2_Section_B_Tables_80JSC020R0034_FC_FRFP.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Facilities Contract Federal contract opportunity
Solicitation number
80JSC020R0034
Issued by
National Aeronautics and Space Administration Johnson Space Center

About this file

This document contains pricing tables for a facilities contract solicitation from NASA's Johnson Space Center. The solicitation seeks cost-plus-fixed-fee and firm-fixed price task orders for facilities-related services such as electrical work, architectural projects, asbestos abatement, cleaning, painting, and interior finishes. The tables include fully burdened labor rates, coefficient factors, pre-priced line items, an award fee schedule, and design costs for small projects. Services will be required over a five-year period from June 2021 through May 2026 and include a phase-in period and four additional one-year ordering periods. Pricing is to be offered for a base period and multiple options.

View the file

Other files for this federal contract opportunity

Other files attached to Facilities Contract, newest first.
File Type Posted
Facilities 80JSC020R0034 Source Selection Statement_Redactions.pdf PDF
Facilities_Contract_Virtual-Pre-Proposal-Conference-Attendee-List.pdf PDF
3_Attach_J-A_GFP_80JSC020R0034_FC_FRFP_Amend4.xlsx XLSX spreadsheet
2_Section_B_Tables_80JSC020R0034_FC_FRFP_Amend4.xlsx XLSX spreadsheet
0_SF30_Q_A_Changes_Log_80JSC020R0034_FC_FRFP_Amend4.pdf PDF
1_SF33_Model_Contract_80JSC020R0034_FC_FRFP_Amend4.pdf PDF
4_Attach_L-2_EPM_80JSC020R0034_FC_FRFP_Amend4.xlsx XLSX spreadsheet
4_Sections_L_M_Attach_L_80JSC020R0034_FC_FRFP_Amend3.pdf PDF
8_Attach_L-8_PP_Matrix_80JSC020R0034_FC_FRFP_Amend3.xlsx XLSX spreadsheet
2_Section_B_Tables_80JSC020R0034_FC_FRFP_Amend3.xlsx XLSX spreadsheet
7_Attach_L-4_SB_Tables_80JSC020R0034_FC_FRFP_Amend3.xlsx XLSX spreadsheet
0_SF30_Changes_Log_80JSC020R0034_FC_FRFP_Amend3.pdf PDF
6_Attach_L-2_EPM_80JSC020R0034_FC_FRFP_Amend3.xlsx XLSX spreadsheet
1_SF33_Model_Contract_80JSC020R0034_FC_FRFP_Amend3.pdf PDF
5_Attach_L-1_Pre-award_Survey_80JSC020R0034_FC_FRFP_Amend3.pdf PDF
3_Attach_J-A_GFP_80JSC020R0034_FC_FRFP_Amend3.xlsx XLSX spreadsheet
SF30_Q_A_80JSC020R0034_FC_FRFP_Amendment_2.pdf PDF
SF30_SF33_80JSC020R0034_FC_FRFP_Amendment_1.pdf PDF
FC Virtual Pre-Proposal-Conference-Slides.pdf PDF
7_Attachment_L-8 PP Relevance Matrix_80JSC020R0034_FC_FRFP.xlsx XLSX spreadsheet
0_BJ4-SEB-20-019_Cover_Letter_80JSC020R0034_FC_FRFP.pdf PDF
3_Attachment_J-A_GFP_80JSC020R0034_FC_FRFP.xlsx XLSX spreadsheet
1_80JSC020R0034_FC_FRFP.pdf PDF
4_Attachment_L-1_Pre-award_Survey_80JSC020R0034_FC_FRFP.pdf PDF
5_Attachment_L-2_EPM_80JSC020R0034_FC_FRFP.xlsx XLSX spreadsheet
6_Attachment_L-4_SB_Tables_80JSC020R0034_FC_FRFP.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CPFF Task Order

To be used for Cost Plus Fixed Fee Task Order
Standard Labor CategoryFully-Burdened Labor Rates (Excluding Fee)
Base PeriodOption 1Option 2
Contract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5
6/1/21 - 5/31/226/1/22 - 5/31/236/1/23 - 5/31/246/1/24 - 5/31/256/1/25 - 5/31/26
Program Manager$OFI$OFI$OFI$OFI$OFI
Manager$OFI$OFI$OFI$OFI$OFI
Supervisor$OFI$OFI$OFI$OFI$OFI
Safety Manager$OFI$OFI$OFI$OFI$OFI
Engineer I$OFI$OFI$OFI$OFI$OFI
Engineer II$OFI$OFI$OFI$OFI$OFI
Engineer III$OFI$OFI$OFI$OFI$OFI
Quality Engineer I$OFI$OFI$OFI$OFI$OFI
Quality Engineer II$OFI$OFI$OFI$OFI$OFI
Safety Engineer$OFI$OFI$OFI$OFI$OFI
System Operator I$OFI$OFI$OFI$OFI$OFI
System Operator II$OFI$OFI$OFI$OFI$OFI
Technician I$OFI$OFI$OFI$OFI$OFI
Technician II$OFI$OFI$OFI$OFI$OFI
Technician III$OFI$OFI$OFI$OFI$OFI
Craft I$OFI$OFI$OFI$OFI$OFI
Craft II$OFI$OFI$OFI$OFI$OFI
Craft III$OFI$OFI$OFI$OFI$OFI
Laborer$OFI$OFI$OFI$OFI$OFI
Driver$OFI$OFI$OFI$OFI$OFI
IT Professional I$OFI$OFI$OFI$OFI$OFI
IT Professional II$OFI$OFI$OFI$OFI$OFI
IT Professional III$OFI$OFI$OFI$OFI$OFI
Drafter I$OFI$OFI$OFI$OFI$OFI
Drafter II$OFI$OFI$OFI$OFI$OFI
Drafter III$OFI$OFI$OFI$OFI$OFI
Business Specialist I$OFI$OFI$OFI$OFI$OFI
Business Specialist II$OFI$OFI$OFI$OFI$OFI
Business Specialist III$OFI$OFI$OFI$OFI$OFI
Administration Specialist I$OFI$OFI$OFI$OFI$OFI
Administration Specialist II$OFI$OFI$OFI$OFI$OFI
Administration Specialist III$OFI$OFI$OFI$OFI$OFI
G&A to be Applied to Non-Labor Resources (NLRs) RatesOFI%OFI%OFI%OFI%OFI%
Fee Rate PercentageOFI%OFI%OFI%OFI%OFI%

Final RFP No. 80JSC020R0034 SECTION B

FFP Delivery Order

To be used for Firm Fixed Price Delivery Order
Standard Labor CategoryBase Labor Rates
Base PeriodOption 1Option 2
Contract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5
6/1/21 - 5/31/226/1/22 - 5/31/236/1/23 - 5/31/246/1/24 - 5/31/256/1/25 - 5/31/26
Program Manager$OFI$OFI$OFI$OFI$OFI
Manager$OFI$OFI$OFI$OFI$OFI
Supervisor$OFI$OFI$OFI$OFI$OFI
Safety Manager$OFI$OFI$OFI$OFI$OFI
Engineer I$OFI$OFI$OFI$OFI$OFI
Engineer II$OFI$OFI$OFI$OFI$OFI
Engineer III$OFI$OFI$OFI$OFI$OFI
Quality Engineer I$OFI$OFI$OFI$OFI$OFI
Quality Engineer II$OFI$OFI$OFI$OFI$OFI
Safety Engineer$OFI$OFI$OFI$OFI$OFI
System Operator I$OFI$OFI$OFI$OFI$OFI
System Operator II$OFI$OFI$OFI$OFI$OFI
Technician I$OFI$OFI$OFI$OFI$OFI
Technician II$OFI$OFI$OFI$OFI$OFI
Technician III$OFI$OFI$OFI$OFI$OFI
Craft I$OFI$OFI$OFI$OFI$OFI
Craft II$OFI$OFI$OFI$OFI$OFI
Craft III$OFI$OFI$OFI$OFI$OFI
Laborer$OFI$OFI$OFI$OFI$OFI
Driver$OFI$OFI$OFI$OFI$OFI
IT Professional I$OFI$OFI$OFI$OFI$OFI
IT Professional II$OFI$OFI$OFI$OFI$OFI
IT Professional III$OFI$OFI$OFI$OFI$OFI
Drafter I$OFI$OFI$OFI$OFI$OFI
Drafter II$OFI$OFI$OFI$OFI$OFI
Drafter III$OFI$OFI$OFI$OFI$OFI
Business Specialist I$OFI$OFI$OFI$OFI$OFI
Business Specialist II$OFI$OFI$OFI$OFI$OFI
Business Specialist III$OFI$OFI$OFI$OFI$OFI
Administration Specialist I$OFI$OFI$OFI$OFI$OFI
Administration Specialist II$OFI$OFI$OFI$OFI$OFI
Administration Specialist III$OFI$OFI$OFI$OFI$OFI
Coefficient FactorsBase PeriodOption 1Option 2
Contract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5
6/1/21 - 5/31/226/1/22 - 5/31/236/1/23 - 5/31/246/1/24 - 5/31/256/1/25 - 5/31/26
Labor - Normal Work HoursOFI%OFI%OFI%OFI%OFI%
Labor - Other Than Normal Work HoursOFI%OFI%OFI%OFI%OFI%
Material & EquipmentOFI%OFI%OFI%OFI%OFI%
Subcontracted WorkOFI%OFI%OFI%OFI%OFI%

Final RFP No. 80JSC020R0034 SECTION B

Pre-Priced Items

To be used for Pre-Priced Items
Pre-Priced Line ItemsBase PeriodOption 1Option 2
Contract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5
IdentifierTitleUnit6/1/21 - 5/31/226/1/22 - 5/31/236/1/23 - 5/31/246/1/24 - 5/31/256/1/25 - 5/31/26
aCommon Electrical
a.1Cap floor receptacleEach$OFI$OFI$OFI$OFI$OFI
a.2Activate existing floor receptacleEach$OFI$OFI$OFI$OFI$OFI
a.3Install new floor receptacleEach$OFI$OFI$OFI$OFI$OFI
a.4Install new floor receptacle on flooring containing asbestosEach$OFI$OFI$OFI$OFI$OFI
a.5Install 3/4" EMT conduitLinear Foot$OFI$OFI$OFI$OFI$OFI
a.6Install 3/4" EMT conduit in asbestos containing ceiling plenumLinear Foot$OFI$OFI$OFI$OFI$OFI
a.7Add a 20A breaker to an existing 120/208V electrical panelEach$OFI$OFI$OFI$OFI$OFI
a.8Install 3 12 AWG wiring in EMTCLF$OFI$OFI$OFI$OFI$OFI
a.9Install 3 12 AWG wiring in EMT in asbestos containing ceiling plenumCLF$OFI$OFI$OFI$OFI$OFI
a.10Install flexible metal conduit in existing wallEach$OFI$OFI$OFI$OFI$OFI
a.11Install new duplex wall receptacleEach$OFI$OFI$OFI$OFI$OFI
bTelevision and Projector Mounts
b.1TV or Monitor Mount (Metal wall)Each$OFI$OFI$OFI$OFI$OFI
b.2TV or Monitor Mount (CMU block wall)Each$OFI$OFI$OFI$OFI$OFI
b.3TV or Monitor Mount (Gypsum board wall)Each$OFI$OFI$OFI$OFI$OFI
b.4TV or Monitor Mount (Gypsum board wall with truss)Each$OFI$OFI$OFI$OFI$OFI
b.5TV or Monitor Mount (CMU block wall with truss)Each$OFI$OFI$OFI$OFI$OFI
b.6TV or Monitor Mount (Metal wall with truss)Each$OFI$OFI$OFI$OFI$OFI
cCommon Architectural
c.1Construct two sided gypsum board wall (up to 10' high)Square Foot$OFI$OFI$OFI$OFI$OFI
c.2Install new 3'x7' door, hardware, and frame in new wallEach$OFI$OFI$OFI$OFI$OFI
c.3Install new 3'x7' door, hardware and frame in existing wallEach$OFI$OFI$OFI$OFI$OFI
c.4Substitute a Solid Wood Walnut Door Instead of a Birch DoorEach$OFI$OFI$OFI$OFI$OFI
c.5Provide and Install mortise cypher lock in a doorEach$OFI$OFI$OFI$OFI$OFI
c.6Install keyed lock in a doorEach$OFI$OFI$OFI$OFI$OFI
c.7Replace asbestos containing flooring with vinyl tileSquare Foot$OFI$OFI$OFI$OFI$OFI
c.8Replace small areas of asbestos containing vinyl tile flooringSquare Foot$OFI$OFI$OFI$OFI$OFI
c.9Provide and install new carpetSquare Foot$OFI$OFI$OFI$OFI$OFI
c.10Provide and install new carpet on top of existing flooringSquare Foot$OFI$OFI$OFI$OFI$OFI
dSidewalks
d.1Remove/replace exposed aggregate concrete sidewalkSquare Foot$OFI$OFI$OFI$OFI$OFI
d.2Remove/replace broom finish concrete sidewalkSquare Foot$OFI$OFI$OFI$OFI$OFI
d.3Install new 4” deep, broom finish concrete sidewalkSquare Foot$OFI$OFI$OFI$OFI$OFI
eCommon Asbestos Procedures
e.1Provide asbestos containment barrierLinear Foot$OFI$OFI$OFI$OFI$OFI
e.2JPR #I-1 asbestos abatement ProceduresSquare Foot$OFI$OFI$OFI$OFI$OFI
e.3JPR #I-2 asbestos abatement ProceduresSquare Foot$OFI$OFI$OFI$OFI$OFI
e.4JPR #I-3 asbestos abatement ProceduresEach$OFI$OFI$OFI$OFI$OFI
e.5JPR #II-1 asbestos abatement ProceduresSquare Foot$OFI$OFI$OFI$OFI$OFI
e.6JPR #II-2 asbestos abatement ProceduresSquare Foot$OFI$OFI$OFI$OFI$OFI
e.7JPR #III-4 asbestos abatement ProceduresEach$OFI$OFI$OFI$OFI$OFI
e.8JPR #III-5 asbestos abatement ProceduresEach$OFI$OFI$OFI$OFI$OFI
e.9JPR #III-7 asbestos abatement ProceduresEach$OFI$OFI$OFI$OFI$OFI
e.10JPR #III-10 asbestos abatement ProceduresEach$OFI$OFI$OFI$OFI$OFI
e.11JPR #III-11 asbestos abatement ProceduresEach$OFI$OFI$OFI$OFI$OFI
fCommon Cleaning
f.1Power washing100 sq. ft.$OFI$OFI$OFI$OFI$OFI
f.2Site sweeping1000 sq.ft.$OFI$OFI$OFI$OFI$OFI
gStreet and Crosswalk Painting
g.1Crosswalk paintingSquare Foot$OFI$OFI$OFI$OFI$OFI
g.2Street and parking lot markingsLinear Foot$OFI$OFI$OFI$OFI$OFI
hCommon Civil
h.1Water and Gas System AppurtenancesEach$OFI$OFI$OFI$OFI$OFI
h.2Exterior and miscellaneous paintingSquare Foot$OFI$OFI$OFI$OFI$OFI
h.3Security bollards and staples paintingEach$OFI$OFI$OFI$OFI$OFI
h.4Traffic control, warning, and hazard signsEach$OFI$OFI$OFI$OFI$OFI
h.5Provide new traffic control sign and mounting postEach$OFI$OFI$OFI$OFI$OFI
h.6Reserved Parking Space Designations (Stenciled)Each$OFI$OFI$OFI$OFI$OFI
h.7Provide and install metal name plate holders on curb stopsEach$OFI$OFI$OFI$OFI$OFI

i Support for hurricane level 4 Each $OFI $OFI $OFI $OFI $OFI

jNitrogen Delivery
j.1Small nitrogen deliveryEach$OFI$OFI$OFI$OFI$OFI
j.2Standard nitrogen deliveryEach$OFI$OFI$OFI$OFI$OFI
kInterior Finishes
k.aInterior Finish MobilizationJob$OFI$OFI$OFI$OFI$OFI
k.1Paint existing interior metal, masonry or gypsum board walls or ceilingsSquare Foot$OFI$OFI$OFI$OFI$OFI
k.2Paint existing metal or wood doorSide$OFI$OFI$OFI$OFI$OFI
k.3Hang Government furnished fire extinguisherEach$OFI$OFI$OFI$OFI$OFI
k.4Install Government furnished picturesEach$OFI$OFI$OFI$OFI$OFI
k.5Remove Government furnished picturesEach$OFI$OFI$OFI$OFI$OFI
k.6Relocate or replace Government furnished pictures or temporarily remove and reinstall Government furnished picturesEach$OFI$OFI$OFI$OFI$OFI
k.7Purchase 3’X2’ White Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.8Purchase 4’x3’ White Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.9Purchase 6’x4’ White Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.10Purchase 8’x4’ White Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.11Purchase 3’x2’ Magnetic White Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.12Purchase 4’x3’ Magnetic White Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.13Purchase 6’x4’ Magnetic White Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.14Purchase 8’x4’ Magnetic White Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.15Purchase 3’x2’ Bulletin BoardEach$OFI$OFI$OFI$OFI$OFI
k.16Purchase 4’x3’ Bulletin BoardEach$OFI$OFI$OFI$OFI$OFI
k.17Purchase 6’x4’ Bulletin BoardEach$OFI$OFI$OFI$OFI$OFI
k.18Purchase 8’x4’ Bulletin BoardEach$OFI$OFI$OFI$OFI$OFI
k.19Purchase 3’x2’ Glass Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.20Purchase 4’x3’ Glass Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.21Purchase 6’x4’ Glass Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.22Purchase 8’x4’ Glass Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.23Remove BoardEach$OFI$OFI$OFI$OFI$OFI
k.24Install Board (other than Glass Dry-erase Board)Each$OFI$OFI$OFI$OFI$OFI
k.25Install Glass Dry-erase Board (Gypsum board wall)Each$OFI$OFI$OFI$OFI$OFI
k.26Install Glass Dry-erase Board (CMU block wall)Each$OFI$OFI$OFI$OFI$OFI
k.27Install Glass Dry-erase Board (Metal wall)Each$OFI$OFI$OFI$OFI$OFI
k.28Relocate or replace board or temporarily remove and reinstall board (other than Glass Dry-erase Board)Each$OFI$OFI$OFI$OFI$OFI
k.29Provide and Install Interior Sign Starter PlateEach$OFI$OFI$OFI$OFI$OFI
k.30Provide and Install Interior Name Plate/Number SignEach$OFI$OFI$OFI$OFI$OFI
Pre-Priced Design Costs For Projects With An Estimated Construction Value Less Than $160,001
Construction Cost RangeUnitContract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5
$0 - $2,500Each$OFI$OFI$OFI$OFI$OFI
$2,501 - $5,000Each$OFI$OFI$OFI$OFI$OFI
$5,001 - $10,000Each$OFI$OFI$OFI$OFI$OFI
$10,001 - $20,000Each$OFI$OFI$OFI$OFI$OFI
$20,001 - $40,000Each$OFI$OFI$OFI$OFI$OFI
$40,001 - $80,000Each$OFI$OFI$OFI$OFI$OFI
$80,001 - $160,000Each$OFI$OFI$OFI$OFI$OFI

Final RFP No. 80JSC020R0034 SECTION B

FFP, Est. Cost & Award Fee

FIRM-FIXED PRICE, ESTIMATED COST AND AWARD FEE SCHEDULE
Contract YearPeriod No.Evaluation PeriodDurationContract TypeFirm-Fixed PriceAvailable Award FeeEstimated CostEstimated Cost and Award Fee
Phase-inPhase-in61 days4/1/21 – 5/31/21Firm-Fixed Price$OFI
Year 1Base Period12 months6/1/21 - 5/31/22Cost-Plus Award Fee (CPAF)$OFI$OFI$OFI
Year 2Base Period12 months6/1/22 - 5/31/23CPAF$OFI$OFI$OFI
Year 3Option 112 months6/1/23 - 5/31/24CPAF$OFI$OFI$OFI
Year 4Option 112 months6/1/24 - 5/31/25CPAF$OFI$OFI$OFI
Year 5Option 212 months6/1/25 - 5/31/26CPAF$OFI$OFI$OFI

Final RFP No. 80JSC020R0034 SECTION B