATIVE PRESSURE CONTAINMENT

A1

A2 A3

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREAS S S S

THE ABATEMENT SCOPE OF THE WORK IN BUILDING 52

CONSISTS OF REMOVING VARIOUS ASBESTOS AND LEAD

IMPACTED MATERIALS THROUGHOUT THE PROJECT LIMITS.

ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL

FEDERAL, STATE AND LOCAL REGULATIONS AND THE

CONTRACT SPECIFICATIONS.

IN BUILDING 52, ASBESTOS CONTAINING PIPE INSULATION IS

PRESENT THROUGHOUT THE WORK AREAS ON THE 1ST

FLOOR, BUT MAY NOT BE DIRECTLY IMPACTED UNLESS

INDICATED BY THE KEYNOTES. PROTECT AS REQUIRED TO

PREVENT ANY DAMAGE OR DISTURBANCE.

ASBESTOS TRANSITE PANELS SHOULD BE ASSUMED TO BE

PRESENT BEHIND RADIATORS. NO ABATEMENT OF THIS

MATERIAL IS ANTICIPATED AND SHALL BE PROTECTED AS

REQUIRED.

LEAD-CONTAINING GLAZED BLOCK WALLS ARE LOCATED

THROUGHOUT THE PROJECT LIMITS, BUT WILL ONLY BE

IMPACTED IN AREAS IDENTIFIED WITH SPECIFIC KEYNOTES.

REMAINING WALLS SHALL BE PROTECTED AS REQUIRED.

ALL ABATEMENT WORK SHALL BE CONDUCTED DURING

ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS; EXCEPT THE OUT OF

PHASE WORK WHICH SHALL BE ACCOMPLISHED AT NIGHT

(5:00 PM TO 5:00 AM) OR ON A WEEKEND (5:00 PM FRIDAY TO

6:00 PM SUNDAY). DUE TO THE EXTENTS OF ABATEMENT,

MULTIPLE PHASES (INCLUDING SUB-PHASES), MULTIPLE

MOBILIZATIONS, AND MULTIPLE WEEKENDS WILL BE

REQUIRED. PROPER COORDINATION WITH ALL PARTIES WILL

BE REQUIRED.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES,

CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO

THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED

BY THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL

AND EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED

WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS

ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH

THE VA COR.

ABATED PIPE INSULATION AND FITTINGS, EXCLUDING PIPING

THAT WILL BE DEMOLISHED, SHALL BE PROPERLY

RE-INSULATED WITH EQUIVALENT INSULATING PROPERTIES IN

ACCORDANCE WITH VA SPECIFICATION 23 07 11, HVAC AND

BOILER PLANT INSULATION.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS

AND WASTE DISPOSAL CONTAINERS SHALL BE FIELD

VERIFIED WITH THE VA COR AND VPIH. ALL LOADOUT

PROCEDURES SHALL BE COORDINATED WITH THE VA COR

AND VPIH. SEE DEMOLITION DRAWINGS FOR TEMPORARY

PARTITION AND INFECTION CONTROL DETAILS.

