8 2026_0219_Palmer_100CD_spec.pdf
PDF 5 MB Posted
- Attached to
- Palmer Courthouse Expansion Construction
- Solicitation number
- Not on record
- Issued by
- Matanuska-Susitna Borough, Alaska
About this file
This is a Project Manual for the Palmer Courthouse Renovation & Expansion project prepared for the Alaska Court System, containing 100% Construction Documents dated February 19, 2026. The project involves comprehensive renovation and expansion work at the Palmer Courthouse located at 515 East Dahlia Avenue, Palmer, AK 99645. The specifications document encompasses all construction divisions including procurement and contracting requirements, general requirements, concrete, masonry, metals, wood construction, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, and utilities. A mandatory pre-bid meeting and site inspection is scheduled for Wednesday, May 6, 2026 at 10:30 AM in the courthouse lobby at 435 S. Denali Street, Palmer, AK 99645. The deadline for contractor questions is 10 calendar days prior to the bid submission date, with sealed bids due on Monday, May 25, 2026 at 10:00 AM. Bids should be submitted to Alaska Court System, Attn: Sam Duke, Facilities Deputy Director, 820 W. 4th Avenue, Anchorage, AK 99501.
The specification documents establish comprehensive quality assurance, submitting, and execution requirements for all mechanical, plumbing, fire protection, and HVAC systems. Payment procedures include a schedule of values with separate costs for principal items, applications for payment with supporting documentation and lien waivers, and initial project costs to be submitted within 30 days of Notice to Proceed. The project specifies single-source manufacturers for critical systems including motors, variable frequency drives, and control components, with warranty periods ranging from one year minimum to five years for specific equipment. All work must comply with applicable Alaska building codes, NFPA standards, ASHRAE requirements, and other referenced industry standards. The specifications require that all mechanical system installation be completed by qualified contractors with minimum documented experience, include commissioning and testing procedures, and maintain comprehensive operation and maintenance documentation for the Owner upon project completion.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manual
Palmer Courthouse Renovation & Expansion 515 East Dahlia Avenue Palmer, AK 99645
February 19, 2026
Prepared for:
Alaska Court System
Prepared by:
Aris Garrison Associate, Architect Irvine, CA
(949) 923-6007
Stantec Project No. 2014331970
Volume 01: Divisions 00-33
Stantec Alaska Court System Project No. 2014331970 Palmer Courthouse Renovation & Expansion 2/19/2026 100% Construction Documents
SEALS PAGES 00 01 07 - 1
DOCUMENT 00 01 07 - SEALS PAGES
1.1 ARCHITECTURE
A. I hereby certify that the architectural portions of this Project Specification were prepared by me or under my direct supervision and that I am a duly registered Architect under the laws of the State of Alaska.
Aris Garrison Architect of Record Phone: (949) 294-7074 aris.garrison@stantec.com
SEALS PAGES 00 01 07 - 2
1.2 CIVIL ENGINEERING
A. I hereby certify that the civil portions of this Project Specification were prepared by me or under my direct supervision and that I am a duly registered Professional Engineer under the laws of the State of Alaska.
Ryan Whittle, PE Civil Engineer of Record Phone: (206) 224-3682 ryan.whittle@stantec.com
SEALS PAGES 00 01 07 - 3
1.3 STRUCTURAL ENGINEERING
A. I hereby certify that the structural portions of this Project Specification were prepared by me or under my direct supervision and that I am a duly registered Professional Engineer under the laws of the State of Alaska.
Robert Koruna, PE, SE Structural Engineer of Record Phone: 907-343-5164 robert.koruna@stantec.com
2/19/2026 100% Construction Documents
SEALS PAGES 00 01 07 - 4
1.4 MECHANICAL ENGINEERING
A. I hereby certify that the mechanical portions of this Project Specification were prepared by me or under my direct supervision and that I am a duly registered Professional Engineer under the laws of the State of Alaska.
Carol Li Mechanical Engineer of Record Phone: (213) 269-4210 carol.li@stantec.com
SEALS PAGES 00 01 07 - 5
1.5 ELECTRICAL ENGINEERING
A. I hereby certify that the electrical portions of this Project Specification were prepared by me or under my direct supervision and that I am a duly registered Professional Engineer under the laws of the State of Alaska.
