METTS III_80MSFC20R0036_DRFP.docx

DOCX document 3 MB Posted

Attached to
Marshall Engineering Technicians and Trades Support (METTS III) Services Federal contract opportunity
Solicitation number
80MSFC20R0036
Issued by
National Aeronautics and Space Administration Marshall Space Flight Center

About this file

This document outlines a solicitation for the Marshall Engineering Technicians and Trades Support III (METTS III) services contract to provide direct support to the Marshall Space Flight Center Engineering Directorate, Facilities Management Office, and other MSFC programs and projects requiring engineering technician and trade support services. Key details include that the solicitation is anticipated to be an 8(a) small business set-aside for a cost-plus-award-fee contract with an indefinite delivery/indefinite quantity component to support functions such as propellants and pressurants delivery systems and valve and component services. The incumbent is the Jacobs Technology METTS II contract. Interested parties were notified through a request for information and presolicitation synopsis to download the solicitation anticipated for release. The response deadline for the RFI was June 25, 2019 with award planned for late 2020.

View the file

Other files for this federal contract opportunity

Other files attached to Marshall Engineering Technicians and Trades Support (METTS III) Services, newest first.
File Type Posted
80MSFC20R0036P00006 - SF30 Amendment 6.pdf PDF
Final RFP-Amendment 6 (P00006).docx DOCX document
LFT_User_Guide.pdf PDF
LFT_Quick_Start_Guide.pdf PDF
Final RFP-Amendment 5 (P00005).docx DOCX document
80MSFC20R0036P00005 - SF30 Amendment 5.pdf PDF
80MSFC20R0036P00004 - SF30 Amendment 4.pdf PDF
Final RFP-Amendment 4.docx DOCX document
80MSFC20R0036P00003 - SF30 Amendment 3.pdf PDF
80MSFC20R0036P00002 - SF30 Amendment 2.pdf PDF
Final RFP-Amendment 1.docx DOCX document
80MSFC20R0036P00001 - SF30 Amendment 1.pdf PDF
Attachment L-1 EPM 1_Final 3-4-2020.xlsx XLSX spreadsheet
Attachment L-1 EPM 1_Final.xlsx XLSX spreadsheet
Final RFP.docx DOCX document
RFP Cover Letter and Clarifications.pdf PDF
80MSFC20R0036 - Section A (SF33).pdf PDF
Attachment L-2 EPM 2_Final.xlsx XLSX spreadsheet
METTS III Phase-in PO_80MSFC20P0003 - SF1449.pdf PDF
ET10_PTL Brochure.pdf PDF
METTS III Industry Day Scripts (site tour_12-19-19).pdf PDF
Industry Day Attendee (Company) List.pdf PDF
Presentation Industry Day Briefing 12-19-19.pptx PPTX presentation
METTS III_80MSFC20R0036_Attachment L-1 Excel Pricing Model 1 updated 12-17-19.xlsx XLSX spreadsheet
METTS III_80MSFC20R0036_Attachment L-2 Excel Pricing Model 2 updated 12-17-19.xlsx XLSX spreadsheet
METTS III_80MSFC20R0036_DRFP Cover Letter.pdf PDF
METTS III_80MSFC20R0036_Attachment L-2 Excel Pricing Model 2.xlsx XLSX spreadsheet
METTS III_80MSFC20R0036_Attachment L-12 CAOF.xlsx XLSX spreadsheet
METTS III_80MSFC20R0036_Attachment L-1 Excel Pricing Model 1.xlsx XLSX spreadsheet
Aerie Aerospace APPROVED agreement (CBA).pdf PDF
METTS III_80MSFC20R0036_IAGP List.xlsx XLSX spreadsheet
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80MSFC20R0036

80MSFC20R0036

[Page Reserved for signed SBU sheet. Delete these instructions.] H-1

SECTION A – Solicitation, Offer, and Award

A-2

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

MSFC 52.216-91 SUPPLIES AND/OR SERVICES TO BE PROVIDED AND TYPE OF CONTRACT (JUN 2017)

(a) The contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to perform and/or deliver the services in accordance with Attachment J-1, Performance Work Statement (PWS).

(b) The contract type will be cost-plus-award fee for both the Mission Services and indefinite-delivery, indefinite-quantity (IDIQ) components.

(c) Mission Services Core mission work that has been identified in advance and for which the estimated cost and fee have been negotiated, shall comprise the negotiated contract value. The negotiated contract value, including the values negotiated for each option period, includes all direct and indirect costs and fee necessary for delivery of the services required of this contract effort.

(d) Indefinite-Delivery, Indefinite-Quantity Work In addition to the Mission Services requirements delineated in Attachment J-1, IDIQ effort may be performed to support future program/project-specific mission services as such services are identified, under Attachment J-1, Section, 3.0, Indefinite-Delivery, Indefinite-Quantity (IDIQ) Support. The Government may order IDIQ services at any time after contract start in accordance with the procedures set forth in NASA FAR Supplement (NFS) Clause 1852.216-80, Task Ordering Procedure, FAR Clause 52.216-18, Ordering, and FAR Clause 52.216-19, Order Limitations. In performing these services, the contractor shall provide all required necessary labor, materials, travel, and other direct costs (ODCs) as delineated in the individual task order (TO) proposals based on the rates delineated in Attachment J-4, Indefinite-Delivery, Indefinite-Quantity (IDIQ) Rates.

80MSFC20R0036

(End of clause) B-1

ESTIMATED COST AND FEE

The estimated cost of this contract is $ To Be Proposed (TBP ) (base period only). The maximum available award fee, excluding base fee, if any, is $ TBP (base period only). The base fee is $ 0. Total estimated cost, base fee, and maximum award fee are $ TBP (base period only).

*Note: The Contractor shall invoice fee at the percentage delineated in Attachment J-4, Indefinite-Delivery, Indefinite-Quantity (IDIQ) Rates, Table J-4-3, Contract Other Direct Costs (ODC) Burden and Fee Rates, based on the ODC costs expended during the invoicing period. The Contractor shall not be entitled to invoice for the balance of the fixed fee unless the full estimated cost of the ODC task order is expended for the contract period.

CONTRACT PERIOD
CLIN
AWARD FEE PERIOD

(AFP)

ESTIMATED COST

*FIXED FEE on ODC (If Applicable)

MAXIMUM AVAILABLE AWARD FEE
EARNED AWARD FEE
TOTAL CLIN CONTRACT VALUE
AWARD FEE REFERENCE
MAXIMUM AVAILABLE AWARD FEE
EARNED AWARD FEE
% OF AVAILABLE FEE EARNED
CONTRACT MOD
BASE PERIOD
001 (Mission)
AFP 1
10/1/2020-3/31/2021
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
$TBD
###

002 (IDIQ)

$TBD

$TBD
$TBD
$TBD
$TBD
$TBD

003 (ODC)

$TBD
$TBD

$TBD

AFP 1 TOTALS

$TBP
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
001 (Mission)
AFP 2
3/31/2021-9/30/2021
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
$TBD
###

002 (IDIQ)

$TBD

$TBD
$TBD
$TBD
$TBD
$TBD

003 (ODC)

$TBD
$TBD

$TBD

AFP 2 TOTALS

$TBP
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
BASE PERIOD TOTALS
$TBP
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
OPTION 1
004 (Mission)
AFP 3
10/1/2021-3/31/2022
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
$TBD
###

005 (IDIQ)

$TBD

$TBD
$TBD
$TBD
$TBD
$TBD

006 (ODC)

$TBD
$TBD

$TBD

AFP 3 TOTALS

$TBP
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
004 (Mission)
AFP 4
3/31/2022-9/30/2022
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
$TBD
###

005 (IDIQ)

$TBD

$TBD
$TBD
$TBD
$TBD
$TBD

006 (ODC)

$TBD
$TBD

$TBD

AFP 4 TOTALS

$TBP
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD

OPTION 1 TOTALS

$TBP
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
OPTION 2
007 (Mission)
AFP 5
10/1/2022-3/31/2023
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
$TBD
###

008 (IDIQ)

$TBD

$TBD
$TBD
$TBD
$TBD
$TBD

009 (ODC)

$TBD
$TBD

$TBD

AFP 5 TOTALS

$TBP
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
007 (Mission)
AFP 6
3/31/2023-9/30/2023
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
$TBD
###

008 (IDIQ)

$TBD

$TBD
$TBD
$TBD
$TBD
$TBD

009 (ODC)

$TBD
$TBD

$TBD

AFP 6 TOTALS

$TBP
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD

OPTION 2 TOTALS

$TBP
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
OPTION 3
010 (Mission)
AFP 7
10/1/2023-3/31/2024
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
$TBD
###

011 (IDIQ)

$TBD

$TBD
$TBD
$TBD
$TBD
$TBD

012 (ODC)

$TBD
$TBD

$TBD

AFP 7 TOTALS

$TBP
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
010 (Mission)
AFP 8
3/31/2024-9/30/2024
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
$TBD
###

011 (IDIQ)

$TBD

$TBD
$TBD
$TBD
$TBD
$TBD

012 (ODC)

$TBD
$TBD

$TBD

AFP 8 TOTALS

$TBP
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD

OPTION 3 TOTALS

$TBP
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
OPTION 4
013 (Mission)
AFP 9
10/1/2024-3/31/2025
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
$TBD
###

014 (IDIQ)

$TBD

$TBD
$TBD
$TBD
$TBD
$TBD

015 (ODC)

$TBD
$TBD

$TBD

AFP 9 TOTALS

$TBP
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
013 (Mission)
AFP 10
3/31/2025-9/30/2025
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD
$TBD
###

014 (IDIQ)

$TBD

$TBD
$TBD
$TBD
$TBD
$TBD

015 (ODC)

$TBD
$TBD

$TBD

AFP 10 TOTALS

$TBP
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD

OPTION 4 TOTALS

$TBP
$TBP
$TBP
$TBD
$TBP
$TBP
$TBD

CONTRACT TOTAL VALUE

$TBP (base period only)
$TBP (base period only)
$TBP (base period only)
$TBD
$TBP (base period only)
$TBP (base period only)
$TBD

Note: For the purposes of this contract, this clause is the equivalent to NFS Clause 1852.216-85, “Estimated Cost and Award Fees” referred to in NFS Clause 1852.216-76, Award Fee for Service Contracts.

(End of clause)

B-7

1852.232-81 CONTRACT FUNDING (JUN 1990)

(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is $ TBD. This allotment is for all CLINs and covers the following estimated period of performance: TBD.

(b) An additional amount of $ TBD is obligated under this contract for payment of fee.

(End of clause)

MSFC 52.216-90 IDIQ CONTRACT VALUE BY PERIOD OF PERFORMANCE (MAY 2017)

The maximum potential not-to-exceed (NTE) value for the indefinite-delivery, indefinite-quantity (IDIQ) component of this contract including Options, is $196,793,000. This contract provides for performance of cost reimbursable indefinite-delivery indefinite-quantity (IDIQ) task/delivery orders. The NTE value shall not be exceeded without the prior written approval of the Contracting Officer.

The values for each period of performance are set forth below:

PERIOD OF PERFORMANCE
MINIMUM VALUE
MAXIMUM VALUE
Base Period
10/01/2020 - 09/30/2021
$0
$38,000,000
Option 1
10/01/2021 - 09/30/2022
$0
$38,725,000
Option 2
10/01/2022 - 09/30/2023
$0
$39,268,000
Option 3
10/01/2023 - 09/30/2024
$0
$40,000,000
Option 4
10/01/2024 - 09/30/2025
$0
$40,800,000

Note: Any unused IDIQ value for any period will roll over to the subsequent period. IDIQ unearned fee will not roll over.

MSFC 52.216-92 MATRIX OF CONTRACT LINE ITEMS (CLINs) (OCT 2017)

The current total contract value is as specified below. To separately track the components of the value, separate CLINs have been established as follows:

CLIN
DESCRIPTION
VALUE
OPTION STATUS
001
Base Mission

(10/01/2020 -09/30/2021)

See Clause “Estimated Cost and Award Fee”
Awarded
002
Base IDIQ

(10/01/2020 -09/30/2021)

See Clause “Estimated Cost and Award Fee”
Awarded
003
Base ODC

(10/01/2020 -09/30/2021)

See Clause “Estimated Cost and Award Fee”
Awarded
004
Option 1 Mission

(10/01/2021 -09/30/2022)

See Clause “Estimated Cost and Award Fee”
Not Exercised
005
Option 1 IDIQ

(10/01/2021 -09/30/2022)

See Clause “Estimated Cost and Award Fee”
Not Exercised
006
Option 1 ODC

(10/01/2021 -09/30/2022)

See Clause “Estimated Cost and Award Fee”
Not Exercised
007
Option 2 Mission

(10/01/2022 -09/30/2023)

See Clause “Estimated Cost and Award Fee”
Not Exercised
008
Option 2 IDIQ

(10/01/2022 -09/30/2023)

See Clause “Estimated Cost and Award Fee”
Not Exercised
009
Option 2 ODC

(10/01/2022 -09/30/2023)

See Clause “Estimated Cost and Award Fee”
Not Exercised
010
Option 3 Mission

(10/01/2023 -09/30/2024)

See Clause “Estimated Cost and Award Fee”
Not Exercised
011
Option 3 IDIQ

(10/01/2023 -09/30/2024)

See Clause “Estimated Cost and Award Fee”
Not Exercised
012
Option 3 ODC

(10/01/2023 -09/30/2024)

See Clause “Estimated Cost and Award Fee”
Not Exercised
013
Option 4 Mission

(10/01/2024 -09/30/2025)

See Clause “Estimated Cost and Award Fee”
Not Exercised
014
Option 4 IDIQ

(10/01/2024 -09/30/2025)

See Clause “Estimated Cost and Award Fee”
Not Exercised
015
Option 4 ODC

(10/01/2024 -09/30/2025)

See Clause “Estimated Cost and Award Fee”
Not Exercised
Total Value of Base and All Exercised Options
See Clause “Estimated Cost and Award Fee”

MSFC 52.227-91 DATA REQUIREMENTS (JUN 2017)

(a) The contractor shall furnish all data identified and described in the data requirements list (DRL) of the data procurement document (DPD) which is attached to this contract. All expenses associated therewith are included in the estimated cost or firm fixed price of this contract, or any associated task orders if applicable.

(b) The Government reserves the right to delay the delivery of any or all data requirements descriptions (DRDs) specified in the DRL and such right may be exercised at no increase to the estimated cost or firm fixed price of this contract or any associated task orders.

(c) Nothing contained in this clause shall relieve the contractor from delivering data that is not identified and described in the DRL/DPD, but required under another section of this contract.

(d) To the extent that data required to be delivered under a DRD is also required to be delivered under another section of the contract, the requirements established by both the DRD and such other contract section shall apply. In the event of a conflict between the data requirements of the DPD and another contract section, the specific contract section will take precedence.

(End of clause)

CONTRACTOR INNOVATIONS, APPROACHES, ADVANCE AGREEMENTS, AND CORPORATE CAPITAL INVESTMENTS

The innovations and approaches proposed by the Contractor and accepted by the Government as part of the MSFC Marshall Engineering Technicians and Trades Support (METTS III) services competitive acquisition are hereby incorporated as Appendix A to Attachment J-1, Performance Work Statement (PWS).

(End of Clause)

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

MSFC 52.211-93 DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK/PERFORMANCE WORK STATEMENT (MAY 2019)

The Description/Specifications/Statement of Work/Performance Work Statement is located at Attachment J-1.

C-1

SECTION D - PACKAGING AND MARKING

1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT (JAN 2011)

(a) The Contractor shall identify all equipment to be delivered to the Government using NASA Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard (NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.

(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item’s operation.

(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:

(1) Item Description.

(2) Unique Identification Number (License Tag).

(3) Unit Price.

(4) An explanation of the data used to make the unique identification number.

(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:

(1) Date originally placed in service.

(2) Item condition.

(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:

NASA/ George C. Marshall Space Flight Center Central Receiving Facility, Building 4631

MSFC, AL 35812

(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.