ALL PERIMETER AIR MONITORING, CLEARANCE SAMPLING,

AND WIPE SAMPLING WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR

RELOCATING ALL EQUIPMENT, COMPUTERS, SUPPLIES,

FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE

ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO,

HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN

DURING ALL ABATEMENT ACTIVITIES. ABATEMENT OF

ASBESTOS PIPE INSULATION AND FITTING INSULATION FROM

THE STEAM PIPING MUST BE ACCOMPLISHED WHEN THE

STEAM PIPES ARE LESS THAN 150 DEGREES FAHRENHEIT. ALL

REQUIRED STEAM SHUTDOWNS SHALL BE PROPERLY

COORDINATED WITH THE VA TO MINIMIZE IMPACT TO THE

HOSPITAL OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA

COR, VPIH, GENERAL CONTRACTOR AND ABATEMENT

CONTRACTOR SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION

OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT

AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT

RECOGNIZE THE HUD DEFINITION AS A THRESHOLD VALUE

FOR LEAD EXPOSURE. ALTHOUGH THE POTENTIAL LEAD

HAZARD FOR NORMAL DEMOLITION OR CONSTRUCTION

ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY

SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK,

PROCEDURE AND OTHER WORK AREA CONDITIONS. PROPER

OSHA COMPLIANCE IS CONSIDERED PERFORMANCE BASED

AND INCLUDES EVALUATING POTENTIAL WORK EXPOSURES

WITH AIR MONITORING OR BIOLOGICAL EXPOSURE

MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS

THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

S

S

S S

S

SS

S S

S S

S

S

S

S

S

OFFICE

2N111

EXAM

2S01

TREAT.

RM.

2S01

EXAM

2S04

CONTROL

RM.

2S06

EXAM 6

2N118

WAITING

2N114

P.T. / O.T.

2N58

ELEVATOR

E3

ELEVATOR

LOBBY

2S57

PAIN

REHAB.

CENTER

2S56A

CONFERENCE

RM

2S56

OI&T

2S53

CORRIDOR

H204

ELEVATOR

E2

SOILED

UTILITY

2S10

EXAM 1

2S05

OFFICE

2S11

OFFICE

2S11A

OFFICE

2N63

OFFICE

2N60

WAITING

RM.

2N112A

HALLWAY

2N113

WHEEL CHAIR

STORAGE

2N110

HAC

2N64

CORRIDOR

H208

EXAM

2S12B

ELEVATOR

E4

STAIR 2

S2

OPEN

OFFICE

2N59

CLOSET

2N59A

RESTROOM

2N59B

MEDS

2N59C

S S

S

S

S S

S

SS

S S

S S

S

S

S

S

S

OFFICE

2N111

EXAM

2S01

TREAT.

RM.

2S01

EXAM

2S04

CONTROL

RM.

2S06

EXAM 6

2N118

WAITING

2N114

P.T. / O.T.

2N58

ELEVATOR

E3

ELEVATOR

LOBBY

2S57

PAIN

REHAB.

CENTER

2S56A

CONFERENCE

RM

2S56

OI&T

2S53

CORRIDOR

H204

ELEVATOR

E2

SOILED

UTILITY

2S10

EXAM 1

2S05

OFFICE

2S11

OFFICE

2S11A

OFFICE

2N63

OFFICE

2N60

WAITING

RM.

2N112A

HALLWAY

2N113

WHEEL CHAIR

STORAGE

2N110

HAC

2N64

CORRIDOR

H208

EXAM

2S12B

ELEVATOR

E4

STAIR 2

S2

OPEN

OFFICE

2N59

CLOSET

2N59A

RESTROOM

2N59B

MEDS

2N59C

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Date Checked Drawn U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

An Alliance for Success

HA102

SECOND FLOOR ABATEMENT PLANS -

PHASE 2

3 4GKY RAJ

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR, ST.

LOUIS, MO 63125

657-20-102JB20-028

RANDY GOFFIN

Scale: 1/8" = 1'-0"

SECOND FLOOR TSI AND LEAD ABATEMENT PLAN - PHASE 2

N O

R

TH

0 4 8 16 Scale: 1/8" = 1'-0"

SECOND FLOOR FLOORING ABATEMENT PLAN - PHASE 2

N O

R

TH

0 4 8 16

INSIDE A NEGATIVE PRESSURE CONTAINMENT SAW CUT

LEAD-CONTAINING GLAZED BLOCK WALL AS INDICATED ON

ARCHITECTURAL DEMOLITION DRAWINGS.

- PHASE 2A: 30 SF SAW CUTTING OF LEAD-CONTAINING

GLAZED BLOCK WALL

INSIDE A NEGATIVE PRESSURE CONTAINMENT REMOVE

LEAD-CONTAINING CERAMIC TILE COVE BASE USING HAND

TOOLS.

