SA3 FINAL RFP AMENDED 03.15.2021.pdf

PDF 957 KB Posted

Attached to
Safety & Mission Assurance, Audits, Assessments and Analysis (SA3) Services
Solicitation number
80GRC022R0029
Issued by

View the file

Other files

File Type Posted
QAs for RFP Amended 3.22.2021.pdf PDF
SA3 SF30 Modification 2.pdf PDF
OHSA EPA Safety and Health and Environmental Job Specific Requirements.pdf PDF
SF33 Amended.pdf PDF
Attachment J.2(L5) Business Systems Reviews and Status Information Template.xlsx XLSX spreadsheet
Cover Letter Amended.pdf PDF
SA3 SF30 Modification 1.pdf PDF
QAs for RFP FINAL.pdf PDF
FINAL RFP.pdf PDF
Attachment J.2(L1) Labor Category Descriptions.pdf PDF
Attachment J.2(L3) SA3 Cost Template.xlsx XLSX spreadsheet
Attachment J.2(M) Client Authorization Letter (CAL).pdf PDF
Attachment J.2(J) Surveillance Support Sample Task.pdf PDF
Cover Letter FINAL.pdf PDF
Attachment J.2(L2) Travel Projections.pdf PDF
Attachment J.1 (A) Statement of Work.pdf PDF
Attachment J.1(D) Quality Assurance and Surveillance Plan (QASP).pdf PDF
Attachment J.2(K) Audit Support Sample Task.pdf PDF
Attachment J.2(L4) Cognizant Audit Office Template.xlsx XLSX spreadsheet
Attachment J.1(B) Government Furnished Property (GFP).pdf PDF
Attachment J.2(N) Past Performance Questionnaire (PPQ).pdf PDF
Attachment J.1(I2) 533 Baseline Template.xlsx XLSX spreadsheet
Attachment J.1(I1) 533 Template.xlsx XLSX spreadsheet
Attachment J.1(C)- Data Requirements Documents (DRD).pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80GRC022R0029 – Safety & Mission Assurance, Audits, Assessments and Analysis (SA3)

PART I - THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICE/COSTS

B.1 SUPPLIES AND/OR SERVICES TO BE PROVIDED

The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and/or perform the items in accordance with the Statement of Work (SOW) incorporated as Attachment J.1(A) entitled, “NASA Safety Center (NSC) Safety & Mission Assurance, Audits, Assessments and Analysis (SA3) Services Statement of Work”. To accomplish this work, the Contractor shall perform specific tasks that will be defined through the issuance of Task Orders (TOs), in accordance with contract clause I.9 entitled, “Task Ordering Procedure”.

B.2 ESTIMATED COST AND FIXED FEE (NFS 1852.216-74) (DEC 1991)

The estimated cost of this contract is (Offeror fill-in, OFI) exclusive of the fixed fee of (OFI). The total estimated cost and fixed fee is (OFI). The total estimated Cost-Plus-Fixed-Fee amount by contract period is as follows:

(End of clause)

B.3 CONTRACT FUNDING (NFS 1852.232-81) (JUNE 1990)

(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is (Government fill-in, TBD). This allotment is for [Insert applicable item number(s), task(s), or work description, TBD] and covers the following estimated period of performance: (TBD).

(b) An additional amount of (TBD) is obligated under this contract for payment of fee.

B.4 INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) - MINIMUM/MAXIMUM AMOUNT

In accordance with FAR clause 52.216-22 entitled, “Indefinite Quantity”, the minimum amount the Government will order under this contract is (TBD). The maximum amount the Government will order under IDIQ Task Orders (TOs) is (TBD).

[END OF SECTION]

Contract Period

Contract Type Months Cost-Plus-Fixed-Fee Period of Performance

Phase-in FFP 1 (OFI) 30 days prior to full performance Base CPFF 36 (OFI) July 1, 2021 – June 30, 2024

Option CPFF 24 (OFI) July 1, 2024 – June 30, 2026 Extension CPFF Up to 6 (OFI) July 1, 2026 – December 31, 2026

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SPECIFICATION/STATEMENT OF WORK

The Contractor shall provide the item or services specified in Section B in accordance with the following SOW entitled, “NASA Safety Center (NSC) Safety & Mission Assurance, Audits, Assessments and Analysis (SA3) Services Statement of Work” and is listed as ATTACHMENT J.1(A).

C.2 GSR 1-1 TECHNICAL DIRECTION (APR 2016)

(a) Performance of the work under this contract is subject to the technical direction of the Contracting Officer (CO) or the designated Contracting Officer’s Representative (COR).

(b) "Technical direction" means a directive to the Contractor that provides clarification of the contract’s general description of the scope of work, to include approaches, solutions, designs, refinements or shifts within tasks, or inquiries related to the general tasks and requirements in the statement of work or specifications.

(c) Technical Direction does not include any instruction that--

(1) Constitutes an assignment of additional work outside the statement of work (i.e. “new work”;

(2) Constitutes a change as defined in the changes clause;

(3) Constitutes a basis for any increase or decrease in the total price, any milestone price, or the time required for performance or delivery;

(4) Changes any of the expressed terms, conditions, or specifications of the contract; or

(5) Interferes with the contractor's rights to perform the terms and conditions of the contract.