(End of clause)

D-1

SECTION E - INSPECTION AND ACCEPTANCE

52.246-3 INSPECTION OF SUPPLIES—COST-REIMBURSEMENT (MAY 2001)

52.246-5 INSPECTION OF SERVICES--COST-REIMBURSEMENT (APR 1984)

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

Marshall Quality Management System Policy MPD 1280.1 Current Revision

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in—

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require—

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

1852.246-71 GOVERNMENT CONTRACT QUALITY ASSURANCE FUNCTIONS (OCT 1988)

In accordance with the inspection clause of this contract, the Government intends to perform the following functions at the locations indicated:

All Services See MSFC 52.237-91, Place of Performance Inspection/Acceptance

1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT (APR 2015)

(a) At the time of each delivery to the Government under this contract, the Contractor shall prepare and furnish a Material Inspection and Receiving Report (DD Form 250 series). The form(s) shall be prepared and distributed as follows:

Submit 3 copies: 1 copy to the customer (Mail Code: TBD), 1 copy to the Contracting Officer Representative (COR) (Mail Code: ES01), and 1 copy to MSFC Property organization (Mail Code: AS41).

(b) The Contractor shall prepare the DD Form 250 in accordance with NASA FAR Supplement 1846.6. The Contractor shall enclose the copies of the DD Form 250 in the package or seal them in a waterproof envelope, which shall be securely attached to the exterior of the package in the most protected location.

(c) When more than one package is involved in a shipment, the Contractor shall list on the DD Form 250, as additional information, the quantity of packages and the package numbers. The Contractor shall forward the DD Form 250 with the lowest numbered package of the shipment and print the words “CONTAINS DD FORM 250” on the package.

E-2

SECTION F – DELIVERIES OR PERFORMANCE

52.242-15 STOP-WORK ORDER (AUG 1989) ALTERNATE I (APR 1984)

MSFC 52.211-94 PERIOD OF PERFORMANCE (MAY 2017)

The period of performance for this contract is from 10/01/2020 through 09/30/2021.

(End of clause)

MSFC 52.237-91 PLACE OF PERFORMANCE (JUL 2018)

The Contractor shall perform the work under this contract at Marshall Space Flight Center and at such other locations as may be approved in writing by the Contracting Officer.

F-1

SECTION G - CONTRACT ADMINISTRATION DATA

1852.223-71 AUTHORIZATION FOR RADIO FREQUENCY USE (APR 2015)

1852.227-70 NEW TECHNOLOGY—OTHER THAN A SMALL BUSINESS FIRM OR NONPROFIT ORGANIZATION (APR 2015)

1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND PATENT REPRESENTATIVE (APR 2015)

1852.242-73 NASA CONTRACTOR FINANCIAL MANAGEMENT REPORTING (NOV 2004)

1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)

1852.245-78 PHYSICAL INVENTORY OF CAPITAL PERSONAL PROPERTY (AUG 2015)

1852.216-76 AWARD FEE FOR SERVICE CONTRACTS (JUN 2018)

(a) The contractor can earn award fee from a minimum of zero dollars to the maximum stated in NASA FAR Supplement clause 1852.216-85, “Estimated Cost and Award Fee” in this contract.

(b) Beginning six (6) months after the effective date of this contract, the Government shall evaluate the Contractor’s performance every six (6) months to determine the amount of award fee earned by the contractor during the period. The Contractor may submit a self-evaluation of performance for each evaluation period under consideration. These self-evaluations will be considered by the Government in its evaluation. The Government’s Fee Determination Official (FDO) will determine the award fee amounts based on the Contractor’s performance in accordance with Attachment J-16, Performance Evaluation Plan, which is incorporated by reference. The plan may be revised unilaterally by the Government prior to the beginning of any rating period to redirect emphasis.

(c) The Government will advise the Contractor in writing of the evaluation results. The NASA Shared Services Center Financial Management Division (FMD) Accounts Payable will make payment based on the receipt of a fee voucher submitted by the contractor in accordance with 1852.232-80.

(d) The Contracting Officer may direct the withholding of earned award fee payments until a reserve is set aside in an amount that the Contracting Officer considers necessary to protect the Government’s interest relative to an orderly and timely closeout of the contract. This reserve shall not exceed 15 percent of the contract’s total potential award fee or $100,000, whichever is less.

(e) The amount of award fee which can be awarded in each evaluation period is limited to the amounts set forth at 1852.216-85, “Estimated Cost and Award Fee.” Award fee which is not earned in an evaluation period cannot be reallocated to future evaluation periods.

(f)(1) Provisional award fee payments will be made under this contract pending the determination of the amount of fee earned for an evaluation period. If applicable, provisional award fee payments will be made to the Contractor on a monthly basis. The total amount of award fee available in an evaluation period that will be provisionally paid is the lesser of 70 percent or the prior period’s evaluation score.

(2) Provisional award fee payments will be superseded by the final award fee evaluation for that period. If provisional payments exceed the final evaluation score, the Contractor will either credit the next payment voucher for the amount of such overpayment or refund the difference to the Government, as directed by the Contracting Officer.

(3) If the Contracting Officer determines that the Contractor will not achieve a level of performance commensurate with the provisional rate, payment of provisional award fee will be discontinued or reduced in such amounts as the Contracting Officer deems appropriate. The Contracting Officer will notify the Contractor in writing if it is determined that such discontinuance or reduction is appropriate.

(4) Provisional award fee payments will be made prior to the first award fee determination by the Government.

(g) Award fee determinations are unilateral decisions made solely at the discretion of the Government.

(End of clause)

1852.232-80 SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT (APR 2018)

(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529.

(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC’s Vendor Payment information web site at: https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.

(c) Payment requests.

(1) The payment periods are stipulated in the payment clause(s) contained in this contract.

(2) Vouchers submitted under cost type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:

(i) Vouchers.

(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.

(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.

(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.

(D) Progress reports, as required.

(ii) Invoices.

(A) Description of goods and services delivered as part of the contract’s terms and conditions, including the dates of delivery/performance.