Corey Rogers Electrical Engineer of Record Phone: (907)-343-5266 corey.rogers@stantec.com
END OF DOCUMENT
TABLE OF CONTENTS 00 01 10 - 1
SECTION 00 01 10
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 00 PROJECT COVER SHEET
00 01 07 SEALS PAGES
00 01 10 TABLE OF CONTENTS
SPECIFICATIONS GROUP
GENERAL REQUIREMENTS SUBGROUP
DIVISION 01 - GENERAL REQUIREMENTS (Additional Sections by Owner)
01 45 33 CODE-REQUIRED SPECIAL INSPECTIONS AND PROCEDURES
01 57 13 TEMPORARY EROSION AND SEDIMENT CONTROL
FACILITY CONSTRUCTION SUBGROUP
DIVISION 02 - EXISTING CONDITIONS
02 41 19 SELECTIVE DEMOLITION
DIVISION 03 – CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 – MASONRY
04 26 13 MASONRY VENEER
DIVISION 05 – METALS
05 50 00 METAL FABRICATIONS
05 52 13 PIPE AND TUBE RAILINGS
DIVISION 06 - WOOD, PLASTICS AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 16 50 EXTERIOR GYPSUM SHEATHING
06 17 53 SHOP-FABRICATED WOOD TRUSSES
06 18 00 GLUED-LAMINATED CONSTRUCTION
06 20 00 FINISH CARPENTRY
06 41 00 ARCHITECTURAL WOOD CASEWORK
06 42 00 WOOD PANELING
06 64 00 PLASTIC PANELING
TABLE OF CONTENTS 00 01 10 - 2
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 14 00 FLUID-APPLIED WATERPROOFING
07 19 00 WATER REPELLENTS
07 21 00 THERMAL INSULATION
07 21 19 FOAMED IN PLACE INSULATION
07 26 16 UNDER SLAB VAPOR RETARDERS
07 27 00 AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 42 13 METAL PANELS
07 62 00 SHEET METAL FLASHING AND TRIM
07 72 00 ROOF ACCESSORIES
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
07 95 13 EXPANSION JOINT COVER ASSEMBLIES
DIVISION 08 - OPENINGS
08 11 13 HOLLOW METAL DOORS AND FRAMES
08 14 16 FLUSH WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 43 13 ALUMINUM FRAMED STOREFRONTS
08 53 13 VINYL WINDOWS
08 56 59 SERVICE AND TELLER WINDOW UNITS
08 71 00 DOOR HARDWARE
08 80 00 GLAZING
DIVISION 09 - FINISHES
09 05 61 COMMON WORK RESULTS FOR FLOORING PREPARATION
09 21 16 GYPSUM BOARD ASSEMBLIES
09 22 16 NON-STRUCTURAL METAL FRAMING
09 30 00 TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 13 TILE CARPETING
09 72 00 WALL COVERINGS
09 83 22 ACOUSTIC DRAPERY
09 84 30 SOUND-ABSORBING WALL AND CEILING UNITS
09 91 13 EXTERIOR PAINTING
09 91 23 INTERIOR PAINTING
09 93 00 STAINING AND TRANSPARENT FINISHING
DIVISION 10 - SPECIALTIES
10 14 23 PANEL SIGNAGE
10 26 00 WALL AND DOOR PROTECTION
10 28 00 TOILET, BATH, AND LAUNDRY ACCESSORIES
10 44 00 FIRE PROTECTION SPECIALTIES
TABLE OF CONTENTS 00 01 10 - 3
DIVISION 11 - EQUIPMENT
11 30 13 RESIDENTIAL APPLIANCES
DIVISION 12 - FURNISHINGS
12 24 00 WINDOW SHADES
12 36 00 COUNTERTOPS
DIVISIONS 13 - 19 Not Used
DIVISION 20 - FACILITY SERVICES
20 00 00 GENERAL MECHANICAL REQUIREMENTS
20 05 00 COMMON MECHANICAL WORK RESULTS
20 05 13 COMMON MECHANICAL MOTOR REQUIREMENTS
20 05 14 VARIABLE-FREQUENCY MOTOR CONTROLLERS
20 05 19 METERS AND GAUGES
20 05 29 HANGERS AND SUPPORTS
20 05 33 HEAT TRACING
20 05 48 VIBRATION AND SEISMIC CONTROLS
20 05 53 MECHANICAL IDENTIFICATION
20 07 00 MECHANICAL INSULATION
20 08 00 MECHANICAL COMMISSIONING
DIVISION 21 - FIRE SUPPRESSION
21 24 00 DRY-CHEMICAL FIRE-EXTINGUISHING SYSTEM
DIVISION 22 - PLUMBING
22 05 23 GENERAL DUTY VALVES FOR PLUMBING PIPING
22 05 93 TESTING, ADJUSTING, AND BALANCING FOR PLUMBING
22 10 05 PLUMBING PIPING
22 10 06 PLUMBING PIPING SPECIALTIES
22 34 00 FUEL-FIRED, DOMESTIC-WATER HEATERS
22 42 00 COMMERCIAL PLUMBING FIXTURES
22 47 00 DRINKING FOUNTAINS & ELECTRIC WATER COOLERS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 01 30.51 HVAC AIR-DISTRIBUTION SYSTEM CLEANING
23 05 23 GENERAL DUTY VALVES FOR HVAC PIPING
23 05 93 TESTING, AJUSTING AND BALANCING FOR HVAC
23 09 00 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC
23 11 23 FACILITY NATURAL-GAS PIPING
23 21 13 HYDRONIC PIPING
23 21 14 HYDRONIC SPECIALTIES
23 21 23 HYDRONIC PUMPS
TABLE OF CONTENTS 00 01 10 - 4
23 23 00 REFRIGERANT PIPING
23 31 00 HVAC DUCTS AND CASINGS
23 33 00 AIR DUCT ACCESSORIES
23 34 16 CENTRIFUGAL HVAC FANS
23 37 13 AIR OUTLETS AND INLETS
23 41 00 PARTICULATE AIR FILTRATION
23 51 00 BREECHINGS, CHIMNEYS, AND STACKS
23 51 23 GAS VENTS
23 52 16 CONDENSING BOILERS
23 73 13 INDOOR SEMI-CUSTOM AIR-HANDLING UNITS
23 81 26.13 SMALL-CAPACITY SPLIT-SYSTEM AIR CONDITIONERS
DIVISIONS 24 & 25 Not Used
DIVISION 26 - ELECTRICAL
26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33.13 CONDUIT FOR ELECTRICAL SYSTEMS
26 05 33.16 BOXES FOR ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 05 83 WIRING CONNECTIONS
26 24 16 PANELBOARDS
26 27 26 WIRING DEVICES
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 29 HANGERS AND SUPPORTS FOR COMMUNICATIONS SYSTEMS
27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 46 00 FIRE DETECTION AND ALARM
DIVISIONS 29 - 30 Not Used
DIVISION 33 - UTILITIES
33 05 61 CONCRETE MANHOLES
33 31 13 SITE SANITARY SEWERAGE GRAVITY PIPING
33 42 11 STORMWATER GRAVITY PIPING
33 46 00 STORMWATER MANAGEMENT
END OF SECTION
2/19/2026 100% Construction Documents
CODE-REQUIRED SPECIAL INSPECTIONS AND
PROCEDURES 01 45 33 - 1
SECTION 01 45 33
CODE-REQUIRED SPECIAL INSPECTIONS AND PROCEDURES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Code-required special inspections.