(6) Changes any performance-based requirement.

(d) All technical direction will be issued in writing by the CO or the designated COR.

(e) The Contractor shall proceed promptly with the performance of technical direction issued by the CO or COR, unless, in the Contractor's opinion, any instruction or direction falls within any of the categories defined in paragraph (c) of this clause. In the latter event, the Contractor shall not proceed but shall within 5 working days notify the CO in writing of the basis for its opinion. Within 30 calendar days of receiving this notification, the CO will either amend the technical direction, request a proposal for an amendment to the contract or Task Order, advise the Contractor in writing that the technical direction is considered to be within the limits of this clause and that the Contractor should proceed promptly with its performance, or rescind the technical direction in its entirety.

(f) A failure of the Contractor and CO to agree that the instruction or direction is both within the requirements of the contract and does not constitute a change under the changes clause, or a failure to agree upon the contract action to be taken with respect to the instruction or direction, shall be subject to the Disputes clause of this contract.

(g) Any action(s) taken by the Contractor in response to any direction given by any person other than the CO or the designated COR shall be at the Contractor's risk.

(End of clause)

C.3 GSR 18-1 EMERGENCY PREPAREDNESS AND RESPONSE (NOV 2015)

(a) The Contractor’s obligation may include resolution of unusual or emergency situations. The Contractor may be required to assist NASA, within the general scope of work, in preparation for, or in response to emergencies.

(b) Obligations under this requirement shall only arise when one or more of the criteria at FAR 18.001, enabling NASA to utilize “Emergency Acquisition Flexibilities”, are met.

(c) If the emergency preparedness and response requirements result in changes to the contract, all contract adjustments will be processed in accordance with the Changes clause of this contract.

C.4 GSR 37-2 MANDATED AND REQUIRED TRAINING FOR ONSITE CONTRACTOR AND

SUBCONTRACTOR PERSONNEL (FEB 2020)

The contractor shall ensure that its employees performing onsite at the Glenn Research Center and/or Neil A. Armstrong Test Facility (formally known as Plum Brook Station) complete all federally mandated and Agency/Center required training applicable to the work being performed by those employees. The current mandatory and required training may be found at https://workforce.grc.nasa.gov/ohcm/docs/JC/RequiredTraining/FY19%20Mandatory%20Training%20W ebsite%20Update.xlsx

Contractor personnel will be notified when the various training sessions are available for registration or completion via repeated postings on Today@Glenn as the training sessions are added to the System for Administration, Training, and Educational Resources for NASA (SATERN), and shall complete the training in the manner and within the timeframe specified in the notification.

The contractor shall maintain training records for its onsite employees, and, on an annual basis commensurate with the award date of the contract, provide a compliance report to the Contracting Officer’s Representative (COR), as evidence of completion of all applicable mandatory and required training. Further, the COR may perform random reviews of the contractor’s training records at any time throughout the performance period of the contract.

The COR will report any failure to comply with the above requirements to the Contracting Officer for implementation of corrective and/or performance-based actions.

The contractor shall include the substance of this requirement in all subcontracts involving onsite performance at the Glenn Research Center and/or Neil A. Armstrong Test Facility (formally known as Plum Brook Station).

(End of clause)

[END OF SECTION]

https://workforce.grc.nasa.gov/ohcm/docs/JC/RequiredTraining/FY19%20Mandatory%20Training%20Website%20Update.xlsx https://workforce.grc.nasa.gov/ohcm/docs/JC/RequiredTraining/FY19%20Mandatory%20Training%20Website%20Update.xlsx

SECTION D – PACKAGING AND MARKING

D.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE

NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference, which are required to be filled-in by the Government, include only the text of the affected paragraph(s). This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, “Clauses Incorporated by Reference” (FEB 1998), of this contract.

I. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)

None included by reference.

II. NASA FAR SUPPLEMENT (48 CFR CHAPTER 18) CLAUSES

SECTION E – INSPECTION AND ACCEPTANCE

E.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE

NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference, which are required to be filled-in by the Government, include only the text of the affected paragraph(s). This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in

CLAUSE

NUMBER DATE TITLE

52.246-5 APR 1984 INSPECTION OF SERVICES- COST REIMBURSEMENT

II. NASA FAR SUPPLEMENT (48 CFR CHAPTER 18) CLAUSES

E.2 INSPECTION AND ACCEPTANCE (GRC 52.246-92) (JAN 1987)

Final inspection and acceptance of all work performed under this contract, including all deliverable items, will be performed as indicated in the issued Task Orders (TOs).

SECTION F – DELIVERIES OR PERFORMANCE

F.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE

NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference, which are required to be filled-in by the Government, include only the text of the affected paragraph(s). This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in

CLAUSE

NUMBER DATE TITLE

52.242-15 AUG 1989 STOP-WORK ORDER (ALT I) (APR 1984)

F.2 PERIOD OF PERFORMANCE

The base period of performance of this contract (not including any phase-in) shall be for three (3) years.

