This is a Special Provisions document for the Borough of West Conshohocken related to the MacKenzie Park Workout Stations Phase 2E project. The contract involves the removal of existing non-conforming handicap ramps and their replacement with ramps that comply with current federal regulations and requirements. Work must commence no later than January 15, 2027, and be completed by April 15, 2027. Once a contractor begins removing existing handicap ramps, excavation, disposal, subbase preparation, and installation of new conforming ramps must be completed within five consecutive days. All new handicap ramps must be verified by field survey to ensure compliance with federal requirements before installation. No work extensions will be granted. Bidders must submit qualifications documentation demonstrating similar work completed within the previous five years, including project locations, contract amounts with change orders, work dates, detailed narratives, and contact information for the awarding agencies. Weekly or bi-monthly construction progress meetings are mandatory. The contractor must maintain access for residents, businesses, emergency services, and municipal services throughout the project duration and complete all work within any particular right-of-way area within thirty days of commencement.
All unit prices submitted in the proposal shall remain in effect for the contract duration. The contractor is responsible for all excavation, material disposal, and stabilization of previously excavated areas, with these costs included in the bid prices. All materials require Certificates of Conformance submitted in triplicate before work begins. The contractor must obtain pre-construction video documentation establishing baseline conditions, provide comprehensive dust control measures including water wagon application and power broom sweeping at least three times weekly, and maintain all roads and right-of-ways in level condition free from holes or obstructions. The contractor is required to coordinate activities with other contractors working in the borough and must comply with the nuisance ordinance regarding work hours. Restoration work must commence within thirty days of project completion on any particular street unless written permission from the engineer is provided. The borough reserves the right to deduct costs from payment if the contractor fails to perform maintenance or dust control procedures adequately.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01001-1
SECTION 01001
SPECIAL PROVISIONS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. This contract includes the removal of existing non-conforming handicap ramps and replacing them with handicap ramps that comply with new regulations and requirements.
1.2 CONTRACT SCHEDULE AND COMPLETION DATES
A. The following is a MANDATORY schedule for the contract. The roads encompassed in each of the following phases are depicted in the Contract
Drawings.
Milestone Date
Commence Work no later than _Jan 15, 2027__________
Complete Work no later than __Apr 15, 2027_______
B. Once the Contractor begins removal of the existing HANDICAP RAMPS, they must complete the handicap ramp excavation and disposal, subbase preparation and installation of the new conforming handicap ramp within five (5) consecutive days.
C. In no instance shall any of the proposed handicap ramps be installed until it has been verified by a field survey that the new installed handicap ramp will comply with all Federal requirements.
D. The above completion dates shall apply to all work, including final restoration.
E. All unit prices bid in the Form of Proposal shall remain in effect for the duration of the Contract, irrespective of the above milestones.
F. The successful bidder shall take the above stipulations into consideration when preparing their bid. It shall be assumed that they have prepared their bid and entered into Contract in full contemplation of the above.
01001-2
1.3 PRE-CONSTRUCTION VIDEO
A. Prior to the commencement of any work or the mobilization of any equipment or materials, the Contractor must obtain the services of a qualified professional to videotape the existing features adjacent to the route of proposed construction activity. The purpose of this video is to establish the pre-construction conditions of the area, so a determination of the required restoration can be made upon completion of the project.
The video as a minimum shall show the entire cartway from curb to curb, all intersecting streets for a minimum of 100-feet from the primary road, all curbing and sidewalk (in detail) on both sides of the primary road and intersecting streets, and all features within 50-feet beyond the face of the curb or edge of pavement.
Standard size DVD’s, shall be used. One (1) copy shall be presented to the
Owner, and one (1) copy should be presented to the Engineer at the pre-construction meeting.
1.4 QUALIFICATIONS
A. Each bidder shall be required to submit with their sealed proposal a list of work of similar scope and magnitude performed in the last five (5) years. The list as a minimum shall include the following:
1. Location of project.
2. Total Contract Amount (including change orders).
3. Dates work was performed.
4. Detailed narrative of work performed.
5. Name, address and telephone number of contact person for the awarding agency.
B. Any proposal not accompanied by the above qualifications statement may be deemed non-responsive and may not be considered by the Borough.