(B) Progress reports, as required.

(C) Date goods and services were performed.

(iii) Fee vouchers.

(A) Listing of all provisionally-billed fee by period or date earned since contract award.

(B) A reconciliation of all billed and earned fee.

(C) A clear explanation of the fee calculations.

(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:

(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.

(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.

(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.

(End of clause)

1852.245-70 CONTRACTOR REQUESTS FOR GOVERNMENT-FURNISHED PROPERTY (AUG 2015) ALTERNATE I (AUG 2015)

(a) The Contractor shall provide all property required for the performance of this contract. The Contractor shall not acquire or construct items of property to which the Government will have title under the provisions of this contract without the Contracting Officer’s written authorization. Property which will be acquired as a deliverable end item as material or as a component for incorporation into a deliverable end item is exempt from this requirement. Property approved as part of the contract award or specifically required within the statement of work is exempt from this requirement.

(b)(1) In the event the Contractor is unable to provide the property necessary for performance, and the Contractor requests provision of property by the Government, the Contractor’s request shall—

(i) Justify the need for the property;

(ii) Provide the reasons why contractor-owned property cannot be used;

(iii) Describe the property in sufficient detail to enable the Government to screen its inventories for available property or to otherwise acquire property, including applicable manufacturer, model, part, catalog, National Stock Number or other pertinent identifiers;

(iv) Combine requests for quantities of items with identical descriptions and estimated values when the estimated values do not exceed $500,000 per unit; and

(v) Include only a single unit when the acquisition or construction value equals or exceeds $500,000.

(2) Contracting Officer authorization is required for items the Contractor intends to manufacture as well as those it intends to purchase.

(3) The Contractor shall submit requests to the Contracting Officer no less than 30 days in advance of the date the Contractor would, should it receive authorization, acquire or begin fabrication of the item.

(c) The Contractor shall maintain copies of Contracting Officer authorizations, appropriately cross-referenced to the individual property record, within its property management system.

(d) Property furnished from Government excess sources is provided as-is, where-is. The Government makes no warranty regarding its applicability for performance of the contract or its ability to operate. Failure of property obtained from Government excess sources under this clause is insufficient reason for submission of requests for equitable adjustments discussed in the clause at FAR 52.245-1, Government Property, as incorporated in this contract.

(e) In the event the Contracting Officer issues written authorization to provide property, the Contractor shall screen Government sources to determine the availability of property from Government inventory or excess property.

(1) The Contractor shall review NASA inventories and other authorized Federal excess sources for availability of items that meet the performance requirements of the requested property.

(i) If the Contractor determines that a suitable item is available from NASA supply inventory, it shall request the item using applicable Center procedures.

(ii) If the Contractor determines that an item within NASA or Federal excess is suitable, it shall contact the Center Industrial Property Officer to arrange for transfer of the item from the identified source to the Contractor.

(2) If the Contractor determines that the required property is not available from inventory or excess sources, the Contractor shall note the acquisition file with a list of sources reviewed and the findings regarding the lack of availability. If the required property is available, but unsuitable for use, the contractor shall document the rationale for rejection of available property. The Contractor shall retain appropriate cross-referenced documentary evidence of the outcome of those screening efforts as part of its property records system.

(End of clause)

1852.245-71 INSTALLATION—ACCOUNTABLE GOVERNMENT PROPERTY (JUN 2018)

(a) The Government property described in paragraph (c) of this clause may be made available to the Contractor on a no-charge basis for use in performance of this contract. This property shall be utilized only within the physical confines of the NASA installation that provided the property unless authorized by the Contracting Officer under (b)(1)(iv). Under this clause, the Government retains accountability for, and title to, the property, and the Contractor shall comply with the following:

NASA Procedural Requirements (NPR) 4100.1, NASA Materials Inventory Management Manual;

NASA Procedural Requirements (NPR) 4200.1, NASA Equipment Management Procedural Requirements;

NASA Procedural Requirement (NPR) 4300.1, NASA Personal Property Disposal Procedural Requirements;

User Responsibilities: The Contractor shall retain responsibility for ensuring proper use, care, and protection (safeguarding) Installation-Accountable Government Property (IAGP) under his/her custody and control. Individuals shall be responsible for the following:

(1) ensuring IAGP is used only in the pursuit of approved programs, or as otherwise authorized;

(2) notifying cognizant Property Support Assistant (PSA) and/or Property Custodian, of all equipment location changes;

(3) ensuring that any lost, missing or damaged IAGP is officially reported to his/her supervisor, the appropriate PSA, and the Protective Services Department;

(4) notifying PSA of IAGP not being actively used;

(5) ensuring that IAGP is turned into the Property Disposal Officer through the PSA when no longer needed; under no circumstances will the Contractor dispose of IAGP, whether tagged or untagged; and

(6) notifying the Contracting Officer, cognizant PSA, and the Center’s Supply and Equipment Officer upon termination of employment.

Property not recorded in NASA property systems must be managed in accordance with the requirements of the clause at FAR 52.245-1, as incorporated in this contract.

The Contractor shall establish and adhere to a system of written procedures to assure continued, effective management control and compliance with these user responsibilities. In accordance with FAR 52.245-1(h)(1) the contractor shall be liable for property lost, damaged, destroyed or stolen by the contractor or their employees when determined responsible by a NASA Property Survey Board, in accordance with the NASA guidance in this clause.

(b)(1) The official accountable recordkeeping, financial control, and reporting of the property subject to this clause shall be retained by the Government and accomplished within NASA management information systems prescribed by the installation Supply and Equipment Management Officer (SEMO) and Financial Management Officer. If this contract provides for the Contractor to acquire property, title to which will vest in the Government, the following additional procedures apply:

(i) The Contractor’s purchase order shall require the vendor to deliver the property to the installation central receiving area.

