2_Section_B_Tables_80JSC020R0034_FC_FRFP_Amend3.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Facilities Contract
Solicitation number
80JSC020R0034
Issued by

About this file

This document contains rate tables and pre-priced line items for a facilities contract solicitation from NASA's Johnson Space Center. The solicitation seeks cost-plus-fixed-fee and firm-fixed price task orders for facilities services over a five-year period from June 2021 to May 2026. Standard labor categories and fully burdened rates are provided for the base period and two option years. Pre-priced line items cover common electrical, TV/projector mounting, architectural, sidewalk, asbestos, cleaning, painting, and interior finish work. Design costs are included for construction projects under $160,001. Evaluation and award fee terms are specified for the base and option periods to be awarded on a cost-plus-award-fee basis.

View the file

Other files

File Type Posted
Facilities 80JSC020R0034 Source Selection Statement_Redactions.pdf PDF
Facilities_Contract_Virtual-Pre-Proposal-Conference-Attendee-List.pdf PDF
0_SF30_Q_A_Changes_Log_80JSC020R0034_FC_FRFP_Amend4.pdf PDF
4_Attach_L-2_EPM_80JSC020R0034_FC_FRFP_Amend4.xlsx XLSX spreadsheet
1_SF33_Model_Contract_80JSC020R0034_FC_FRFP_Amend4.pdf PDF
3_Attach_J-A_GFP_80JSC020R0034_FC_FRFP_Amend4.xlsx XLSX spreadsheet
2_Section_B_Tables_80JSC020R0034_FC_FRFP_Amend4.xlsx XLSX spreadsheet
4_Sections_L_M_Attach_L_80JSC020R0034_FC_FRFP_Amend3.pdf PDF
8_Attach_L-8_PP_Matrix_80JSC020R0034_FC_FRFP_Amend3.xlsx XLSX spreadsheet
7_Attach_L-4_SB_Tables_80JSC020R0034_FC_FRFP_Amend3.xlsx XLSX spreadsheet
6_Attach_L-2_EPM_80JSC020R0034_FC_FRFP_Amend3.xlsx XLSX spreadsheet
0_SF30_Changes_Log_80JSC020R0034_FC_FRFP_Amend3.pdf PDF
1_SF33_Model_Contract_80JSC020R0034_FC_FRFP_Amend3.pdf PDF
5_Attach_L-1_Pre-award_Survey_80JSC020R0034_FC_FRFP_Amend3.pdf PDF
3_Attach_J-A_GFP_80JSC020R0034_FC_FRFP_Amend3.xlsx XLSX spreadsheet
SF30_Q_A_80JSC020R0034_FC_FRFP_Amendment_2.pdf PDF
SF30_SF33_80JSC020R0034_FC_FRFP_Amendment_1.pdf PDF
FC Virtual Pre-Proposal-Conference-Slides.pdf PDF
2_Section_B_Tables_80JSC020R0034_FC_FRFP.xlsx XLSX spreadsheet
1_80JSC020R0034_FC_FRFP.pdf PDF
3_Attachment_J-A_GFP_80JSC020R0034_FC_FRFP.xlsx XLSX spreadsheet
0_BJ4-SEB-20-019_Cover_Letter_80JSC020R0034_FC_FRFP.pdf PDF
4_Attachment_L-1_Pre-award_Survey_80JSC020R0034_FC_FRFP.pdf PDF
7_Attachment_L-8 PP Relevance Matrix_80JSC020R0034_FC_FRFP.xlsx XLSX spreadsheet
6_Attachment_L-4_SB_Tables_80JSC020R0034_FC_FRFP.xlsx XLSX spreadsheet
5_Attachment_L-2_EPM_80JSC020R0034_FC_FRFP.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CPFF Task Order