- PHASE 2A: 60 LF X 4" LEAD-CONTAINING CERAMIC TILE

COVE BASE

L1.

L2.

INSIDE A NEGATIVE PRESSURE CONTAINMENT REMOVE

SINGLE-LAYER ASBESTOS FLOOR TILE AND ASSOCIATED

ASBESTOS MASTIC.

- PHASE 2A: 790 SF OF ACM FLOOR TILE AND MASTIC

- PHASE 2B: 320 SF OF ACM FLOOR TILE AND MASTIC

- PHASE 2C: 160 SF OF ACM FLOOR TILE AND MASTIC

INSIDE A NEGATIVE PRESSURE CONTAINMENT REMOVE

CARPET, SINGLE-LAYER ASBESTOS FLOOR TILE AND

ASSOCIATED ASBESTOS MASTIC.

- PHASE 2C: 160 SF OF CARPET, ACM FLOOR TILE & MASTIC

INSIDE A NEGATIVE PRESSURE CONTAINMENT REMOVE

ASBESTOS INTERIOR DOOR CAULKING FROM METAL DOOR

FRAMES USING HAND TOOLS.

- PHASE 2A: 136 LF X ½" OF ACM INTERIOR DOOR CAULKING

- PHASE 2C: 17 LF X ½ " OF ACM INTERIOR DOOR CAULKING

INSIDE A NEGATIVE PRESSURE CONTAINMENT DEMOLISH

PLASTER CHASES AS REQUIRED, CLEAN-UP ANY PIPE

INSULATION DEBRIS AND THOROUGHLY CLEAN ALL SURFACES,

REMOVE ASBESTOS PIPE INSULATION, ASBESTOS MUDDED

FITTINGS, ASBESTOS BLACK TAR PIPE FITTINGS AND ASBESTOS

PIPE SADDLE INSULATION USING GLOVEBAG REMOVAL

TECHNIQUES.

- PHASE 2A: 150 SF OF PLASTER PIPE CHASE DEMO AND

CLEANING, 20 LF OF ACM PIPE INSULATION, 10

EACH ACM MUDDED PIPE FITTINGS

- PHASE 2B: 8 EACH MUDDED PIPE FITTINGS >6” DIAMETER, 3

EACH MUDDED PIPE FITTINGS <6” DIAMETER

A1.

A2.

A3.

A4.

REMOVE ACM FLOOR TILE AND MASTIC AS INDICATED

IN KEYNOTES

REMOVE ACM PIPE INSULATION AND FITTINGS AS

INDICATED IN KEYNOTES.

REMOVE LEAD-CONTAINING CERAMIC TILE COVE

BASE AS INDICATED IN KEYNOTES.

REMOVE LEAD GLAZED BLOCK WALLS AS INDICATED

IN KEYNOTES.

A2

A1

A1 A1

A1

A1

A1 A1

A3

A3

A3 A3

A3

A4

L1

L2

L2

PHASE 2A:

LIMITS OF NEGATIVE PRESSURE CONTAINMENTS

PHASE 2B:

LIMITS OF NEGATIVE PRESSURE CONTAINMENTS

PHASE 2C:

LIMITS OF NEGATIVE

PRESSURE CONTAINMENTS

PHASE 2A:

LIMITS OF NEGATIVE PRESSURE CONTAINMENTS

PHASE 2B:

LIMITS OF NEGATIVE

PRESSURE CONTAINMENTS

A4

L2

A3

PHASE 2C:

LIMITS OF NEGATIVE

PRESSURE CONTAINMENT

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREAS S S S

THE ABATEMENT SCOPE OF THE WORK IN BUILDING 52

CONSISTS OF REMOVING VARIOUS ASBESTOS AND LEAD

IMPACTED MATERIALS THROUGHOUT THE PROJECT LIMITS.

ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL

FEDERAL, STATE AND LOCAL REGULATIONS AND THE

CONTRACT SPECIFICATIONS.