(ii) The Contractor shall furnish a copy of each purchase order, prior to delivery by the vendor, to the installation central receiving area.

(iii) The Contractor shall establish a record for Government titled property as required by FAR 52.245-1, as incorporated in this contract, and shall maintain that record until accountability is accepted by the Government.

(iv) Contractor use of Government property at an off-site location and off-site subcontractor use requires advance approval of the Contracting Officer and notification of the Industrial Property Officer. The property shall be considered Government furnished and the Contractor shall assume accountability and financial reporting responsibility. The Contractor shall establish records and property control procedures and maintain the property in accordance with the requirements of FAR 52.245-1, Government Property (as incorporated in this contract), until its return to the installation. NASA Procedural Requirements related to property loans shall not apply to offsite use of property by contractors.

(2) After transfer of accountability to the Government, the Contractor shall continue to maintain such internal records as are necessary to execute the user responsibilities identified in paragraph (a) of this clause and document the acquisition, billing, and disposition of the property. These records and supporting documentation shall be made available, upon request, to the SEMO and any other authorized representatives of the Contracting Officer.

(c) The following property and services are provided if checked:

[X]
(1) Office space, work area space, and utilities. Government telephones are available for official purposes only.
[X]
(2) Office furniture.
[X]
(3) Property listed in Attachment J-13, Installation-Accountable Government Property (IAGP) List

(i) If the Contractor acquires property, title to which vests in the Government pursuant to other provisions of this contract, this property also shall become accountable to the Government upon its entry into Government records.

(ii) The Contractor shall not bring to the installation for use under this contract any property owned or leased by the Contractor, or other property that the Contractor is accountable for under any other Government contract, without the Contracting Officer’s prior written approval.

[]
(4) Supplies from stores stock.
[]
(5) Publications and blank forms stocked by the installation.
[X]
(6) Safety and fire protection for Contractor personnel and facilities.
[X]
(7) Installation service facilities:

(a) Reproduction – Printing: Reproduction services for black and white large engineering prints. Quick copying machines will also be provided.

(b) Security: Base security services

(c) Medical: Ambulance service

(d) Refuse Collection: Refuse collection

(e) Food Service: In addition to cafeteria privileges on the MSFC campus, vending machines are available.

(f) Mail Service: On-post mail service will be limited to a single onsite location.

(g) Vehicle Maintenance: Maintenance and gasoline for Government-owned vehicles.

(h) Janitorial Service: Janitorial services and supplies for the Government-provided facilities.

(i) Desktop Services: Desktop workstation seats, networks, servers, and supporting infrastructure.

(j) Exercise: MSFC Wellness Center

(k) Facilities: MSFC facilities provided (either wholly or partially) to the contractor for use on this Contract: TBD

[X]
(8) Medical treatment of a first-aid nature for Contractor personnel injuries or illnesses sustained during on-site duty.
[X]
(9) Cafeteria privileges for Contractor employees during normal operating hours.
[X]
(10) Building maintenance for facilities occupied by Contractor personnel.
[X]
(11) Moving and hauling for office moves, movement of large equipment, and delivery of supplies. Moving services may be provided on-site, as approved by the Contracting Officer.

1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS (SEP 2017)

(a) In addition to the requirements of the clause at FAR 52.245-1, Government Property, as included in this contract, the Contractor shall comply with the following in performance of work in and around Government real property:

(1) NPD 8800.14, Policy for Real Estate Management.

(2) NPR 8831.2, Facilities Maintenance and Operations Management.

User Responsibilities: The Contractor shall retain responsibility for ensuring proper use, care, and protection (safeguarding) Installation-Accountable Government Property (IAGP) under his/her custody and control. Individuals shall be responsible for the following:

(1) ensuring IAGP is used only in the pursuit of approved programs, or as otherwise authorized;

(2) notifying cognizant Property Support Assistant (PSA) and/or Property Custodian, of all equipment location changes;

(3) ensuring that any lost, missing or damaged IAGP is officially reported to his/her supervisor, the appropriate PSA, and the Protective Services Department;

(4) notifying PSA of IAGP not being actively used;

(5) ensuring that IAGP is turned into the Property Disposal Officer through the PSA when no longer needed; under no circumstances will the Contractor dispose of IAGP, whether tagged or untagged; and

(6) notifying the Contracting Officer, cognizant PSA, and the Center’s Supply and Equipment Officer upon termination of employment.

(b) The Contractor shall obtain the written approval of the Contracting Officer before installing or removing Contractor-owned property onto or into any Government real property or when movement of Contractor-owned property may damage or destroy Government-owned property. The Contractor shall restore damaged property to its original condition at the Contractor’s expense.

(c) The Contractor shall not acquire, construct or install any fixed improvement or structural alterations in Government buildings or other real property without the advance, written approval of the Contracting Officer. Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. Title to such property shall vest in the Government.

(d) The Contractor shall report any real property or any portion thereof when it is no longer required for performance under the contract, as directed by the Contracting Officer.

(End of clause)

MSFC 52.204-91 SECURITY AND BADGING REQUIREMENTS (NOV 2016)

Performance of this contract will require access to facilities, information technology systems, and other resources at the Marshall Space Flight Center and/or the Michoud Assembly Facility. To obtain and maintain access, the Contractor shall comply with the applicable requirements from the latest revision of (1) NASA Procedural Requirements (NPR) 1600.1, “NASA Security Program Procedural Requirements,” (2) NPR 1600.4, “Identity and Credential Management,” (3) Marshall Procedural Requirements (MPR) 1600.1, “MSFC Security Program Procedural Requirements,” (4) MPR 1600.4, “MSFC Identity, Credential, and Access Management,” and (5) NASA Advisory Implementing Instruction (NAII) 1600.4, “Foreign National Access Management.”

(End of clause)

MSFC 52.245-90 CAPITAL ASSET TRACKING (MAY 2017)

In accordance with NASA Procedural Requirements (NPR) 9250.1, “Property, Plant, and Equipment (PPE) and Operating Materials and Supplies”, and NASA Policy Directive (NPD) 9250.1, “Capital Asset Identification and Treatment”, the contractor shall track, report, and separately identify capital assets as separate Work Breakdown Structure elements on the Contractor’s NASA Form 533M reports.

If PP&E greater than $500,000 ($1,000,000 for internal use software) is purchased, the Contractor shall provide a copy of supporting invoices (to include third party invoices to substantiate capitalized asset costs) to the Contracting Officer. PP&E is defined as tangible assets, including land, that meets the following criteria: (1) has an estimated useful life of 2 years or more, (2) is not intended for sale in the ordinary course of operations, and (3) has been acquired or constructed with the intention of being used or being available for use by the entity.

(End of clause)

G-10

SECTION H - SPECIAL CONTRACT REQUIREMENTS

1852.208-81 RESTRICTIONS ON PRINTING AND DUPLICATING (NOV 2004)

1852.223-70 SAFETY AND HEALTH MEASURES AND MISHAP REPORTING (DEC 2015)

1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)

1852.242-72 DENIED ACCESS TO NASA FACILITIES (OCT 2015)

1852.225-70 EXPORT LICENSES (FEB 2000)

(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR parts 120-130, and the Export Administration Regulations (EAR), 15 CFR parts 730-799, in the performance of this contract. In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.

(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at Marshall Space Flight Center, where the foreign person will have access to export-controlled technical data or software.

(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.

(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.

(End of clause)

1852.235-71 KEY PERSONNEL AND FACILITIES (MAR 1989)

(a) The personnel and/or facilities listed below (or specified in the contract Schedule) are considered essential to the work being performed under this contract. Before removing, replacing, or diverting any of the listed or specified personnel or facilities, the Contractor shall (1) notify the Contracting Officer reasonably in advance and (2) submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on this contract.

(b) The Contractor shall make no diversion without the Contracting Officer’s written consent; provided, that the Contracting Officer may ratify in writing the proposed change, and that ratification shall constitute the Contracting Officer’s consent required by this clause.

(c) The list of personnel and/or facilities (shown below or as specified in the contract Schedule) may, with the consent of the contracting parties, be amended from time to time during the course of the contract to add or delete personnel and/or facilities.

Name
Position
TBP
General Manager

MSFC 52.209-91 ASSOCIATE CONTRACTOR AGREEMENTS (ACA) (APR 2017)

(a) The contractor shall enter into an ACA for any portion of the contract requiring cooperation and coordination with another NASA contractor in order to achieve successful contract performance.

(b) ACA shall include the following:

(1) Identification of the parties and the relevant NASA contract (see paragraph (e)).

(2) The specific area(s) of the contract requiring cooperation and coordination.

(3) A description of the proposed interfaces for each area.

(4) The specific nature of the cooperation and coordination for each area in terms of sharing technical data, knowledge, expertise, and/or other resources.

(5) Obligations regarding the protection of proprietary information and/or other restrictions on personnel.

(6) The identification of any organizational conflict of interest (OCI) created as a result of the ACA. (Resolution of identified OCIs shall be appended to the OCI plan in accordance with DRD 1670MA-003, Organizational Conflict of Interest (OCI) Plan.

(7) Expiration date or event.

(c) Prior to execution, a copy of each ACA shall be provided to the Contracting Officer for review and comment. However, notwithstanding the review and comment by the Contracting Officer, the Contractor shall remain fully responsible for the ACA and the successful performance of this contract. Furthermore, the Government shall not be liable in any manner for either a breach of the ACA by a party or the failure to resolve a disagreement with an associate contractor.

(d) Initial ACAs shall be in place within three months of contract award. Subsequent ACAs required during contract performance shall be executed within three months of written notification from the Contracting Officer.

(e) An initial ACA is required for each of the following relevant NASA contracts:

Company
Contract Number
Contract Name
Jacobs Technology
80MSFC18C0011
Engineering Services and Science Capability Augmentation (ESSCA)
Bastion Technologies, Inc.
80MSFC18C0005
Safety and Mission Assurance Services (SMAS)
AECOM Management Services, Inc.
80MSFC17C0007
Facilities Operations and Maintenance Support Services (FOMSS)

MSFC 52.209-92 DISCLOSURE OF ORGANIZATIONAL CONFLICT OF INTEREST (OCI) AFTER CONTRACT AWARD (MAY 2017)

(a) If the Contractor identifies an actual or potential organizational conflict of interest that has not already been adequately disclosed and resolved (or waived in accordance with FAR 9.503), the Contractor shall make a prompt and full disclosure in writing to the Contracting Officer. This disclosure shall include a description of the action the Contractor has taken or proposes to take in order or resolve the conflict. This reporting requirement also includes subcontractors’ actual or potential organizational conflicts of interest not adequately disclosed and resolved prior to award.

(b) Organizational Conflict of Interest Plan. If there is an OCI plan in the contract, the Contractor shall periodically update the plan, based on changes such as changes to the legal entity, the overall structure of the organization, subcontractor arrangements, contractor management, ownership, ownership relationships or modification of the work scope.