If exercised, the subsequent contract option period shall be a single two (2) year option period beginning on the expiration date of the base contract period. If the Government requires performance of services after the base contract period, notification to the Contractor of such requirement shall be in accordance with the clause 52.217-9 entitled, "Option to Extend the Term of the Contract." The Government reserves the right to exercise up to six (6) additional months beyond the base and option periods per FAR clause 52.217-8 entitled, “Option to Extend Services.” The maximum period of performance shall be in accordance with NFS 1817.204(e).

F.3 PLACE OF PERFORMANCE - SERVICES

The services to be performed under this contract shall be performed primarily at the location identified in the issued Task Order (TO), as directed by the Government.

SECTION G – CONTRACT ADMINISTRATION DATA

G.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE

NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference, which are required to be filled-in by the Government, include only the text of the affected paragraph(s). This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in

CLAUSE

NUMBER

DATE TITLE

1852.227-70

1852.245-70 1852.245-71 1852-245-73

1852.245-75 1852.245-78

APR 2015

AUG 2015

JUN 2018

JAN 2011

JAN 2011

AUG 2015

NEW TECHNOLOGY - OTHER THAN A SMALL BUSINESS FIRM OR

NONPROFIT ORGANIZATION

CONTRACTOR REQUESTS FOR GOVERNMENT FURNISHED PROPERTY

INSTALLATION - ACCOUNTABLE GOVERNMENT PROPERTY

FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY OF

CONTRACTORS

PROPERTY MANAGEMENT CHANGES

PHYSICAL INVENTORY OF CAPITAL PERSONAL PROPERTY

G.2 PAYMENT OF FIXED FEE (NFS 1852.216-75) (DEC 1988)

The fixed fee shall be paid in monthly installments based upon the percentage of completion of work as determined by the Contracting Officer.

G.3 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND PATENT REPRESENTATIVE (NFS

1852.227-72) (APR 2015)

(a) For purposes of administration of the clause of this contract entitled "New Technology-Other than a Small Business Firm or Nonprofit Organization" or "Patent Rights--Ownership by the Contractor," whichever is included, the installation New Technology and Patent Representatives identified at https://prod.nais.nasa.gov/pub/pub_library/techrep.html are hereby designated by the Contracting Officer to administer such clause for the appropriate installation:

(b) Disclosures of reportable items and of subject inventions, interim new technology summary reports, final new technology summary reports, utilization reports, and other reports required by the applicable “New Technology” or “Patent Rights-Ownership by the Contractor” clause, as well as any https://prod.nais.nasa.gov/pub/pub_library/techrep.html correspondence with respect to such matters, shall be directed to the New Technology Representative unless transmitted in response to correspondence or request from the Patent Representative. Inquiries or requests regarding disposition of rights, election of rights, or related matters shall be directed to the Patent Representative. This clause shall be included in any subcontract hereunder requiring a "New Technology-Other than a Small Business Firm or Nonprofit Organization" clause or "Patent Rights-- Ownership by the Contractor" clause, unless otherwise authorized or directed by the Contracting Officer. The respective responsibilities and authorities of the aforementioned representatives are set forth in 1827.305-270 of the NASA FAR Supplement.

G.4 TRAVEL OUTSIDE OF THE UNITED STATES (NFS 1852.242-71) (DEC 1988)

(a) The Contracting Officer must authorize in advance and in writing travel to locations outside of the United States by Contractor employees that is to be charged as a cost to this contract. This approval may be granted when the travel is necessary to the efforts required under the contract and it is otherwise in the best interest of NASA.

(b) The Contractor shall submit requests to the Contracting Officer at least 30 days in advance of the start of the travel.

(c) The Contractor shall submit a travel report at the conclusion of the travel. The Contracting Officer's approval of the travel will specify the required contents and distribution of the travel report.

G.5 NASA CONTRACTOR FINANCIAL MANAGEMENT REPORTING (NFS 1852.242-73) (NOVEMBER

2004)

(a) The Contractor shall submit NASA Contractor Financial Management Reports on NASA Forms 533 in accordance with the instructions in NASA Procedures and Guidelines (NPR) 9501.2, NASA Contractor Financial Management Reporting, and on the reverse side of the forms, as supplemented in the Schedule of this contract. The detailed reporting categories to be used, which shall correlate with technical and schedule reporting, shall be set forth in the Schedule. Contractor implementation of reporting requirements under this clause shall include NASA approval of the definitions of the content of each reporting category and give due regard to the Contractor's established financial management information system.

(b) Lower level detail used by the Contractor for its own management purposes to validate information provided to NASA shall be compatible with NASA requirements.

(c) Reports shall be submitted in the number of copies, at the time, and in the manner set forth in the Schedule or as designated in writing by the Contracting Officer. Upon completion and acceptance by NASA of all contract line items, the Contracting Officer may direct the Contractor to submit Form 533 reports on a quarterly basis only, report only when changes in actual cost occur, or suspend reporting altogether.

(d) The Contractor shall ensure that its Form 533 reports include accurate subcontractor cost data, in the proper reporting categories, for the reporting period.

(e) If during the performance of this contract NASA requires a change in the information or reporting requirements specified in the Schedule, or as provided for in paragraph (a) or (c) of this clause, the Contracting Officer shall effect that change in accordance with the Changes clause of this contract.

