Amendment_P00002_Attachment_L-1_(PC).xlsx

XLSX spreadsheet 114 KB Posted

Attached to
Consolidated Program Support Services (CPSS) Project Coordination (PC) Federal contract opportunity
Solicitation number
80MSFC19R0011
Issued by
National Aeronautics and Space Administration Marshall Space Flight Center

About this file

This document package includes a solicitation template and related federal contract opportunity notice. The solicitation template provides instructions and formatting for offerors to propose on the Consolidated Program Support Services Project Coordination contract with the National Aeronautics and Space Administration Marshall Space Flight Center. The contract requires general project and program coordination support, office information technology management support, and space act agreement and enhanced use lease support. The total contract period of performance is one base year and seven option years. The contract has a firm-fixed-price line item for mission services and an indefinite-delivery, indefinite-quantity line item for additional support services. The opportunity is set aside for women-owned small businesses. A draft request for proposal was slated for release on or around July 30, 2019, with comments due on or around August 14, 2019. The contract will provide support for MSFC and other NASA centers on subsequent task orders.

Amendment P00002_Attachment L-1, EPM

View the file

Other files for this federal contract opportunity

Other files attached to Consolidated Program Support Services (CPSS) Project Coordination (PC), newest first.
File Type Posted
Amendment P00009.pdf PDF
adobe_P00008_SF30.pdf PDF
Attachment_L-1_(PC)_11_4_19.xlsx XLSX spreadsheet
Amendment__P00008_RFP.docx DOCX document
Amendment__P00007_RFP.docx DOCX document
Amendment__P00006_RFP.docx DOCX document
P00006_Adobe_SF30.pdf PDF
P00005_SF30_signed.pdf PDF
Amendment__P00005_RFP.docx DOCX document
SF30.pdf PDF
Amendment__P00004_RFP.docx DOCX document
Attachment_L-1_(P00003).xlsx XLSX spreadsheet
Amendment__P00003_RFP.docx DOCX document
Amendment_P00002_ATOMS_Guide_10_2_19.pdf PDF
Amendment_P00002_Adobe_SF_30.pdf PDF
Amendment_P00002_Attachment_A_and_B.docx DOCX document
Amendment__P00002_RFP.docx DOCX document
Amendment_0001_Attachment_L-1_(PC).xlsx XLSX spreadsheet
Amendment_001_Attachment_A_and_B.docx DOCX document
Amendment__0001_RFP.docx DOCX document
80MSFC19P0021_-_SF1449.pdf PDF
SF30.pdf PDF
80MSFC19R0011_-_SF33_Adobe.pdf PDF
Final__RFP_80MSFC19R0011_CPSS_(PC).docx DOCX document
PC_Final_RFP_Cover_Letter.pdf PDF
Final_Attachments_A_and_B.docx DOCX document
Final_Attachment_L-1_(PC).xlsx XLSX spreadsheet
Automated_Task_Order_Management_System_User_Guide.pdf PDF
Interested_Parties_List.pdf PDF
Task_Order_Routing_Process.pdf PDF
CPSS_Presentation_Industry_Briefing_-PC.pdf PDF
Attachment_L-1_(PC).xlsx XLSX spreadsheet
draft_DRB_80MSFC19F0011_CPSS_(PC).docx DOCX document
PC_DRFP_Cover_Letter_signed.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX PC

Company Name: Company XYZ, Inc. INDEX PC

Attachment L-1

TabTitleSpecific Instruction
A-1Summary of Total PriceThis tab is designed to summarize the total price (mission services and IDIQ) for the entire contract effort. Offerors shall input the applicable burden rate(s) to be applied to the IDIQ ODC (e.g., travel, training, materials). This tab is linked to other tabs within the workbook. Most of this tab will automatically fill in once the other tabs have been completed. The Government-provided IDIQ ODC (e.g., travel, training, materials) values are pre-populated in this tab. Offerors shall fill in the areas highlighted in yellow.
No Subcontractor manual input required.Prime
A-2Summary of Mission by Teammate/SubcontractorTab A-2 will be completed by Offeror only. The tab is linked to B-1 and B-2. Rows 8 through 14 compute the total WYEs and Mission Labor Price for the individual company (offeror or applicable subcontractor) who is filling the EPM. Subcontractors do not need to input any information on Tab A-2.

This tab compiles each teammate’s participation in mission labor. The top table is linked to each subsequent tab used to compute a total mission price for the company completing the EPM. The tables below are where the offeror would include each teammate/subcontractor's price for the work assigned to them.

No Subcontractor manual input required.

Prime
B-1 thru B-2Computation of Mission Price by Center (MSFC or MAF) (to be completed by Offeror and Major Subcontractors)Tab B-1 shall be completed by the offeror and applicable subcontractors. Rows 6 through 11 are pre-filled with the total required WYEs. These rows shall be revised to reflect the offeror or applicable subcontractor WYEs for their own workshare. Row 15 requires input of the offeror’s productive hours. Rows 19 through 24 generate labor hours. Rows 30 through 35 requires input of the offeror’s fully burdened labor rates (FBLR) for the labor category that is included in their workshare. Rows 39 through 44 generate total proposed labor dollars.

This tab is used to calculate the fully burdened labor dollars using the proposed WYEs multiplied by the proposed fully burden labor rates and the productive factor generated from the available hours for that contract period. The WYEs have been pre-populated by the Government. The worksheet automatically calculates hours and dollars from other tabs completed within this workbook.

Prime & Major Subcontractor
********* PRIME ONLY PRIME ONLY PRIME ONLY PRIME ONLY *********
C-1 thru C-11Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by CenterThis tab calculates the IDIQ labor price by Center. The labor hours have been pre-populated by the Government for each labor category, for each period of performance. These rates must include all anticipated subcontract rates as well as the offeror's handling and profit. Note: The Government-provided pre-populated hours are provided only as a means of establishing a total proposed price for evaluation purposes. Offerors shall ensure that fully-burdened labor rates are provided for all labor categories, for all years of performance, for all Centers.Prime

80MSFC19R0011

&"Times New Roman,Bold"Page &P of &N &"Times New Roman,Bold"&F &A

Tab A - 1

Company XYZ, Inc.Tab A - 1
Summary of Total Price
PC

ELEMENTS Base Yr Option Yr. 1 Option Yr. 2 Option Yr. 3 Option Yr. 4 Option Yr. 5 Option Yr. 6 Option Yr. 7 Totals

WYE - Mission
MSFC78.777.774.774.272.971.970.970.9591.9
MAF3.03.03.03.03.03.03.03.024.0
Total WYE81.780.777.777.275.974.973.973.9615.9
Fully Burdened Labor - Mission
MSFC$0$0$0$0$0$0$0$0$0
MAF$0$0$0$0$0$0$0$0$0
Total Mission Labor$0$0$0$0$0$0$0$0$0
IDIQ Labor by Center
AFRC$0$0$0$0$0$0$0$0$0
ARC$0$0$0$0$0$0$0$0$0
GRC$0$0$0$0$0$0$0$0$0
GSFC$0$0$0$0$0$0$0$0$0
HQ$0$0$0$0$0$0$0$0$0
JSC$0$0$0$0$0$0$0$0$0
KSC$0$0$0$0$0$0$0$0$0
LaRC$0$0$0$0$0$0$0$0$0
MSFC$0$0$0$0$0$0$0$0$0
MAF$0$0$0$0$0$0$0$0$0
SSC$0$0$0$0$0$0$0$0$0
Total IDIQ Labor$0$0$0$0$0$0$0$0$0
PC IDIQ ODC Value$500,000$500,000$500,000$500,000$500,000$500,000$500,000$500,000$4,000,000
ODC Burden (%)0%0%0%0%0%0%0%0%
Total ODC Burden$0$0$0$0$0$0$0$0$0
Total IDIQ Labor and Burden$0$0$0$0$0$0$0$0$0

Total Price - Mission and IDIQ $0 $0 $0 $0 $0 $0 $0 $0 $0

Areas in Yellow Require Manual Input
It is the offeror's responsibility to provide an accurate proposal. The IDIQ other direct cost (training, travel and other direct cost) value is not included in the total Price.
Offerors may revise formulas if needed.
Acronyms for NASA Centers
AFRC - Armstrong Flight Research Center, Edwards, CA

ARC - Ames Research Center, Moffett Field, CA

GRC - Glenn Research Center, Cleveland, OH

GSFC - Goddard Space Flight Center, Greenbelt, MD

HQ - NASA Headquarters Acquisition Division, Washington, DC

JSC - Johnson Space Center, Houston, TX

KSC - Kennedy Space Center, Merritt Island, FL

LaRC - Langley Research Center, Hampton, VA

MSFC - Marshall Space Flight Center, Huntsville, AL

MAF - Michoud Assembly Facility, New Orleans, LA

SSC - Stennis Space Center, Bay St. Louis, MS

RFP# 80MSFC19R0011

&"Times New Roman,Bold"Page &P of &N &"Times New Roman,Bold"&F &A

Tab A -2

Company XYZ, Inc.Tab A -2
Summary of Mission by Teammate/Subcontractor
PC
ELEMENTSBase YrOption Yr. 1Option Yr. 2Option Yr. 3Option Yr. 4Option Yr. 5Option Yr. 6Option Yr. 7Totals
Prime (or offeror)completes this tab.
WYE - MissionTab A-2 will be completed by Offeror only. The tab is linked to B-1 and B-2. Rows 8 through 14 compute the total WYEs and Mission Labor Price for the individual company (offeror or applicable subcontractor) who is filling the EPM. Subcontractors do not need to input any information on Tab A-2.
MSFC78.777.774.774.272.971.970.970.9591.9
MAF3.03.03.03.03.03.03.03.024.0
Total WYE81.780.777.777.275.974.973.973.9615.9
Fully Burdened Labor - Mission
MSFC$0$0$0$0$0$0$0$0$0
MAF$0$0$0$0$0$0$0$0$0
Mission Labor Price - Prime$0$0$0$0$0$0$0$0$0
Subcontractor Name #1
WYE - Mission
MSFC0.0
MAF0.0
Total WYE0.00.00.00.00.00.00.00.00.0
Fully Burdened Labor - Mission
MSFC$0
MAF$0
Mission Labor Price - Sub 1$0$0$0$0$0$0$0$0$0
Subcontractor Name #2
WYE - Mission
MSFC0.0
MAF0.0
Total WYE0.00.00.00.00.00.00.00.00.0
Fully Burdened Labor - Mission
MSFC$0
MAF$0
Mission Labor Price - Sub 2$0$0$0$0$0$0$0$0$0
Subcontractor Name #3
WYE - Mission
MSFC0.0
MAF0.0
Total WYE0.00.00.00.00.00.00.00.00.0
Fully Burdened Labor - Mission
MSFC$0
MAF$0
Mission Labor Price - Sub 3$0$0$0$0$0$0$0$0$0
Subcontractor Name #4
WYE - Mission
MSFC0.0
MAF0.0
Total WYE0.00.00.00.00.00.00.00.00.0
Fully Burdened Labor - Mission
MSFC$0
MAF$0
Mission Labor Price - Sub 4$0$0$0$0$0$0$0$0$0
Subcontractor Name #5
WYE - Mission
MSFC0.0
MAF0.0
Total WYE0.00.00.00.00.00.00.00.00.0
Fully Burdened Labor - Mission
MSFC$0
MAF$0
Mission Labor Price - Sub 5$0$0$0$0$0$0$0$0$0

Repeat the Above table for each subcontractor and add to totals

Total Team WYE and Labor for Mission
WYE - Mission
MSFC78.777.774.774.272.971.970.970.9591.9
MAF3.03.03.03.03.03.03.03.024.0
Total WYE81.780.777.777.275.974.973.973.9615.9
Fully Burdened Labor - Mission
MSFC$0$0$0$0$0$0$0$0$0
MAF$0$0$0$0$0$0$0$0$0
Mission Labor Price - Sub$0$0$0$0$0$0$0$0$0

Areas in Yellow Require Manual Input

RFP# 80MSFC19R0011

&"Times New Roman,Bold"Page &P of &N &"Times New Roman,Bold"&F &A

B-1 MSFC

Company XYZ, Inc.B-1 MSFC
NASA CenterMSFC
Computation of Mission Price By Center (MSFC)
WYE WYE WYE WYE WYE
NASA Labor CategoryOfferor Labor CategoryBase YrOption 1Option 2Option 3Option 4Option 5Option 6Option 7TotalTab B-1 shall be completed by the offeror and applicable subcontractors. Rows 6

through 11 are pre-filled with the total required WYEs. These rows shall be revised to reflect the offeror or applicable subcontractor WYEs for their own workshare. Row 15 requires input of the offeror’s productive hours. Rows 19 through 24 generate labor hours. Rows 30 through 35 requires input of the offeror’s fully burdened labor rates (FBLR) for the labor category that is included in their workshare. Rows 39 through 44 generate total proposed labor dollars.