(End of clause)

MSFC 52.209-94 RESOLUTION OF ORGANIZATIONAL CONFLICTS OF INTEREST (MAY 2017)

(a) The Organizational Conflict of Interest (OCI) Plan and its obligations (which includes any appended resolution strategies related to identified OCIs), are hereby incorporated in the contract by reference.

(b) Changes. (1) Either the Contractor or the Government may propose changes to the OCI Plan. Such changes are subject to the mutual agreement of the parties and will become effective only upon incorporating the change into the plan by contract amendment.

(2) In the event that the Government and the Contractor cannot agree upon a mutually acceptable change, the Government reserves the right to make a unilateral change to the OCI Plan as necessary, with the approval of the head of the contracting activity, subject to Contractor appeal as provided in the Disputes clause.

(c) Violation. The Contractor shall report any violation of the OCI Plan, whether by its own personnel or those of the Government or other contractors, to the Contracting Officer. This report shall include a description of the violation and the actions the Contractor has taken or proposes to take to mitigate and avoid repetition of the violation. After conducting such further inquiries and discussions as may be necessary, the Contracting Officer and the Contractor shall agree on appropriate corrective action, if any, or the Contracting Officer shall direct corrective action.

(d) Breach. Any breach of the above restrictions or any nondisclosure or misrepresentation of any relevant facts required regarding OCI to be disclosed may result in termination of this contract for default or other remedies as may be available under law or regulation.

(e) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (e), in subcontracts where the work includes or may include tasks related to the OCI. The terms “Contractor” and “Contracting Officer” shall be appropriately modified to reflect the change in parties and to preserve the Government’s rights.

(End of clause)

MSFC 52.223-90 ASBESTOS MATERIAL (AUG 2015)

During performance of this contract, Contractor personnel performing work in MSFC buildings may come in contact with materials containing asbestos. MSFC Buildings 4200, 4201, and 4663 are of special concern since they are known to contain a sprayed on fire insulation on or above the ceiling, usually located on the metal or concrete structure of the buildings. Examples of asbestos-containing material are floor tile, pipe and lagging insulation, exterior siding, roofing felt, and many other building materials. To facilitate communication, MSFC has established a website where the inventory of asbestos-containing material, their condition and approximate location are provided. The URL for this website is http://ais.ndc.nasa.gov/default.aspx. If the Contractor is unable to access this URL, they may contact the Contracting Officer or MSFC’s Environmental Engineering and Occupational Health (EEOH) Office (organization code AS10) for assistance. Prior to performing tasks which may disturb building material containing asbestos or suspected asbestos, the Contractor shall notify MSFC’s EEOH Office for assistance. The Contractor shall also be responsible for ensuring that all Contractor personnel working onsite are made aware of and comply with the requirements of this clause.

(End of clause)

MSFC 52.223-91 HAZARDOUS MATERIAL REPORTING (FEB 2016)

(a) If during the performance of this contract, the Contractor transports or accepts delivery of any hazardous materials (hazardous as defined under the latest version of Federal Standard No. 313, including revisions adopted during the term of the contract) on-site to Marshall Space Flight Center, the hazardous material shall be processed through MSFC Central Receiving to be bar-coded for inventory. Alternative receiving points may be designated if approval is granted in accordance with MWI 8550.5, “Hazardous Material Management.” Chemical containers shall be managed in accordance with the provisions of MWI 8550.5. The Contractor shall be responsible for ensuring that all Contractor/subcontractor personnel are made aware of and comply with this clause.

(b) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material; or with clauses regarding hazardous materials, which may be contained in the contract and/or order.

(End of clause)

MSFC 52.223-92 ENVIRONMENTAL - GENERAL CLAUSE (AUG 2010)

Contractors performing on-site shall comply with all applicable Environmental policies and procedures including, but not limited to, MPD 8500.1, “MSFC Environmental Management Policy” and MPR 8500.1, “MSFC Environmental Engineering and Occupational Health Program.” MSFC contractors performing on-site activities that could potentially impact the environment shall be responsible for following all established NASA/MSFC environmental procedures. These procedures and other applicable policies and procedures are available by contacting the NASA/MSFC Environmental Engineering & Occupational Health Office. Failure to comply with environmental policies and procedures, may result in damage to the environment, and could potentially result in regulatory penalties against NASA and/or the Contractor, and Contractor loss of access to NASA/MSFC facilities.

(End of clause)

MSFC 52.223-95 PREVENTION OF AND RESPONSE TO THREATENING OR VIOLENT BEHAVIOR IN THE WORKPLACE (MAR 2017)

The Contractor shall comply with all applicable Contractor responsibilities set forth in Marshall Procedural Requirements (MPR) 1600.2, “Prevention of and Response to Threatening or Violent Behavior in the Workplace”.

(End of clause)

MSFC 52.223-96 MEDICAL SERVICES (SEP 2018)

Contractors with employees requiring NASA-specific and Occupational Health and Safety Association (OSHA) required medical certification health examinations may utilize the MSFC Medical Center’s service provider for such services; however, the Contractor is responsible for all associated costs and payments. The MSFC Medical Center’s service provider is located in Building 4249 and is generally open between 7:00 a.m. and 4:30 p.m., Monday through Thursday and 7:00 a.m. to 3:30 p.m. every other Friday (excluding Government holidays, Center-approved closures, early dismissals, or delayed openings), coinciding with the MSFC flexible work schedule. Contractors should utilize the MSFC emergency medical services system for any incident that occurs at MSFC and which requires emergency medical treatment by dialing 911.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .