View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Blanket Purchase Agreement for Electrical Disciplines, newest first.
File Type Posted
Amendment_00002.pdf PDF
Master_BPA_Rev_1.pdf PDF
Sept_6th_BPA_sign_in_sheet.pdf PDF
Electrical_Construction_Services_BPA_Questions1.docx.pdf PDF
Tab_40_-_Amend_SF30-_Nov16.pdf PDF
Appendix_12_Rev.pdf PDF
Master_BPA_Agreement_Rev.pdf PDF
SIMPLEX_JOFOC_2018.pdf PDF
Appendix_32.JPG JPG image
Electrical_Construction_Services_BPA_Questions.pdf PDF
80KSC018Q0028.pdf PDF
Appendices.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

NASA/KSC SOLICITATION 80KSC018Q0028

ATTACHMENT J.2. – KSC PROJECT SPECIFIC REQUIREMENTS

MASTER BPA

KENNEDY SPACE CENTER PROJECT SPECIFIC REQUIREMENTS APPLICABLE TO ALL

WORK PERFORMED UNDER THIS CONTRACT

The Kennedy Space Center project specific requirements supporting Contract Section I are identified in this Attachment J.2. Nothing contained in this Attachment J.2. shall relieve the Contractor from complying with other requirements of this Agreement, which are not identified and described in this

Attachment J.2. All costs associated with the requirements of this Attachment J.2. are included in the firm-fixed price of each BPA call.

J.2.1. UTILITY OUTAGE, ENERGIZED ELECTRICAL WORK, ELECTRICAL

HAZARD ANALYSIS, AND EXCAVATION PERMITS (AUG 2018)

(a) Utility Outage Requests and Electrical Work Permits

(1) Utility Outage Requests: All outages required during the prosecution of work which affects utility systems, such as electrical, water, fire detection and protection systems and air handling systems will require permits. Work shall be scheduled to hold outages to a minimum. Request for utility outage permits shall be made in writing to the Contracting

Officer at least fourteen (14) working days in advance of the time required. The request shall state the system involved, area involved, approximate time of outage, and the nature of the work involved. The fact that the Contractor requests an outage for a specific time period does not necessarily mean that the outage will take place. Due to the nature of the operations at Kennedy Space Center, the Contractor probably will not know until the day before the requested date if the outage will take place as scheduled. All outages will take place outside regular working hours. The Contractor will not be entitled to additional payment for working irregular hours due to outages.

(2) Electrical Work Permits: Prior to beginning work on an electrical system under an approved outage, the Contractor shall obtain an executed Work Permit (form number KSC-

26-400NS) from the Institutional Services Contractor, and then execute complex lockout/tag-out procedures for all Work Permit related work as follows:

(i) The Contractor’s employee in charge of the required lockout/tag-out shall be present at the time the Government switches high-, medium-, or low-voltage circuits under

Government access control which are to be locked and tagged out by the Contractor.

The Contractor shall coordinate with the Contracting Officer’s Representative (COR) for the required switching period time and date. Due to KSC operational considerations the switching period time and date may be at any time, and outside of normal working hours or work days.

(ii) Once Government switching is complete the Contractor’s employee in charge of the lockout/tag-out shall sign the Work Permit and immediately install the required OSHA compliant lockout / tag-out on the required switching device(s). Once installed the

Contractor’s employee in charge of the lockout/tag-out shall individually note the locations of the locks and tags on the Work Permit form.

(iii) A lockout/tag-out lock box shall be used for all such lockout / tag-outs. The key(s) from the lock(s) installed by the Contractor’s employee in charge of the lockout/tag-out shall be placed in the box and the employee in charge shall place an additional personal lock on the lock box to secure the keys inside. Lock box shall be kept at the work site and all other Contractor employees shall attach their personal lockout/tag-out on this box at any time they are working on the applicable equipment.

(iv) At the start of the first standard work period following the lockout/tag-out of a

Government switched circuit for which a Work Permit is issued, the Contractor’s employee in charge of the lockout/tag-out shall complete the required lockout/tag-out

(lock box) procedures. Immediately upon completing the lockout/tag-out the

Contractor shall verify no voltage is present on all circuit conductors using suitable testing equipment, safe work practices, and all required personal protective equipment. All other circuit safeguards such as grounding shall occur immediately after the voltage test and each safeguard shall be individually recorded on the Work

Permit.

(b) Energized Electrical Work and Hazard Analysis

(1) Live parts to which an employee might be exposed shall be put into an electrically safe work condition before an employee works on or near them, unless the employer can demonstrate that de-energizing introduces additional or increased hazards or is infeasible due to equipment design or operational limitations. If live parts are not placed in an electrically safe work condition (i.e., due to increased or additional hazards or infeasibility), work to be performed shall be considered energized electrical work. Safety plans, job hazard analysis, and work practices for work on or in proximity to energized parts shall be in accordance with KNPR 8715.7, KSC Construction Contractor Safety and

Health Practices Procedural Requirements.

(c) Excavation Permits:

The Contractor shall request and obtain excavation permit(s) prior to performing any excavation.

KSC Form 26-312V3 NS, Utility Locate/Excavation Permit Request, shall be prepared by the

Contractor and submitted to the Government for approval at least 15 working days prior to the planned excavation date. The Contractor shall comply with the requirements of the Institutional

Base Support Contractor’s "Utility Locate / Excavation Permit Procedure” ENG-I-MP07 (latest revision), in the preparation, submission and use of the permit(s).

(End of Project Specific Requirement)

J.2.2. FIRE PROTECTION AND REQUIRED PERMITS (MAR 2014)

The KSC Fire Department will provide fire suppression, inspection and rescue services to the

Contractor as necessary. The Contractor shall:

(a) Provide approved fire extinguishers of appropriate type for hazards involved.

(b) Report all fires to the Fire Service at 867-7911 or 867-1911.

(c) Comply with all requirements of KHB 1710.2C Section 504 (Heat Producing Devices) and

NSS 1740.11 “NASA Safety Standard for Fire Protection” Section 702 and Chapter 8 for work performed at the Kennedy Space Center.

(d) Provide a fire watch in accordance with Federal OSHA Safety and Health Standards 29

CFR 1926.352/1910.252 when required by the welding and burning permitting official.

(e) Prevent false fire alarms by providing 24-hour advance notice to the Contracting Officer's

Representative (COR) when construction activities in areas protected by fire alarm and/or detection systems may produce airborne particulates (smoke or dust) caused by construction activities such as painting, stripping, cutting drywall or concrete, sandblasting, and/or removing raised floor panels.

(f) Request permits for all welding and burning operations. Requests for these permits shall be made in writing to the Government at least seven (7) working days in advance of the time required.

(g) Report in the Contractor’s Safety and Health Plan how it intends to comply with the above requirements.

J.2.3. PERMANENTLY INSTALLED SAFETY SYSTEMS (MAR 2014)

(a) The Contractor shall protect and in no way interrupt the service of any installed safety systems or personnel safety devices.

(b) In the event that the Contractor requires entrance into systems serving safety devices, the Contractor shall obtain prior approval from the Contracting Officer. In the event the

Contractor determines that it is necessary to temporarily remove or render inoperable any personnel safety devices in order to accomplish contract requirements, the Contractor shall provide alternate means of protection prior to removing or rendering inoperable any permanently installed safety devices or equipment and shall obtain prior approval of the

Contracting Officer.

J.2.4. STORAGE AND PROTECTION OF MATERIAL TO BE RE-USED (MAR 2014)

All items of material to be removed and re-installed by the Contractor shall be protected during removal and stored in a manner such that the material will not be damaged during removal or storage. Any material designated for re-use, which is not suitable due to the Contractor's damage, will be replaced by the Contractor at no additional cost to the Government.

J.2.5. INTERFERENCES AND COORDINATION OF WORK (MAR 2014)

(a) The Contractor shall coordinate construction layout, systems configuration and work scheduling to avoid interference’s between the various construction trades and their installations. Interferences and obstructions resulting from lack of Contractor coordination shall be corrected by the Contractor as approved by the Contracting Officer. All components, fittings and reworking necessary for such corrections shall be provided by the Contractor at no additional cost to the government. Dimensions shown for existing work, and all dimensions required for work that is to connect to existing work, shall be verified by the Contractor by actual field measurement of the existing work. Any work at variance with that specified or shown in the drawings shall not be performed by the Contractor until approved in writing by the Contracting Officer.

(b) To the extent possible, the as-built dimensions of all new work shall be verified by actual field measurement prior to ordering or fabricating mechanical, electrical, or specialty equipment and materials to be installed. If such field measurement is not possible, then the contract drawings and applicable shop drawings shall be checked by the contractor for dimensional accuracy prior to ordering or fabricating equipment and materials to ensure proper fit for field installation.

(c) The Contractor shall be responsible for correction of all field fitup problems and interferences which could have been avoided by field measurement or drawing checks prior to equipment fabrication.

J.2.6. PCB MANAGEMENT (AUG 2018)

Polychlorinated Biphenyls (PCB) wastes may include, but are not limited to, oil-filled transformers, Oil-contaminated transformer concrete pads, light ballasts, capacitors, electric motors, pumps and paint coatings. PCB wastes shall be managed in accordance with 40 CFR 761. PCB waste management and disposal shall be coordinated through the Contracting Officer (CO).

J.2.7. SOLID WASTE (MAR 2014)

(a) The Contractor shall be responsible for the proper management of all solid waste generated at the Kennedy Space Center from the execution of this contract. The Contractor shall segregate and transport all solid waste to disposal locations designated in the Contract Documents. The

Contractor shall police work areas daily for loose trash and debris. The Contractor shall collect and properly dispose of wind-blown debris daily to prevent migration of debris/trash offsite.

