SF30_Q_A_80JSC020R0034_FC_FRFP_Amendment_2.pdf

PDF 239 KB Posted

Attached to
Facilities Contract
Solicitation number
80JSC020R0034
Issued by

About this file

This final request for proposal solicits offers for a facilities contract to provide operations, maintenance, and engineering services at the National Aeronautics and Space Administration's Johnson Space Center. Offerors must provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items necessary to perform facility-related work. The contract term is five years including options and has an estimated value of $250 million.

Proposals are due by September 16, 2020 and should include five volumes: past performance, cost/price, mission suitability, responsibility, and a model contract. The past performance volume is requested by September 2 but not due until the final proposal date. Offerors must demonstrate experience in facilities operations, project management, and engineering. Pricing methods include both fixed-price and cost-reimbursable task orders. The incumbent contractor is also invited to submit a proposal.

View the file

Other files

File Type Posted
Facilities 80JSC020R0034 Source Selection Statement_Redactions.pdf PDF
Facilities_Contract_Virtual-Pre-Proposal-Conference-Attendee-List.pdf PDF
0_SF30_Q_A_Changes_Log_80JSC020R0034_FC_FRFP_Amend4.pdf PDF
4_Attach_L-2_EPM_80JSC020R0034_FC_FRFP_Amend4.xlsx XLSX spreadsheet
1_SF33_Model_Contract_80JSC020R0034_FC_FRFP_Amend4.pdf PDF
3_Attach_J-A_GFP_80JSC020R0034_FC_FRFP_Amend4.xlsx XLSX spreadsheet
2_Section_B_Tables_80JSC020R0034_FC_FRFP_Amend4.xlsx XLSX spreadsheet
4_Sections_L_M_Attach_L_80JSC020R0034_FC_FRFP_Amend3.pdf PDF
2_Section_B_Tables_80JSC020R0034_FC_FRFP_Amend3.xlsx XLSX spreadsheet
8_Attach_L-8_PP_Matrix_80JSC020R0034_FC_FRFP_Amend3.xlsx XLSX spreadsheet
7_Attach_L-4_SB_Tables_80JSC020R0034_FC_FRFP_Amend3.xlsx XLSX spreadsheet
6_Attach_L-2_EPM_80JSC020R0034_FC_FRFP_Amend3.xlsx XLSX spreadsheet
0_SF30_Changes_Log_80JSC020R0034_FC_FRFP_Amend3.pdf PDF
1_SF33_Model_Contract_80JSC020R0034_FC_FRFP_Amend3.pdf PDF
5_Attach_L-1_Pre-award_Survey_80JSC020R0034_FC_FRFP_Amend3.pdf PDF
3_Attach_J-A_GFP_80JSC020R0034_FC_FRFP_Amend3.xlsx XLSX spreadsheet
SF30_SF33_80JSC020R0034_FC_FRFP_Amendment_1.pdf PDF
FC Virtual Pre-Proposal-Conference-Slides.pdf PDF
2_Section_B_Tables_80JSC020R0034_FC_FRFP.xlsx XLSX spreadsheet
1_80JSC020R0034_FC_FRFP.pdf PDF
3_Attachment_J-A_GFP_80JSC020R0034_FC_FRFP.xlsx XLSX spreadsheet
0_BJ4-SEB-20-019_Cover_Letter_80JSC020R0034_FC_FRFP.pdf PDF
4_Attachment_L-1_Pre-award_Survey_80JSC020R0034_FC_FRFP.pdf PDF
7_Attachment_L-8 PP Relevance Matrix_80JSC020R0034_FC_FRFP.xlsx XLSX spreadsheet
6_Attachment_L-4_SB_Tables_80JSC020R0034_FC_FRFP.xlsx XLSX spreadsheet
5_Attachment_L-2_EPM_80JSC020R0034_FC_FRFP.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

PAGE OF PAGES

3. EFFECTIVE DATE 5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO.

7. ADMINISTERED BY (If other than Item 6) CODE

FACILITY CODECODE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code)

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

1. CONTRACT ID CODE

16B. UNITED STATES OF AMERICA 16C. DATE

SIGNED

15B. CONTRACTOR/OFFEROR 15C. DATE

SIGNED

(Signature of Contracting Officer)(Signature of person authorized to sign)

15A NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

is not

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by orletter provided electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, E. IMPORTANT: Contractor is not, is required to sign this document and return

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) is extended, copies to issuing office.

4. REQUISITION/PURCHASE REQ. NO.

1 9

P00002

NASA

Johnson Space Center 2101 NASA Parkway Houston TX 77058-3696

X

80JSC020R0034

08/03/2020

X X

See Continuation Sheet If Applicable

Lara N. Procknow appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

CHECK ONE

(X)

See Continuation Sheet If Applicable electronic communication, orlettereach

See Block 16B.

(A)

ITEM NO.

(F)

AMOUNT

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED

NAME OF OFFEROR OR CONTRACTOR

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

Page of

80JSC020R0034P00002

2 9

The purpose of Amendment 2 is to:

Release the Facilities Contract Final Request for Proposal (FRFP) 80JSC020R0034 Questions and Answers.

Facilities Contract

Lara N. Procknow, BJ/Contracting Officer Email: lara.n.procknow@nasa.gov Work: 281-483-0155

0001 Phase-In

0002 Incremental Funding

Number References Questioner's Statement Question or Recommendation Government Response 1 General Will NASA answer Draft questions before the RFP is released?

Please note the Facilities Contract 80JSC020R0034 Draft RFP Questions and Answers were published on Friday, July 17, 2020, via https://beta.sam.gov/.

