This amendment modifies the solicitation for the Marshall Engineering Technicians and Trades Support III (METTS III) services contract to be awarded by the National Aeronautics and Space Administration Marshall Space Flight Center. The incumbent contractor is the Marshall Engineering Technicians and Trades Support II contractor. The solicitation seeks proposals for engineering technician, trade support, and related services to support various directorates and programs at the Marshall Space Flight Center. The acquisition is set aside for 8(a) small businesses and will result in an indefinite-delivery, indefinite-quantity cost-plus-award-fee contract. The amendment provides responses to industry questions about requirements for including labor hours and costs for prime and subcontractor staff in the Excel pricing model templates. Offerors must submit pricing models with work year equivalents and costs for both prime and subcontractor labor, with subcontractor models only including applicable labor categories and rates.

View the file

Other files for this federal contract opportunity

Other files attached to Marshall Engineering Technicians and Trades Support (METTS III) Services, newest first.
File Type Posted
80MSFC20R0036P00006 - SF30 Amendment 6.pdf PDF
Final RFP-Amendment 6 (P00006).docx DOCX document
LFT_User_Guide.pdf PDF
LFT_Quick_Start_Guide.pdf PDF
80MSFC20R0036P00005 - SF30 Amendment 5.pdf PDF
Final RFP-Amendment 5 (P00005).docx DOCX document
80MSFC20R0036P00004 - SF30 Amendment 4.pdf PDF
Final RFP-Amendment 4.docx DOCX document
80MSFC20R0036P00002 - SF30 Amendment 2.pdf PDF
80MSFC20R0036P00001 - SF30 Amendment 1.pdf PDF
Attachment L-1 EPM 1_Final 3-4-2020.xlsx XLSX spreadsheet
Final RFP-Amendment 1.docx DOCX document
Attachment L-1 EPM 1_Final.xlsx XLSX spreadsheet
RFP Cover Letter and Clarifications.pdf PDF
80MSFC20R0036 - Section A (SF33).pdf PDF
Attachment L-2 EPM 2_Final.xlsx XLSX spreadsheet
METTS III Phase-in PO_80MSFC20P0003 - SF1449.pdf PDF
Final RFP.docx DOCX document
Presentation Industry Day Briefing 12-19-19.pptx PPTX presentation
Industry Day Attendee (Company) List.pdf PDF
ET10_PTL Brochure.pdf PDF
METTS III Industry Day Scripts (site tour_12-19-19).pdf PDF
METTS III_80MSFC20R0036_Attachment L-2 Excel Pricing Model 2 updated 12-17-19.xlsx XLSX spreadsheet
METTS III_80MSFC20R0036_Attachment L-1 Excel Pricing Model 1 updated 12-17-19.xlsx XLSX spreadsheet
METTS III_80MSFC20R0036_IAGP List.xlsx XLSX spreadsheet
METTS III_80MSFC20R0036_DRFP.docx DOCX document
METTS III_80MSFC20R0036_DRFP Cover Letter.pdf PDF
METTS III_80MSFC20R0036_Attachment L-1 Excel Pricing Model 1.xlsx XLSX spreadsheet
METTS III_80MSFC20R0036_Attachment L-2 Excel Pricing Model 2.xlsx XLSX spreadsheet
METTS III_80MSFC20R0036_Attachment L-12 CAOF.xlsx XLSX spreadsheet
Aerie Aerospace APPROVED agreement (CBA).pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

PAGE OF PAGES

3. EFFECTIVE DATE 5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO.

7. ADMINISTERED BY (If other than Item 6) CODE

FACILITY CODECODE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code)

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

1. CONTRACT ID CODE

16B. UNITED STATES OF AMERICA 16C. DATE

SIGNED

15B. CONTRACTOR/OFFEROR 15C. DATE

SIGNED

(Signature of Contracting Officer)(Signature of person authorized to sign)

15A NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

is not

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by orletter provided electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, E. IMPORTANT: Contractor is not, is required to sign this document and return

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) is extended, copies to issuing office.

4. REQUISITION/PURCHASE REQ. NO.

1 2

P00003 03/16/2020

NASA

Marshall Space Flight Center Office of Procurement Marshall Space Flight Center

AL 35812

NASA

Marshall Space Flight Center Marshall Space Flight Center

AL 35812

X

80MSFC20R0036

0 / 3/2020

X X

X 1 appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

CHECK ONE

(X) electronic communication, orlettereach

RHONEY TRIPLETT

Digitally signed by RHONEY

TRIPLETT

Date: 2020.03.16 09:27:37 -05'00'

80MSFC20R0036 - P00003

(PS60 Rev. 2020-02-28)

BLOCK 14. DESCRIPTION OF AMENDMENT/MODIFICATION (continued)

(a) The purpose of this amendment is to respond to a question that was submitted after issuance of Amendment P00002 to the Marshall Engineering Technicians and Trades Support (METTS III) Request for Proposal (RFP) on March 10, 2020.

(b) Attachment A, RESPONSES TO INDUSTRY RFP QUESTIONS, provides responses to questions and comments provided by industry.

(c) Failure by the offeror to acknowledge receipt of this amendment, either on the Standard Form

33, SOLICITATION, OFFER, AND AWARD, SF30, AMENDMENT OF

SOLICITATION/MODIFICATION OF CONTRACT, or transmittal letter by the due date for receipt of proposals may result in a determination that the proposal is unacceptable and therefore ineligible for award.

(d) All other terms and conditions of RFP 80MSFC20R0036 remain unchanged.

80MSFC20R0036 - P00003

(PS60 Rev. 2020-02-28)

ATTACHMENT A – RESPONSES TO INDUSTRY RFP QUESTIONS

Index Industry-

Provided RFP Reference

Question Response

Final RFP - Amendment 1

Section L, Volume II – Cost Factor Instructions, Page L-37, Attachment L-1 EPM 1_Final_3- 4-2020, Tab B-1 through B-5

(B) Tab B: Summary by PWS – “This tab serves as the instrument to input WYEs by PWS and labor category. Once the WYE has been entered in a cell, the sheet automatically calculates hours and dollars from other sheets completed within this workbook. This tab also requires input of indirect rates to include fringe benefit, overhead, and G&A. Offerors shall ensure that Tab B accounts for all WYEs by labor category for each year of performance, whether assigned to the Offeror or proposed subcontractor(s), as delineated in Attachment L-6, Projected Mission Requirements. There will be no advantage in proposing staffing levels less than those delineated in Attachment L-6 as the Offeror’s probable cost will be adjusted to reflect these levels.”

The highlighted statement indicates that both Prime and Subcontractor Labor should be entered into Tab B. However, if both are entered it will calculate into Tab B row 342, which then feeds to Tab A Row 8.

Tab A would then duplicate the Subcontractor rates when we enter the total Subcontract Cost into Row 15. Further, adding Subcontract Labor into Tab B will apply inapplicable Fringe and Overhead to the Subcontract along with the allowed G&A calculation.

We would like to ask the Government to allow for Offerors to submit EPM L-1 including only the Prime Labor on Tab B and having a separate Tab B included with only the Subcontractor Labor. Doing so would allow for the correct calculation of rates and applicable Overhead/Fringe/GA and would eliminate the possibility of duplicating the Subcontractor Costs in Tab A Row 15.

Offerors and subcontractors (i.e., all subcontractors, to include interdivisional and/or intra-company effort, with a value of $5 million or greater over the life of the contract) shall include WYE’s in Tabs B-1 through B-5 of their respective Excel Pricing Models (EPMs), with EPMs for subcontractors reflecting those labor categories assigned to them by the offeror. Upon completion of Tab B, the total of the Offeror’s and subcontractor’s WYEs in their respective EPMs should equal the total WYEs in Attachment L-6, Projected Mission Requirements.

File details come from the government source that posted it. Updated .