(b) Trash items not requiring special handling, or which cannot be resold or recycled, shall be disposed of in receptacles slated for disposal in either the KSC Landfill or the Brevard County

Landfill. The Kennedy Space Center has numerous policies and processes in place to properly categorize, handle, store and dispose of waste streams generated during the project. It is the contractor’s responsibility to make every effort to reduce the impact of the project on the environment. This includes utilizing all practical means to reduce the amount of waste that is landfilled or incinerated.

J.2.8. SCHWARTZ ROAD LANDFILL OPERATIONS (JAN 2017)

(a) The KSC Landfill is an unlined Class III landfill. Any waste permitted by DEP regulations for disposal in a Class III landfill as defined in Rule 62-701.200(14), FAC can be accepted at the landfill (excluding friable asbestos). For the purpose of meeting recycling, waste diversion and reuse goals, KSC has restricted certain solid waste from landfill disposal (See Project

Specific Requirement titled Recycling and Salvaging Materials). Landfilling of waste shall be the Contractor’s last option for disposal.

(b) The physical dimensions of the waste shall be within the handling capabilities of the landfill disposal equipment. The physical dimensions for the landfill handling capabilities are 8 feet in length x 8 feet in width. Only the following items listed will be accepted at the landfill:

(1) Asphalt: Asphalt removed from parking lots, driveways, and roadways.

(2) Blast Media: The blast media must be as free from debris as possible and determined nonhazardous for acceptance into the KSC Landfill. The Spent Sandblast Media

Disposal Form must accompany the blast media to the landfill and will be reviewed by the landfill operator. Blasting media determined to be a hazardous waste must be managed as hazardous waste.

(3) Carpeting

(4) Construction and Demolition Debris: Materials considered not water soluble and non-hazardous in nature, including but not limited to steel, brick, glass, concrete, asphalt, pipe, gypsum wallboard and non-pressure treated or unpainted lumber. This also includes rocks, soils, tree remains and other vegetative matter, which normally result from land clearing or development. Scrap metal from demolition projects should be managed according to guidance provided under article entitled “Recycling and

Salvaging Materials”. The landfill may not accept any painted materials that test above the lower Toxicity Characteristic Leaching Procedure (TCLP) detection limits for barium, cadmium, chromium, lead, and mercury. If TCLP results are above the lower

TCLP detection limits, the Contractor shall submit a PWQ for evaluation per article entitled “Hazardous Wastes.”

(5) Fiberglass

(6) Glass (except light bulbs or lamps).

(7) Non-Friable Asbestos: Non-friable asbestos, also referred to as Non-Regulated Asbestos

Containing Materials (NRACM) is handled on a case-by-case basis. KSC policy allows for the disposal of NRACM only. In order to dispose of non-friable asbestos, the

Contractor shall complete and submit the KSC/Schwartz Road Landfill Non-Friable

Asbestos form (KSC 28-1084 NS), which can be obtained from the Contracting Officer

(CO) or the CO’s designee. The form shall be sent to NASA EAB, SI-E2. The following scheduling procedures shall be followed before NRACM wastes are accepted at the landfill:

(i) The waste generator/hauler shall make arrangements with the landfill operator a minimum of 24 hours before disposal of NRACM waste and shall inform the operator of the quantity of the waste and the scheduled date the shipment will arrive at the landfill.

(ii) NRACM will be accepted at the landfill with prior arrangement with the scale house attendant (minimum of 24 hours notification) Tuesday and Thursday, excluding holidays, from 0700 hours to 1100 hours and from 1200 hours to 1500 hours.

(8) Pallets (Unserviceable Wood and Plastics): Pallets that are not reusable or recyclable are accepted.

(9) PCB Bulk Product Waste: Refer to Clause “PCB Management.”

(10) Wood: Miscellaneous non-pressure treated wood items are accepted.

(11) Yard Waste (Vegetation): Vegetation from maintenance and land clearing activities is accepted.

J.2.9. AS-BUILTS DURING CONSTRUCTION (JUL 2017)

The Contractor is responsible for providing a full set of construction as-builts at the completion of the project. The Contractor is required to include as-built drawing status and completion percentage in the construction schedule and all schedule submittals. As-built status and submittal is a requirement and on all pay request submittals. As-built drawings or redline drawings shall be readily available at all times on the jobsite, in the prime contractor’s possession, for review by the Government, inspectors, or other authorized personnel.

General Decision Number: FL180001 08/17/2018 FL1

Superseded General Decision Number: FL20170001

State: Florida

Construction Types: Building, Heavy and Highway

County: Brevard County in Florida.

**CAPE CANAVERAL AIR STATION, PATRICK AIR FORCE BASE KENNEDY

SPACE CENTER AND MALABAR RADAR SITE IN BREVARD COUNTY BUILDING

CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and partments up to and including 4 stories) HEAVY AND HIGHWAY CONSTRUCTION

PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 03/16/2018 3 04/20/2018 4 06/01/2018 5 07/06/2018 6 08/17/2018

ASBE0067-001 01/01/2018

Rates Fringes

Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems).........................$ 27.89 15.19

ASBE0067-002 07/01/2017

8/21/2018https://www.wdol.gov/wdol/scafiles/davisbacon/FL1.dvb?v=6

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal, scrapping, vacuuming,bagging, and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not).........$ 16.50 10.90

BOIL0433-001 03/01/2018

BOILERMAKER......................$ 30.07 22.71

BRFL0008-001 01/01/2018

BRICKLAYER (BRICKLAYERS,

BLOCKLAYERS, PLASTERERS,

TERRAZZO WORKERS, TILE

SETTERS AND CEMENT MASONS)

COMMERCIAL..................$ 22.68 6.31

INDUSTRIAL..................$ 26.08 6.31

INDUSTRIAL work includes: Bulk plants, power houses, chemical plants, missile sites including all work at Cape Canaveral Air Force Station and Kennedy Space Flight Center.

CARP1000-001 07/01/2014

MILLWRIGHT.......................$ 29.48 12.40

* CARP1905-002 06/01/2017

Carpenters:

*INDUSTRIAL:

CARPENTERS.................$ 25.25 7.55

PILEDRIVERMEN..............$ 21.75 8.65

COMMERCIAL:

CARPENTERS.................$ 23.11 9.85

PILEDRIVERMEN..............$ 21.75 8.65

ELEC0222-001 09/01/2016

Line Construction:

CABLE SPLICER...............$ 35.72 5.00+24.5%

GROUNDMAN...................$ 19.39 5.00+24.5%

LINEMAN; HEAVY EQUIPMENT

OPERATOR....................$ 34.02 5.00+24.5%

ELEC0756-001 01/01/2018

ELECTRICIAN

Cable Splicer...............$ 26.64 5.5%+ $11.23 Wireman.....................$ 26.64 5.5%+ $11.23

ELEV0139-001 01/01/2018

ELEVATOR MECHANIC................$ 41.40 32.645

FOOTNOTE:

A. Employer contributions 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; Employer contributions 6% of regular hourly rate to vacation pay credit for employee who has worked in business less than 5 years.

Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; The Friday after Thanksgiving Day; and Christmas Day.

ENGI0673-001 05/01/2013

Power equipment operators:

GROUP 1.....................$ 26.30 10.85

GROUP 2.....................$ 24.14 10.85

GROUP 3.....................$ 23.00 10.85

GROUP 4.....................$ 20.36 10.85

POWER EQUIPMENT OPERATORS

CLASSIFICATIONS GROUP 1: Tower Crane, Locomotive Crane, Crawler Crane, Truck Crane, Hydro Crane, Piledriver (incluidng auger and boring machine)

GROUP 2: Mechanic/Welder and operators of: Gantry Crane, Bridge Crane, Clam Shell, Dragline, Backhoe, Gradeall, Grader, Sideboom Cat, Hulti-Drum Hoist, Highlift (10' or higher), Locomotive Engineer, Tugboat Captain (150 hp or more), Concrete Pump with boom

GROUP 3: Bulddozers, Forklifts, Straddle Buggy, Single Drum Hoist, Winch Truck, Trenching Machine, Concrete Paver, Scraper, Loader, Asphalt Paving Machine, Lubricating Engineer, Fireman, Concrete Breaking Machine, Concrete Mixer

GROUP 4: Tractors, Wellpoint System Operator and Installer, Air Compressor, Pulver Mixer, Motor boat, Power Boat, Power Sweeper, Welding Machine, Oiler, Mechanic's Helper, Pump, Conveyor, Roller, Watertruck, Asphalt distributor, Concrete Pump (trailer type), Utility Operator

IRON0808-001 02/01/2017

IRONWORKER.......................$ 26.03 12.95

LABO0517-001 05/01/2017

Laborers:

Asbestos Abatement, Hazardous and Toxic Waste Removal Laborers; (On all mechaincal systems: Lead Base Paint Removal;pipes, boilers, ducts, flues, breechings, ect.; that are going to be scrapped, the removal of all insulating materials whether they contain asbestos or not shall be the exclusive work of the laborers;.......$ 19.45 7.85 Carpenter Tender, Cement Mason Tender, Block/ Bricklayer Tender Plasterer Tender............$ 19.20 7.85 Demolition Laborers.........$ 19.20 7.85 General Laborer.............$ 19.20 7.85 Pipelayer Laborer, Laborer engaged in the pouring of concrete, mortar mixers, masonry forklift operator, and operation of power tools.......................$ 19.20 7.85