G.6 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR 52.245–1 (NFS 1852.245-76)

(JAN 2011)

For performance of work under this contract, the Government will make available Government property identified below or in ATTACHMENT J.1(B), Government Furnished Property, of this contract on a no charge-for-use basis pursuant to the clause at FAR 52.245–1, Government Property, as incorporated in this contract. The Contractor shall use this property in the performance of this contract at [Insert applicable site(s) where property will be used] and at other location(s) as may be approved by the Contracting Officer. Under FAR 52.245–1, the Contractor is accountable for the identified property.

G.7 SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT (NFS 1852.232-80) (April 2018)

(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529.

(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC’s Vendor Payment information web site at:

https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at 1- 877-NSSC123 (1-877-677-2123) with any additional questions or comments.

Fee vouchers shall be separate submissions from vouchers for cost reimbursement. Credit memos for amounts owed back to NASA shall be separate submissions with the same documentation requirements as (c)(2)(i) below.

(c) Payment requests.

(1) The payment periods are stipulated in the payment clause(s) contained in this contract.

(2) Vouchers submitted under cost-type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:

(i) Vouchers.

(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.

https://www.nssc.nasa.gov/vendorpayment

(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.

(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.

(D) Progress reports, as required.

(ii) Invoices.

(A) Description of goods and services delivered as part of the contract’s terms and conditions, including the dates of delivery/performance.

(B) Progress reports, as required.

(C) Date goods and services were performed.

(iii) Fee vouchers. NASA Federal Acquisition Regulation Supplement Part 1852 Solicitation Provisions and Contract Clauses 2015 EDITION (Thru PN 20-08) 1852-100

(A) Listing of all provisionally-billed fee by period or date earned since contract award.

(B) A reconciliation of all billed and earned fee.

(C) A clear explanation of the fee calculations.

(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:

(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.

(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment requests. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoices within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.

(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.

G.8 GRC 52.242-96 NASA CONTRACTOR FINANCIAL REPORTING – SUPPLEMENTAL REQUIREMENTS (Dec 2016)

(a) The following reporting requirements are associated with those stated in the NASA Contractor

Financial Management Reporting clause (1852.242-73) of this contract, and NPR 9501.2, NASA Contractor Financial Management Reporting. NPR 9501.2 may be accessed through the NODIS Library at https://nodis3.gsfc.nasa.gov/displayDir.cfm?t=NPR&c=6000&s=1H.

(1) Approved Contract Baseline

(i) Within thirty (30) working days after the contract effective date, the Contractor shall provide a summary page(s) to the Contracting Officer (CO) and Contracting Officer’s Representative (COR), showing each reporting category as budgeted on a month-by- month basis for the duration of the work effort (Optional work efforts shall be separately summarized and Fiscal Years shall be subtotaled).

(ii) The corresponding monthly amounts on this summary shall be the amounts appearing in the “Planned” columns (7b and 7d) of each month’s NF 533 as reported during the duration of the work effort.

(iii) The following cost categories are required to appear in the “Contract Value” column (9b) of the NF

533. No amounts shall accrue against any cost category not listed herein, unless authorized in writing by the CO (Email is sufficient). Variations in format or organization are authorized, as long as they conform to the contract reporting requirements.

Direct Labor Hours _________X__________

Direct Labor Dollars _________X__________

Labor Overhead/Fringe Dollars _________X__________

Material Dollars _________X__________

Material Overhead Dollars _________X__________

Other Direct Cost Dollars

- Travel _________X__________

- Freight ____________________

- Equipment ____________________

- Training _________X__________

Subcontract Dollars _________X__________

Other Indirect Dollars _________X__________

G&A Dollars _________X__________

COM Dollars _________X__________

Fee Dollars _________X__________

Total Cost Plus Fee

(iv) In the event of a revision to the work effort, the Contractor shall provide a revised month-by-month summary within 15 working days after the revision is approved.

(2) Monthly and Quarterly NF 533 Reports

(i) The Contractor shall submit the following financial reports:

(A) NF 533M (Monthly Contractor Financial Management Report) Refer to attachment J.1(I1) for template

(B) NF 533Q (Quarterly Contractor Financial Management Report) Refer to attachment J.1(I2) for template

(ii) Upon written request, the CO may authorize an alternative format that provides substantially the same level of detail as the required NF 533(s), but is more compatible with the Contractor’s standard accounting/reporting format.

(iii) The report(s) shall be prepared in accordance with the instructions contained in contract clause 1852.242-73 and NPR 9501.2, and on the reverse of the forms. Additionally, any contract requirements identified as Capital Assets have special reporting requirements, which are specified in the “Capital Asset Acquisition” clause of this contract. Column 7b Cost Incurred/Hours Worked During Month Planned and 7d Cost Incurred/Hours Worked Cum. to Date Planned of the NF 533 M represent the negotiated baseline plan plus authorized changes for the contract. There may not be a direct relationship between the estimates provided in section 8 (Estimated Cost/Hours to Complete) of the NF 533 M and columns 7b and 7d. Columns 7b and 7d represent the negotiated baseline plan plus authorized changes, unlike the estimates provided in columns 8a, 8b, and 8c. Data in section 8 should not be simply a restatement of the baseline values.