B. Testing services incidental to special inspections.
C. Submittals.
1.02 DEFINITIONS
A. Code or Building Code: ICC (IBC), International Building Code, most recent edition adopted by authority having jurisdiction, including all applicable amendments and supplements without limitation, and specifically Chapter 17 - Special Inspections and Tests.
B. Authority Having Jurisdiction (AHJ): Agency or individual officially empowered to enforce the building, fire and life safety code requirements of the permitting jurisdiction in which the Project is located.
C. Special Inspections and Tests: Inspections and testing of materials, installation, fabrication, erection, or placement of components and connections mandated by Building Code to safeguard public welfare.
1. Special inspections and tests are separate from and independent of tests and inspections conducted by Owner or Contractor for purposes of quality assurance and contract administration.
1.03 REFERENCE STANDARDS
A. ASTM E329 - Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection; 2025.
B. IAS AC89 - Accreditation Criteria for Testing Laboratories; 2021.
C. IAS AC291 - Accreditation Criteria for Special Inspection Agencies AC291; 2025.
D. ICC (IBC) - International Building Code; Most Recent Edition Adopted by Authority Having
Jurisdiction, Including All Applicable Amendments and Supplements.
1.04 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements for submittal procedures.
B. Special Inspection Agency Qualifications: Prior to start of work, Special Inspection Agency is required to:
1. Submit agency name, address, and telephone number, names of full time registered
Engineer and responsible officer.
2. Submit certification that Special Inspection Agency is acceptable to AHJ.
C. Testing Agency Qualifications: Prior to start of work, Testing Agency is required to:
1. Submit agency name, address, and telephone number, and names of full time registered
Engineer and responsible officer.
2. Submit certification that Testing Agency is acceptable to AHJ.
D. Fabricator's Qualification Statement: When required by AHJ, submit documentation of fabrication facilities and methods and quality control procedures. Include documentation of AHJ approval.
E. Special Inspection Reports: After each special inspection, Special Inspector is required to submit at least two copies of report; one to Architect and one to AHJ.
1. Include:
a. Date issued.
b. Project title and number.
2/19/2026 100% Construction Documents
CODE-REQUIRED SPECIAL INSPECTIONS AND
PROCEDURES 01 45 33 - 2
c. Name of Special Inspector.
d. Date and time of special inspection.
e. Identification of product and specifications section.
f. Location in the Project.
g. Type of special inspection.
h. Date of special inspection.
i. Results of special inspection.
j. Compliance with contract documents.
2. Final Special Inspection Report: Document special inspections and correction of discrepancies prior to the start of the work.
F. Fabricator Special Inspection Reports: After each special inspection of fabricated items at fabricator's facility, Special Inspector is required to submit report to Architect and to AHJ.
1. Include:
a. Date issued.
b. Project title and number.
c. Name of Special Inspector.
d. Date and time of special inspection.
e. Identification of fabricated item and specification section.
f. Location in the Project.
g. Results of special inspection.
h. Verification of fabrication and quality control procedures.
i. Compliance with contract documents.
j. Compliance with referenced standards.
G. Test Reports: After each test or inspection, Testing Agency is required to submit report to Architect and to AHJ.
1. Include:
a. Date issued.
b. Project title and number.
c. Name of inspector.
d. Date and time of sampling or inspection.
e. Identification of product and specifications section.
f. Location in the Project.
g. Type of test or inspection.
h. Date of test or inspection.
i. Results of test or inspection.
j. Compliance with contract documents.
H. Certificates: When required by AHJ, Special Inspector will submit certification by manufacturer, fabricator, and installation subcontractor to Architect and AHJ.
1. Indicate material or product complies with or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.
1.05 SPECIAL INSPECTION AND TESTING AGENCY
A. Owner to employ services of Special Inspection Agency to perform Special Inspections as required by building code.
B. Special Inspection Agency may delegate to independent testing agency to perform testing and sampling associated with special inspections and required by building code.
C. Employment of agency in no way relieves Contractor of obligation to perform work in accordance with requirements of contract documents.
1.06 TESTING AND INSPECTION AGENCIES
2/19/2026 100% Construction Documents
CODE-REQUIRED SPECIAL INSPECTIONS AND
PROCEDURES 01 45 33 - 3
A. Ownerto employ services of independent testing agency to perform testing and sampling required by the contract documents to support Special Inspections or associated with special inspections but not required by building code.
B. Employment of agency in no way relieves Contractor of obligation to perform work in accordance with requirements of contract documents.
1.07 QUALITY ASSURANCE
A. Special Inspection Agency Qualifications:
1. Independent firm specializing in performing testing and inspections of the type specified in this section.
2. Accredited by IAS according to IAS AC291.
B. Testing Agency Qualifications:
1. Independent firm specializing in performing testing and inspections of the type specified in this section.
2. Accredited by IAS according to IAS AC89.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 SPECIAL INSPECTIONS AND TESTING
A. The Code requires special inspections and testing of certain materials, components, assemblies, and connections used in constructing the project. Special inspections and testing will be performed in accordance with the Code.
