8 Work List

115 KB Posted

Attached to
BES-WHES HVAC 55144-23-RFP-671
Solicitation number
55144-23-671
Issued by
Haralson County, Georgia

About this file

This is a Work List document from Haralson County School District detailing HVAC installation requirements at two elementary school locations. The project encompasses HVAC system installation at West Haralson Elementary School (4552 Hwy 100, Tallapoosa, GA 30176) and Buchanan Elementary School (215 College Circle, Buchanan, GA 30113). The scope of work at each location includes HVAC installation according to provided drawings, furnishing and installation of Honeywell TH8321WF1001/U thermostats, furnishing and installation of new exhaust fans for restrooms and code-required spaces, electrical and gas connections to units, testing and balancing of all units, and work area cleanup. All work must be completed by June 30, 2023.

All work is specified as turn-key, requiring contractors to provide materials, labor, and equipment. Contractors must price all items as separate line items in their bids. The contractor assumes responsibility for obtaining all required permits at federal, state, and local levels. This project is subject to the Davis-Bacon Wages Act requirements. The work list items provided by the owner are noted as not guaranteed to be accurate, requiring contractors to verify specifications and comply with all applicable drawings and regulations.

Text of this file

Haralson County School District Work List

Notes: 1. All Work listed are Turn-Key (materials, labor & equipment). Please list all items as line items when pricing. Note: The following work list items are provided by the Owner for convenience and are not guaranteed to be accurate.

Contractor must comply with Davis-Bacon Wages Act Permits including federal, state or local are the contractor’s responsibility. All work must be completed no later than June 30, 2023.

West Haralson Elementary School 4552 Hwy 100 Tallapoosa, GA 30176

● Install HVAC according to drawings.

● Furnish and install new thermostats (Honeywell TH8321WF1001/U).

● Furnish and install new exhaust fans for ventilating restrooms and other code required spaces.

● Connect electrical and gas to units.

● Testing and balance of all units.

● Clean up the work area.

Buchanan Elementary School 215 College Circle Buchanan, GA 30113

● Install HVAC according to drawings.

● Furnish and install new thermostats (Honeywell TH8321WF1001/U).

● Furnish and install new exhaust fans for ventilating restrooms and other code required spaces.

● Connect electrical and gas to units.

● Testing and balance of all units.

● Clean up the work area.

Other files

File Type Posted
3 Restrictions —
4 HCSD Non-Collusion —
WHES DRAWINGS —
7 RFP HVAC Renovation —
Award Information —
1 HCSD Request for Proposal —
WHES Specs —
9 Business Reference —
10 HCSD Proposer Information —
BES Specs —
5 HCSD Suspension —
11 HCSD Subcontractor Form —
BES DRAWINGS —
6 HCSD Contract Template —
2 HCSD General Terms —
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .