17-3.0 MacKenzie Park Phase 2E Plans (Issued for Bid).pdf

PDF 13 MB Posted

Attached to
MacKenzie Park Workout Stations Phase 2E
Solicitation number
US.262761
Issued by
Montgomery County, Pennsylvania

About this file

This document consists of the design plans and specifications for MacKenzie Park Workout Stations Phase 2E, a public improvement project issued for bid by the Borough of West Conshohocken, Pennsylvania. The project involves the installation of outdoor fitness equipment and safety improvements within MacKenzie Park along an existing walking trail. The scope of work includes installation of seven workout stations featuring cardio and strength training equipment (cardio walker, chest press, lateral pull down, leg extension, leg press, recumbent cycle, trapeze rack, assisted functional trainer, hi-lo chin up bar, sit-up station, and balance beam), all to be placed on mulch safety surfaces totaling approximately 100 square feet. The site is located at 112 Ford Street, West Conshohocken, PA 19428 in Montgomery County. Sealed bids are due December 4, 2026 at 11:00 A.M., with bid documents available through PennBid (www.PennBid.net). Hard copies are available for purchase, and project drawings may be inspected at the Borough offices. The contract award will be made following the bid opening, with no specific contract term or renewal options indicated in the documents.

The estimated project cost is $100.00 for document purchase. Bidders must submit an unconditional bid accompanied by a certified check or bid bond equal to not less than ten percent (10%) of the bid amount, payable to the Borough of West Conshohocken. The successful bidder will be required to provide Performance and Labor and Material Bonds equal to one hundred percent (100%) of the contract amount, a Maintenance Bond of twenty-five percent (25%) of the total contract price, and a Certificate of Insurance. All bids must comply with Pennsylvania Prevailing Wage requirements. No bid withdrawals are permitted within sixty (60) days after the scheduled bid closing time. The project is funded in part through the Montgomery County Montco 2040 Implementation Grant Program, as indicated in the design specifications. The Borough reserves the right to waive any informality or reject any or all bids. Design and engineering services were provided by Pennoni Associates Inc., with plans issued for bid on October 13, 2026 and revised October 27, 2026 per Montgomery County Planning Commission comments.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U:

\A cc ou nt s\W

CO

NM

\w co nm

- m ck en zie p ar k i m pr ov em en ts pr oje ct\

DE

SI

GN

SH

EE

TS

\6 ph as e

2e w or ko ut st at ion s\P lan s\C S0

1.

dw g

PL

OT

TE

D:

/2 9/

:2

PM,

B Y:

An ge na T ra n

PL

OT

ST

YL

E:

Pe nn on i N

CS

.st b

PR

OJ

EC

T

ST

AT

US

CS0001

BY

N

O

D

AT

E R

EV

IS

IO

N

S

PH

AS

E 2E

M

AC

KE

N

ZI

E

PA

R

K W

O R

KO

U

T

ST

AT

IO

N S

C H

U R

C H

S

TR

EE

T

W

ES

T C

O N

SH

O

H O

C

KE

N ,P

A

FO

R

D S

TR

EE

T W

ES

T

C O

N

SH

O H

O C

KE

N

, P A

BO

R

O U

G H

O F

W

ES

T C

O N

SH

O

H O

C

KE

N

C O

VE

R

S H

EE

T

WCONM23001

GDK

2026/10/13

KRH

SHEET

APPROVED BY

OF1 7

DRAWN BY

DRAWING SCALE

DATE

PROJECT

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES

ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTED

TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON

THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION

OR ADAPTATION BY PENNONI ASSOCIATES FOR THE

SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS

SOLE RISK AND WITHOUT LIABILITY OR LEGAL

EXPOSURE TO PENNONI ASSOCIATE; AND OWNER SHALL

INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES

FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES

ARISING OUT OF OR RESULTING THEREFROM.

AL

L

D

IM

EN

SI

O N

S M

U

ST

B E

VE

R

IF

IE

D B

Y C

O N

TR

AC

TO

R

AN

D

O W

N

ER

M U

ST

B

E N

O

TI

FI

ED

O F

AN

Y

D

IS

C R

EP

AN

C

IE

S

BE

FO

R

E

PR

O C

EE

D

IN

G

W

IT

H W

O R

K

PREPARED FOR:

OWNER/DEVELOPER

BOROUGH OF WEST CONSHOHOCKEN

112 FORD STREET

WEST CONSHOHOCKEN, PA 19428

610-828-9742

BOROUGH OF WEST CONSHOHOCKEN MACKENZIE PARK PHASE

2E WORKOUT STATIONS

SITE PLANS

MONTGOMERY COUNTY, PENNSYLVANIA

OCTOBER 13, 2026

REVISED OCTOBER 27, 2026

LOCATION MAP

Scale: 1" = 500'

USGS MAP

Scale: 1" = 500'

N O

R

TH

N O

R

TH

CALL 1-800-242-1776

CALL BEFORE YOU DIG

BEFORE YOU DIG ANYWHERE IN PENNSYLVANIA

PA. ACT 287 OF 1974 REQUIRES THREE WORKING DAYS

NOTICE TO UTILITIES BEFORE YOU EXCAVATE, DRILL OR

BLAST PENNSYLVANIA ONE-CALL SYSTEM, INC.

SERIAL NUMBER(S):

PREPARED BY:

PENNONI ASSOCIATES INC.

3100 Horizon Drive, Suite 200 King of Prussia, PA 19406 T 610.277.2402 F 610.277.7449

SITE

PE

N

N O

N I A

SS

O

C

IA

TE

S

IN

C

H or iz on D riv e, S ui te

Ki ng o f P ru ss ia

, P A

T

0.

7.

F

0.

7.

SITE

SHEET LIST TABLE

PAGE SHEET TITLE ISSUED DATE REVISED DATE

1 OF 7 CS0001 COVER SHEET 2026/10/13 2026/10/27

2 OF 7 CS0501 EXISTING FEATURES PLAN 2026/10/13 2026/10/27

3 OF 7 CS1001 SITE AND GRADING PLAN 2026/10/13 2026/10/27

4 OF 7 CS6001 SITE DETAILS 2026/10/13 2026/10/27

5 OF 7 CS6002 SITE DETAILS 2026/10/13 2026/10/27

6 OF 7 CS8001 E&S PLAN 2026/10/13 2026/10/27

7 OF 7 CS8105 E&S DETAILS 2026/10/13 2026/10/27

BY

A

T N

O .1

/1 0/

R

EV

IS

ED

P

ER

M

C

PC

C O

M M

EN

TS

D

AT

ED

0/

/2

12" RCP

" R

C P

12" RCP

18" RCP

18" RCP

12" R C

P

12" RCP

" C

M P

" C

M P

18" C

MP

" C

M P

18" CMP

15" R C

P

15" CMP18" CMP18" CMP

EX INL-1

GRATE 197.37

INV IN 192.37 (EX INL-1 TO EX INL-2)

INV OUT 192.27 ( TO EX INL-1)

EX INL-2

GRATE 196.05

INV IN 193.45 (EX INL-2 TO EX INL-3)

INV IN 192.85 (EX INL-2 TO EX INL-6)

INV OUT 192.70 (EX INL-1 TO EX INL-2)

EX INL-3

GRATE 198.04

INV IN 194.09 (EX INL-3 TO EX INL-4)

INV OUT 194.12 (EX INL-2 TO EX INL-3)

EX INL-4 (ELEVATED INLET)

GRATE 198.77

INV IN 195.17 (EX INL-4 TO EX INL-5)

INV OUT 195.04 (EX INL-3 TO EX INL-4)

EX INL-5

GRATE 198.14

INV OUT 195.74 (EX INL-4 TO EX INL-5)

EX INL-6

GRATE 196.67

INV IN 194.42 (EX INL-6 TO EX INL-7)

INV OUT 194.37 (EX INL-2 TO EX INL-6)

EX INL-7 (INV OUT FAILED)

GRATE 197.20

INV IN 194.90 (EX INL-7 TO EX INL-8)

