Domestic or Foreign End Product - Components.xlsx

XLSX spreadsheet 46 KB Posted

Attached to
Electrified Powertrain Flight Demonstration Federal contract opportunity
Solicitation number
80AFRC21R0009
Issued by
National Aeronautics and Space Administration Armstrong Flight Research Center

About this file

This document contains a product origination worksheet and details of a related federal contract opportunity for an electrified powertrain flight demonstration. The product origination worksheet requires identification of key components and subcomponents of an integrated MW-class powertrain system to be tested during flight demonstrations, including their domestic or foreign origin. Respondents must indicate if any foreign components are assembled in the U.S. and how they meet domestic content requirements.

The associated federal contract opportunity is for multiple awards to develop, conduct ground testing of, and perform flight tests with an MW-class electrified powertrain system. The National Aeronautics and Space Administration Armstrong Flight Research Center intends to release a request for proposal to solicit proposals for this work. Interested parties should monitor the Federal Business Opportunity website for release of the RFP.

View the file

Other files for this federal contract opportunity

Other files attached to Electrified Powertrain Flight Demonstration, newest first.
File Type Posted
80AFRC21R0009P00003.pdf PDF
EPFD-01-03 Integrated Data Requirements Description Document.pdf PDF
EPFD-01-03 Integrated Data Requirements Description Document.pdf PDF
AFOP-8715.3-005-2.pdf PDF
Industry Day Presentation.pdf PDF
TE-02 Worksheet in EPFD-01-03.xlsx XLSX spreadsheet
TE-03 Worksheet in EPFD-01-03.xlsx XLSX spreadsheet
AFOP-7900.3-023.pdf PDF
AFOP-8730.5-007-2.pdf PDF
80AFRC21R0009P00002.pdf PDF
EPFD-02-06 Technical Measures of Effectiveness-Rev B .pdf PDF
Industry Day Questions and Answers.pdf PDF
80AFRC21R0009P00001.pdf PDF
EPFD-01-03 Integrated Data Requirements Description Document Final.pdf PDF
EPFD_01_03_Integrated Data Requirements Description Document.pdf PDF
80AFRC21R0009.pdf PDF
EPFD Statement of Objectives.pdf PDF
EPFD-02-02 System Requirements Document.pdf PDF
EPFD-02-06 Technical Measures of Effectiveness.pdf PDF
EPFD Industry Day QAs.pdf PDF
EPFD Industry Day-Public Webinar QAs.pdf PDF
EPFD Pre-solicitation Industry Day Slides Final 12.10_with all updates_12_15_2020pptx.pdf PDF
EPFD Public Webinars December 11_2020_final__updated_12_15_2020.pdf PDF
Draft_EPFD Programmatic Data Requirement Deliverables.pdf PDF
Small Business Subcontracting Goals.pdf PDF
Draft_EPFD Technical Data Requirement Deliverables.pdf PDF
EPFD_02_02_SRD-DRAFT-REV A-20201130.pdf PDF
Draft EPFD-02-06 Technical Measures of Effectiveness Preliminary.pdf PDF
DRAFT RFP 80AFRC21R0009.pdf PDF
DRAFT Statement of Objectives.pdf PDF
Notice of Contract Action.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

The response to DRD-TE-04 Product Origination Worksheet should be consistent with the integrated MW-class powertrain components that will be tested during the flight test program.
An example of a notional system diagram is shown below, however the proposer should update the table to map to their actual flight test system and list the specific components associated with it.
DRD-TE-04 Product Origination Worksheet
Key ComponentsKey Technology SubcomponentU.S. Domestic or Foreign End Product / Components (If Foreign, identify location of manufacture)Identified as a U.S Domestic End Product based on the following (Check as applicable)Identify if item consists of Foreign End Products / Components that are assembled in U.S.Comments
Components Manufactured in U.S.Cost of components manufactured in the U.S. exceeds 55 percent of the cost of all its components.
Aircraft SystemFlight test aircraft
Turboprop, Turbofan, or equivelant
Other flight test hardware
Integrated MW Class PowertrainControl systems
Thermal management system
Powertrain ComponentsElectric Machines
Inverters & Converters & Other Power Electronics
Battery or Equivalent
Cables & Connectors
Circuit Protection Devices/Switches
Domestic end product means—

(1) For an end product that does not consist wholly or predominantly of iron or steel or a combination of both–

(i) An unmanufactured end product mined or produced in the United States;

(ii) An end product manufactured in the United States, if—

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind as those that the agency determines are not mined, produced, or manufactured in sufficient and reasonably available commercial quantities of a satisfactory quality are treated as domestic. Components of unknown origin are treated as foreign. Scrap generated, collected, and prepared for processing in the United States is considered domestic;

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the end product.

image1.png

File details come from the government source that posted it. Updated .