This document contains an invitation for bid for the WAPA-Sierra Nevada Region Substation Service Upgrade Construction Project. The project involves removing existing substation equipment and installing new pad mount transformers, automatic transfer switches, main distribution panels and associated station service equipment at three Western Area Power Administration substations near Byron, Cottonwood, and Livermore, California. It also includes installing a new 230kV bay with disconnect switch, government furnished station service voltage transformers, and associated materials and equipment at the Olinda Substation. The solicitation will be available for download on March 30, 2020 from the SAM website. Questions must be submitted in writing by the specified date to the listed contracting officer. The estimated value of the contract is between $2.5 million and $5 million. The North American Industry Classification code for this opportunity is 237130. The acquisition will be conducted as a 100% small business set-aside and the contract type will be firm-fixed price.

View the file

Other files

File Type Posted
89503120BWA000022_0003.pdf PDF
Olinda Drawings - Amendment 003.pdf PDF
Tracy Drawings - Amendment 003.pdf PDF
Bid Schedule - Amendment 0003.pdf PDF
Livermore Specification - Amendment 003.pdf PDF
Wage Determination - Alameda County - CA202000018.pdf PDF
Olinda Specification - Amendment 003.pdf PDF
Livermore Drawings - Amendment 003.pdf PDF
Wage Determination - Shasta County - CA20200007.pdf PDF
89503120BWA000022_0003.pdf PDF
Tracy Specification - Amendment 003.pdf PDF
Tracy Revised Specification - Amendment 0002 (2).pdf PDF
Tracy Revised Specification - Amendment 0002.pdf PDF
Tracy Revised Specification - Amendment 0002.pdf PDF
Livermore Revised Specification - Amendment 0002.pdf PDF
Olinda Revised Specification - Amendment 0002.pdf PDF
89503120BWA000022_0002.pdf PDF
Olinda Revised Drawing Package - Amendment 0002.pdf PDF
89503120BWA000022_0001.pdf PDF
Site Visit Attendance Roster.pdf PDF
Attachment I - Wage Determination - Alameda County - CA202000018.pdf PDF
Attachment B - Tracy Specification - SNR Station Service Upgrades.pdf PDF
Attachment A - Bid Schedule - SNR Station Service Upgrades.pdf PDF
Attachment G - Olinda Drawings - SNR Station Service Upgrades.pdf PDF
Attachment D - Olinda Specification - SNR Station Service Upgrades.pdf PDF
Attachment C - Livermore Specification - SNR Station Service Upgrades.pdf PDF
Attachment J - Wage Determination - Shasta County - CA20200007.pdf PDF
Attachment F - Livermore Drawings - SNR Station Service Upgrades.pdf PDF
Attachment E - Tracy Drawings - SNR Station Service Upgrades.pdf PDF
89503120BWA000022.pdf PDF
Attachment H - Submittal Log - SNR Station Service Upgrades.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B

SUPPLIES OR SERVICES AND PRICES

BIDDING SCHEDULE - Amendment 0002 WAPA Sierra Nevada Region Station Service Upgrades Project

PART A: TRACY SUBSTATION, STATION SERVICE UPGRADES

CLIN Work or Material Estimated Quantity Unit Unit Price Amount

0001T Mobilization and preparatory work LS $ _

0002T Miscellaneous sitework LS $ _

0003T Demolition LS $ _

0004T Existing outdoor electrical equipment and material

LS $ _

0005T Concrete foundations 49.6 CY $ $ _

0006T Cable Trench LS $ _

0007T Concrete encasement LS $ _

0008T Steel structures, welded (galvanized) 2788 LB $ $ _

0009T Modifying steel structures 30 LB $ $ _

0010T Free-standing automatic transfer switch, 480V, 1200 amps, three-phase

2 EA $ $ _

0011T Station service transformers 4 EA $ $ _

0012T 1/0 AWG, 25-kV, insulated copper cable 3600 LF $ $ _

0013T 1/0 AWG, 35-kV, insulated copper cable 2700 LF $ $ _

0014T Safety Switches 4 EA $ $ _

0015T Shielded insulated conductors LS $ _

0016T Outdoor AC main distribution panelboard 2 EA $ $ _

0017T Furnishing 12/C No. 10 AWG control cable 2500 LF $ $ _

0018T Furnishing RS-485 communication cable 1100 LF $ $ _

0019T Installing 12/C No. 10 AWG control cable 2500 LF $ $ _

0020T Installing RS-485 communication cable 1100 LF $ $ _

0021T Associated electrical equipment and material LS $ _

0022T Existing outdoor electrical equipment and material

LS $ _

PART A TOTAL

PART B: LAWRENCE LIVERMORE SUBSTATION, STATION SERVICE UPGRADES

CLIN Work or Material

Quantity Unit Unit Price Amount

0001L Mobilization and preparatory work LS $ _

0002L Miscellaneous sitework LS $ _

0003L Demolition LS $ _

0004L Existing outdoor electrical equipment and material

LS $ _

0005L Concrete foundations 27 CY $ $ _

0006L Cable trench LS $ _

0007L Concrete encasement LS $ _

0008L Steel structures, welded (galvanized) 1564 LB $ $ _

0009L Automatic transfer switch, 240V, 600 amps, three phase

1 EA $ $ _

0010L Station service transformers 2 EA $ $ _

0011L 1/0 AWG, 25-kV, insulated copper cable 360 LF $ $ _

0012L Safety Switches 2 EA $ $ _

0013L Insulated conductors LS $ _

0014L Outdoor AC main distribution panelboard 2 EA $ $ _

0015L Furnishing RS-485 communication cable 250 LF $ $ _

0016L Installing RS-485 communication cable 250 LF $ $ _

0017L Associated electrical equipment and material LS $ _

0018L Existing outdoor electrical equipment and material

LS $ _

PART B TOTAL $ _

PART C: OLINDA SUBSTATION, STATION SERVICE UPGRADES

CLIN Work or Material Estimated Quantity Unit Unit Price Amount

0001D Mobilization and preparatory work LS $ _

0002D Miscellaneous sitework LS $ _

0003D Demolition LS $ _

0004D Existing outdoor electrical equipment and material

LS $ _

0005D Concrete foundations 73.7 CY $ $ _

0006D Cable trench LS $ _

0007D Concrete pull boxes LS $ _

0008D Concrete encasement LS $ _

0009D Steel structures, welded (galvanized) 10,603 LB $ $ _

0010D Station service voltage transformer, 230-kV, 333 kVA (Government furnished)

3 EA $ $ _

0011D Motor-operated disconnecting switch 230kV, 2,000 amps with whips

1 EA $ $ _

0012D Surge arrester 230kV, 192kV Duty cycle, 152kV MCOV

3 EA $ $ _

0013D Free-standing automatic transfer switch, 480V, 1200 amps, three-phase

1 EA $ $ _

0014D Station service transformer 1 EA $ $ _

0015D Temporary 1/0 AWG, 35-kV, insulated copper cable

450' LF $ $ _

0016D 1/0 AWG, 35-kV, insulated copper cable 450' LF $ $ _

0017D Safety Switches 3 EA $ $ _

0018D Shielded 500MCM 600V Insulated conductors LS $ _

0019D Shielded insulated conductors LS $ _

0020D Outdoor AC main distribution panelboard 1 EA $ $ _

0021D Furnishing 12/C No. 10 AWG control cable 3000 LF $ $ _

0022D Furnishing 2/C No. 6 AWG control cable 1500 LF $ $ _

0023D Furnishing RS-485 communication cable 450 LF $ $ _

0024D Installing 12/C No. 10 AWG control cable 3000 LF $ $ _

0025D Installing 2/C No. 6 AWG control cable 1500 LF $ $ _

0026D Installing RS-485 communication cable 450 LF $ $ _

0027D Associated electrical equipment and material LS $ _

PART C TOTAL $ _

PART A TOTAL $ _

PART B TOTAL $ _

PART C TOTAL $ _

TOTAL FOR PARTS A, B, & C $ _

ABBREVIATIONS

CLIN = Contract Line Item Number

CY = cubic yards EA = each LF = linear feet LS = for the lump sum of LB = pounds