Program Manager1.01.01.01.01.01.01.01.08.0
Project Coordinator 116.016.016.016.016.016.016.016.0128.0
Project Coordinator 219.018.016.016.015.015.015.015.0129.0
Project Coordinator 328.028.027.027.027.026.025.025.0213.0
Project Coordinator 3 (HQ)1.01.01.01.01.01.01.01.08.0
Project Coordinator 413.713.713.713.212.912.912.912.9105.9
Total WYE78.777.774.774.272.971.970.970.9591.9
Base YrOption 1Option 2Option 3Option 4Option 5Option 6Option 7
Total Productive Hours
HRS HRS HRS HRS HRS
NASA Labor CategoryOfferor Labor CategoryBase YrOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Program Manager- 0- 0- 0- 0- 0- 0- 0- 0- 0
Project Coordinator 1- 0- 0- 0- 0- 0- 0- 0- 0- 0
Project Coordinator 2- 0- 0- 0- 0- 0- 0- 0- 0- 0
Project Coordinator 3- 0- 0- 0- 0- 0- 0- 0- 0- 0
Project Coordinator 3 (HQ)- 0- 0- 0- 0- 0- 0- 0- 0- 0
Project Coordinator 4- 0- 0- 0- 0- 0- 0- 0- 0- 0
Total Hours0.00.00.00.00.00.00.00.00.0
FBLR FBLR FBLR FBLR
NASA Labor CategoryOfferor Labor CategoryBase YrOption 1Option 2Option 3Option 4Option 5Option 6Option 7
Program Manager
Project Coordinator 1
Project Coordinator 2
Project Coordinator 3
Project Coordinator 3 (HQ)
Project Coordinator 4
$$$ $$$ $$$ $$$ $$$
NASA Labor CategoryOfferor Labor CategoryBase YrOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Program Manager$ -$ -$ -$ -$ -$ -$ -$ -$ -
Project Coordinator 1$ -$ -$ -$ -$ -$ -$ -$ -$ -
Project Coordinator 2$ -$ -$ -$ -$ -$ -$ -$ -$ -
Project Coordinator 3$ -$ -$ -$ -$ -$ -$ -$ -$ -
Project Coordinator 3 (HQ)$ -$ -$ -$ -$ -$ -$ -$ -$ -
Project Coordinator 4$ -$ -$ -$ -$ -$ -$ -$ -$ -
Total Labor Dollars$0$0$0$0$0$0$0$0$0

Areas in Yellow Require Manual Input

B-2 MAF

Company XYZ, Inc.B-2 MAF
NASA CenterMAF
Computation of Mission Price By Center (MAF)
WYE WYE WYE WYE WYETab B-1 shall be completed by the offeror and major subcontractors. Rows 6 through 11 are pre-filled with the total required WYEs. These rows shall be revised to reflect the offeror or major subcontractor WYEs for their own workshare. Row 15 requires input of the offerors productive hours. Rows 19 through 24 generate labor hours . Rows 30 through 35 requires input of the offerors fully burdened labor rates (FBLR) for the labor category that is included in their workshare. Rows 39 through 44 are generate total proposed labor dollars.
NASA Labor CategoryOfferor Labor CategoryBase YrOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 11.01.01.01.01.01.01.01.08.0
Project Coordinator 2
Project Coordinator 32.02.02.02.02.02.02.02.016.0
Project Coordinator 4
Total WYE3.03.03.03.03.03.03.03.024.0
Base YrOption 1Option 2Option 3Option 4Option 5Option 6Option 7
Total Productive Hours
HRS HRS HRS HRS HRS
NASA Labor CategoryOfferor Labor CategoryBase YrOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1- 0- 0- 0- 0- 0- 0- 0- 0- 0
Project Coordinator 2- 0- 0- 0- 0- 0- 0- 0- 0- 0
Project Coordinator 3- 0- 0- 0- 0- 0- 0- 0- 0- 0
Project Coordinator 4- 0- 0- 0- 0- 0- 0- 0- 0- 0
Total Hours0.00.00.00.00.00.00.00.00.0
FBLR FBLR FBLR FBLR
NASA Labor CategoryOfferor Labor CategoryBase YrOption 1Option 2Option 3Option 4Option 5Option 6Option 7
Project Coordinator 1
Project Coordinator 2
Project Coordinator 3
Project Coordinator 4
$$$ $$$ $$$ $$$ $$$
NASA Labor CategoryOfferor Labor CategoryBase YrOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1$ -$ -$ -$ -$ -$ -$ -$ -$ -
Project Coordinator 2$ -$ -$ -$ -$ -$ -$ -$ -$ -
Project Coordinator 3$ -$ -$ -$ -$ -$ -$ -$ -$ -
Project Coordinator 4$ -$ -$ -$ -$ -$ -$ -$ -$ -
Total Labor Dollars$0$0$0$0$0$0$0$0$0

Areas in Yellow Require Manual Input

C-1 AFRC

Company XYZ, Inc.C-1 AFRC
NASA Center:AFRC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor Rates
AFRC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7
Project Coordinator 1
Project Coordinator 2
Project Coordinator 3
Project Coordinator 4
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit
Areas in Yellow Require Manual Input
IDIQ Hours
AFRC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1100010001000100010001000100010008000
Project Coordinator 2100010001000100010001000100010008000
Project Coordinator 3100010001000100010001000100010008000
Project Coordinator 4100010001000100010001000100010008000
Total IDIQ Hours4000400040004000400040004000400032000
IDIQ Dollars
AFRC
BaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1$0$0$0$0$0$0$0$0$0
Project Coordinator 2$0$0$0$0$0$0$0$0$0
Project Coordinator 3$0$0$0$0$0$0$0$0$0
Project Coordinator 4$0$0$0$0$0$0$0$0$0
Total IDIQ Model$0$0$0$0$0$0$0$0$0
These totals forward to Tab A

&"Times New Roman,Bold Italic"&K0070C0RFP# 80MSFC19R0011

C-2 ARC

Company XYZ, Inc.C-2 ARC
NASA Center:ARC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor Rates
ARC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7
Project Coordinator 1
Project Coordinator 2
Project Coordinator 3
Project Coordinator 4
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit
Areas in Yellow Require Manual Input
IDIQ Hours
ARC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1100010001000100010001000100010008000
Project Coordinator 2100010001000100010001000100010008000
Project Coordinator 3100010001000100010001000100010008000
Project Coordinator 4100010001000100010001000100010008000
Total IDIQ Hours4000400040004000400040004000400032000
IDIQ Dollars
ARC
BaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1$0$0$0$0$0$0$0$0$0
Project Coordinator 2$0$0$0$0$0$0$0$0$0
Project Coordinator 3$0$0$0$0$0$0$0$0$0
Project Coordinator 4$0$0$0$0$0$0$0$0$0
Total IDIQ Model$0$0$0$0$0$0$0$0$0
These totals forward to Tab A

&"Times New Roman,Bold Italic"&K0070C0RFP# 80MSFC19R0011

C-3 GRC

Company XYZ, Inc.C-3 GRC
NASA Center:GRC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor Rates
GRC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7
Project Coordinator 1
Project Coordinator 2
Project Coordinator 3
Project Coordinator 4
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit
Areas in Yellow Require Manual Input
IDIQ Hours
GRC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1100010001000100010001000100010008000
Project Coordinator 2100010001000100010001000100010008000
Project Coordinator 3100010001000100010001000100010008000
Project Coordinator 4100010001000100010001000100010008000
Total IDIQ Hours4000400040004000400040004000400032000
IDIQ Dollars
GRC
BaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1$0$0$0$0$0$0$0$0$0
Project Coordinator 2$0$0$0$0$0$0$0$0$0
Project Coordinator 3$0$0$0$0$0$0$0$0$0
Project Coordinator 4$0$0$0$0$0$0$0$0$0
Total IDIQ Model$0$0$0$0$0$0$0$0$0
These totals forward to Tab A

&"Times New Roman,Bold Italic"&K0070C0RFP# 80MSFC19R0011

C-4 GSFC

Company XYZ, Inc.C-4 GSFC
NASA Center:GSFC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor Rates
GSFC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7
Project Coordinator 1
Project Coordinator 2
Project Coordinator 3
Project Coordinator 4
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit
Areas in Yellow Require Manual Input
IDIQ Hours
GSFC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1100010001000100010001000100010008000
Project Coordinator 2100010001000100010001000100010008000
Project Coordinator 3100010001000100010001000100010008000
Project Coordinator 4100010001000100010001000100010008000
Total IDIQ Hours4000400040004000400040004000400032000
IDIQ Dollars
GSFC
BaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1$0$0$0$0$0$0$0$0$0
Project Coordinator 2$0$0$0$0$0$0$0$0$0
Project Coordinator 3$0$0$0$0$0$0$0$0$0
Project Coordinator 4$0$0$0$0$0$0$0$0$0
Total IDIQ Model$0$0$0$0$0$0$0$0$0
These totals forward to Tab A

&"Times New Roman,Bold Italic"&K0070C0RFP# 80MSFC19R0011

C-5 HQ

Company XYZ, Inc.C-5 HQ
NASA Center:HQ

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor Rates
HQ
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7
Project Coordinator 1
Project Coordinator 2
Project Coordinator 3
Project Coordinator 4
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit
Areas in Yellow Require Manual Input
IDIQ Hours
HQ
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1100010001000100010001000100010008000
Project Coordinator 2100010001000100010001000100010008000
Project Coordinator 3100010001000100010001000100010008000
Project Coordinator 4100010001000100010001000100010008000
Total IDIQ Hours4000400040004000400040004000400032000
IDIQ Dollars
HQ
BaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1$0$0$0$0$0$0$0$0$0
Project Coordinator 2$0$0$0$0$0$0$0$0$0
Project Coordinator 3$0$0$0$0$0$0$0$0$0
Project Coordinator 4$0$0$0$0$0$0$0$0$0
Total IDIQ Model$0$0$0$0$0$0$0$0$0
These totals forward to Tab A

&"Times New Roman,Bold Italic"&K0070C0RFP# 80MSFC19R0011

C-6 JSC

Company XYZ, Inc.C-6 JSC
NASA Center:JSC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor Rates
JSC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7
Project Coordinator 1
Project Coordinator 2
Project Coordinator 3
Project Coordinator 4
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit
Areas in Yellow Require Manual Input
IDIQ Hours
JSC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1100010001000100010001000100010008000
Project Coordinator 2100010001000100010001000100010008000
Project Coordinator 3100010001000100010001000100010008000
Project Coordinator 4100010001000100010001000100010008000
Total IDIQ Hours4000400040004000400040004000400032000
IDIQ Dollars
JSC
BaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1$0$0$0$0$0$0$0$0$0
Project Coordinator 2$0$0$0$0$0$0$0$0$0
Project Coordinator 3$0$0$0$0$0$0$0$0$0
Project Coordinator 4$0$0$0$0$0$0$0$0$0
Total IDIQ Model$0$0$0$0$0$0$0$0$0
These totals forward to Tab A

&"Times New Roman,Bold Italic"&K0070C0RFP# 80MSFC19R0011

C-7 KSC

Company XYZ, Inc.C-7 KSC
NASA Center:KSC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor Rates
KSC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7
Project Coordinator 1
Project Coordinator 2
Project Coordinator 3
Project Coordinator 4
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit
Areas in Yellow Require Manual Input
IDIQ Hours
KSC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1100010001000100010001000100010008000
Project Coordinator 2100010001000100010001000100010008000
Project Coordinator 3100010001000100010001000100010008000
Project Coordinator 4100010001000100010001000100010008000
Total IDIQ Hours4000400040004000400040004000400032000
IDIQ Dollars
KSC
BaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1$0$0$0$0$0$0$0$0$0
Project Coordinator 2$0$0$0$0$0$0$0$0$0
Project Coordinator 3$0$0$0$0$0$0$0$0$0
Project Coordinator 4$0$0$0$0$0$0$0$0$0
Total IDIQ Model$0$0$0$0$0$0$0$0$0
These totals forward to Tab A