IN BUILDING 52, ASBESTOS CONTAINING PIPE INSULATION IS

PRESENT THROUGHOUT THE WORK AREAS ON THE 1ST

FLOOR, BUT MAY NOT BE DIRECTLY IMPACTED UNLESS

INDICATED BY THE KEYNOTES. PROTECT AS REQUIRED TO

PREVENT ANY DAMAGE OR DISTURBANCE.

ASBESTOS TRANSITE PANELS SHOULD BE ASSUMED TO BE

PRESENT BEHIND RADIATORS. NO ABATEMENT OF THIS

MATERIAL IS ANTICIPATED AND SHALL BE PROTECTED AS

REQUIRED.

LEAD-CONTAINING GLAZED BLOCK WALLS ARE LOCATED

THROUGHOUT THE PROJECT LIMITS, BUT WILL ONLY BE

IMPACTED IN AREAS IDENTIFIED WITH SPECIFIC KEYNOTES.

REMAINING WALLS SHALL BE PROTECTED AS REQUIRED.

ALL ABATEMENT WORK SHALL BE CONDUCTED DURING

ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS; EXCEPT THE OUT OF

PHASE WORK WHICH SHALL BE ACCOMPLISHED AT NIGHT

(5:00 PM TO 5:00 AM) OR ON A WEEKEND (5:00 PM FRIDAY TO

6:00 PM SUNDAY). DUE TO THE EXTENTS OF ABATEMENT,

MULTIPLE PHASES (INCLUDING SUB-PHASES), MULTIPLE

MOBILIZATIONS, AND MULTIPLE WEEKENDS WILL BE

REQUIRED. PROPER COORDINATION WITH ALL PARTIES WILL

BE REQUIRED.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES,

CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO

THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED

BY THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL

AND EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED

WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS

ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH

THE VA COR.

ABATED PIPE INSULATION AND FITTINGS, EXCLUDING PIPING

THAT WILL BE DEMOLISHED, SHALL BE PROPERLY

RE-INSULATED WITH EQUIVALENT INSULATING PROPERTIES IN

ACCORDANCE WITH VA SPECIFICATION 23 07 11, HVAC AND

BOILER PLANT INSULATION.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS

AND WASTE DISPOSAL CONTAINERS SHALL BE FIELD

VERIFIED WITH THE VA COR AND VPIH. ALL LOADOUT

PROCEDURES SHALL BE COORDINATED WITH THE VA COR

AND VPIH. SEE DEMOLITION DRAWINGS FOR TEMPORARY

PARTITION AND INFECTION CONTROL DETAILS.

ALL PERIMETER AIR MONITORING, CLEARANCE SAMPLING,

AND WIPE SAMPLING WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR

RELOCATING ALL EQUIPMENT, COMPUTERS, SUPPLIES,

FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE

ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO,

HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN

DURING ALL ABATEMENT ACTIVITIES. ABATEMENT OF

ASBESTOS PIPE INSULATION AND FITTING INSULATION FROM

THE STEAM PIPING MUST BE ACCOMPLISHED WHEN THE

STEAM PIPES ARE LESS THAN 150 DEGREES FAHRENHEIT. ALL

REQUIRED STEAM SHUTDOWNS SHALL BE PROPERLY

COORDINATED WITH THE VA TO MINIMIZE IMPACT TO THE

HOSPITAL OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA

COR, VPIH, GENERAL CONTRACTOR AND ABATEMENT

CONTRACTOR SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION

OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT

AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT

RECOGNIZE THE HUD DEFINITION AS A THRESHOLD VALUE

FOR LEAD EXPOSURE. ALTHOUGH THE POTENTIAL LEAD

HAZARD FOR NORMAL DEMOLITION OR CONSTRUCTION

ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY

SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK,

PROCEDURE AND OTHER WORK AREA CONDITIONS. PROPER

OSHA COMPLIANCE IS CONSIDERED PERFORMANCE BASED

AND INCLUDES EVALUATING POTENTIAL WORK EXPOSURES

WITH AIR MONITORING OR BIOLOGICAL EXPOSURE

MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS

THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

S S

S

OPEN

OFFICE

2N60

EQUIP

STORAGE

2N111

RESTROOM

2N114A

MEDS

2N116

TELEHEALTH

2N112

GROUP

ROOM

2S58

CONSULT

2S56ELEVATOR

LOBBY

H209

EXAM 6

2N118

RESTROOM

2N118A

EXAM 5

2S01

LOGISTICS

STORAGE

2N117

SOILED

UTILITY

2S10

OFFICE

(PSYCH)