B. Special inspections and testing will be performed in accordance with the Code for the following materials and project components:
1. Concrete.
2. Masonry.
3. Wood.
4. Soils.
5. Mastic and intumescent fire-resistant coatings.
6. Fire-resistant penetrations and joints.
7. Seismic resistance.
8. Wind resistance.
9. Structural observations required by ICC (IBC) section 1704.6.
3.02 SPECIAL INSPECTION AGENCY DUTIES AND RESPONSIBILITIES
A. Special Inspection Agency shall:
1. Verify samples submitted by Contractor comply with the referenced standards and the approved Contract Documents.
2. Provide qualified personnel at site. Cooperate with Architect and Contractor in performance of services.
3. Perform specified sampling and testing of products in accordance with specified reference standards.
4. Ascertain compliance of materials and products with requirements of Contract Documents.
5. Promptly notify Architect and Contractor of observed irregularities or non-compliance of work or products.
6. Perform additional tests and inspections required by Architect.
7. Submit reports of all tests or inspections specified.
B. Limits on Special Inspection Agency Authority:
1. Agency may not release, revoke, alter, or enlarge on requirements of Contract
Documents.
2. Agency may not approve or accept any portion of the work.
2/19/2026 100% Construction Documents
CODE-REQUIRED SPECIAL INSPECTIONS AND
PROCEDURES 01 45 33 - 4
3. Agency may not assume any duties of Contractor.
4. Agency has no authority to stop the work.
C. Re-testing required because of non-compliance with specified requirements shall be performed by the same agency on instructions by Architect.
D. Re-testing required because of non-compliance with specified requirements shall be paid for by Contractor.
3.03 TESTING AGENCY DUTIES AND RESPONSIBILITIES
A. Testing Agency Duties:
1. Provide qualified personnel at site. Cooperate with Architect and Contractor in performance of services.
2. Perform specified sampling and testing of products in accordance with specified standards.
3. Ascertain compliance of materials and mixes with requirements of Contract Documents.
4. Promptly notify Architect and Contractor of observed irregularities or non-compliance of work or products.
5. Perform additional tests and inspections required by Architect.
6. Submit reports of all tests or inspections specified.
B. Limits on Testing or Inspection Agency Authority:
1. Agency may not release, revoke, alter, or enlarge on requirements of Contract
Documents.
2. Agency may not approve or accept any portion of the work.
3. Agency may not assume any duties of Contractor.
4. Agency has no authority to stop the work.
C. On instructions by Architect, perform re-testing required because of non-compliance with specified requirements, using the same agency.
D. Contractor will pay for re-testing required because of non-compliance with specified requirements.
3.04 CONTRACTOR DUTIES AND RESPONSIBILITIES
A. Contractor Responsibilities, General:
1. Deliver to agency at designated location, adequate samples of materials for special inspections that require material verification.
2. Cooperate with agency and laboratory personnel; provide access to approved documents at project site, to the work, to manufacturers' facilities, and to fabricators' facilities.
3. Provide incidental labor and facilities:
a. To provide access to work to be tested or inspected.
b. To obtain and handle samples at the site or at source of Products to be tested or inspected.
c. To facilitate tests or inspections.
d. To provide storage and curing of test samples.
4. Notify Architect and laboratory 24 hours prior to expected time for operations requiring testing or inspection services.
5. Arrange with Owner's agency and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.
2/19/2026 100% Construction Documents
TEMPORARY EROSION AND SEDIMENT
CONTROL 01 57 13 - 1
SECTION 01 57 13
TEMPORARY EROSION AND SEDIMENT CONTROL
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Prevention of erosion due to construction activities.
B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities.
C. Restoration of areas eroded due to insufficient preventive measures.
D. Performance bond.
E. Compensation of Owner for fines levied by authorities having jurisdiction due to non-compliance by Contractor.
1.02 REFERENCE STANDARDS
A. ASTM D4355/D4355M - Standard Test Method for Deterioration of Geotextiles by Exposure to Light, Moisture, and Heat in a Xenon Arc-Type Apparatus; 2021.
B. ASTM D4491/D4491M - Standard Test Methods for Water Permeability of Geotextiles by Permittivity; 2022.
C. ASTM D4533/D4533M - Standard Test Method for Trapezoid Tearing Strength of Geotextiles;
2015 (Reapproved 2023).
D. ASTM D4632/D4632M - Standard Test Method for Grab Breaking Load and Elongation of Geotextiles; 2015a (Reapproved 2023).
E. ASTM D4751 - Standard Test Methods for Determining Apparent Opening Size of a Geotextile;
2021a.
F. ASTM D4873/D4873M - Standard Guide for Identification, Storage, and Handling of Geosynthetic Rolls and Samples; 2017 (Reapproved 2021).
1.03 PERFORMANCE REQUIREMENTS
A. Also comply with all more stringent requirements of State of Alaska Erosion and Sedimentation
Control Manual.
B. Comply with all requirements of State of Alaska or Palmer County for erosion and sedimentation control .
C. Develop and follow an Erosion and Sedimentation Prevention Plan and submit periodic inspection reports.
D. Do not begin clearing, grading, or other work involving disturbance of ground surface cover until applicable permits have been obtained; furnish all documentation required to obtain applicable permits.
1. Owner will obtain permits and pay for securities required by authority having jurisdiction.
E. Provide to Owner a Performance Bond covering erosion and sedimentation preventive measures only, in an amount equal to 100 percent of the cost of erosion and sedimentation control work.
F. Timing: Put preventive measures in place as soon as possible after disturbance of surface cover and before precipitation occurs.
G. Storm Water Runoff: Control increased storm water runoff due to disturbance of surface cover due to construction activities for this project.