(iv) The cost categories for the monthly and quarterly reports are the same as those specified in paragraph (a)(1)(iii) above.

(v) The Contractor shall provide a narrative explanation for any variance listed in the table below that exceeds the listed threshold. The explanation shall be provided as a footnote on the NF 533 report page, or included in a variance explanation table attached to the NF 533 report, and shall be detailed by cost category. The explanation shall include the cause of the variance, its impact on contract completion within the estimated cost, and the corrective action taken or proposed to be taken by the Contractor.

VARIANCE REPORTING REQUIREMENTS

Title of Variance Definition Threshold

Actual vs.

Estimated

Cost

Any variance at the total contract level between a previous estimated month- specific expenditure and the actual expenditure reported for the same month. For example: The March 533M reported an estimated total contract expenditure for April of $100K, and subsequent April 533M reported actual total contract costs of $88K, which is a variance of 12%

10%

Actual vs.

Planned to

Date

Any variance at the total contact level between the planned cost to date and the actual cost to date

The lesser of 10% or $100K

Contractor Final Estimate

vs. Contract

Value

Any variance at the total contract level between the contractor’s current final cost estimate and the current contract value. The lesser of

5% or $100K

(Additional variance reporting requirements may be added at the discretion of the Contracting Officer)

(vi) IF THIS IS A TASK ORDER CONTRACT:

(A) The Contractor shall submit one set of monthly reports that summarize the entire contract at the Task

Order Level (total hours/dollars per Task Order), and monthly reports showing cost detailed by the individual cost categories identified in paragraph (a)(1)(iii) above, for each active Task Order and for the total contract effort.

(B) If the contract includes identified capital asset expenditures, each capital asset shall be reported on its own report page. The level of reporting detail for capital assets shall be equal to the separate reporting for Task Orders under the contract.

(vii) Report periods and submittal dates shall be in accordance with the instructions contained in NPR

9501.2. All reports shall include the signature of the Contractor party responsible for the information on the reports.

Report periods for both the 533M and 533Q and the due date for the 533Q shall be in accordance with the instructions contained in the NPR 9501.2. The due date for the 533M report shall be the earlier of:

(A) 10 working days following the close of the contractor accounting period for the 533M report or

(B) 5 working days following the issuance of any voucher or invoice for contract operations cost reimbursement or Fee for the invoice service period that coincides or corresponds to the accounting period for the 533M report.

The Contracting Officer reserves the right to reject or short pay any invoice that exceeds a 533 costed amount for that given time period. These invoices shall not be subject to interest payments under the Prompt Payments clause.

The timely submission of the 533M report is important to the success of NASA’s mission. To accommodate the close of the NASA government fiscal year on September 30, submission of the 533M report in September is critical and early submission may be required up to two weeks prior to normal submission. Exact date to be communicated by the Contracting Officer.

(viii) Reports shall be submitted electronically in the number of copies, and to the individuals/areas indicated below:

Individual/Area No. of Copies E = Electronic H = Hard copy

Email Address

Contracting Officer (CS) E raenala.c.brown@nasa.gov

Contracting Officer Representative (COR) E lisa.m.hicks@nasa.gov

Accounting and Financial Analysis Division (AFAD) E grc-nf533-reports@lists.nasa.gov

(ix) Late, Inaccurate, or Incomplete Reports may result in the following penalties:

(C) Payment withheld until compliance is demonstrated,

(D) Negative Contractor Performance Assessment ratings, and/or

(E) Reduction in award fee.

(3) 533 Supplemental Reporting Schedule

(i) The Contractor shall submit the financial reports listed on the 533 Supplemental Reporting Schedule in the format referenced.

(A) GRC 533 Template – The contractor shall submit this template in addition to the reporting listed in Section (2)

(B) GRC Baseline Template – The contractor shall use the baseline template to satisfy the requirements listed above in Section (a)(1)

(ii) The contractor shall contact AFAD for questions when populating these templates.

(b) The following reporting requirements are in addition to those stated in the NASA Contractor Financial

Management Reporting clause (1852.242-73) of this contract, and NPR 9501.2, NASA Contractor Financial Management Reporting.

(1) Contractor Accounting Calendar

(i) The contractor shall prepare an accounting calendar for the life of the contract (base period plus all option periods).

(ii) The accounting calendar sample will be provided to the contractor after award.

(iii) The accounting calendar shall be submitted electronically to the CO within fifteen (15) working days after the contract effective date.

G.9 CAPITAL ASSET ACQUISITION – INDEFINITE DELIVERY, INDEFINITE QUANTITY (IDIQ)

CONTRACTS (GRC 52.245-99) (NOV 2015)

A. When any task/delivery order issued under this contract includes a requirement for capital assets* the contracting officer will identify those items as such and create separate line items for them on the task/delivery order.