C. The Borough has the right to reject any bidders who do not demonstrate adequate experience and qualifications.
1.5 COORDINATION
A. The Contractor shall be required to coordinate all of their activities with other
Contractors working throughout the Borough.
01001-3
B. The successful bidder shall take the above into consideration when preparing this bid. It shall be assumed that they have prepared their bid and entered into contract in full contemplation of this requirement.
C. No Contract extensions will be granted, nor will the Contractor be entitled to any claims resulting from the lack of proper coordination.
1.6 CONSTRUCTION PROGRESS MEETINGS
A. Weekly or bi-monthly meetings may be held during the duration of the contract to discuss the status and progress of construction. Attendance by the contractor is mandatory. The dates, place and times of the meeting will be scheduled upon mutual consensus of the Borough, Engineer and Contractor.
1.7 WORK IN RESIDENTIAL AND COMMERCIAL (BUSINESS) AREAS
A. For work within a residential area the Contractor must ensure that all residents are able to conveniently and safely access their property at all times.
B. The Contractor must ensure that typical (normal) daily and emergency access is provided for Municipal Trash removal services, public and private school bus services, and all other Municipal and Emergency services to the project area.
C. For work in a commercial (business) area the Contractor must ensure that all business owners, patrons, delivery personnel are able to conveniently and safely access their business and property at all times.
1.8 WORK WITHIN EASEMENTS
A. ONCE THE CONTRACTOR DISTURBS A RIGHT-OF-WAY AREA IN
ANY MANNER, THEY MUST CONTINUE TO WORK WITHIN THE
RIGHT-OF-WAY AREA AND ENDEAVOR TO COMPLETE THE WORK
AS EXPEDITIOUSLY AS POSSIBLE. MOREOVER, ALL WORK MUST
BE COMPLETED WITHIN 30-DAYS OF COMMENCEMENT OF WORK
IN ANY PARTICULAR RIGHT-OF-WAY AREA.
1.9 EXISTING CONDITIONS
A. IN MANY INSTANCES, THE NEW ADA HANDICAP RAMPS WILL BE IN
CLOSE PROXIMITY TO EXISTING STRUCTURES/UTILITIES OR IN
01001-4
PREVIOUSLY EXCAVATED AREAS. THE CONTRACTOR WILL BE
RESPONSIBLE FOR ALL MEASURES NECESSARY TO STABILIZE THE
EXCAVATED AREAS. THE CONTRACTOR SHALL INCLUDE THE COST
OF THIS WORK IN THE PRICES BID.
B. THE CONTRACTOR SHALL BE AWARE THAT ALL EXCAVATION
REQUIRED TO INSTALL THE NEW ADA HANDICAP RAMPS IS
UNCLASSIFIED. AS SUCH, THE CONTRACTOR IS RESPONSIBLE FOR
EXCAVATION AND DISPOSAL OF ALL MATERIAL NECESSARY TO
INSTALL THE ADA HANDICAP RAMPS TO THE PROPOSED LINE AND
GRADES. THIS INCLUDES BUT IS NOT LIMITED TO THE REMOVAL OF
ALL ROCK, EVEN IF THE EXISTING SIDEWALK AND HANDICAP
RAMPS WAS NOT CONSTRUCTED TO THE LINE AND GRADE
INDICATED ON THE PLANS. THE CONTRACTOR SHALL INCLUDE THE
COST OF THIS WORK IN THE PRICES BID.
1.10 QUANTITY OF STORED MATERIALS
A. Storage of materials shall in no instance block vehicular or pedestrian access to any business or residence, nor shall they block sidewalk areas or present a hazard in any manner. In no instance shall any materials or equipment be stored on private property.
1.11 NUISANCE ORDINANCE
A. The Contractor shall comply with the Nuisance Ordinance for the duration of the project. No work whatsoever, or operation of machinery, may be performed before or after the stated hours or on a Sunday, unless written permission is provided by the Borough.
1.12 FAILURE TO PERFORM WORK IN ACCORDANCE WITH SPECIFICATIONS
A. If during the duration of this contract, the Contractor fails or refuses to perform work in accordance with the specifications and/or the direction of the Borough or
Engineer, the Borough, may at his discretion, order the Contractor to correct the deficient work and may hold the dollar value of such deficient work from any monies due or become due to the Contractor until the work is corrected to his satisfaction. If such an instance occurs, the Contractor shall have no claim for extra time and/or money as a result of any circumstances related to the deficient work included but not limited to any delays of future work, delivery of materials or interest earned on the monies withheld.
01001-5
The contractor shall take the above into consideration when preparing the bid and it shall be assumed that they have prepared their bid and entered into contract in full contemplation of these stipulations.
1.13 PERMANENT RESTORATION
A. The Contractor must commence with restoration work within thirty (30) days after the completion of the work on any particular street, or easement, unless written permission to the contrary is given by the Engineer. The Engineer shall have the final determination as to the point when the work is complete. If only minor items remain, the Engineer may order the Contractor to commence restoration work. In no event shall completion of the work in any particular area be delayed for the sole purpose of delaying restoration work.
1.14 CERTIFICATES OF CONFORMANCE
A. Before any work is started, Certificates of Conformance for all materials shall be submitted to the Engineer, in triplicate, proving conformance with specifications.
1.15 PUBLIC UTILITIES
A. The Contractor is required to fully inform their selves concerning location of public utilities on, under or over the project which may or may not require removal, resetting, construction or reconstruction and which may interfere with the operations. They shall be assumed to have prepared the bid and entered into contract in full contemplation of the conditions to be encountered and their responsibility in connection therewith. The Contractor shall use special care in execution of the work in order to avoid interference or damage to any operating utilities. When there is any possibility of such interference or damage, the
Contractor shall make satisfactory arrangements with responsible officers or owners of the utilities covering the necessary precautions to be used during the performance of the work by the Contractor. Such arrangements shall be made before work is started and shall be subject to the approval of the Engineer, which approval will not be considered as releasing the Contractor from any responsibility for acts of himself or his representatives.
B. The Contractor shall note that public utilities may be in close proximity with the existing and proposed handicap ramp locations. Proper measures must be taken to assure that these utilities are protected and preserved.
01001-6
1.16 DUST CONTROL
A. The Contractor must provide means to immediately remove any excavated material which is to be discarded. The material must be loaded directly onto the trucks and will not be permitted to be stockpiled for later removal.
B. The Contractor must also have on-site at all times a water wagon to minimize the amount of residual dust created during the construction activities. Application will be as required, or as directed, by the Engineer.
C. At least three times a week, the Contractor must employ a power broom or street sweeper to remove all residual dirt, stone and other debris from the entire cartway. This requirement does not release the Contractor from thoroughly cleaning the roadway at the end of each day.
D. The cost for all necessary dust control procedures shall be included in the unit price of the various quantities and will not be measured for payment separately.
E. If the contractor fails to perform the necessary procedures, the work will be performed by the Borough, and all costs incurred by the Borough deducted from the monies due or become due to the Contractor.
1.17 TRENCHING (DELETED)
1.18 STAGING AREA
A. The Contractor shall only be permitted to maintain staging areas at location(s) approved by the Borough. If the Contractor plans to utilize either private or public property for staging areas they should obtain the necessary approvals from the
Borough prior to submitting their bid.
B. The Contractor shall also be permitted to negotiate with local property Owners to obtain additional staging areas.
C. At the completion of work, the staging area will be restored to at least its original condition.
1.19 MATERIAL TESTING
A. Compaction testing of all backfill material may be completed in accordance with
Section 02260.
01001-7
B. Testing of all concrete placed must be completed in accordance with Section
03300. Also, certificates of compliance and batch design slips must be submitted with each load of concrete delivered to the site.
C. Bituminous paving may be tested for compaction and will be cored to check for compliance to PennDOT standard specifications.
1.20 MAINTENANCE OF ROADWAY
A. The Contractor shall be required to maintain all roads and right-of-ways for the duration of the Contract. All roads shall be level and free from any holes, divots, depressions, or other encumbrances that will preclude normal vehicular traffic.
B. Should the contractor fail to maintain the road in a reasonable manner, or respond to Borough requests for maintenance, the Borough may retain the services of qualified professionals to remedy the situation to the extent deemed necessary. All monies for such services will then be deducted from payment to the Contractor.
END OF SECTION
END OF SECTION