2S11

OFFICE

(SW)

2S11A

CORRIDOR

H204

OI&T_

2S53

CONFERENCE

2S54

CORRIDOR

2N115

WAITING

2N114

CORRIDOR

H208

CHASE_

H208B

ELECT.

CLOSET

H208AELEVATOR

E4

STAIR 2

S2

ELEVATOR

E3

ELEVATOR

E2

CLOSET

2N60A

EXAM 1

2S05

RECEPTION

2N113

EXAM

2S12B

HAC

2N64

WHEELCHAIR

STORAGE

2N110

S S

S

S

S S

S

SS

S S

S S

S

S

S

S

TREAT.

RM.

2S05

EXAM

2S04

CONTROL

RM.

2S06

S S

S

S S

OPEN

OFFICE

2N60

EQUIP

STORAGE

2N111

RESTROOM

2N114A

MEDS

2N116

TELEHEALTH

2N112

GROUP

ROOM

2S58

CONSULT

2S56ELEVATOR

LOBBY

H209

EXAM 6

2N118

RESTROOM

2N118A

EXAM 5

2S01

LOGISTICS

STORAGE

2N117

SOILED

UTILITY

2S10

OFFICE

(PSYCH)

2S11

OFFICE

(SW)

2S11A

CORRIDOR

H204

OI&T_

2S53

CONFERENCE

2S54

CORRIDOR

2N115

WAITING

2N114

CORRIDOR

H208

CHASE_

H208B

ELECT.

CLOSET

H208AELEVATOR

E4

STAIR 2

S2

ELEVATOR

E3

ELEVATOR

E2

CLOSET

2N60A

EXAM 1

2S05

RECEPTION

2N113

EXAM

2S12B

HAC

2N64

WHEELCHAIR

STORAGE

2N110

S S

S

S

S S

S

SS

S S

S S

S

S

S

S

TREAT.

RM.

2S05

EXAM

2S04

CONTROL

RM.

2S06

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

CONSULTANTS: PROJECT MANAGER:

Date Checked Drawn U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

An Alliance for Success

HA103

SECOND FLOOR ABATEMENT PLANS -

PHASE 3

4 4GKY RAJ

RENOVATE SECOND FLOOR

CENTER, JB BLDG 52

1 JEFFERSON BARRACKS DR, ST.

LOUIS, MO 63125

657-20-102JB20-028

RANDY GOFFIN

Scale: 1/8" = 1'-0"

SECOND FLOOR TSI AND LEAD ABATEMENT PLAN - PHASE 3

N O

R

TH

0 4 8 16

Scale: 1/8" = 1'-0"

SECOND FLOOR FLOORING ABATEMENT PLAN - PHASE 3

N O

R

TH

0 4 8 16

ASBESTOS KEY NOTES: LEAD KEY NOTES:

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

INSIDE A NEGATIVE PRESSURE CONTAINMENT, DEMOLISH

PLASTER WALLS AND CEILINGS, REMOVE LEAD SHIELDING,

LEAD SHIELDED DOORS, DOOR FRAMES AND VIEWING

WINDOWS USING HAND TOOLS AND DISMANTLING

TECHNIQUES.

- PHASE 1A: 750 SF OF PLASTER WALLS, CEILINGS AND LEAD

SHIELDING, 1 EACH LEAD SHIELDED DOOR AND

FRAME, 1 EACH LEAD SHIELDED VIEWING

WINDOW

INSIDE A NEGATIVE PRESSURE CONTAINMENT, REMOVE

LEAD-BASED PAINTED PIPE HANGERS USING DISMANTLING

TECHNIQUES.