1. Prevent runoff into storm and sanitary sewer systems, including open drainage channels, in excess of actual capacity or amount allowed by authorities having jurisdiction, whichever is less.
2/19/2026 100% Construction Documents
TEMPORARY EROSION AND SEDIMENT
CONTROL 01 57 13 - 2
2. Anticipate runoff volume due to the most extreme short term and 24-hour rainfall events that might occur in 25 years.
H. Erosion On Site: Minimize wind, water, and vehicular erosion of soil on project site due to construction activities for this project.
1. Control movement of sediment and soil from temporary stockpiles of soil.
2. Prevent development of ruts due to equipment and vehicular traffic.
3. If erosion occurs due to non-compliance with these requirements, restore eroded areas at no cost to Owner.
I. Erosion Off Site: Prevent erosion of soil and deposition of sediment on other properties caused by water leaving the project site due to construction activities for this project.
1. Prevent windblown soil from leaving the project site.
2. Prevent tracking of mud onto public roads outside site.
3. Prevent mud and sediment from flowing onto sidewalks and pavements.
4. If erosion occurs due to non-compliance with these requirements, restore eroded areas at no cost to Owner.
J. Sedimentation of Waterways On Site: Prevent sedimentation of waterways on the project site, including rivers, streams, lakes, ponds, open drainage ways, storm sewers, and sanitary sewers.
1. If sedimentation occurs, install or correct preventive measures immediately at no cost to
Owner; remove deposited sediments; comply with requirements of authorities having jurisdiction.
2. If sediment basins are used as temporary preventive measures, pump dry and remove deposited sediment after each storm.
K. Sedimentation of Waterways Off Site: Prevent sedimentation of waterways off the project site, including rivers, streams, lakes, ponds, open drainage ways, storm sewers, and sanitary sewers.
1. If sedimentation occurs, install or correct preventive measures immediately at no cost to
Owner; remove deposited sediments; comply with requirements of authorities having jurisdiction.
L. Open Water: Prevent standing water that could become stagnant.
M. Maintenance: Maintain temporary preventive measures until permanent measures have been established.
1.04 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Erosion and Sedimentation Control Plan:
1. Include:
a. Site plan identifying soils and vegetation, existing erosion problems, and areas vulnerable to erosion due to topography, soils, vegetation, or drainage.
b. Site plan showing grading; new improvements; temporary roads, traffic accesses, and other temporary construction; and proposed preventive measures.
c. Where extensive areas of soil will be disturbed, include storm water flow and volume calculations, soil loss predictions, and proposed preventive measures.
d. Schedule of temporary preventive measures, in relation to ground disturbing activities.
e. Other information required by law.
f. Format required by law is acceptable, provided any additional information specified is also included.
2. Obtain the approval of the Plan by authorities having jurisdiction.
3. Obtain the approval of the Plan by Owner.
2/19/2026 100% Construction Documents
TEMPORARY EROSION AND SEDIMENT
CONTROL 01 57 13 - 3
C. Certificate: Mill certificate for silt fence fabric attesting that fabric and factory seams comply with specified requirements, signed by legally authorized official of manufacturer; indicate actual minimum average roll values; identify fabric by roll identification numbers.
D. Inspection Reports: Submit report of each inspection; identify each preventive measure, indicate condition, and specify maintenance or repair required and accomplished.
PART 2 PRODUCTS
2.01 MATERIALS
A. Grass Seed For Temporary Cover: Select a species appropriate to climate, planting season, and intended purpose. If same area will later be planted with permanent vegetation, do not use species known to be excessively competitive or prone to volunteer in subsequent seasons.
B. Silt Fence Fabric: Polypropylene geotextile resistant to common soil chemicals, mildew, and insects; non-biodegradable; in longest lengths possible; fabric including seams with the following minimum average roll lengths:
1. Average Opening Size: 30 U.S. Std. Sieve (0.600 mm), maximum, when tested in accordance with ASTM D4751.
2. Permittivity: 0.05 sec^-1, minimum, when tested in accordance with ASTM
D4491/D4491M.
3. Ultraviolet Resistance: Retaining at least 70 percent of tensile strength, when tested in accordance with ASTM D4355/D4355M after 500 hours exposure.
4. Tensile Strength: 100 pounds-force (450 N), minimum, in cross-machine direction; 124 pounds-force (550 N), minimum, in machine direction; when tested in accordance with
ASTM D4632/D4632M.
5. Elongation: 15 to 30 percent, when tested in accordance with ASTM D4632/D4632M.
6. Tear Strength: 55 pounds-force (245 N), minimum, when tested in accordance with ASTM
D4533/D4533M.
7. Color: Manufacturer's standard, with embedment and fastener lines preprinted.
C. Silt Fence Posts: One of the following, minimum 5 feet (1500 mm) long:
1. Steel U- or T-section, with minimum mass of 1.33 pound per linear foot (1.98 kg per linear m).
2. Softwood, 4 by 4 inches (100 by 100 mm) in cross section.
3. Hardwood, 2 by 2 inches (50 by 50 mm) in cross section.
D. Gravel: See Section 31 23 23 for aggregate.
E. Concrete: See Section 03 30 00.
PART 3 EXECUTION
3.01 EXAMINATION
A. Examine site and identify existing features that contribute to erosion resistance; maintain such existing features to greatest extent possible.
3.02 PREPARATION
A. Schedule work so that soil surfaces are left exposed for the minimum amount of time.
3.03 SCOPE OF PREVENTIVE MEASURES
A. In all cases, if permanent erosion resistant measures have been installed temporary preventive measures are not required.