* PAIN0078-001 08/01/2018

GLAZIER..........................$ 24.71 12.95

* PAIN0078-002 08/01/2018

PAINTER..........................$ 24.71 12.95

PLUM0295-001 01/01/2018

Plumber/Pipefitter/Steamfitter INDUSTRIAL: Bulk Plants, Power-houses, Chemical Plants, Missile Sites, (Including all Work at Cape Canaveral Air Force Station and Kennedy Space Flight Center but excluding work performed at Patrick Air Force Base and Malabar Radar Site), Oil Refineries, etc., and such other work which is related to and considered a part of the above type projects....................$ 34.11 18.78 Schools, Hospitals, Shopping Centers, and work not listed as Industrial....$ 34.11 18.78

ROOF0136-001 08/01/2016

ROOFER...........................$ 19.99 8.16

SFFL0821-002 07/01/2018

SPRINKLER FITTER

Commercial..................$ 28.38 18.89 Industrial..................$ 30.73 18.89

Industrial: Jobs covering sugar mills, power plants, trash burning plants, military installations and Cape Kennedy. All other work shall be commercial rate.

SHEE0015-001 12/01/2013

SHEET METAL WORKER...............$ 24.12 13.95

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

August 14, 2018

Attachment J-4: Requirements for Low Voltage Electrical Work at Kennedy Space Center (KSC)

These requirements apply to all electrical work performed on low voltage systems (1000 volts or less) that are not located in explosive (Class 1 Div. II) environments.

• General Electrical Work Requirements

• All electrical work shall be in accordance with the latest edition of the National Electrical Code

(NFPA 70) in effect at the date of contract award

• In addition to the bonding and grounding requirements of the National Electrical Code, all electrical equipment shall be bonded and grounded per KSC-STD-E-0012, Standard for Facility

Grounding and Lightning Protection.

• All materials required for this project shall be supplied by the Contractor unless otherwise specified in this document.

• Electrical work on energized equipment is not permitted; de-energize equipment and verify as de-energized before starting work. Coordinate power outages with the Contracting Officer, or designated representative and all Stakeholders in advance of outage. Comply with all power outage and working hour restrictions applicable to this project.

• All electrical circuits associated with this work shall be field verified prior to starting work. If any anomalies are detected the Contractor shall bring them to the attention of the Contracting

Officer prior to the start of work.

• Existing conditions shall be recorded in the presence of the Contracting Officer, or designated representative, showing conditions of adjacent areas in locations where work will be performed.

Stated conditions shall be verified prior to start of work.

• The contractor shall become familiar with areas and verify conditions of this project and shall furnish all non-GFE hardware and associated equipment necessary to complete the required work.

• Work shall be accomplished by workers skilled in low voltage electrical work. All installation shall be made so that there is no degradation of equipment during installation.

• Electrical work shall be performed so as not to interfere with other trades working concurrently.

• Perform minor touch-up painting of finished wall areas disturbed by the work associated with this project and visible from normally occupied areas of the facility. Match existing finishes as closely as possible.

• Electrical Equipment and Installation Requirements

• All materials furnished for this project shall be listed as UL approved except the Maintenance

Isolation Switches (MIS).

• Where feeders or branch circuits pass through a junction box, pull box, panel or common raceway that is accessible, the phase, neutral, and ground conductors shall be labeled to indicate the panel, circuit and phase from which they are fed. Phase color coding shall be as defined in Table 1 and/or Table 2 herein.

• All penetrations through walls and ceilings shall be sealed and fire-stopped per NFPA 101 requirements. Provide fire stop location and detail drawings as part of the Preconstruction

Submittals.

• Install grounding wire (green insulation) in all raceways and bond all enclosures, boxes, and all non-current carrying equipment. The use of conduit and raceways as the ground conductor is not permitted. Install insulated bushing at all conduit terminations.

• All hardware for bonding and grounding shall be stainless steel, zinc plated steel, or nickel-plated steel.

• Conductor Requirements

• All conductors shall be copper. Conductors larger than #8 AWG shall be stranded unless otherwise specified.

• All insulation on conductors shall be THHN or THWN-2 except as noted on the drawings, 600 volt and marked with wire size in AWG.

• The use of split-bolts is not permitted for joining conductors. Utilize insulated tap connectors

(e.g. “Polaris Connector” or approved equal) for joining conductors. The use of wire nuts is permitted only for #12 AWG or smaller conductors.

• Provide conductor identification that meets the requirements of NFPA 70, Articles 200.6, 210.5(C), and 250.119. Conductors that are #2 AWG and smaller shall have factory-applied color impregnated insulation for phase, neutral, and ground. Conductors larger than #2 AWG are permitted to have colored electrical tape applied to indicate phase, neutral, and ground.

The insulation color scheme shall be in accordance with the tables below:

Table 1 Table 2 120/208 VAC Systems 277/480 VAC Systems

Conductor Color Conductor Color Phase A Black Phase A Brown Phase B Red Phase B Orange Phase C Blue Phase C Yellow Neutral White Neutral Gray Ground Green Ground Green

• Conduit Requirements

• Field route all conduit installed as part of the contract. The choice of location of fittings to be used for installing and supporting conduit is at the discretion of the Contractor, but shall meet

NFPA 70 requirements. The Contractor will determine the conduit route so that the most efficient and practical path is achieved.