*A capital asset is an item: 1) With a total acquisition cost of $500,000 or more, 2) With an estimated useful life of 2 years or more, 3) Not intended for sale in the contractor’s ordinary course of operations, 4) Acquired and/or constructed by the contractor with the intention of being used, or being available for use, by NASA, and 5) With a greater than 50% likelihood that the item will be used on another program/project(s) that has not yet commenced. (Note: Items and/or services with values less than $500,000 that contribute to the acquisition or increased value of a capital asset (e.g. surveys for real property or components for capital equipment) are also subject to capitalization rules. Generally, NASA will inform the contractor if such items and/or services are classified as capital assets.)

B. During contract performance, if the contractor determines a need to acquire or fabricate an item that may meet the criteria for capital asset, the contractor shall submit a written request for approval to the contracting officer. Based on internal review, if the item is determined necessary for contract performance and determined to be a capital asset, the contracting officer will either: 1) Issue a new task/delivery order for the capital asset, or 2) Modify an appropriate existing task/delivery order to add a separate line item for the capital asset.

C. If NASA Contractor Financial Management Reports (NASA Form (NF) 533’s) are required under this contract, the contractor shall report all costs incurred against each identified capital asset on its own report page on the NF 533’s.

D. The costs incurred for each item designated as a capital asset shall be identified separately on any invoice, voucher, or other authorized payment request submitted by the contractor under this contract.

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE

NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference, which are required to be filled in by the Government, include only text of the affected paragraph(s). This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, “Clauses Incorporated by Reference” (FEB 1998), of this contract.

II. NASA FAR SUPPLEMENT (48 CFR CHAPTER 18) CLAUSES

CLAUSE

NUMBER DATE TITLE

1852.208-81 1852.223-70 1852.223-75

NOV 2004

DEC 2015

FEB 2002

RESTRICTIONS ON PRINTING AND DUPLICATING

SAFETY AND HEALTH MEASURES AND MISHAP REPORTING

MAJOR BREACH OF SAFETY OR SECURITY

H.2 LIMITATION OF FUTURE CONTRACTING (NFS 1852.209-71) (DEC 1988)

(a) The Contracting Officer has determined that this acquisition may give rise to a potential organizational conflict of interest. Accordingly, the attention of prospective offerors is invited to FAR Subpart 9.5--Organizational Conflicts of Interest.

(b) The nature of this conflict is for example: Audit on self, subsidiary, or partner, hiring of employees or former employees of a company that is subject to the audit, instances where the Prime contractor may act as a subcontractor on another NASA contract would require employees to be firewalled to either the Prime or the sub.

(c) The restrictions upon future contracting are as follows:

(1) If the Contractor, under the terms of this contract, or through the performance of tasks pursuant to this contract, is required to develop specifications or statements of work that are to be incorporated into a solicitation, the Contractor shall be ineligible to perform the work described in that solicitation as a prime or first-tier subcontractor under an ensuing NASA contract. This restriction shall remain in effect for a reasonable time, as agreed to by the Contracting Officer and the Contractor, sufficient to avoid unfair competitive advantage or potential bias (this time shall in no case be less than the duration of the initial production contract). NASA shall not unilaterally require the Contractor to prepare such specifications or statements of work under this contract.

(2) To the extent that the work under this contract requires access to proprietary, business confidential, or financial data of other companies, and as long as these data remain proprietary or confidential, the Contractor shall protect these data from unauthorized use and disclosure and agrees not to use them to compete with those other companies.

H.3 EXPORT LICENSES (NFS 1852.225-70) (FEB 2000)

(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR Parts 120 through 130, and the Export Administration Regulations (EAR), 15 CFR Parts 730 through 799, in the performance of this contract. In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.

(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at any site as designated by the issued Task Order (TO), where the foreign person will have access to export-controlled technical data or software.

(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.

(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.

H.4 DENIED ACCESS TO NASA FACILITIES (NFS 1852.242-72) (OCT 2015)

(a)(1) The performance of this contract requires contractor employees of the prime contractor or any subcontractor, affiliate, partner, joint venture, or team member with which the contractor is associated, including consultants engaged by any of these entities, to have access to, physical entry into, and to the extent authorized, mobility within, a NASA facility.

(2) NASA may close and or deny contractor access to a NASA facility for a portion of a business day or longer due to any one of the following events:

(i) Federal public holidays for federal employees in accordance with 5 U.S.C. 6103.

(ii) Fires, floods, earthquakes, unusually severe weather to include snow storms, tornadoes and hurricanes.

(iii) Occupational safety or health hazards.

(iv) Non-appropriation of funds by Congress.

(v) Any other reason.

(3) In such events, the contractor employees may be denied access to a NASA facility, in part or in whole, to perform work required by the contract. Contractor personnel already present at a NASA facility during such events may be required to leave the facility.

(b) In all instances where contractor employees are denied access or required to vacate a NASA facility, in part or in whole, the contractor shall be responsible to ensure contractor personnel working under the contract comply. If the circumstances permit, the contracting officer will provide direction to the contractor, which could include continuing on-site performance during the NASA facility closure period.

In the absence of such direction, the contractor shall exercise sound judgment to minimize unnecessary contract costs and performance impacts by, for example, performing required work off-site if possible or reassigning personnel to other activities if appropriate.

(c) The contractor shall be responsible for monitoring the local radio, television stations, NASA Web sites, other communications channels, for example contracting officer notification, that the NASA facility is accessible. Once accessible the contractor shall resume contract performance as required by the contract.

