4 20260219_Palmer_Courthouse_100_Construction_Documents_Part1.pdf

PDF 19 MB Posted

Attached to
Palmer Courthouse Expansion Construction
Solicitation number
Not on record
Issued by
Matanuska-Susitna Borough, Alaska

About this file

This file comprises 100% construction documents for the Palmer Courthouse Renovation & Expansion project, a joint undertaking between the Alaska Court System and Stantec Architecture Inc. The project involves renovation and expansion of the Palmer Courthouse located at 515 East Dahlia Avenue, Palmer, Alaska 99645, with work encompassing four primary areas: Area M (Modular Expansion), Area B (Basement Renovation), Area P (Courthouse Renovation), and Area C (Connector Renovation). The construction documents, issued February 19, 2026, include comprehensive architectural, structural, mechanical, electrical, plumbing, and civil design drawings, along with detailed specifications for finishes, door and window schedules, partition types, interior details, and accessibility compliance requirements. The project is classified as Type V one-hour wood frame construction under the Alaska Building Code 2015, with a sprinklered design permitting unlimited building area in the B occupancy classification. The modular addition functions as a jury assembly space accommodating 70 occupants, while the connector area includes three courtrooms and associated judicial office spaces totaling approximately 116 occupants.

The construction documents establish specific compliance requirements including full adherence to ADA accessibility standards, OSHA requirements, local fire codes, and manufacturer specifications for all building systems. The contractor is responsible for verifying all dimensions in the field, coordinating with the owner's representative for site mobilization and temporary utilities, and managing all cutting, removing, or altering of existing building utilities and life safety systems. Deferred submittals include fire protection systems (sprinklers and fire alarm), security access control systems, audio/video installations, and signage, with furniture and equipment noted as owner-furnished. The project incorporates 1-hour fire-rated partitions, acoustic insulation on all interior walls, deflection tracking per structural requirements, and firestopping materials at all rated wall penetrations. General contractor responsibilities include installing temporary fire extinguishers, maintaining unobstructed exits, cutting and framing all openings for other trades, and coordinating with building department and health department approved permit drawings throughout the construction phase.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .