SF30 - 80HQTR23R0001 Amendment 003 Pages 1-4.pdf

PDF 298 KB Posted

Attached to
Headquarters Operational Support Services (HOSS) II
Solicitation number
80HQTR23R0001
Issued by

View the file

Other files

File Type Posted
Exhibits 1-9A rev 7.19.23.pdf PDF
Attach A - Performance Work Statement (PWS) - Core Services 7.14.23.pdf PDF
HOSS II RFP QA 174-181.pdf PDF
Exhibit 10 - Past Performance Questionnaire.pdf PDF
Exhibits 1-9A.pdf PDF
Signed SF30 80HQTR23R0001 - Amendment 002.pdf PDF
HOSS II RFP QA 159-173.pdf PDF
80HQTR23R0001 Amendment 001 - Page 2.pdf PDF
HOSS II RFP QA 65-158.pdf PDF
HOSS II RFP QA 13-64.pdf PDF
Attach B - IDIQ Labor Rates Matrix 6.29.23.pdf PDF
Attach E - Safety and Health Plan 6.28.23.pdf PDF
80HQTR23R0001 Amendment 001 Page 2.pdf PDF
Signed SF30-80HQTR23R0001 -Amendment 001.pdf PDF
HOSS II RFP QA 1-12.pdf PDF
Enclosure 3 - Exec Driver RTO 1.pdf PDF
Attach F - Contract Historical Data.pdf PDF
Attach G - OCI Avoidance Plan.pdf PDF
Attach K - DOL Wage Determination 2015-4281 rev 26.pdf PDF
Attach H - IT Security Applicable Docs.pdf PDF
Attach E - Safety and Health Plan.pdf PDF
Enclosure 1 - ITSMP Template.pdf PDF
Exhibits 1-9A.pdf PDF
Attach C - IAGP.pdf PDF
Enclosure 2 - QASP.pdf PDF
80HQTR23R0001 HOSS II - Cover Letter.pdf PDF
80HQTR23R0001 HOSS II RFP.pdf PDF
Attach I - ITSMP.pdf PDF
Attach B - IDIQ Labor Rates Matrix.pdf PDF
Exhibit 10 - Past Performance.pdf PDF
Enclosure 5 - Incumbent Weighted Average.pdf PDF
Attach M - Contract Data Requirements List.pdf PDF
Attach L - Contractor Proposed Enhancements.pdf PDF
Attach D - DEIA Plan.pdf PDF
Attach J - DD254.pdf PDF
Enclosure 4 - Safety and Health Plan.pdf PDF
Attach A - HOSS II Core PWS.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to he hour and date specified in the solicitation or as amended, by one of the following me hods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible )

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Candis Edwards, Contracting Officer

The purpose of this amendment is to revise the RFP as a result of the questions received from industry. Please see page two accordingly.

NASA Goddard Space Flight Center Headquarters Procurement Office Greenbelt, MD 20771

NASA Goddard Space Flight Center Headquarters Procurement Office Greenbelt, MD 20771

80HQTR23R0001

1 4

07/19/2023

06/12/2023

80HQTR23R0001

Amendment 003

The purpose of this amendment is to revise the RFP as a result of the questions received from industry. Changes will be identified below in bold and italics:

1. RFP clause J.1 has been revised to read as follows:

J.1 GSFC 52.211-101 List of Attachments (Nov. 2022)

The following documents are attached hereto and made a part of this contract:

Attachment Description Date

No. of Pages

(including the cover page)

A Performance Work Statement (PWS)

– Core Services

7/14/2023 20

B IDIQ Labor Rates Matrix TBP --

C List of Installation Accountable Government Property

10/31/2022 5

D Diversity, Equity, Inclusion, and Accessibility (DEIA) Plan

TBS*** 3

E Safety and Health Plan TBP --

F Contract Historical Data March 2015 3

G Organizational Conflicts of Interest (OCI) Avoidance Plan

TBS** --

H Information Technology (IT) Security Applicable Documents List

March 2021 7

I IT Security Management Plan TBS* --

J DD form 254, Contract Security Classification Specification

10/25/2022 2

K Department of Labor, Wage Determination 2015-4281, Rev. 26

05/10/2023 12

L Contractor Proposed Enhancements TBP --

M Control Data Requirements List (includes DEIA and OCI DRDs)

May 2023 --

TBS = To Be Submitted TBP = To Be Proposed *TBS within 30 days of the contract effective date **TBS with proposal ***TBS within 30 days of contract award

2. RFP provision L.3(b)(1) table is revised as follows:

Proposal Component Volume Reference Page Limitations

Offer Volume I L.4 None

Organizational Conflict of Interest (OCI) Avoidance Plan

None

Mission Suitability Volume II L.5 75 pages

Cover Page, Indices, Table of Contents, PWS Compliance Matrix, Phase-in Plan, Safety and Health Plan, Contractor Proposed Enhancements and List of Acronyms

Excluded

Price Volume III L.6 Mixed

(a) Table of Contents, IDIQ Direct Labor Rates Matrix (Attachment B)

None

(b) Price Exhibits None

(c) Basis of Estimates 5 Pages per WBS Level 3**

Past Performance Volume IV L.7 Mixed

(a) Information from the Offeror 20 Pages**

(b) Cover Page, Indices, Table of Contents, List of those sent Past Performance Questionnaires, Customer Evaluations, Excluded

Proposal Component Volume Reference Page Limitations

Termination/Descope information, and List of Acronyms

3. RFP Provision L.6(b)(1), final paragraph regarding Exhibit 9A, is revised as follows:

Exhibit 9A shows the Direct Labor Hours, Direct Labor Hourly Rates, and Direct Labor Costs for the Core by individual direct labor category (onsite and offsite), CY and WBS Level, starting at WBS Level 3 and then summarizing for each higher WBS Level up to WBS Level 1 (overall Core contract). A separately identified and labeled Exhibit 9A shall be submitted for the Core, by CY and WBS Level, from the Prime Offeror, JV Entity, JV partner and each individual Significant Subcontractor. The Prime Offeror or JV Entity shall use in Exhibit 9A the Subtotal Prime Offeror’s or JV Entity's Direct Labor Hourly Rates Loaded through G&A (no profit) from Exhibit 3A. The Significant Subcontractors shall use in Exhibit 9A the Significant Subcontractor’s Direct Labor Hourly Rates Fully Loaded (with Profit) from Exhibit 4A.

(Note: the final two sentences of this paragraph are removed.)

4. Attachment A - Performance Work Statement (PWS) dated June 2023 has been deleted in its entirety and replaced with Attachment A - Performance Work Statement (PWS) – Core Services, dated 7.14.23. Note: the only significant change (i.e. other than document title and date) to Attachment A is the addition of Section 7.1 Drug- and Alcohol-Free Workplace.

5. Exhibit 9A has been deleted in its entirety and replaced with Exhibit 9A - 7.19.2023.

6. Proposal submission has been extended to 07/28/2023 at 12:00PM Eastern standard time.

7. All other terms and conditions remain unchanged.

(End of Amendment 3)