B. Construction Entrances: Traffic-bearing aggregate surface.
1. Width: As required; 20 feet (7 m), minimum.
2. Length: 50 feet (16 m), minimum.
3. Provide at each construction entrance from public right-of-way.
2/19/2026 100% Construction Documents
TEMPORARY EROSION AND SEDIMENT
CONTROL 01 57 13 - 4
4. Where necessary to prevent tracking of mud onto right-of-way, provide wheel washing area out of direct traffic lane, with drain into sediment trap or basin.
C. Linear Sediment Barriers: Made of silt fences.
1. Provide linear sediment barriers:
a. Along downhill perimeter edge of disturbed areas, including soil stockpiles.
b. Across the entrances to culverts that receive runoff from disturbed areas.
2. Space sediment barriers with the following maximum slope length upslope from barrier:
a. Slope of Less Than 2 Percent: 100 feet (30 m)..
b. Slope Between 2 and 5 Percent: 75 feet (23 m).
c. Slope Between 5 and 10 Percent: 50 feet (15 m).
d. Slope Between 10 and 20 Percent: 25 feet (7.5 m).
e. Slope Over 20 Percent: 15 feet (4.5 m).
D. Storm Drain Curb Inlet Sediment Trap: Protect each curb inlet using one of the following measures:
1. Filter fabric wrapped around hollow concrete blocks blocking entire inlet face area; use one piece of fabric wrapped at least 1-1/2 times around concrete blocks and secured to prevent dislodging; orient cores of blocks so runoff passes into inlet.
2. Straw bale row blocking entire inlet face area; anchor into pavement.
E. Storm Drain Drop Inlet Sediment Traps: As detailed on drawings.
F. Temporary Splash Pads: Stone aggregate over filter fabric; size to suit application; provide at downspout outlets and storm water outlets.
G. Soil Stockpiles: Protect using one of the following measures:
1. Cover with polyethylene film, secured by placing soil on outer edges.
2. Cover with mulch at least 4 inches (100 mm) thickness of pine needles, sawdust, bark, wood chips, or shredded leaves, or 6 inches (150 mm) of straw or hay.
H. Mulching: Use only for areas that may be subjected to erosion for less than 6 months.
I. Temporary Seeding: Use where temporary vegetated cover is required.
3.04 INSTALLATION
A. Traffic-Bearing Aggregate Surface:
1. Excavate minimum of 6 inches (150 mm).
2. Place geotextile fabric full width and length, with minimum 12 inch (300 mm) overlap at joints.
3. Place and compact at least 6 inches (150 mm) of 1 1/2 to 3 1/2 inch (40 to 90 mm) diameter stone.
B. Silt Fences:
1. Store and handle fabric in accordance with ASTM D4873/D4873M.
2. Where slope gradient is less than 3:1 or barriers will be in place less than 6 months, use nominal 16 inch (405 mm) high barriers with minimum 36 inch (905 mm) long posts spaced at 6 feet (1830 mm) maximum, with fabric embedded at least 4 inches (100 mm) in ground.
3. Where slope gradient is steeper than 3:1 or barriers will be in place over 6 months, use nominal 28 inch (710 mm) high barriers, minimum 48 inch (1220 mm) long posts spaced at 6 feet (1830 mm) maximum, with fabric embedded at least 6 inches (150 mm) in ground.
4. Where slope gradient is steeper than 3:1 and vertical height of slope between barriers is more than 20 feet (6 m), use nominal 32 inch (810 mm) high barriers with woven wire reinforcement and steel posts spaced at 4 feet (1220 mm) maximum, with fabric embedded at least 6 inches (150 mm) in ground.
5. Install with top of fabric at nominal height and embedment as specified.
2/19/2026 100% Construction Documents
TEMPORARY EROSION AND SEDIMENT
CONTROL 01 57 13 - 5
6. Do not splice fabric width; minimize splices in fabric length; splice at post only, overlapping at least 18 inches (460 mm), with extra post.
7. Fasten fabric to wood posts using one of the following:
a. Four nails per post with 3/4 inch (19 mm) diameter flat or button head, 1 inch (25 mm) long, and 14 gauge, 0.083 inch (2.11 mm) shank diameter.
b. Five staples per post with at least 17 gauge, 0.0453 inch (1.150 mm) wire, 3/4 inch
(19 mm) crown width and 1/2 inch (12 mm) long legs.
8. Fasten fabric to steel posts using wire, nylon cord, or integral pockets.
9. Wherever runoff will flow around end of barrier or over the top, provide temporary splash pad or other outlet protection; at such outlets in the run of the barrier, make barrier not more than 12 inches (300 mm) high with post spacing not more than 4 feet (1220 mm).
C. Temporary Seeding:
1. When hydraulic seeder is used, seedbed preparation is not required.
2. When surface soil has been sealed by rainfall or consists of smooth undisturbed cut slopes, and conventional or manual seeding is to be used, prepare seedbed by scarifying sufficiently to allow seed to lodge and germinate.
3. If temporary mulching was used on planting area but not removed, apply nitrogen fertilizer at 1 pound per 1000 sq ft (0.5 kg per 100 sq m).
4. On soils of very low fertility, apply 10-10-10 fertilizer at rate of 12 to 16 pounds per 1000 sq ft (6 to 8 kg per 100 sq m).
5. Incorporate fertilizer into soil before seeding.
6. Apply seed uniformly; if using drill or cultipacker seeders place seed 1/2 to 1 inch (12 to 25
mm) deep.
7. Irrigate as required to thoroughly wet soil to depth that will ensure germination, without causing runoff or erosion.
8. Repeat irrigation as required until grass is established.
3.05 MAINTENANCE
A. Inspect preventive measures weekly, within 24 hours after the end of any storm that produces
0.5 inches (13 mm) or more rainfall at the project site, and daily during prolonged rainfall.