- PHASE 3C: 5 EACH LEAD-BASED PAINTED PIPE HANGER

(NIGHTS & WEEKENDS)

L1.

L2.

INSIDE A NEGATIVE PRESSURE CONTAINMENT REMOVE

SINGLE-LAYER ASBESTOS FLOOR TILE AND ASSOCIATED

ASBESTOS MASTIC.

- PHASE 3A: 440 SF OF ACM FLOOR TILE AND MASTIC

- PHASE 3B: 700 SF OF ACM FLOOR TILE AND MASTIC

- PHASE 3C: 1,415 SF OF ACM FLOOR TILE AND MASTIC

(NIGHTS & WEEKENDS)

INSIDE A NEGATIVE PRESSURE CONTAINMENT REMOVE

CARPET AND ASBESTOS MASTIC.

- PHASE 3B: 380 SF OF CARPET AND ACM MASTIC

INSIDE A NEGATIVE PRESSURE CONTAINMENT REMOVE

ASBESTOS INTERIOR DOOR CAULKING FROM METAL DOOR

FRAMES USING HAND TOOLS.

- PHASE 3A: 102 LF X ½ " OF ACM INTERIOR DOOR CAULKING

INSIDE A NEGATIVE PRESSURE CONTAINMENT REMOVE

ASBESTOS PIPE INSULATION, ASBESTOS MUDDED FITTINGS,

ASBESTOS BLACK TAR PIPE FITTINGS AND ASBESTOS PIPE

SADDLE INSULATION USING GLOVEBAG REMOVAL

TECHNIQUES.

- PHASE 3C: 25 EACH ACM MUDDED PIPE FITTINGS, 45 EACH

ACM PIPE SADDLE INSULATION, 4 EACH ACM

TAR PIPE FITTINGS

(NIGHTS & WEEKENDS)

A1.

A2.

A3.

A4. ABATEMENT LEGEND

REMOVE ACM FLOOR TILE AND MASTIC AS INDICATED

IN KEYNOTES

REMOVE ACM PIPE INSULATION AND FITTINGS AS

INDICATED IN KEYNOTES.

REMOVE LEAD SHIELDING AS INDICATED IN

KEYNOTES.

SHEET NOTES:

A2

A1 A1

A1

A1 A1

A1 A1 A1

A3

A3

A4

L1

L2 A4

L2

A4

L2

PHASE 3C (NIGHTS & WEEKENDS):

LIMITS OF NEGATIVE PRESSURE CONTAINMENTS

PHASE 3B:

LIMITS OF NEGATIVE PRESSURE CONTAINMENTS

PHASE 3A:

LIMITS OF NEGATIVE PRESSURE CONTAINMENT

PHASE 3C (NIGHTS & WEEKENDS):

LIMITS OF NEGATIVE PRESSURE CONTAINMENTS

PHASE 3A:

LIMITS OF NEGATIVE PRESSURE CONTAINMENT

A1

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREAS S S S

THE ABATEMENT SCOPE OF THE WORK IN BUILDING 52

CONSISTS OF REMOVING VARIOUS ASBESTOS AND LEAD

IMPACTED MATERIALS THROUGHOUT THE PROJECT LIMITS.

ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL

FEDERAL, STATE AND LOCAL REGULATIONS AND THE

CONTRACT SPECIFICATIONS.

IN BUILDING 52, ASBESTOS CONTAINING PIPE INSULATION IS

PRESENT THROUGHOUT THE WORK AREAS ON THE 1ST

FLOOR, BUT MAY NOT BE DIRECTLY IMPACTED UNLESS

INDICATED BY THE KEYNOTES. PROTECT AS REQUIRED TO

PREVENT ANY DAMAGE OR DISTURBANCE.

