9-Attachment FF - Heat Protection Safety Requirements.pdf

PDF 43 KB Posted

Attached to
ITB – Drainage Improvements in the Bear Creek Village Subdivision – Stage B (2018) for Harris County Precinct 4 (FEMA)
Solicitation number
26/0097
Issued by
Harris County, Texas

About this file

This is a safety requirements attachment for a drainage improvements project in the Bear Creek Village Subdivision Stage B (2018) for Harris County Precinct 4 in Texas, funded through FEMA. The document establishes mandatory weather-related safety provisions that all vendors and prime contractors must incorporate into their project Safety Plans. The requirements mandate protection for workers against extreme heat, cold, and other adverse weather conditions, with specific provisions including heat acclimatization, water supply, rest periods, and shade when temperatures reach 90 degrees or higher (including heat index). During extended periods of adverse weather, prime contractors must provide necessary accommodations to workers as determined appropriate for the conditions. Vendors acknowledge and agree to comply with these heat protection safety requirements upon submission of their bid acknowledgement.

The attachment does not address pricing terms, funding allocations, or contract duration, as it functions as a standalone safety guidance document. All bidders are bound by these requirements as a condition of bid submission, making compliance with the heat protection and adverse weather safety protocols a mandatory contractual obligation regardless of project award or contract terms.

View the file

Other files

File Type Posted
7-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
29-Attachment EE - BABAA Self-Certification Form.pdf PDF
20-Attachment T - General Conditions.pdf PDF
5-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
17-Attachment M - Harris County Minimum Insurance Requirements (Construction).pdf PDF
23-Attachment BB – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
25-Attachment HH - Policy for Payment.pdf PDF
22-Attachment AA - Report File.pdf PDF
16-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
24-Attachment GG - Prevailing Wage Rates TX20260031.pdf PDF
10-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
19-Attachment S - Plans and Drawings.pdf PDF
1-Attachment B - Bid Schedule - Pricing Form.pdf PDF
28-Federal IFB General Conditions and Specifications - Construction.pdf PDF
12-Attachment A - Bid Addenda Acknowledgement.pdf PDF
26-Attachment II - Harris County Contractor and Worksite Safety Policies (Approved 1.29.26).pdf PDF
15-Harris County Minimum Wage FAQs as of December 2025 - Final.pdf PDF
4-Attachment F - References.pdf PDF
6-Attachment K - Payment Bond.pdf PDF
13-Attachment Z - Harris County Minimum Wage Policy and Certification.pdf PDF
27-Attachment JJ - Safety Record Questionnaire.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
18-Attachment P - Required Contract Provisions.pdf PDF
3-Attachment D - Statement of Bidder Qualifications.pdf PDF
11-Attachment G - Contractor Profile.pdf PDF
21-Attachment U - General Notices, Notes and Information.pdf PDF
14-Attachment CC – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
8-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment FF

Heat Protection Safety Requirement

Guidance for all weather-related safety of workers, including but not limited to, extreme heat, cold weather or any adverse weather conditions shall be included in the project

Safety Plan. At a minimum, this must include provisions for keeping workers safe from heat related and/or cold related illnesses throughout the execution of their work. During extended periods of adverse weather conditions, the Prime Contractor shall provide accommodations to the workers as deemed necessary. This may include a project specific Heat Awareness Plan when temperatures reach over 90 degrees (temperature or heat index) with provisions for acclimatization, water, rest and shade.

Vendor understands by signing the Bid Acknowledgement at the time of submission that they agree to follow this heat protection safety requirement.

File details come from the government source that posted it. Updated .