B. Repair deficiencies immediately.
C. Silt Fences:
1. Promptly replace fabric that deteriorates unless need for fence has passed.
2. Remove silt deposits that exceed one-third of the height of the fence.
3. Repair fences that are undercut by runoff or otherwise damaged, whether by runoff or other causes.
D. Clean out temporary sediment control structures weekly and relocate soil on site.
E. Place sediment in appropriate locations on site; do not remove from site.
3.06 CLEAN UP
A. Remove temporary measures after permanent measures have been installed, unless permitted to remain by Architect.
B. Clean out temporary sediment control structures that are to remain as permanent measures.
C. Where removal of temporary measures would leave exposed soil, shape surface to an acceptable grade and finish to match adjacent ground surfaces.
2/19/2026 100% Construction Documents
SELECTIVE DEMOLITION 02 41 19 - 1
SECTION 02 41 19
SELECTIVE DEMOLITION
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Demolition and removal of selected site elements.
1.02 REFERENCE STANDARDS
A. American National Standards Institute (ANSI) A10.6: Safety Requirements for Demolition
Operations.
B. National Fire Protection Agency (NFPA) 241: Standard for Safeguarding Construction, Alteration, and Demolition Operations.
C. Resilient Floor Covering Institute (RFCI): Recommended Work Practices for Removal of
Resilient Floor Coverings.
1.03 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
1.04 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
1.05 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review structural load limitations of existing structure.
3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.
4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
5. Review areas where existing construction is to remain and requires protection.
1.06 INFORMATIONAL SUBMITTALS
A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property for environmental protection, for dust control and, for noise control. Indicate proposed locations and construction of barriers.
B. Schedule of Selective Demolition Activities: Indicate the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's on-site operations are uninterrupted.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
4. Use of elevator and stairs.
5. Coordination of Owner's continuing occupancy of portions of existing building and of
Owner's partial occupancy of completed Work.
C. Predemolition Photographs or Video: Show existing conditions of adjoining construction, including finish surfaces, that might be misconstrued as damage caused by demolition operations. Submit before Work begins.
2/19/2026 100% Construction Documents
SELECTIVE DEMOLITION 02 41 19 - 2
1.07 QUALITY ASSURANCE
A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition work similar in material and extent to that indicated for this Project.
B. Pre-Demolition Conference: Conduct conference at Project site to review methods and procedures related to selective demolition including, but not limited to, the following:
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review structural load limitations of existing structure.
3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.
4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
5. Review areas where existing construction is to remain and requires protection.
1.08 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area.
Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. If suspected hazardous materials are encountered, do not disturb; immediately notify
Architect and Owner. Hazardous materials will be removed by Owner.
E. Utility Service:
1. Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
2. Maintain fire-protection facilities in service during selective demolition operations.
1.09 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties.
1.10 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with Owner's operations.
PART 2 PRODUCTS
2.01 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Survey existing conditions and correlate with requirements indicated to determine extent of selec-tive demolition required.
2/19/2026 100% Construction Documents
SELECTIVE DEMOLITION 02 41 19 - 3
C. When unanticipated mechanical, electrical, or structural elements that conflict with intended func-tion or design are encountered, investigate and measure the nature and extent of conflict.
Promptly submit a written report to Architect.
D. Perform surveys as the Work progresses to detect hazards resulting from selective demolition ac-tivities.
3.02 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. Owner will arrange to shut off indicated services/systems when requested by Contractor.
2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
3. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.
c. Equipment to Be Removed: Disconnect and cap services and remove equipment.
d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
e. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
f. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.
3.03 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Cover and protect furniture, furnishings, and equipment that have not been removed.
5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Section 01 56 00 "Temporary Barriers and Enclosures."
B. Remove temporary barricades and protections where hazards no longer exist.
3.04 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
2/19/2026 100% Construction Documents
SELECTIVE DEMOLITION 02 41 19 - 4
Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
4. Maintain adequate ventilation when using cutting torches.
5. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
6. Dispose of demolished items and materials promptly.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
D. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition.
3.05 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Concrete: Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals using power-driven saw, and then remove concrete between saw cuts.
B. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts.
C. Resilient Floor Coverings: Remove floor coverings and adhesive according to recommendations in RFCI's "Recommended Work Practices for the Removal of Resilient Floor Coverings."
D. Roofing: Remove no more existing roofing than what can be covered in one day by new roofing and so that building interior remains watertight and weathertight. See Section 07 54 00 - Thermoplastic Membrane Roofing for new roofing requirements.
3.06 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction and recycle or dispose of them as required.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
B. Burning: Do not burn demolished materials.
3.07 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
2/19/2026 100% Construction Documents
SELECTIVE DEMOLITION 02 41 19 - 5
2/19/2026 100% Construction Documents
CAST-IN-PLACE CONCRETE 03 30 00 - 1
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Concrete formwork.
B. Floors and slabs on grade.
C. Concrete shear walls, elevator shaft walls, and foundation walls.
D. Concrete reinforcement.
E. Joint devices associated with concrete work.
F. Miscellaneous concrete elements, including equipment pads, equipment pits, light pole bases, flagpole bases, thrust blocks, and manholes.
G. Concrete curing.
1.02 RELATED REQUIREMENTS
A. Section 07 92 00 - Joint Sealants: Products and installation for sealants and joint fillers for saw cut joints and isolation joints in slabs.
