TE-02 Worksheet in EPFD-01-03.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Electrified Powertrain Flight Demonstration Federal contract opportunity
- Solicitation number
- 80AFRC21R0009
About this file
This document contains a federal contract opportunity notice and a related technical worksheet.
The federal contract opportunity is a pre-solicitation notice for multiple awards to develop, conduct ground testing of, and flight test an electrified powertrain demonstration system with a megawatt-scale power capacity. The solicitation number is 80AFRC21R0009 and it is being issued by the National Aeronautics and Space Administration Armstrong Flight Research Center. Interested offerors should monitor the Federal Business Opportunities website for release of a formal Request for Proposal.
The technical worksheet appears to be a template for documenting technology readiness levels and assessing technical and integration risks at key project milestones for an aircraft electrified powertrain system. It includes powertrain components, subsystem tests, and integrated tests. Completion of significant tests between formal reviews would trigger a risk assessment.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technology
| Maturation of Technology Readiness Levels | |||||||||
| TRL Level of Key Technologies | At Proposal submission | SRR | PDR | CDR | FRR | PFAR | Major Actionable Events - Significant series of events such as tests that may occur in between life cycle reviews and its completion triggers an assessment of TPMs as required per DRD-TE-03: Technical Data Requirements and Reporting | ||
| Component and Subsystem Ground Test(s) | Integrated Ground Test(s) | ||||||||
| Aircraft Systems | Control Integration | ||||||||
| Thermal Management of Electronics | |||||||||
| Turbofan and Electric System Integration | |||||||||
| Power System Integration | High Voltage | ||||||||
| EMI/Power Quality/Dynamic Stability | |||||||||
| Powertrain Components and Subsystem | Electric Machines | ||||||||
| Inverters | |||||||||
| Energy Storage | |||||||||
| DC/DC Converter | |||||||||
| Circuit Protection Devices/Switches | |||||||||
| Cables and Connectors |
BarrierTechnicalRisk
| Maturation of Barrier Technical and Integration Risk Scores Across Life Cycle Reviews | ||||||||
| Technical Barrier & Integration Risk | At Proposal submission | SRR | PDR | CDR | FRR | PFAR | Major Actionable Events - Significant series of events such as tests that may occur in between life cycle reviews and its completion triggers an assessment of TPMs as required per DRD-TE-03: Technical Data Requirements and Reporting | |
| Component and Subsystem Ground Test(s) | Integrated Ground Test(s) | |||||||
| High Voltage Operation at Altitude | ||||||||
| Thermal Management | ||||||||
| Propulsion System Integration | ||||||||
| Battery System Performance Shortfall | ||||||||
| Powertrain System Integration | ||||||||
| Aircraft System Integration |