To be used for Cost Plus Fixed Fee Task Order
Standard Labor CategoryFully-Burdened Labor Rates (Excluding Fee)
Base PeriodOption 1Option 2
Contract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5
6/1/21 - 5/31/226/1/22 - 5/31/236/1/23 - 5/31/246/1/24 - 5/31/256/1/25 - 5/31/26
Program Manager$OFI$OFI$OFI$OFI$OFI
Manager$OFI$OFI$OFI$OFI$OFI
Supervisor$OFI$OFI$OFI$OFI$OFI
Safety Manager$OFI$OFI$OFI$OFI$OFI
Engineer I$OFI$OFI$OFI$OFI$OFI
Engineer II$OFI$OFI$OFI$OFI$OFI
Engineer III$OFI$OFI$OFI$OFI$OFI
Quality Engineer I$OFI$OFI$OFI$OFI$OFI
Quality Engineer II$OFI$OFI$OFI$OFI$OFI
Safety Engineer$OFI$OFI$OFI$OFI$OFI
System Operator I$OFI$OFI$OFI$OFI$OFI
System Operator II$OFI$OFI$OFI$OFI$OFI
Technician I$OFI$OFI$OFI$OFI$OFI
Technician II$OFI$OFI$OFI$OFI$OFI
Technician III$OFI$OFI$OFI$OFI$OFI
Craft I$OFI$OFI$OFI$OFI$OFI
Craft II$OFI$OFI$OFI$OFI$OFI
Craft III$OFI$OFI$OFI$OFI$OFI
Laborer$OFI$OFI$OFI$OFI$OFI
Driver$OFI$OFI$OFI$OFI$OFI
IT Professional I$OFI$OFI$OFI$OFI$OFI
IT Professional II$OFI$OFI$OFI$OFI$OFI
IT Professional III$OFI$OFI$OFI$OFI$OFI
Drafter I$OFI$OFI$OFI$OFI$OFI
Drafter II$OFI$OFI$OFI$OFI$OFI
Drafter III$OFI$OFI$OFI$OFI$OFI
Business Specialist I$OFI$OFI$OFI$OFI$OFI
Business Specialist II$OFI$OFI$OFI$OFI$OFI
Business Specialist III$OFI$OFI$OFI$OFI$OFI
Administration Specialist I$OFI$OFI$OFI$OFI$OFI
Administration Specialist II$OFI$OFI$OFI$OFI$OFI
Administration Specialist III$OFI$OFI$OFI$OFI$OFI
G&A to be Applied to Non-Labor Resources (NLRs) RatesOFI%OFI%OFI%OFI%OFI%
Fee Rate PercentageOFI%OFI%OFI%OFI%OFI%

Final RFP No. 80JSC020R0034 SECTION B

FFP Delivery Order

To be used for Firm Fixed Price Delivery Order
Standard Labor CategoryBase Labor Rates
Base PeriodOption 1Option 2
Contract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5
6/1/21 - 5/31/226/1/22 - 5/31/236/1/23 - 5/31/246/1/24 - 5/31/256/1/25 - 5/31/26
Program Manager$OFI$OFI$OFI$OFI$OFI
Manager$OFI$OFI$OFI$OFI$OFI
Supervisor$OFI$OFI$OFI$OFI$OFI
Safety Manager$OFI$OFI$OFI$OFI$OFI
Engineer I$OFI$OFI$OFI$OFI$OFI
Engineer II$OFI$OFI$OFI$OFI$OFI
Engineer III$OFI$OFI$OFI$OFI$OFI
Quality Engineer I$OFI$OFI$OFI$OFI$OFI
Quality Engineer II$OFI$OFI$OFI$OFI$OFI
Safety Engineer$OFI$OFI$OFI$OFI$OFI
System Operator I$OFI$OFI$OFI$OFI$OFI
System Operator II$OFI$OFI$OFI$OFI$OFI
Technician I$OFI$OFI$OFI$OFI$OFI
Technician II$OFI$OFI$OFI$OFI$OFI
Technician III$OFI$OFI$OFI$OFI$OFI
Craft I$OFI$OFI$OFI$OFI$OFI
Craft II$OFI$OFI$OFI$OFI$OFI
Craft III$OFI$OFI$OFI$OFI$OFI
Laborer$OFI$OFI$OFI$OFI$OFI
Driver$OFI$OFI$OFI$OFI$OFI
IT Professional I$OFI$OFI$OFI$OFI$OFI
IT Professional II$OFI$OFI$OFI$OFI$OFI
IT Professional III$OFI$OFI$OFI$OFI$OFI
Drafter I$OFI$OFI$OFI$OFI$OFI
Drafter II$OFI$OFI$OFI$OFI$OFI
Drafter III$OFI$OFI$OFI$OFI$OFI
Business Specialist I$OFI$OFI$OFI$OFI$OFI
Business Specialist II$OFI$OFI$OFI$OFI$OFI
Business Specialist III$OFI$OFI$OFI$OFI$OFI
Administration Specialist I$OFI$OFI$OFI$OFI$OFI
Administration Specialist II$OFI$OFI$OFI$OFI$OFI
Administration Specialist III$OFI$OFI$OFI$OFI$OFI
Coefficient FactorsBase PeriodOption 1Option 2
Contract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5
6/1/21 - 5/31/226/1/22 - 5/31/236/1/23 - 5/31/246/1/24 - 5/31/256/1/25 - 5/31/26
Labor - Normal Work HoursOFI%OFI%OFI%OFI%OFI%
Labor - Other Than Normal Work HoursOFI%OFI%OFI%OFI%OFI%
Material & EquipmentOFI%OFI%OFI%OFI%OFI%
Subcontracted WorkOFI%OFI%OFI%OFI%OFI%