• Conduit shall be routed above existing ceilings where ceiling systems exist.

• When metal conduit is installed, fiber bushings shall be installed at all conduit joints, couplings, and fittings prior to pulling conductors through the conduit in order to protect conductor insulation during wire pulls.

• When installing threaded conduit fittings to sheet metal enclosures provide enough thread to ensure a minimum of one full turn of thread protrudes from bottom of fully tightened locknut.

• Vertical conduit runs shall be inside existing wall systems unless otherwise stated in the statement of work portion of the contract.

• All conduit routed in facility shall be rigid metal conduit (RMC). Polyvinylchloride (PVC) conduit is not permitted.

• All fittings and couplings shall be thread type. Set-screw type fittings and couplings are not permitted.

• All conduit installed below grade shall be Schedule 80 PVC. Transition of below-grade conduit into above grade exterior conduit or through facility walls shall be made not less than 18 inches above grade or finished floor, as applicable.

• All above-grade conduit installed on facility exteriors shall be ridged metal conduit (RMC) and shall be painted per KSC painting standards NASA-STD-5008.

• Electrical Panel Requirements

• All electrical panels (i.e. panelboards) provided as part of this contract shall be new, and shall be provided with enclosure and a hinged dead-front panel cover unless otherwise specified in the Statement of Work.

• All panelboard bus bars shall be copper and shall be equipped with a full capacity neutral (i.e.

the neutral bus bar shall have the same current carrying capacity as the phase bus bars).

• Both exterior GFE enclosures shall be fed from the back side, not top fed, to prevent water intrusion.

• Equipment Labeling Requirements

• Provide and install updated panel schedules in all panels installed or effected as part of the contract. Panel schedules shall be typewritten; hand-written panel schedules are not permitted.

• Provide and install a lamacoid label on each receptacle and switch installed or re-fed as part of the contract. Labels shall indicate the panel and circuit feeding the device in the format “FED

FROM PANEL XXX, CIRCUIT” YY where “XXX” is the panel name and “YY” is the circuit number.

Labels shall be black with white lettering, and shall be not less than ½” tall with lettering not less than ¼” tall.

• Provide and install a lamacoid label on each panel, disconnect switch, junction box, transfer switch and transformer installed or re-fed as part of the contract. Install the label centered on and approximation one inch from the top of the dead front equipment cover. The label and information contained therein shall be in the following format:

• Test and Inspection Requirements

• Upon completion of fabrication and installation of new electrical equipment, prior to initial energizing of circuits, an inspection and test shall be conducted on all newly installed equipment to verify proper electrical connections, circuit continuity and wiring per project drawings and wiring diagrams, and that short circuits do not exist when megger tested phase-to-phase and phase-to-ground. Inspection and test results shall be documented and provided to the Government Contracting Officer.

THIS DOCUMENT WILL BE DUE AFTER AWARD

OF A MASTER BLANKET PURCHASE AGREEMENT

1 | P a g e KNPR 8715.7 ATTACHMENT J.5.

Blanket Purchase Master Agreement Safety and Health Plan (SHP)

2018 Kennedy Space Center Electrical Blanket Purchase Master Agreement

Agreement Number

______________________<<Company’s Name>>__________________________

Date

The following listed Official is <<Company’s Name>>’s authority for approval of this SHP.

Name of Company Official Title Signature

2 | P a g e KNPR 8715.7 ATTACHMENT J.5.

Table of Contents

Safety and Health Sections

1. General Safety and Health Information 4

2. Voluntary Protection Program (VPP) 4

3. Contractor Employee Training 5

4. Accident/Incident (Mishap/Close Call) Reporting 5

5. Weather Policy 6

6. Clothing 7

7. Construction Site Safety 8

8. Controlled Areas 8

9. Sanitation Conditions and Facilities 8

10. Evacuation (Facility or Area) 8

11. First Aid and Medical 9

12. Heat Stress 9

13. Housekeeping 10

14. Inspections (by Contractor) 10

15. Inspections (by NASA) 10

16. Job Hazard Analysis 10

17. Pre-task Meetings 11

18. Safety Systems – (Permanently Installed) 11

19. Vehicle Operations 11

20. Cranes and Lifting Operations 11

21. Electrical Safety 11

22. Equipment 13

23. Excavation 13

24. Fall Protection 14

25. Fire Protection and Prevention 14

26. Hand and Power Tools 14

27. Hazardous Substances 14

28. Hot Work Permits 15

29. Ladder Use 15

30. Lockout/Tagout (Control of Hazardous Energy) 16

31. Personal Protective Equipment (PPE) 17

32. Scaffolding 18

List of Appendixes 19

Appendix A: Table 1: Specified Exposure Control Methods When Working With Materials Containing Crystalline Silica

Appendix B: Training Certifications Appendix C: Job Hazard Analysis (Electrical)

3 | P a g e KNPR 8715.7 ATTACHMENT J.5.