(d) For the period that NASA facilities were not accessible to contractor employees, the contracting officer may—

(1) Adjust the contract performance or delivery schedule for a period equivalent to the period the NASA facility was not accessible;

(2) Forego the work;

(3) Reschedule the work by mutual agreement of the parties; or

(4) Consider properly documented requests for equitable adjustment, claim, or any other remedy pursuant to the terms and conditions of the contract.

(e) Notification procedures of a NASA facility closure, including contractor denial of access, as follows:

(1) The contractor shall be responsible for monitoring the local radio, television stations, NASA Web sites, other communications channels, for example contracting officer notification, for announcement of a NASA facility closure to include denial of access to the NASA facility. The contractor shall be responsible for notification of its employees of the NASA facility closure to include denial of access to the NASA facility. The dismissal of NASA employees in accordance with statute and regulations providing for such dismissals shall not, in itself, equate to a NASA facility closure in which contractor employees are denied access. Moreover, the leave status of NASA employees shall not be conveyed or imputed to contractor personnel. Accordingly, unless a NASA facility is closed and the contractor is denied access to the facility, the contractor shall continue performance in accordance with the contract.

(2) NASA’s Emergency Notification System (ENS). ENS is a NASA-wide Emergency Notification and Accountability System that provides NASA the ability to send messages, both Agency-related and/or Center-related, in the event of an emergency or emerging situation at a NASA facility. Notification is provided via multiple communication devices, e.g. Email, text, cellular, home / office numbers. The ENS provides the capability to respond to notifications and provide the safety status. Contractor employees may register for these notifications at the ENS Web site:

http://www.hq.nasa.gov/office/ops/nasaonly/ENSinformation.html .

(End of clause)

H.5 PERSONAL IDENTITY VERIFICATION (PIV) CARD ISSUANCE PROCEDURES (GRC 52.204-96) (AUG 2006)

"PIV Card Issuance Procedures", posted on the World Wide Web at http://www.grc.nasa.gov/WWW/Procure/PIVCardIssuanceProcedures.doc, are incorporated herein by reference and made a part hereof.

These PIV Card Issuance Procedures are in accordance with FAR clause 52.204-9, "Personal Identity Verification of Contractor Personnel" and NASA Procurement Information Circular (PIC) 06-01 entitled "Personal Identity Verification of Contractors," dated January 18, 2006.

H.6 CONTRACTORS' DUTIES AND RESPONSIBILITIES ON-SITE (GRC 52.237-91) (DEC 2016)

(a) BADGES AND PASSES

(i) Badge and Pass Issuance

Support Service Contractor personnel having a need to enter areas of the Glenn Research Center Lewis Field or Plum Brook Station shall have an identification badge or pass. This badge or pass shall be obtained at the Badge Control Office or Visitor Control Office located at the Main Gate of either Lewis Field or Plum Brook Station.

(1) Permanent Badge (Personal Identify Verification (PIV) Credential) Requirements

a. It is recommended that the contractor complete the new employee hiring process at least 10 work days prior to the employee’s start date.

b. Upon the selection of a new employee, the contractor’s Human Resource (HR) representative shall create an identity in the Identity and Access Management Tool (IdMAX).

c. The contractor’s HR representative shall also complete NASA Form 1760, Position Risk Designation for Non-NASA Employee and GRC 1760, Position Risk Designation Cover sheet. Once completed, both forms shall be signed by the NASA COTR and sent to the Office of Protective Services POC for Non-Government Investigations.

d. At the time of the Center visit or the Entry-on-Duty appointment, the new employee shall complete the Enroll for PIV credential process at the Main Gate Badge Control Office.

e. During this activity the new employee shall provide verification of their identity by providing two forms of I-9 documentation and fingerprints.

f. Upon Entry-on-Duty, the employee shall be issued a temporary credential (badge) for access to the http://www.hq.nasa.gov/office/ops/nasaonly/ENSinformation.html http://www.grc.nasa.gov/WWW/Procure/PIVCardIssuanceProcedures.doc

Center until a Permanent Credential (badge) is created.

Please reference the GRC Office of Protective Services web site for the Permanent Support Service Contractor (SSC) New Hire Identity Creation Process (https://security.grc.nasa.gov/im_ssc_new_hire.cfm), and for additional information.

(2) Temporary Pass Requirements

• Short Term Visitors (1-29 days) shall receive a Visitor Pass. Please reference the GRC Office of Protective Services web site (https://security.grc.nasa.gov/form_visit_information.cfm) to complete the on-line visitor request form.

• NASA GRC Service and Vendor Personnel shall receive a Service / Vendor Personnel Pass which will allow only physical access to NASA GRC. Please reference the GRC Office of Protective Services web site (https://security.grc.nasa.gov/crm_grc_serv_vend_pers.cfm) for complete information.

• The contractor shall ensure that, for badging purposes, each contractor employee is in possession of GRC 9975 (Construction Contractor Registration & ID Badge), prior to reporting to work. Contractor employees not in possession of the above mentioned form will be delayed at the gate until the contractor supervisor/foreman or that individual’s representative reports to the Main Gate with the appropriate paperwork for badging

• Temporary workers are defined as those employees that are on Center for more than 29 days and less than 180 days. Please reference the GRC Office of Protective Services web site (https://security.grc.nasa.gov/crm_temporary_worker.cfm) for complete information.