Additionally, please see the below link from the Facilities Contract website (https://procurement.jsc.nasa.gov/fac/):

• Pre-Solicitation Synopsis link at https://beta.sam.gov/opp/45262de75c1649118337a78e2aa9a98f/view

2 Page 10; Section L; Para.

(a)

Several questions that affect the Past Performance Volume have been submitted. Given that the PP volume is requested three weeks before the August 31 due date, that will leave bidders aproximatley a week to complete and submit the volume including submitting PP questionnaires.

Will NASA answer DRFP questions that may affect the RFP before the RFP release date so bidders can adjust to any changes?

Please note the Facilities Contract 80JSC020R0034 Draft RFP Questions and Answers were published on Friday, July 17, 2020, via https://beta.sam.gov/.

Additionally, please see the below link from the Facilities Contract website (https://procurement.jsc.nasa.gov/fac/):

• Pre-Solicitation Synopsis link at https://beta.sam.gov/opp/45262de75c1649118337a78e2aa9a98f/view

3 Virtual Facilities Pre- Proposal Conference - Micosoft Teams Chat Question

Will a list of attendees be published? Yes, the list of attendees from the Virtual Facilities Pre-Proposal Conference will be published and posted to the Facilities Contract website at https://procurement.jsc.nasa.gov/fac/ and https://beta.sam.gov/.

4 Cover Letter The Final RFP was released on 8/3, the pre-proposal conference was held in the afternoon of 8/12, and questions on the Final RFP are due by noon on 8/17, which is 15 days before the proposal due date of September 2.

Due to this short window after the completion of these activites, will the Government consider a request for an extension until September 30 in order to adequately address all of the requirements?

Yes, the Government will grant an extension. The Past Performance Factor - Volume I is requested by September 2, 2020, at 1:00 p.m. Central Time, but not officially due until the proposal submittal date and time listed in Block 9 of the SF33. The proposal due date is extended from September 2, 2020, at 1:00 p.m. Central Time to September 16, 2020, at 1:00 p.m. Central Time.

5 SECTION B

JSC 52.216-90 IDIQ

MINIMUM AND

MAXIMUM ORDERING

LIMITS (AUG 2018)

The Government states that guaranteed minimum amount to be ordered under this contract is $500,000 and the contract Not to Exceed (NTE) amount is $250,000,000.

Please clarify whether NTE is for the CORE contract or if this amount includes ID/IQ work.

JSC 52.216-90 IDIQ MINIMUM AND MAXIMUM ORDERING LIMITS (AUG 2018)

pertains to IDIQ.

6 Page 1-1; PDF page 23

Section

1_80JSC020R0034_FC_F

RFP.pdf; Gov_Fac- Areas.xlsx

Para. 1.1.3-1.1.3.2

Which buildings provide enclosed warehousing/storage for the facilities contractor and what is approximate square footage?

Which buildings/spaces offered to the Contractor for use are utilized for what purpose are at the Contractor's discretion within the limitations of the Contract, such as safety restrictions. The following three buildings offer some limited indoor storage space: Building 321 - 5000 SF; Building 325 - 10000 SF;

Building 342 - 2500 SF. Additionally, the Government on occassion takes delivery of materials purchased for later installation and stores them in other spaces not offered to the Contractor.

7 Page 1-1; PDF page 23

Section

1_80JSC020R0034_FC_F

RFP.pdf; Gov_Fac- Areas.xlsx

Para. 1.1.3-1.1.3.2

Will the Government allow the incoming Facilities Contractor to install a temporary building during phase-in?

Yes, depending on the details of the building. Permission may be granted by the Contracting Officer's Representative in accordance with Section C 1.1.3.1.

8 Page 1-1; PDF page 23

Section

1_80JSC020R0034_FC_F

RFP.pdf; Gov_Fac- Areas.xlsx

Para. 1.1.3-1.1.3.2

Will the Government provide utilities to temporary buildings installed by the facilities contractor?

The Government will provide electrical power, potable water, sewer collection service, and a LAN connection. The Contractor will be responsible for making the connections to the utility system and removing the connections when no longer needed.

9 General Can the contractor computers utilize NASA's internet connection?

All Contractor provided hardware that connects to the Government’s Local Area Network (LAN), shall meet Government IT security requirements. The Contractor shall not store their payroll, personnel or company proprietary information on the Government provided systems.

10 Page 220/791

Section C

Table 9A

This table indicts that the Maximo software is Version 6.21.

Question: Can the Government confirm that this is the most recent version of Maximo being provided to the contractor?

Maximo software was recently upgraded to Version 7.6. The RFP will be corrected to reflect this.

11 Page 24/791 and 154/791

Section C

SOW 1.1.4.2; SOW 1.4.3,

and SOW 6.6.2

The SOW's section reference Annex 7. There is no Annex 7 in the RFP.

Question: Should these references be Annex 2? Yes, these references will be corrected.

12 Page 82/791

Section C

SOW 2.11

3rd Paragraph

This section states: "The Government will issue to the Contractor ten hand held radios, supported by a radio repeater network with JSC wide range, for the Contractor’s use for quick communications with emergency responders."

Question: Are these radios tuned to the emergency responder frequency only?

Question: Is the current JSC radio repeater network trunking system available for contractor-provided frequencies and radios?

The radios are connected to the City of Houston’s emergency channel.

Additional channels may be made available from the City of Houston. The current JSC radio repeater network trunking system will be deactivated upon start of the Facilities Contract.

13 Page 61/791 and 69/791

Section C

SOW 2.2.5, SOW 2.1.3

and Table 9A

SOW 2.1.3 states the Government will provide 29 Handheld Computers, 31 Tablets, 25 Laptops, and 14 Notebook Computers. SOW 2.2.5 indicates that the Government will provide 8 iPads and 3 Windows Tablets with CMMS related software (DataSplice). Table 9A indicates there are 35 licenses for DataSplice.

Question: Are the iPads and Tablets in SOW 2.2.5 in addition to the computers provided in SOW 2.1.3?

Question: Can the offeror configure additional computers in SOW 2.1.3 to run the DataSplice software using the DataSplice licenses listed in Table 9A?