1.03 REFERENCE STANDARDS
A. ACI CODE-318 - Building Code Requirements for Structural Concrete and Commentary; 2019 (Reapproved 2022).
B. ACI PRC-211.1 - Selecting Proportions for Normal-Density and High Density-Concrete - Guide;
2022.
C. ACI PRC-302.1 - Guide to Concrete Floor and Slab Construction; 2015.
D. ACI PRC-304 - Guide for Measuring, Mixing, Transporting, and Placing Concrete; 2000
(Reapproved 2009).
E. ACI PRC-306 - Guide to Cold Weather Concreting; 2016.
F. ACI PRC-308 - Guide to External Curing of Concrete; 2016.
G. ACI PRC-347 - Guide to Formwork for Concrete; 2014 (Reapproved 2021).
H. ACI SPEC-117 - Specification for Tolerances for Concrete Construction and Materials; 2010
(Reapproved 2015).
I. ACI SPEC-301 - Specifications for Concrete Construction; 2020.
J. ASTM A615/A615M - Standard Specification for Deformed and Plain Carbon-Steel Bars for
Concrete Reinforcement; 2024.
K. ASTM A1064/A1064M - Standard Specification for Carbon-Steel Wire and Welded Wire
Reinforcement, Plain and Deformed, for Concrete; 2024.
L. ASTM C33/C33M - Standard Specification for Concrete Aggregates; 2024a.
M. ASTM C39/C39M - Standard Test Method for Compressive Strength of Cylindrical Concrete
Specimens; 2024.
N. ASTM C109/C109M - Standard Test Method for Compressive Strength of Hydraulic Cement
Mortars (Using 50 mm [2 in.] Cube Specimens); 2024.
O. ASTM C143/C143M - Standard Test Method for Slump of Hydraulic-Cement Concrete; 2020.
P. ASTM C150/C150M - Standard Specification for Portland Cement; 2024.
Q. ASTM C173/C173M - Standard Test Method for Air Content of Freshly Mixed Concrete by the
Volumetric Method; 2024a.
R. ASTM C260/C260M - Standard Specification for Air-Entraining Admixtures for Concrete; 2024.
2/19/2026 100% Construction Documents
CAST-IN-PLACE CONCRETE 03 30 00 - 2
S. ASTM C494/C494M - Standard Specification for Chemical Admixtures for Concrete; 2024.
T. ASTM C685/C685M - Standard Specification for Concrete Made by Volumetric Batching and
Continuous Mixing; 2024.
U. ASTM C827/C827M - Standard Test Method for Change in Height at Early Ages of Cylindrical
Specimens of Cementitious Mixtures; 2023.
V. ASTM C881/C881M - Standard Specification for Epoxy-Resin-Base Bonding Systems for
Concrete; 2020a.
W. ASTM C1107/C1107M - Standard Specification for Packaged Dry, Hydraulic-Cement Grout
(Nonshrink); 2020.
X. ASTM C1602/C1602M - Standard Specification for Mixing Water Used in the Production of
Hydraulic Cement Concrete; 2022.
Y. ASTM D8139 - Standard Specification for Semi-Rigid, Closed-Cell Polypropylene Foam, Preformed Expansion Joint Fillers for Concrete Paving and Structural Construction; 2023.
Z. ASTM E1643 - Standard Practice for Selection, Design, Installation, and Inspection of Water
Vapor Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs; 2024.
AA. ASTM E1745 - Standard Specification for Plastic Water Vapor Retarders Used in Contact with
Soil or Granular Fill under Concrete Slabs; 2017 (Reapproved 2023).
1.04 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements for submittal procedures.
B. Product Data: Submit manufacturers' data on manufactured products showing compliance with specified requirements and installation instructions.
1. For curing compounds, provide data on method of removal in the event of incompatibility with floor covering adhesives.
C. Mix Design: Submit proposed concrete mix design.
1. Indicate proposed mix design complies with requirements of ACI SPEC-301, Section 4 - Concrete Mixtures.
2. Indicate proposed mix design complies with requirements of ACI CODE-318, Chapter 5 - Concrete Quality, Mixing and Placing.
D. Samples: Submit samples of underslab vapor retarder to be used.
E. Test Reports: Submit report for each test or series of tests specified.
1.05 QUALITY ASSURANCE
A. Perform work of this section in accordance with ACI SPEC-301 and ACI CODE-318.
B. Follow recommendations of ACI PRC-306 when concreting during cold weather.
PART 2 PRODUCTS
2.01 FORMWORK
A. Formwork Design and Construction: Comply with guidelines of ACI PRC-347 to provide formwork that will produce concrete complying with tolerances of ACI SPEC-117.
B. Form Materials: Contractor's choice of standard products with sufficient strength to withstand hydrostatic head without distortion in excess of permitted tolerances.
1. Form Facing for Exposed Finish Concrete: Contractor's choice of materials that will provide smooth, stain-free final appearance.
2. Earth Cuts: Do not use earth cuts as forms for vertical surfaces. Natural rock formations that maintain a stable vertical edge may be used as side forms.
3. Form Coating: Release agent that will not adversely affect concrete or interfere with application of coatings.
2/19/2026 100% Construction Documents
CAST-IN-PLACE CONCRETE 03 30 00 - 3
4. Form Ties: Cone snap type that will leave no metal within 1-1/2 inches (38 mm) of concrete surface.
2.02 REINFORCEMENT MATERIALS
A. Reinforcing Steel: ASTM A615/A615M, Grade 60 (60,000 psi) (420 MPa).
1. Type: Deformed billet-steel bars.
2. Finish: Unfinished, unless otherwise indicated.
B. Steel Welded Wire Reinforcement (WWR): Galvanized,…
This is the start of the file's text. The full file is on GovTribe.