29-Attachment EE - BABAA Self-Certification Form.pdf

PDF 132 KB Posted

Attached to
ITB – Drainage Improvements in the Bear Creek Village Subdivision – Stage B (2018) for Harris County Precinct 4 (FEMA)
Solicitation number
26/0097
Issued by
Harris County, Texas

About this file

This document is a Build America, Buy America Act (BABAA) Self-Certification Form required for the Drainage Improvements in the Bear Creek Village Subdivision – Stage B (2018) project in Harris County Precinct 4, Texas, which is funded by FEMA federal financial assistance. The form certifies compliance with BABAA requirements mandating that all iron, steel, manufactured products, and construction materials used in infrastructure projects receiving federal financial assistance must be produced in the United States. The contractor or subcontractor signing this certification attests that all iron and steel used in the project have completed all manufacturing processes, including initial melting and coating application, within the United States; all manufactured products have a minimum of 55 percent domestic content by component cost unless an alternative standard applies; and all construction materials have undergone their complete manufacturing processes in the United States.

The certification form requires signature and identification of an authorized contractor or subcontractor official along with the project name, location, and date. The signatory acknowledges that the truthfulness and accuracy of the certification falls under the provisions of 31 U.S.C. Chapter 38, which addresses administrative remedies for false claims and statements, establishing legal accountability for any misrepresentations regarding domestic content compliance under the BABAA requirements.

View the file

Other files

File Type Posted
7-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
20-Attachment T - General Conditions.pdf PDF
5-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
17-Attachment M - Harris County Minimum Insurance Requirements (Construction).pdf PDF
23-Attachment BB – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
9-Attachment FF - Heat Protection Safety Requirements.pdf PDF
25-Attachment HH - Policy for Payment.pdf PDF
22-Attachment AA - Report File.pdf PDF
16-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
24-Attachment GG - Prevailing Wage Rates TX20260031.pdf PDF
10-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
19-Attachment S - Plans and Drawings.pdf PDF
1-Attachment B - Bid Schedule - Pricing Form.pdf PDF
28-Federal IFB General Conditions and Specifications - Construction.pdf PDF
12-Attachment A - Bid Addenda Acknowledgement.pdf PDF
26-Attachment II - Harris County Contractor and Worksite Safety Policies (Approved 1.29.26).pdf PDF
15-Harris County Minimum Wage FAQs as of December 2025 - Final.pdf PDF
4-Attachment F - References.pdf PDF
6-Attachment K - Payment Bond.pdf PDF
13-Attachment Z - Harris County Minimum Wage Policy and Certification.pdf PDF
27-Attachment JJ - Safety Record Questionnaire.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
18-Attachment P - Required Contract Provisions.pdf PDF
3-Attachment D - Statement of Bidder Qualifications.pdf PDF
11-Attachment G - Contractor Profile.pdf PDF
21-Attachment U - General Notices, Notes and Information.pdf PDF
14-Attachment CC – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
8-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment EE Build America, Buy America Act (BABAA) Self-Certification Form

The undersigned certifies, to the best of their knowledge and belief, that:

The Build America, Buy America Act (BABAA) requires that no federal financial assistance for

“infrastructure” projects is provided “unless all of the iron, steel, manufactured products, and construction materials used in the project are produced in the United States.” Section 70914 of Public Law No. 117-58, §§ 70901-52.

The undersigned certifies that for the _______________________________ (Project Name and Location)

______________________ the iron, steel, manufactured products, and construction materials used in this contract are in full compliance with the BABAA requirements including:

1. All iron and steel used in the project are produced in the United States. This means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States.

2. All manufactured products purchased with FEMA financial assistance must be produced in the

United States. For a manufactured product to be considered produced in the United States, the cost of the components of the manufactured product that are mined, produced, or manufactured in the

United States is greater than 55% of the total cost of all components of the manufactured product, unless another standard for determining the minimum amount of domestic content of the manufactured product has been established under applicable law or regulation.

3. All construction materials are manufactured in the United States. This means that all manufacturing processes for the construction material occurred in the United States

“The, ____ [Contractor or Subcontractor] __, certifies or affirms the truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the

[Contractor or Subcontractor] understands and agrees that the provisions of 31 U.S.C. Chap. 38, Administrative Remedies for False Claims and Statements, apply to this certification and disclosure, if any.”

Signature of [Contractor’s or Subcontractor’s] Authorized Official

Name and Title of [Contractor’s or Subcontractor’s] Authorized Official

Date

File details come from the government source that posted it. Updated .