Yes, the handheld devises in Section C (Statement of Work) 2.1.3 are in addition to the computer seats identified in Section C (Statement of Work)

2.1.3. It may be possible to reconfigure the handheld units of Section C (Statement of Work) 2.1.3 using the DataSplice licenses.

14 Page 7-43 thru 7-46;

PDF pages 220-223

Table 9A – Operational Software and Database Listing

Is the software listed in Table 9A Government-furnished, or must the Contractor obtain licenses?

All Software in Table 9A is Government-furnished, except that WinEst and CAD software are purchased by the Facilities Contractor and the license is in the Government’s name.

Facilities Contract 80JSC020R0034 Final Request for Proposal (RFP) Questions and Answers

15 Page 7-43 thru 7-46;

PDF pages 220-223

Table 9A – Operational Software and Database Listing

Will the databases listed in Table 9A be made available to the incoming Contractor during Phase- In?

During phase-in, the new Facilities Contractor will have Read-Only Access into the databases until the official contract start date.

16 Page 77/791

Section C

SOW 2.5

This section states: "The Government is establishing a “Data Repository” to link to, and share data between, multiple COD databases, so that they all communicate together, and when information is updated in one system, it will be updated in all of the other systems."

Question: Will the "Data Reposity" be fully established by the start of the new contact?

No, the "Data Repository" will not be fully established by the start of the new contract.

17 Page 77/791

Section C

SOW 2.5

This section states: "The Government is establishing a “Data Repository” to link to, and share data between, multiple COD databases, so that they all communicate together, and when information is updated in one system, it will be updated in all of the other systems.

"Question: If the Data Repositiry is not fully implemented by contract start, what is the progress to achive the Data Repository?

No work on the Data Repository has begun. The Facilities Contractor may be asked to develop it as an IDIQ funded project. During the transition period, the incumbent Facilities Support Services Contractor will be instructed to create a backup copy of historical data and turn it over in manner that will simplify its use in a future data repository.

18 Page 77/791

Section C

SOW 2.5

This section states: "The Government is establishing a “Data Repository” to link to, and share data between, multiple COD databases, so that they all communicate together, and when information is updated in one system, it will be updated in all of the other systems."

Question: What platform/Software is being used to establish the 'Data Repository" ?

No work on the Data Repository has begun. The Facilities Contractor may be asked to develop it as an IDIQ funded project. Data is currently being pulled from WAD and Maximo systems using a back end SQL interface. During the transition period, the incumbent facilities contractor will be instructed to create a backup copy of historical data and turn it over in manner that will simplify its use in a future data repository.

19 Page 77/791

Section C

SOW 2.5.1

The Outcome for this SOW states: "Accurately Track and Document all ID/IQ Work."

Question: Does the "Data Repository" only contain ID/IQ data (i.e., not CORE data) for the Facilities Contract?

Once established, the Data Repository will contain both CORE and ID/IQ data.

20 DRFP - 5.6.1 *GIS

Support, Section C, Page 5-13

"The Government has a standalone contract for Geospatial Support Services (GSS). …………."supporting GIS meetings, working group meetings and face-to-face activities as requested by the Government"

What are the face-to-face activities the Facility contractor is expected to do to support GSS Contractor.

Clarification needed on what are the Face-to-Face Activities

Face-to-Face activities are defined by the Contracting Officer's Representative (COR), but include meetings and teleconferences. [Section C (Statement of Work) 5.6.1]

21 2_Section_B_Tables_80J SC020R0034_FC_FRFP.xl sx

e. Pre-Priced Items Tab

The pre-priced line items e.1 through e.11 are not commonly used terms in our known asbestos work experience or with other experienced SMEs.

Will the government please give clarification to offerors to level the field with the incumbant contractor?

Pre-priced services (Section C, Table 7) items e.1 through e.11 (Common Asbestons Procedures) reference specific requirements in JPR 1700.1, JSC Safety and Health Requirements, found in the Technical Library.

22 Page 229/791

Section C

Para. Glossary

The Glossary defines Normal Work Hours as from 6:00 a.m. to 6:00 p.m.

Question: Does this include holidays and weekends?

Question: Are Contractor Key Personnel (e.g., Program Manager) required to be onsite during Normal Working Hours?

Normal Work Hours are only on Workdays, which do not include weekends or holidays.

Key personnel are not required to be onsite during Normal Working Hours.

23 DRD AR-1-4 The DRD states that "For areas of potential future subcontracting, identify the area of work, the percentage of the Contract that this is expected to encompass, potential subcontractors and their small business or small business subcategory classification."

It is not possible pre-award to know specific subcontractor names and therefore, their small business subcategory classification.

Will the government please clarify this requirement?

List potential future subcontracts, which would go to small businesses, in accordance with DRD AR-1-4. For each subcontract, the Offeror must identify at least one small business, which could perform the subcontract and their small business subcategory classification.

24 DRD AR-1-7 DRD AR-1-7 (8)states: Discuss the Contractor’s company’s fringe benefit policies and practices. Each Offeror must propose a compensation structure that is sufficient to recruit and retain employees.

• For each benefit, discuss whether the benefit applies to exempt employees, non-exempt and non-union employees, and/or non-exempt and union employees, (or some combination thereof).

• For Vacation (or Paid-Time Off) map the hours to the years of service. For example: 1-5 years = X hours; 5-10 years = X hours; 10 -15 years = X hours, 15-20 years = X hours, and 20+=X hours.

• For insurance benefits, discuss whether the benefit applies to the employee only, or the employee and family.

• If a category is non-applicable, then insert: “N/A” in the box.

• Each item must be addressed. Offerors may add fringe benefit categories to the table below, but cannot delete benefit categories. The table may be modified to convey the information.

Will the Govenrment please clarify whether to explain the benefits the TCP requirement is to use the DRD AR-1-7 table or is the requirement to simply provide the data stated in the DRD as detailed above?

The Offeror is to provide the data in the requested table. Each item must be addressed. Offerors may add fringe benefit categories to the table below, but cannot delete benefit categories. The table may be modified to convey the information. The Offeror is also responsible for answering questions 1-7 of

DRD AR-1-7.

25 DRD MO-1-5 In Attachment J-D Data Requirements List, DRD MO-1-4 (Contractor Financial Management Report (NF533)) has a conflict. Block 6 indicates that 1st Submission Date - 30 days after Contact Award. Block 9 indicates “Initial is due with 30 working days after Contract Start."

Will the Government please clarify which initial submittal date is correct?

The initial submittal is due 30 working days after Contract Award. The DRL and DRD will be corrected.

26 Virtual Facilities Pre- Proposal Conference - Micosoft Teams Chat Question

If Union agreement takes precedence over other requirements and there is no indication of sick leave within the GPPMA agreement, why does the 56 hour agreement from the Executive Order or WD apply to the GPPMA?

The GPPMA union members do not receive paid vacation, sick, or holiday leave according to the GPPMA CBA. However, in accordance with 29 CFR 13.4(f), Executive Order 13706 applies when the collective bargaining agreement terminates or January 1, 2020 (whichever comes first). In this case, the Executive Order applies because January 2020 has passed. For additional information, please review Fact Sheet: Final Rule to Implement Executive Order 13706, Establishing Paid Sick Leave for Federal Contractors at https://www.dol.gov/sites/dolgov/files/WHD/legacy/files/PaidLeaveFS.pdf.

29 CFR 13.4(f) Employees whose covered work is governed by a collective bargaining agreement that already provides 56 hours of paid sick time. If a collective bargaining agreement ratified before September 30, 2016 applies to an employee's work performed on or in connection with a covered contract and provides the employee with at least 56 hours (or 7 days, if the agreement refers to days rather than hours) of paid sick time (or paid time off that may be used for reasons related to sickness or health care) each year, the requirements of the Executive Order and this part do not apply to the employee until the earlier of the date the agreement terminates or January 1, 2020. If a collective bargaining agreement ratified before September 30, 2016 applies to an employee's work performed on or in connection with a covered contract and provides the employee with paid sick time (or paid time off that may be used for reasons related to sickness or health care) each year, but the amount of such leave provided under the agreement is less than 56 hours (or 7 days, if the agreement refers to days rather than hours), the requirements of the Executive Order and this part do not apply to the employee until the earlier of the date the agreement terminates or January 1, 2020, provided that each year the contractor provides covered employees with the difference between 56 hours (or 7 days) and the amount provided under the existing

27 Attachment J-E GPPMA- Agreement-Bookv10, Page 12, RFP page 514

The GPPMA Union Agreement refers to a Labor Maintenance Trust Fund in Article XII, Section 10 (pg 12 of agreement, 514 of the RFP).

Is there more detail available on this required fund such as total costs to be accounted for?

The historic Labor Maintenance Trust Fund rates below are per year. The contractor or subcontractor should expect an invoice from the GPPMA:

Contractor: 1 site- $5000 2 more sites- $7500

Subcontractor: 1 site: $1200 2 or more sites: $2000

However, according to the GPPMA CBA, the amount to be contributed shall be determined by the Fund Trustees. Therefore, these amounts may be subject to change.

28 Virtual Facilities Pre- Proposal Conference - Micosoft Teams Chat Question

The GPPMA Agreement indicates that Attachment A is where agreements on vacation are listed, but the Attachment A given does not indicate any specific information about vacation.

Is there additional documentation, or do we have all information (no vacation)?

The GPPMA union members do not receive paid vacation, sick, or holiday leave according to the GPPMA Collective Bargaining Agreement (CBA). However, the current incumbent offers the GPPMA union members the amount of sick leave described in the Executive Order 13706.

29 Attachment J-G SLC Mapping, RFP page 695

The SLC Mapping attachment J-G starting on pg 695 of the RFP lists Database Administrator III, Programming Assistant III, and Systems Engineer IV all as "IT Professional" without indicating differences between IT Professional I, II, and III as indicated in the EPM.

Will the government provide further clarification on which position matches to each SLC?

The SLC Mapping is provided to show how the incumbent Contractor mapped their job titles to their SLCs. The SLCs on this procurement vary slightly from the SLCs on the incumbent contract, so the example mapping may vary from the SLCs listed for this procurement.

30 Attachment J-G SLC Mapping, RFP page 696

The SLC Mapping starting on pg 695 of the RFP lists this position description under both Safety Manager and Administrative Specialist I.

Will the government provide further clarification on which mapping is correct?

The position mapped to Administrative Specialist I is an Environmental Health and Safety Analyst II. The position mapped to Safety Manager is Environmental Health and Safety Analyst III.

31 L.10.4.(a)(1)(iii) This states that ". . . the Offeror shall document the methodology behind determining those goals, and the Offeror’s approach to successfully managing the subcontractor and consistently meeting the higher

Will the Government please clarify the 2 similar requirements -- are these both asking for the same information, or is the former related strictly to identified subcontractors with the latter asking for

The former is asking for subcontract management plans to meet high goals.

The latter is how to meet the goals in light of fluctating workload.

32 Virtual Facilities Pre- Proposal Conference - Micosoft Teams Chat Question

How do you maintain sequential page numbering when pulling out the individual plans, DRDs.

Can the Gov't remeove individual plans from the page count?

Each file shall be numbered sequentially with Arabic numerals proceeded by upper case Roman numerals matching the associated volume. Section L will be amended via an RFP amendment. The Government will not remove the individual plans from the page count. Please refer to the RFP Section L, Table L- 2: Overview of Proposal Volumes, Page Limitations, and Format.

33 L.16.2 (g) 1 L.16.2 (g) (1) states: In each volume, all pages shall be numbered sequentially with Arabic numerals (1, 2, 3, etc.) preceded by upper case roman numerals matching the volume number; for example, when paginating for volume II, paginate pages as II-1, II-2, II-3, etc. and for volume 4, paginate pages as IV-1, IV-2, IV-3, etc.

Will the Government please clarify how to number the pages sequentially when several of the plans, etc., are to be submitted as a separate document but part of the overall page count? Will the Government consider a request that those separate documents, Contract Management Plan, Total Compensation Plan Transition Plan and Efficiencies and Innovations be excluded from overall page count?

Each file shall be numbered sequentially with Arabic numerals proceeded by upper case Roman numerals matching the associated volume. Section L will be amended via an RFP amendment. The Government will not remove the individual plans from the page count. Please refer to the RFP Section L, Table L- 2: Overview of Proposal Volumes, Page Limitations, and Format.

34 L.16.2(g)(1) L.16.2(g)(1) states, “Text in diagrams, charts, tables, artwork, and photographs shall be consistent with requirements stated above [12-point Arial], and shall not be used to circumvent the font size limitations of the proposal.” The requirement to use 12-point Arial font in diagrams, charts, and tables severely limits the amount of detail offerers can provide – for example in organization charts and flow diagrams which is not in the Government’s interest.

Will the Government allow offerors to use 10-point Arial font in figures, graphics, call-out boxes, etc.?

No. The requirement is for 12-point Arial font.

35 DRD AR-1-7 As part of DRD AR-1-7, the Government is requesting a benefits table with 21 rows. With 3 unique CBAs, SCA, and Exempt workers that is a total of 105 rows of information, not including additional company benefits.

In order to provide the Government with the requested information, the tables alone will be over the 10 page TCP limit.

Will the government remove the tables from page count?

The Government will not remove the tables from the page count. However, the Government will increase the TCP page count to 12 pages. It should also be noted that the TCP will be excluded from the overall mission suitability page count.

36 DRD AR-1-7; Table L.2 Will the Government please confirm, in spite of the language in DRD AR-1-7 and L.19.1(c)MA3 that as it states in the Asterick after Table L-2, a prime contractor and its subcontractors may combine their data into one 10-page TCP?

Yes, a prime contractor and its subcontractors may combine their data into one 12-page TCP. The Government will increase the TCP page count to 12 pages.

37 Virtual Facilities Pre- Proposal Conference - Micosoft Teams Chat Question

Considering the existence of 3 different unions with unique requirements, will the government consider adding pages to the TCP limitation?

The Government will increase the TCP page count to 12 pages.

38 Table L.2 Given the amount of information required, will the Government consider increasing the page count to 15 and exclude the TCP from the 100 page limit in Missin Suitability?

The Government will increase the TCP page count to 12 pages. Per the RFP Section L, Table L-2: Overview of Proposal Volumes, Page Limitations, and Format, the TCP will be excluded from the total page limit in Mission Suitability.

39 Table L-2 * The * asterick states that the page limit for the Total Compensation Plan (TCP) is 10 pages for the Prime and 10 pages for each subcontractor [subcontractors are defined in JPI 1852.231-71(d)]. It goes on to state that for joint ventures, the page limit is 10 pages per team member. The final statement is that the prime, subcontractors, and team members are permitted to combine data into one combined TCP at 10 pages.

Will the government please confirm that acceptability of have a combined 10-page TCP applies to both previous sentences (in order words to a prime/subcontrator relationship, as well as for a joint venture relationship)?

The team members (prime/subcontractor or joint venture relationship) may have one combined 12 page TCP or each team member may submit its own

TCP.

For example, a team of 3 members may submit one TCP (which will result in 12 pages) or each member may submit its unique TCP (which may result in 36 pages).

The Government will increase the TCP page count to 12 pages.

40 L19.1 (c) (d); M 5.1 (c ) Are subcontractors required to submit a Total

Compensation Plan as well as individual Incumbent Retention and Pay (IRAP) and Fringe Benefits Analysis of Compensation Plans (FBACP) for the cost volume?

Major subcontractors are required to submit a Total Compensation Plan as well as individual Incumbent Retention and Pay (IRAP) template and Fringe Benefits Analysis of Compensation Plans (FBACP) in their cost volume. In addition, submission of the FBACP templates is required of ALL subcontractors as defined in NFS 1852.231-71(d).

41 RFP Section L Table L-2:

Overview of Proposal Volumes, Page Limitations, and Format (page 727 of 791)

Table L-2 limits both the Organizational Conflicts of Interest (OCI) Plan (DRD AN-1-2) and the Government Property Management Plan (PMP) (DRD AR-1-5) to 10 pages each. To provide sufficient detail in an executable plan, we request the page limit be increased to 20 pages each.

Will the Government increase the page count of the OCI plan and PMP to 20 pages each?

DRD AN-1-2 and DRD AR-1-5 will be changed to 15 pages each.

42 Table L-21, Volumne III, Subfactor 4

The table states that the Small Business Subcontracting Plan is included in the 100 pages. However, both the Quality Plan and the Safety and Health Plan are excluded from the 100 pages.

As the Small Business Subcontracting Plan is a DRD just like the Quality and Safety plans, will the Government consider also excluding the Small Business Subcontracting Plan from the 100 pages?

No, the Government will not consider excluding the Small Business Subcontracting Plan from the 100 pages.

43 Virtual Facilities Pre- Proposal Conference - Micosoft Teams Chat Question

With the reduction of page count from 150pgs to 100pgs, can the Gov't remove plans from the page count?

The Government will not remove plans from the page count. Please reference the Change Log from the Final RFP, which describes the logic behind this reduction.

44 L.19.2(b) To be compliant with L.19.2 (b) BOE requirement, there would be insufficient page space to put technical narrative beyond the BOE data.

Will the Government please add an additional 50 pages to accommodate both BOE and Technical Approach.

No. The requirement in L.19.2(b) stands.

45 Table L.2 Volume III Mission Suitability Factor has a page count limitation of 100 pages. To be included within Volume III (among the other requirements) are both DRD AN-1- 4 Contract Management Plan (under Subfactor 1 Management Approach) and the TA1 CORE Technical Understanding Narrative (under Subfactor 1 Technical Approach).

Given the amount of data required in these two sections, will the Government either increase the overall page count for Volume III or extend the due date by two weeks in order to provide sufficient time to compress the material adequately to provide the Government with the information to perform a valid evaluation of the offeror’s approach?

Yes, the Government will grant an extension. The Past Performance Factor - Volume I is requested by September 2, 2020, at 1:00 p.m. Central Time, but not officially due until the proposal submittal date and time listed in Block 9 of the SF33. The proposal due date is extended from September 2, 2020, at 1:00 p.m. Central Time to September 16, 2020, at 1:00 p.m. Central Time.

46 L.16.2 and L.20 L.16.2's Table for Volume IV includes "Subcontrating Arrangement Information" in the information required to be submitted in Volume IV. However, L.20 skips the requirement for "Subcontracting Arrangement Information."

Will the Government please confirm whether "Subcontracting Arrangement Information" is required in the 2 pages of Volume IV, and if so, please provide the specific requirements for this information?

The "Subcontracting Arrangement Information" will be removed from Table L- 2: Overview of Proposal Volumes, Page Limitations, and Format.

47 RFP Section L, Table L-2:

Overview of Proposal Volumes, Page Limitations, and Format (page 729 of 791) and Section L.20(a), Business System Adequacy (751 of 791)

Table L-2 limits the page count for Volume IV, Responsibility Considerations Factor, to 2 total pages for Business System Adequacy Documentation, Taxpayer ID, Waiver of Rights, Subcontracting Arrangement Information, and Company Information.

Section L.20(a) states "Thus, the Offeror shall provide evidence of an adequate accounting system, as determined by the cognizant administrative office for accumulating and reporting incurred costs, by stating whether all business systems, including but not limited to, accounting, property control, purchasing, estimating, project reporting and employee compensation, which require Government acceptance or approval (as applicable) are currently accepted/approved by DCAA, without condition.

To provide evidence (copy of signed letter from the cognizant administrative office) as well as the additional required information within Volume IV, request the Government increase the page count from "2 Total Pages" to "10 Total pages".

Business system adequacy will be excluded from the page count limit in Volume IV.

48 Page Business Systems Adequacy

Section L

Para. 20(a)

The government requires the Offeror to provide documentation showing approval status of business system adequacy in Volume IV, which is limited to 2 pages.

Will the Government allow this documentation to be presented as an attachment to Volume IV because it does not fit into the page count allowed?

Business system adequacy will be excluded from the page count limit in Volume IV.

49 RFP Section L Table L-2:

Overview of Proposal Volumes, Page Limitations, and Format (page 727 of 791) Volume V Model Contract and Additional Requirements (page 753 pf 791)

The documents that comprise the model contract total 714 pages. Table L-2 requires the model contract in MS Word. To provide the model contract requires either converting the PDF to Word or copying numerous JPGs into the Word document.

Request the Government revise Table L-2 and allow offerors to submit the model contract as a PDF.

Table L-2: Overview of Proposal Volumes, Page Limitations, and Format will be revised to allow Offerors to submit the model contract as a PDF.

50 Table L-2 **/***; L.21 Table L-2 implies that Sections A-J should be in one attachment to Volume V with Section K in a second attachment to Volume V. However, L.21 and Table L-7 states that Offerors shall submit in Volume V the Model Contract in its entirety per Table L-7, whcih includes Sections A thorugh K.

Will the Government please clarify if Sections A-J and Section K should be in separate attachments to Volume V, or all in one attachment to Volume V?

The entire Model Contract (Sections A through K) should be submitted as a single file attachment to Volume V.

51 L.17(i); M.3 Insurance Letter

Is an insurance letter also required for major subcontractors?

Yes, the insurance letter is also required for major subcontractors.

52 Page 21, L.18 Cost and Price Factor - Volume II AND Page 22 L.18 Cost and Price Factor - Volume II (b)Specific Guidelines (6) Forecasted Business Base Data Support

(b)Specific Guidelines (4) Indirect Rate Historical Data and Analysis - For indirect rates not included in an FPRA or FPRR, Offerors shall provide its indirect rate history for the past three years. Offerors shall indicate the primary reasons for any significant changes in the indirect rate from year to year. Additionally, Offerors shall specifically provide, and explain, the rationale for any elements of cost in either the “pool” or the “base” that are driving significant changes in the prospective indirect rates when compared to the historical indirect rates. Where an Offeror does not have three prior years of history for an indirect rate, then the Offeror shall provide and explain both the basis of estimate and the rationale for the “pool” and “base” costs that comprise each indirect rate for the years available.

For each year of the Contract period, the annual base costs used in all Indirect Rate calculations (Overhead, Fringe Benefit {if separated from the Overhead}, G&A, and any other Indirect Rates proposed), shall be segregated into the following categories: Base costs relating to current existing contracts; Base costs relating to prospective contracts; Base costs relating to this Contract AND page 22 L.18 Cost and Price Factor - Volume II (b)Specific Guidelines (6) Forecasted Business Base Data Support - For indirect rates not included in a FPRA or FPRR, the Offeror shall provide detailed information relative to the Offeror’s Forecasted Business Base dollars included in the OHT, Question: Will NASA remove the requirements for indirect rates historical data and analysis and forecasted business base data support for indirect rates in (b)Specific Guidelines (4) Indirect Rate Historical Data and Analysis and (6) Forecasted Business Base Data Support for bidders who have submitted a FPRP and are capable of providing the full FPRP submittal in their proposal?

The RFP will be amended to clarify that if an FPRA or FPRR is used to develop the proposal, historical data is not required. However, if an FPRP is used in developing the proposal, the required OHT and GAT templates shall be completed, and three years of historical data shall be provided.

53 L.19.2 Per L.19.2 etc., will the Government please confim an Offerer can provide all BOE data in Vol II and provide an appropriate cross-reference in each CLIN section of Vol III?

Yes. The Bases of Estimate may be placed in Volume II or Volume III at the Offeror's discretion (but they must all be in the same volume) and referenced from the other Volume.

54 L.19.2(a)(2), L.9.2 (a) (4), Attachment L-6

L.19.2 (a) (4) states "If any of the required information is provided elsewhere in Volume 1 or Volume II, the Offeror may simply reference it in this section [Subfactor 2, Technical Approach)".

Willl the Government please confirm that an Offeror may provide required Basis of Estimate data as an element in the Cost and Price Factor, Volume

II?

Yes. The Bases of Estimate may be placed in Volume II or Volume III at the Offeror's discretion (but they must all be in the same volume) and referenced from the other Volume.

55 L.19.2(a)(4) The RFP L.19.2(a)(4) states that : “If any of the required information is provided elsewhere in Volume I or Volume II, the Offeror may simply reference it in this section.”

However, slide 44 of the pre-proposal conference presentation states: “Proposal information in a page-limited volume or section should not be moved to another volume/section without such page limitations.”

Will the Government please clarify? If in the process of answering a requirement in one volume information is presented that is needed as part of answering another requirement in a different volume, that information does not need to be presented twice, but can be referenced. On the other hand, data that clearly belongs in a specific volume should not be incorporated into a separate volume in order to transfer between page-limited volumes.

56 L.19.4(a) The language after the asterisk states that "The Section M evaluation for SDB participation ensures that the Government only evaluates participation of SDBs in industries that are designated by the Department of Commerce as underrepresented.

For purposes of the Small Business Subcontracting Plan, the proposed subcontracting goal for SDBs will be evaluated based upon the SDB's status as a small business." (1) Will the Government please clarify whether small businesses who self-identify as an SDB will be evaluated under the SDB category? (2) Do we need to provide documentation on the SDB status? (3) Section M does not specifically address the evaluation of SDB -- will the Government be providing additional information?

(1) The Government will evaluate SDB's in accordance with the requirements of FAR 19.704, Subcontracting Plan Requirements and Section M.5.4 Small Business Utilization (SBU) - MS Subfactor 4. (2) No additional documentation will need to be provided on the SBD status. (3) The Offeror's Small Business Subcontracting Plan will also be evaluated in terms of meeting the requirements of FAR 19.704, Subcontracting Plan Requirements, in accordance with Section M.5.4 Small Business Utilization (SBU) - MS Subfactor 4.

57 L.19.4(a)(2) This paragaph states that offerors shall modify the attachment L-4 to show the proposed subcontracting goals for the basic Contract requirement and each option separately. However, the chart on page H-13 shows each year separately within the basic contract requirement and the first option (both of which are 2 years).

Will the Government please confirm that the L-4 tables should reflect the 2-year base, the 2-year option and then the 1-year option and not each of the 5 years individually? Does the Government want the chart for each period on a separate tab or all on the same tab?

Attachment L-4 should reflect each of the 5 years individually. Provide the chart for each period on separate tabs of Attachment L-4.

58 L.20(a) The language in L.20(a) for FAR 16.301-3 is not current and the outdated language requires documentation that is not used. For example, there is not a property control, compensation or project reporting business system or approvals of these.

Will the Government please confirm the requirements?

The language will be removed from L.20(a).

59 L.18(c); L.17(a); DRD AR- 1-3; L.20(f)

Both L.17(a) and L.18(b) define Major Subconractors as subcontractors with an estimated annual contract value that equals or exceeds $3M. DRD AR-1-3 defines Major Subcontractor as subcontractors with a $1M annual value. L.20(f) states that Company Information must be provided for each subcontractor with a value of $10 million and over (which equates to $2M annually).

Will the Government please confirm the definition of major subcontractor is $3M? Also, should the requirement in L.20(f) remain at $10M for the life of the subcontract?

DRD AR-1-3 defines Major Subconractors as subcontractors with an estimated annual contract value that equals or exceeds $3M. Yes, the requirement in L.20(f) shall remain at $10M for the life of the subcontract.

60 Section L.21, Model Contract and Additional Requirements - Volume V, Table L-5: Instructions for Model Contract Preparation (page 753 pf 791)

Table L-5: Instructions for Section A require an original signature. With a Large File Transfer submission, there will not be an original signature

Request the Government revise Table L-5 to delete the word "original" before signature.

The word "original" before signature will be deleted and replaced with the word "electronic" before signature in Section A of Table L-5: Instructions for Model Contract Preparation.

61 Table L-7 For Section F, Table L-7 states "None" for the Areas of Model Contract Offerors are Required to Complete.

However,on page F-2, $OFI is shown in the Option to Extend Period of Performance.

Do the $OFI values on page F-2 need to be filled-in by the Offeror?

Yes, the $OFI values on page F-2 need to be filled-in by the Offeror. Table L-5 Instructions for Model Contract Preparation will be updated.

62 Table L-7 For Section H, Table L-7 states "None" for the Areas of Model Contract Offerors are Required to Complete.

However, on pages H-13 and H-14, OFI% is shown both in the text as well as in the Small Business Subcontrating Goals table.

Do these OFIs need to be filled out by the offeror? Yes, the OFIs need to be filled out by the Offeror. Table L-5 Instructions for Model Contract Preparation will be updated.

63 Table L-7 For Section I, Table L-7 states "None" for the Areas of Model Contract Offerors are Required to Complete.

However, there are checkboxes on pages I-34, I-35 and I- 36, and a fill-in on page I-40.

Do these checkboxes and fill-in need to be completed by the offeror?

Yes, the OFIs need to be filled out by the Offeror. Table L-5 Instructions for Model Contract Preparation will be updated.

64 Table L-7 For Section J, Table L-7 states "None" for the Areas of Model Contract Offerors are Required to Complete.

However, in Attachment J-C on page J-2 (or 344 of 791), $OFI is shown both in Table 1.

Do these $OFIs need to be filled out by the offeror? Yes, the OFIs need to be filled out by the Offeror. Table L-5 Instructions for Model Contract Preparation will be updated.

65 L.19.2(b) Can the offeror add a Tab in the EPM for the BOE to satisfy the requirement in L.19.2, due to the limited page count in Mission Suitability?

No. The EPM should not contain discussions or explanations, just numerical data and calculations.

66 Attachment L-2 EPM The provided Government 4_Attachment_L- 2_EPM_80JSC020R0034_FC_DRFP includes External links to customer systems and urls.

Will the Government remove all External Links provided within the Governments "4_Attachment_L-

2_EPM_80JSC020R0034_FC_DRFP"?

The EPM templates will be amended to exclude all external links.

67 L18(d)(1)(iii) Attachment L-2 EPM CET-X worksheets

The CET-X worksheet templates cited in the FRFP Section L18(d)(1)(iii) for Attachment L-2 EPM include three columns for Prior Yr. 1, 2 and 3 Contractor Fiscal Year data. In other worksheets, indirect rate cost elements supported by FPRA or FPRR rates do not require three years of historical data.

Will the Government please confirm the prior year data is not required on the CET-X worksheets for FPRA or FPRR indirect rates and update the CET-X worksheet template instructions to reflect similar language used on other worksheet instructions?

Prior years' data are not required for the CET-X worksheets if an FPRA or FPRR provides the required Co-Efficients. The template instructions will be modified to reflect this clarification.

68 Page 24 (c) Pricing Methodology (2) Pricing for Core Work

The CPT-CORE is structured to allow Offerors to propose all resources except Non-Labor Resources (NLR) for the entire period of performance (Contract years 1 through 5). NLRs to be used in the proposal are provided by the Government and included in the EPM.

Offerors shall provide, in Attachment L-5, its estimate of the level of resources necessary to perform the CORE tasks with the appropriate skill mix, based on their unique technical approach AND Page L.19.2 Technical Approach (TA) -MS Subfactor 2 (a) TA 1 Specific Technical Understanding and Resources - CORE "The Offeror shall demonstrate understanding by providing detailed responses to each task (CLIN) listed in Attachment L-5. Within Attachment L-5, each CLIN is labeled with a “level of detail” designation (an “A,” “B,” or “C” or a combination thereof) identifying the information Offerors are required to address and provide for that CLIN.

QUESTION 1: Where in Attachment L-5 is the Offeror to provide the estimtae of the level of resources required? QUESTION 2: Where in Volume II should the completed Attachment L-5 be provided? Attachment L-5 is not shown in Table L- 2: Overview of Proposal Volumes, Page Limitations, and Format.

Attachment L-5 provides information on the level of detail required in an acceptable proposal when providing resource estimates, bases of estimates, and technical approach narratives. The information is to be included in the appropriate volume of the proposal, not on Attachment L-5.

69 Section I-4; Section L18(b)(2); Attachment L-

2 EPM (LPT, OPT, FBR-

CPFF, TOPT-IDIQ-CPFF,

TOPT-IDIQ-FFP and IRAP worksheets)

; DRAFT RFP Q&A # 87

and #112

The Government includes 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards - Price Adjustment (Multiple Year and Option Contracts) within Section I-4 of the RFP, and additionally provides instruction at Section L.18(b)(2) on Direct Labor Rate Escalation. The Section L.18(b)(2) Direct Labor Rate Escalation instructions coupled with Attachment L-2 EPM Instructions contained within the worksheets (LPT, OPT, FBR-CPFF, TOPT-IDIQ-CPFF, TOPT-IDIQ-FFP and IRAP) elude to a singular, applicable labor escalation factor applicable to both Firm Fixed Price (FFP) and Cost Type Task Order Contractual Arrangements. In the Government’s previous DRFP Q&A response to questions #87 and #112, it appears the answers were conflicting on the correct application of labor escalation to the Fixed Price portion and the Cost Type labor rates.

Please confirm which DRFP Q&A answer is correct and which is not correct as applied to the FRFP and completion of Labor Rates in the EPM workbook.

Also, please clarify the referenced Attachment L-2 EPM instructions for the worksheets (LPT, OPT, FBR- CPFF, TOPT-IDIQ-CPFF, TOPT-IDIQ-FFP and IRAP Tabs) that indicate a singular applicable escalation factor is applicable for all labor types on both Firm Fixed Price (FFP) and Cost Type Task Order Contractual Arrangements.

The templates will be modified to allow annual escalation factors to be applied at the SLC level. Section L.18(b)(2) will be changed accordingly.

70 Virtual Facilities Pre- Proposal Conference - Micosoft Teams Chat Question

The LPT only has a single place for escalation percentage on direct labor rates but the contract includes many different labor classifications that may have differing escalation.

Will the government allow a different escalation for each standard labor category, and will the government modify the form to accommodate this or is the offeror given permission to modify as needed?

The EPM Templates will be amended to accommodate a different annual escalation for each standard labor category.

71 Virtual Facilities Pre- Proposal Conference - Micosoft Teams Chat Question

The LPT only has a single place for productive hours per WYE but the contract includes many different labor classifications that have differing vacation requirements or expectations.

Will the government allow for a different productive hour per WYE per standard labor category, and will the government modify the form to accommodate this or is the offeror given permission to modify as needed?

The EPM…