&"Times New Roman,Bold Italic"&K0070C0RFP# 80MSFC19R0011

C-8 LaRC

Company XYZ, Inc.C-8 LaRC
NASA Center:LaRC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor Rates
LaRC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7
Project Coordinator 1
Project Coordinator 2
Project Coordinator 3
Project Coordinator 4
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit
Areas in Yellow Require Manual Input
IDIQ Hours
LaRC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1100010001000100010001000100010008000
Project Coordinator 2100010001000100010001000100010008000
Project Coordinator 3100010001000100010001000100010008000
Project Coordinator 4100010001000100010001000100010008000
Total IDIQ Hours4000400040004000400040004000400032000
IDIQ Dollars
LaRC
BaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1$0$0$0$0$0$0$0$0$0
Project Coordinator 2$0$0$0$0$0$0$0$0$0
Project Coordinator 3$0$0$0$0$0$0$0$0$0
Project Coordinator 4$0$0$0$0$0$0$0$0$0
Total IDIQ Model$0$0$0$0$0$0$0$0$0
These totals forward to Tab A

&"Times New Roman,Bold Italic"&K0070C0RFP# 80MSFC19R0011

C-9 MSFC

Company XYZ, Inc.C-9 MSFC
NASA Center:MSFC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor Rates
MSFC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7
Project Coordinator 1
Project Coordinator 2
Project Coordinator 3
Project Coordinator 4
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit
Areas in Yellow Require Manual Input
IDIQ Hours
MSFC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1100010001000100010001000100010008000
Project Coordinator 2100010001000100010001000100010008000
Project Coordinator 3100010001000100010001000100010008000
Project Coordinator 4100010001000100010001000100010008000
Total IDIQ Hours4000400040004000400040004000400032000
IDIQ Dollars
MSFC
BaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1$0$0$0$0$0$0$0$0$0
Project Coordinator 2$0$0$0$0$0$0$0$0$0
Project Coordinator 3$0$0$0$0$0$0$0$0$0
Project Coordinator 4$0$0$0$0$0$0$0$0$0
Total IDIQ Model$0$0$0$0$0$0$0$0$0
These totals forward to Tab A

&"Times New Roman,Bold Italic"&K0070C0RFP# 80MSFC19R0011

C-10 MAF

Company XYZ, Inc.C-10 MAF
NASA Center:MAF

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor Rates
MAF
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7
Project Coordinator 1
Project Coordinator 2
Project Coordinator 3
Project Coordinator 4
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit
Areas in Yellow Require Manual Input
IDIQ Hours
MAF
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1100010001000100010001000100010008000
Project Coordinator 2100010001000100010001000100010008000
Project Coordinator 3100010001000100010001000100010008000
Project Coordinator 4100010001000100010001000100010008000
Total IDIQ Hours4000400040004000400040004000400032000
IDIQ Dollars
MAF
BaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1$0$0$0$0$0$0$0$0$0
Project Coordinator 2$0$0$0$0$0$0$0$0$0
Project Coordinator 3$0$0$0$0$0$0$0$0$0
Project Coordinator 4$0$0$0$0$0$0$0$0$0
Total IDIQ Model$0$0$0$0$0$0$0$0$0
These totals forward to Tab A

&"Times New Roman,Bold Italic"&K0070C0RFP# 80MSFC19R0011

C-11 SSC

Company XYZ, Inc.C-11 SSC
NASA Center:SSC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor Rates
SSC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7
Project Coordinator 1
Project Coordinator 2
Project Coordinator 3
Project Coordinator 4
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit
Areas in Yellow Require Manual Input
IDIQ Hours
SSC
NASA Labor CategoryBaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1100010001000100010001000100010008000
Project Coordinator 2100010001000100010001000100010008000
Project Coordinator 3100010001000100010001000100010008000
Project Coordinator 4100010001000100010001000100010008000
Total IDIQ Hours4000400040004000400040004000400032000
IDIQ Dollars
SSC
BaseOption 1Option 2Option 3Option 4Option 5Option 6Option 7Total
Project Coordinator 1$0$0$0$0$0$0$0$0$0
Project Coordinator 2$0$0$0$0$0$0$0$0$0
Project Coordinator 3$0$0$0$0$0$0$0$0$0
Project Coordinator 4$0$0$0$0$0$0$0$0$0
Total IDIQ Model$0$0$0$0$0$0$0$0$0
These totals forward to Tab A

&"Times New Roman,Bold Italic"&K0070C0RFP# 80MSFC19R0011

File details come from the government source that posted it. Updated .