Final RFP No. 80JSC020R0034 SECTION B

Pre-Priced Items

To be used for Pre-Priced Items
Pre-Priced Line ItemsBase PeriodOption 1Option 2
Contract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5
IdentifierTitleUnit6/1/21 - 5/31/226/1/22 - 5/31/236/1/23 - 5/31/246/1/24 - 5/31/256/1/25 - 5/31/26
aCommon Electrical
a.1Cap floor receptacleEach$OFI$OFI$OFI$OFI$OFI
a.2Activate existing floor receptacleEach$OFI$OFI$OFI$OFI$OFI
a.3Install new floor receptacleEach$OFI$OFI$OFI$OFI$OFI
a.4Install new floor receptacle on flooring containing asbestosEach$OFI$OFI$OFI$OFI$OFI
a.5Install 3/4" EMT conduitLinear Foot$OFI$OFI$OFI$OFI$OFI
a.6Install 3/4" EMT conduit in asbestos containing ceiling plenumLinear Foot$OFI$OFI$OFI$OFI$OFI
a.7Add a 20A breaker to an existing 120/208V electrical panelEach$OFI$OFI$OFI$OFI$OFI
a.8Install 3 12 AWG wiring in EMTCLF$OFI$OFI$OFI$OFI$OFI
a.9Install 3 12 AWG wiring in EMT in asbestos containing ceiling plenumCLF$OFI$OFI$OFI$OFI$OFI
a.10Install flexible metal conduit in existing wallEach$OFI$OFI$OFI$OFI$OFI
a.11Install new duplex wall receptacleEach$OFI$OFI$OFI$OFI$OFI
bTelevision and Projector Mounts
b.1TV or Monitor Mount (Metal wall)Each$OFI$OFI$OFI$OFI$OFI
b.2TV or Monitor Mount (CMU block wall)Each$OFI$OFI$OFI$OFI$OFI
b.3TV or Monitor Mount (Gypsum board wall)Each$OFI$OFI$OFI$OFI$OFI
b.4TV or Monitor Mount (Gypsum board wall with truss)Each$OFI$OFI$OFI$OFI$OFI
b.5TV or Monitor Mount (CMU block wall with truss)Each$OFI$OFI$OFI$OFI$OFI
b.6TV or Monitor Mount (Metal wall with truss)Each$OFI$OFI$OFI$OFI$OFI
cCommon Architectural
c.1Construct two sided gypsum board wall (up to 10' high)Square Foot$OFI$OFI$OFI$OFI$OFI
c.2Install new 3'x7' door, hardware, and frame in new wallEach$OFI$OFI$OFI$OFI$OFI
c.3Install new 3'x7' door, hardware and frame in existing wallEach$OFI$OFI$OFI$OFI$OFI
c.4Substitute a Solid Wood Walnut Door Instead of a Birch DoorEach$OFI$OFI$OFI$OFI$OFI
c.5Provide and Install mortise cypher lock in a doorEach$OFI$OFI$OFI$OFI$OFI
c.6Install keyed lock in a doorEach$OFI$OFI$OFI$OFI$OFI
c.7Replace asbestos containing flooring with vinyl tileSquare Foot$OFI$OFI$OFI$OFI$OFI
c.8Replace small areas of asbestos containing vinyl tile flooringSquare Foot$OFI$OFI$OFI$OFI$OFI
c.9Provide and install new carpetSquare Foot$OFI$OFI$OFI$OFI$OFI
c.10Provide and install new carpet on top of existing flooringSquare Foot$OFI$OFI$OFI$OFI$OFI
dSidewalks
d.1Remove/replace exposed aggregate concrete sidewalkSquare Foot$OFI$OFI$OFI$OFI$OFI
d.2Remove/replace broom finish concrete sidewalkSquare Foot$OFI$OFI$OFI$OFI$OFI
d.3Install new 4” deep, broom finish concrete sidewalkSquare Foot$OFI$OFI$OFI$OFI$OFI
eCommon Asbestos Procedures
e.1Provide asbestos containment barrierLinear Foot$OFI$OFI$OFI$OFI$OFI
e.2JPR #I-1 asbestos abatement ProceduresSquare Foot$OFI$OFI$OFI$OFI$OFI
e.3JPR #I-2 asbestos abatement ProceduresSquare Foot$OFI$OFI$OFI$OFI$OFI
e.4JPR #I-3 asbestos abatement ProceduresEach$OFI$OFI$OFI$OFI$OFI
e.5JPR #II-1 asbestos abatement ProceduresSquare Foot$OFI$OFI$OFI$OFI$OFI
e.6JPR #II-2 asbestos abatement ProceduresSquare Foot$OFI$OFI$OFI$OFI$OFI
e.7JPR #III-4 asbestos abatement ProceduresEach$OFI$OFI$OFI$OFI$OFI
e.8JPR #III-5 asbestos abatement ProceduresEach$OFI$OFI$OFI$OFI$OFI
e.9JPR #III-7 asbestos abatement ProceduresEach$OFI$OFI$OFI$OFI$OFI
e.10JPR #III-10 asbestos abatement ProceduresEach$OFI$OFI$OFI$OFI$OFI
e.11JPR #III-11 asbestos abatement ProceduresEach$OFI$OFI$OFI$OFI$OFI
fCommon Cleaning
f.1Power washing100 sq. ft.$OFI$OFI$OFI$OFI$OFI
f.2Site sweeping1000 sq.ft.$OFI$OFI$OFI$OFI$OFI
gStreet and Crosswalk Painting
g.1Crosswalk paintingSquare Foot$OFI$OFI$OFI$OFI$OFI
g.2Street and parking lot markingsLinear Foot$OFI$OFI$OFI$OFI$OFI
hCommon Civil
h.1Water and Gas System AppurtenancesEach$OFI$OFI$OFI$OFI$OFI
h.2Exterior and miscellaneous paintingSquare Foot$OFI$OFI$OFI$OFI$OFI
h.3Security bollards and staples paintingEach$OFI$OFI$OFI$OFI$OFI
h.4Traffic control, warning, and hazard signsEach$OFI$OFI$OFI$OFI$OFI
h.5Provide new traffic control sign and mounting postEach$OFI$OFI$OFI$OFI$OFI
h.6Reserved Parking Space Designations (Stenciled)Each$OFI$OFI$OFI$OFI$OFI
h.7Provide and install metal name plate holders on curb stopsEach$OFI$OFI$OFI$OFI$OFI

i Support for hurricane level 4 Each $OFI $OFI $OFI $OFI $OFI

jNitrogen Delivery
j.1Small nitrogen deliveryEach$OFI$OFI$OFI$OFI$OFI
j.2Standard nitrogen deliveryEach$OFI$OFI$OFI$OFI$OFI
kInterior Finishes
k.aInterior Finish MobilizationJob$OFI$OFI$OFI$OFI$OFI
k.1Paint existing interior metal, masonry or gypsum board walls or ceilingsSquare Foot$OFI$OFI$OFI$OFI$OFI
k.2Paint existing metal or wood doorSide$OFI$OFI$OFI$OFI$OFI
k.3Hang Government furnished fire extinguisherEach$OFI$OFI$OFI$OFI$OFI
k.4Install Government furnished picturesEach$OFI$OFI$OFI$OFI$OFI
k.5Remove Government furnished picturesEach$OFI$OFI$OFI$OFI$OFI
k.6Relocate or replace Government furnished pictures or temporarily remove and reinstall Government furnished picturesEach$OFI$OFI$OFI$OFI$OFI
k.7Purchase 3’X2’ White Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.8Purchase 4’x3’ White Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.9Purchase 6’x4’ White Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.10Purchase 8’x4’ White Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.11Purchase 3’x2’ Magnetic White Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.12Purchase 4’x3’ Magnetic White Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.13Purchase 6’x4’ Magnetic White Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.14Purchase 8’x4’ Magnetic White Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.15Purchase 3’x2’ Bulletin BoardEach$OFI$OFI$OFI$OFI$OFI
k.16Purchase 4’x3’ Bulletin BoardEach$OFI$OFI$OFI$OFI$OFI
k.17Purchase 6’x4’ Bulletin BoardEach$OFI$OFI$OFI$OFI$OFI
k.18Purchase 8’x4’ Bulletin BoardEach$OFI$OFI$OFI$OFI$OFI
k.19Purchase 3’x2’ Glass Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.20Purchase 4’x3’ Glass Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.21Purchase 6’x4’ Glass Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.22Purchase 8’x4’ Glass Dry-erase BoardEach$OFI$OFI$OFI$OFI$OFI
k.23Remove BoardEach$OFI$OFI$OFI$OFI$OFI
k.24Install Board (other than Glass Dry-erase Board)Each$OFI$OFI$OFI$OFI$OFI
k.25Install Glass Dry-erase Board (Gypsum board wall)Each$OFI$OFI$OFI$OFI$OFI
k.26Install Glass Dry-erase Board (CMU block wall)Each$OFI$OFI$OFI$OFI$OFI
k.27Install Glass Dry-erase Board (Metal wall)Each$OFI$OFI$OFI$OFI$OFI
k.28Relocate or replace board or temporarily remove and reinstall board (other than Glass Dry-erase Board)Each$OFI$OFI$OFI$OFI$OFI
k.29Provide and Install Interior Sign Starter PlateEach$OFI$OFI$OFI$OFI$OFI
k.30Provide and Install Interior Name Plate/Number SignEach$OFI$OFI$OFI$OFI$OFI
Pre-Priced Design Costs For Projects With An Estimated Construction Value Less Than $160,001
Construction Cost RangeUnitContract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5
$0 - $2,500Each$OFI$OFI$OFI$OFI$OFI
$2,501 - $5,000Each$OFI$OFI$OFI$OFI$OFI
$5,001 - $10,000Each$OFI$OFI$OFI$OFI$OFI
$10,001 - $20,000Each$OFI$OFI$OFI$OFI$OFI
$20,001 - $40,000Each$OFI$OFI$OFI$OFI$OFI
$40,001 - $80,000Each$OFI$OFI$OFI$OFI$OFI
$80,001 - $160,000Each$OFI$OFI$OFI$OFI$OFI

Final RFP No. 80JSC020R0034 SECTION B

FFP, Est. Cost & Award Fee

FIRM-FIXED PRICE, ESTIMATED COST AND AWARD FEE SCHEDULE
Contract YearPeriod No.Evaluation PeriodDurationContract TypeFirm-Fixed PriceAvailable Award FeeEstimated CostEstimated Cost and Award Fee
Phase-inPhase-in61 days4/1/21 – 5/31/21Firm-Fixed Price$OFI
Year 1Base Period12 months6/1/21 - 5/31/22Cost-Plus Award Fee (CPAF)$OFI$OFI$OFI
Year 2Base Period12 months6/1/22 - 5/31/23CPAF$OFI$OFI$OFI
Year 3Option 112 months6/1/23 - 5/31/24CPAF$OFI$OFI$OFI
Year 4Option 112 months6/1/24 - 5/31/25CPAF$OFI$OFI$OFI
Year 5Option 212 months6/1/25 - 5/31/26CPAF$OFI$OFI$OFI

Final RFP No. 80JSC020R0034 SECTION B

File details come from the government source that posted it. Updated .