Safety and Health Sections

1. General Project/Safety and Health Information

<<Company Name>>’s SHP is a detailed plan of safety and health information, requirements, and regulations that <<Company Name>> will follow while conducting any work under NASA/KSC Procurement Office Agreement number <<BPA number>>.

a. The work this SHP covers all projects executed under the KSC Electrical Blanket Purchase Master Agreement (NNKXXXXXXXXX) providing the government with a cost-effective simplified acquisition rapid response to unforeseen electrical-related tasks at the Kennedy Space Center.

b. This plan is written to address generic safety and health aspects of projects awarded as part of the Electrical Blanket Purchase Master Agreement.

c. This plan applies to all construction contractor personnel performing working on the site to include any subcontractor employees. <<Company Name’s and their designated site supervisor employee name>> will be responsible for ensuring all employees follow all applicable safety and health regulatory requirements to include this SHP.

d. All work under this contract will be performed safely so as not to create a hazard to personnel health or property (NASA and contractor). All work will be conducted in accordance with NASA and KSC provisions contained in the Master Agreement, all additional clauses contained within a specific BPA Call, all applicable sections of OSHA regulations, and other applicable local, state, and federal laws. <<Company Name>> will implement safe working practices and furnish equipment to assure a safe working environment.

e. <<Company Name>> will ensure employee compliance with this SHP to include employees of any subcontractor that will perform work as part of this project.

Definitions:

2. Voluntary Protection Program

a. <<Company Name>> understands that Kennedy Space Center has implemented a comprehensive safety and health management system and is recognized by the Occupational Health and Safety Administration (OSHA) as a “Voluntary Protection Program (VPP) Star Worksite.” Our company further understands that the VPP program promotes effective worksite-based safety and health by encouraging employers and employees to reduce the number of occupational safety and health hazards at their places of employment.

b. Though our company is not required by contract to be VPP certified we will:

(1) Ensure employees are trained that they can report safety and health issues without fear of retaliation and that they can report anonymously.

(2) Identify, correct, and track uncontrolled hazards on our jobsites in a timely manner.

4 | P a g e KNPR 8715.7 ATTACHMENT J.5.

(3) Comply with NASA/KSC in resolving any non-compliant work practices.

3. Contractor Employee Training

a. All <<Company Name>> and subcontractor employees engaged in jobsite activities will have received the required training that allows them to be safe during work activities. Personnel will not perform any work activity on the jobsite until they have received the training required for their job responsibilities and activities.

b. <<Company Name>> has enclosed a list of employees that will be performing work on KSC (see <<appendix B >>). The list certifies that the employees have received all required training, and a documented copy of the list will be updated before new employees or sub-contractors begin performing work on the jobsite.

c. <<Company Name>> will ensure that new site employees’ training is verified prior to the employees being allowed to work on the site and that all safety and health training is accomplished by the organization employees or an outside company qualified to train.

4. Accident/Incident (Mishap/Close Call) Reporting

a. In the event of a serious injury, employees will immediately (321) 867-7911 (cell phone on KSC) or (321) 853-0911 (cell phone on CCAFS). Ambulances are on call 24 hrs./day; 7 days/week on both KSC and Cape Canaveral Air Force Station (CCAFS).

b. <<Company Name>> will report severe mishap incidents (property damage greater than $500,000 or personnel injury/illness equivalent requiring inpatient hospital care or permanent or partial disability) to the Center Institutional Safety Office (321) 867-SAFE, the project CO, and

COR.

c. Less severe mishap or close call incidents (potential for or actual property damage greater than $20,000 or personnel injury/illness equivalent to or exceeds a nonfatal OSHA-recordable occupational injury and does not meet the criteria of a more severe mishap identified above) will be reported to the CO, and COR within 4 hours of the event (or by 7:30 AM the next workday for incidents occurring during shifts other than first shift).

d. Initial mishap or close call notification/report includes all available information such as:

(1) The time and location of the incident

(2) A detailed incident description

(3) The number of persons involved and associated organization(s)

(4) Causal factors, if known

(5) Corrective/hazard mitigation actions taken

e. In the event of an accident or mishap, <<Company Name>>’s site supervisor will ensure immediate action is taken to secure potentially dangerous conditions (e.g., disconnect electrical power, secure machinery) in order to protect employees. The scene of an accident or mishap

5 | P a g e KNPR 8715.7 ATTACHMENT J.5.

will be secured and remain intact until released by KSC Safety, KSC Security, and the Contracting Officer (CO) or a designated representative.

f. <<Company Name>>’s site supervisor will ensure all potential incident witnesses and affected equipment remains until released by the appropriate NASA authority.

g. <<Company Name>>’s site supervisor will submit to the COR, CO and KSC Institutional Safety Office (SA-E2) a KSC Incident Report, KDP-F-3645 by hand, e-mail, or fax (321) 867- 1120 within 4 hours of the mishap.

h. <<Company Name>> understands that NASA may appoint an observer or investigating authority for any incident.

i. <<Company Name>> will cooperate with any Government incident investigation.

5. Weather Policy

a. <<Company Name>> will ensure employees on the jobsite are protected from adverse weather conditions. That includes winds in excess of 35 knots, heavy rain/hail, tornados, or the potential for lightning within 5 nautical miles that could affect the area within 30 minutes.

b. The site supervisor while working on KSC will have the ability to receive KSC emergency communication (KSC weather advisories and warning alerts). <<Company Name>> will receive these alerts from a weather warning pager or text message received on a cell phone.

The Contractor will request from the CO or COR access to these KSC warning systems.

c. The site supervisor will alert employees of adverse weather conditions and heat stress advisories in the area. The site supervisor will take appropriate action to protect employees when alerted.

d. <<Company Name>> will adhere to the outdoor work restrictions based upon the table below.

WIND LIMITATIONS TABLE

Steady State

Gusts Limitations

18 knots (20.7 mph)

22 knots (25 mph)

No erection of, or work on floats, spiders, and/or scaffolding; nor lifting of personnel in buckets, crane baskets, etc.

30 knots (34.5 mph)

35 knots (40.3 mph)

No work on facility roofs, structure tops, unprotected areas, or outside hand rails (materials on roofs are secured or removed).

35 knots (40.3 mph)

40 knots (46 mph)

Contractor Supervisors will immediately conduct a walk down of their area for unsecured items.

40 knots (46 mph) and above

45 knots (51.7 mph) and above

Immediate actions will be taken to secure at ground level all loose or unanchored items, equipment, supplies, and materials.

e. The contractor will comply with wind advisories and warnings issued by the 45th Space Wing

Weather Office.

6 | P a g e KNPR 8715.7 ATTACHMENT J.5.

f. Upon notification of a KSC announced Adverse Wind Condition or if wind conditions on the jobsite appear to exceed safe working conditions, <<Company Name>>’s site supervisor will determine site specific weather/wind work restrictions.

Lightning Restrictions

a. A Phase I Lightning Watch indicates that conditions are favorable for lightning to occur in indicated areas within 30 minutes. A Phase I Lightning Watch is intended to provide personnel sufficient lead-time to secure their operations before the forecasted lightning begins. During Phase I Lightning Warnings, task leaders and personnel will prepare to safely halt any operations that may be affected if a Phase II Lightning Warning is announced (i.e., be prepared to safely halt operations that expose personnel to lightning hazards or that are required to be halted if a Phase II Lightning Warning is announced).

b. Phase II Lightning Warning indicates that lightning was observed or is forecasted to occur within 5 nautical miles. Individuals will act to protect themselves from the dangers of lightning upon being notified of a Phase II Lightning Warning. Personnel access to roofs or top levels of structures is prohibited. Electrical systems maintenance and any other operation requiring personnel risk of lightning exposure is prohibited.

Tornado Notification

a. Tornado Watch: Conditions exist for a tornado. Prepare for a tornado warning.

b. Tornado Warning: Tornado has been sighted. Personnel will take cover immediately in approved structures.

Hurricane Condition (HURCON) Policy

a. During the Atlantic Hurricane Season (June 1 through November 30) Florida is subject to extreme destruction associated with hurricanes. <<Company Name>>, our employees, and subcontractors will comply with instructions from the CO and follow the NASA/KSC Hurricane Policy.

b. Hurricane Condition III: Hurricane is forecasted to make landfall or impact the immediate area within 72 hours. Prepare site by securing structures and loose objects. Perform the necessary housekeeping. Prepare for evacuation.

c. Hurricane Condition II: Hurricane is forecasted to make landfall or impact the immediate area within 48 hrs. Evacuate site when directed by the CO and leave KSC.

d. <<Company Name>> will remove all equipment/materials from the Kennedy Space Center when Hurricane Condition II is reached.

6. Clothing

a. All employees conducting work on this project will wear appropriate clothing. Appropriate clothing consists of at minimum long pants, short (at least four inches in length) or long-sleeved shirt (no tank tops), and a style of shoe determined by the type of work being performed.

7 | P a g e KNPR 8715.7 ATTACHMENT J.5.

b. The site supervisor will check daily that workers have the proper clothing suitable for tasks and hazard level of work being performed.

c. Fire retardant clothing will be worn for designated tasks that present a potential for arc flash, flash fire, or explosion to minimize the effects of arc flash, flash fires, and burns from contacting hot equipment and material.

7. Construction Site Safety

a. <<Company Name>> ‘s site supervisor will take responsibility for safety and ensure the safety of all personnel from all organizations while within the boundaries of the worksite.

This is to include control of who is on site, what PPE, special conditions, and restrictions will be observed while on site.

b. A site supervisor will be on site at all times during construction. If the site supervisor cannot remain at the site, a designated authorized representative with the responsibilities, accountability, and authority of the absent supervisor must be present.

This is the start of the file's text. The full file is on GovTribe.