ASBESTOS TRANSITE PANELS SHOULD BE ASSUMED TO BE

PRESENT BEHIND RADIATORS. NO ABATEMENT OF THIS

MATERIAL IS ANTICIPATED AND SHALL BE PROTECTED AS

REQUIRED.

LEAD-CONTAINING GLAZED BLOCK WALLS ARE LOCATED

THROUGHOUT THE PROJECT LIMITS, BUT WILL ONLY BE

IMPACTED IN AREAS IDENTIFIED WITH SPECIFIC KEYNOTES.

REMAINING WALLS SHALL BE PROTECTED AS REQUIRED.

ALL ABATEMENT WORK SHALL BE CONDUCTED DURING

ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS; EXCEPT THE OUT OF

PHASE WORK WHICH SHALL BE ACCOMPLISHED AT NIGHT

(5:00 PM TO 5:00 AM) OR ON A WEEKEND (5:00 PM FRIDAY TO

6:00 PM SUNDAY). DUE TO THE EXTENTS OF ABATEMENT,

MULTIPLE PHASES (INCLUDING SUB-PHASES), MULTIPLE

MOBILIZATIONS, AND MULTIPLE WEEKENDS WILL BE

REQUIRED. PROPER COORDINATION WITH ALL PARTIES WILL

BE REQUIRED.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES,

CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO

THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED

BY THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL

AND EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED

WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS

ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH

THE VA COR.

ABATED PIPE INSULATION AND FITTINGS, EXCLUDING PIPING

THAT WILL BE DEMOLISHED, SHALL BE PROPERLY

RE-INSULATED WITH EQUIVALENT INSULATING PROPERTIES IN

ACCORDANCE WITH VA SPECIFICATION 23 07 11, HVAC AND

BOILER PLANT INSULATION.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS

AND WASTE DISPOSAL CONTAINERS SHALL BE FIELD

VERIFIED WITH THE VA COR AND VPIH. ALL LOADOUT

PROCEDURES SHALL BE COORDINATED WITH THE VA COR

AND VPIH. SEE DEMOLITION DRAWINGS FOR TEMPORARY

PARTITION AND INFECTION CONTROL DETAILS.

ALL PERIMETER AIR MONITORING, CLEARANCE SAMPLING,

AND WIPE SAMPLING WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR

RELOCATING ALL EQUIPMENT, COMPUTERS, SUPPLIES,

FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE

ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO,

HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN

DURING ALL ABATEMENT ACTIVITIES. ABATEMENT OF

ASBESTOS PIPE INSULATION AND FITTING INSULATION FROM

THE STEAM PIPING MUST BE ACCOMPLISHED WHEN THE

STEAM PIPES ARE LESS THAN 150 DEGREES FAHRENHEIT. ALL

REQUIRED STEAM SHUTDOWNS SHALL BE PROPERLY

COORDINATED WITH THE VA TO MINIMIZE IMPACT TO THE

HOSPITAL OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA

COR, VPIH, GENERAL CONTRACTOR AND ABATEMENT

CONTRACTOR SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION

OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT

AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT

RECOGNIZE THE HUD DEFINITION AS A THRESHOLD VALUE

FOR LEAD EXPOSURE. ALTHOUGH THE POTENTIAL LEAD

HAZARD FOR NORMAL DEMOLITION OR CONSTRUCTION

ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY

SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK,

PROCEDURE AND OTHER WORK AREA CONDITIONS. PROPER

OSHA COMPLIANCE IS CONSIDERED PERFORMANCE BASED

AND INCLUDES EVALUATING POTENTIAL WORK EXPOSURES

WITH AIR MONITORING OR BIOLOGICAL EXPOSURE

MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS

THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

A1

A3

VAJB B52 Center - Drawing HA100 (BD 8-19-2021)
VAJB B52 Center - Drawing HA101 (BD 8-19-2021)
VAJB B52 Center - Drawing HA102 (BD 8-19-2021)
VAJB B52 Center - Drawing HA103 (BD 8-19-2021)

File details come from the government source that posted it. Updated .