All lost or stolen badges or passes shall be reported immediately to the GRC Office of Protective Services.

(ii) Employee Separation

(1) When an employee terminates and/or resigns employment, the contractor shall issue to the employee GRC 10087, Non-NASA Separation Clearance Record. The contractor shall be responsible for making an inquiry of all offices listed on the form to see if the employee has any outstanding Government items. The employee shall then take this form to all offices that list he/she as having outstanding items. The employee's last stop is for the return of their Government issued I.D. badge. The contractor is also required to send a notice to the Grc-Ssc-Separations@Lists.Nasa.Gov within 1 day of employees' separation.

(2) The contractor shall ensure that the terminated and/or resigned employee has returned his/her badge to the Main Gate Badge Clerk. Final clearance of a contractor upon completion of a contract will depend in part upon accounting for all badges issued to employees during the performance of the contract. Security badges are Government property and any alteration or misuse of these badges may be prosecuted as a violation of Section 499, Title 18, U.S. Code.

(3) The contractor's on-site manager shall comply with the Badge and Property Regulations a copy of which will be given to the contractor's supervisors at the time of the Construction Site Showing.

https://security.grc.nasa.gov/im_ssc_new_hire.cfm https://security.grc.nasa.gov/form_visit_information.cfm https://security.grc.nasa.gov/crm_grc_serv_vend_pers.cfm https://security.grc.nasa.gov/crm_temporary_worker.cfm

(4) Upon termination of duties, each employee's badge will be collected and returned to the Main Gate by the contractor. Final clearance of a contractor upon completion of a contract will depend in part upon the accounting for all badges issued to employees during the performance of the contract.

Security badges are Government property and any alteration or misuse of these badges may be prosecuted as a violation of Section 499, Title 18, U.S. Code.

(b) PERSONNEL LOCATION AND IDENTIFICATION

The contractor shall:

(1) Ensure that office space occupied by its personnel is clearly labeled with the name of the company.

(2) Ensure, to the extent practicable, that external correspondence signed by its personnel is on company letterhead. Internal correspondence, including e-mail and memoranda, must include the name of the company in the signature line or in another clearly identifiable location.

(3) Ensure that its onsite personnel, when receiving or placing telephone calls, identify their employer, in addition to whatever other appropriate greeting is used.

(4) When participating in meetings with Government and/or other contractor personnel, ensure that its personnel properly identify themselves as contractor employees so that their actions will not be construed as acts of Government officials.

(c) EMERGENCY PREPAREDNESS

(1) Emergencies are defined as incidents involving serious personal injury or damage, incidents that cause possible hazardous conditions, or incidents that require immediate attention of the Plant Protection Department or Security. The contractor shall ensure that its employees are informed that Emergency, Fire, Medical, Safety, and Security assistance can be summoned by dialing 911 from a NASA phone, or 216-433-8888 from a cell phone.

(2) For incidents not classified as an emergency, contractor personnel shall be instructed to immediately notify the Contracting Officer's Representative (COR) (rather than dialing 911 from a NASA phone, or 216-433-8888 from a cell phone).

(3) In the event of any accident investigation activity, the contactor shall cooperate fully with the Government Accident Investigator and the Center Accident Investigation Board. This cooperation shall include interviews at the accident site and/or at a Board meeting.

(4) The contractor shall provide written guidance to its employees in the event of an emergency, an incident other than an emergency, a Center closure, a building closure, a fire alarm, or tornado alarm.

The contractor is encouraged to include in this guidance pre-established instructions, when feasible, to employees such that unnecessary delays and confusion may be avoided by employees who may otherwise be awaiting management instructions. For example, the contractor is encouraged to address what actions employees should immediately take in the event of fire, building closure, Center closure (i.e. late Center opening or early center dismissal) for snow or other causes.

(d) TRAFFIC

The contractor agrees to comply, and agrees to require that all of its personnel will comply with all posted traffic signs, signals and instructions of personnel assigned for traffic control and parking purposes and with the provisions of the NASA Glenn Research Center Safety Manual (GLM-QS-1700.1), Chapter 19, Vehicle & Pedestrian Safety, incorporated herein by reference and made a part hereof.

(e) PROHIBITION OF FIREARMS

Firearms or weapons of any kind are strictly prohibited at the Glenn Research Center.

(f) SECURITY INCIDENTS

Theft of Property, Bomb threats, malicious damage and any other threat or violent situations shall be immediately reported to the GRC Office of Protective Services.

(g) AFTER-HOUR ACCESS

During normal working hours, 6:00 a.m. to 6:00 p.m. Monday through Friday, the guards at the gates will permit contractor entrance and departure. At any other time, advance clearance is required.

Advance clearance may be obtained through the Glenn/Plum Brook COR, who will make the request to the Main Gate Officer ( 3-2204 at Glenn and 3-3221 at Plum Brook).

This is the start of the file's text. The full file is on GovTribe.