INV OUT 194.90 (EX INL-6 TO EX INL-7)

EX INL-8 (FORCE FLOW OUT)

GRATE 197.55

INV IN 195.50 (EX INL-8 TO EX INL-9)

INV IN 195.53 (EX INL-8 TO EX INL-11)

INV OUT 195.65 (EX INL-7 TO EX INL-8)

EX INL-9

GRATE 197.40

INV IN 195.90 (EX INL-9 TO )

INV OUT 195.80 (EX INL-8 TO EX INL-9)

EX INL-10

GRATE 199.07

EX INL-11

GRATE 200.30

INV IN 197.70 (EX INL-11 TO EX INL-12)

INV OUT 197.18 (EX INL-8 TO EX INL-11)

EX INL-12

GRATE 215.07

INV IN 212.57 (EX INL-12 TO EX INL-13)

INV OUT 212.17 (EX INL-11 TO EX INL-12)

EX INL-13

GRATE 218.20

INV IN 214.40 (EX INL-13 TO EX INL-14)

INV OUT 214.30 (EX INL-12 TO EX INL-13)

EX INL-14

GRATE 223.35

INV IN 218.60 (EX INL-14 TO EX INL-15)

INV OUT 217.05 (EX INL-13 TO EX INL-14)

EX INL-18

GRATE 189.15

INV OUT 186.35 (EX INL-17 TO EX INL-18)

8" PVC

8" PVC

EX SSMH-1

RIM 190.65

INV IN 181.25 (EX SSMH-1 TO )

INV OUT 181.15 ( TO EX SSMH-1)

6" U

N K

6" U

N K

6" UNK

6" UNK

EX SSMH-3

RIM 225.97

INV IN 218.07 (EX SSMH-3 TO )

INV IN 218.07 (EX SSMH-3 TO EX SSMH-2)

INV OUT 218.02 ( TO EX SSMH-3)

SITE BENCHMARK

CAPPED IRON PIN

N=277,776.89' E=2,648,477.90

ELEV=200.68

PAVILION

BLDG.

PLAY

GROUND

AREA

PARKING

LOT

ST

EA

D S

TR

EE

T

' A

LL

EY

WOODED

AREA

WOODED

AREA

PLAY

GROUND

AREA

WOODED

AREA

WOODED

AREA

15" METAL

UNKNOWN

UTILITY COVER

SEEPAGE

BED

R

ES

ID

EN

TI

AL

N /F

C

AR

O

TA

R

AY

M O

N D

PA

R

C

EL

: 2

4-

-0

-0

1-

C H

U R

C H

S T.

R

ES

ID

EN

TI

AL

N /F

G

EH

R

ET

M

AR

Y

BE

TH

PA

R C

EL

: 2 4-

-0

-0 2-

C

H U

R C

H S

T.

R

ES

ID

EN

TI

AL

N /F

S

EG

ER

S

C U

R

TI

S

JR

G

R

EE

N E

C H

ER

YL

L

PA

R C

EL

: 2 4-

-0

-0 3-

C

H U

R C

H S

T.

R

ES

ID

EN

TI

AL

N /F

O

LE

JA

R

S

EA

N

PA

R C

EL

: 2 4-

-0

-0 0-

C

H U

R C

H S

T.

EX

EM

PT

LO

C

AL

M

U N

IC

IP

AL

IT

Y N

/F W

ES

T

C O

N

SH

O H

O C

KE

N

B O

R O

U G

H

PA

R C

EL

: 2 4-

-0

-0 0-

C

H U

R C

H S

T.

R

ES

ID

EN

TI

AL

N /F

S

TR

U W

E D

AV

ID

R

PA

R C

EL

: 2 4-

-0

-0 0-

C

H U

R C

H S

T.

R

ES

ID

EN

TI

AL

N /F

G O

R N

EY

T

AR

A

A

PA

R C

EL

: 2 4-

-0

-0 0-

C

H U

R C

H S

T.

R

ES

ID

EN

TI

AL

N /F

T

EK

IN

D

EM

IR

U

LK

U

PA

R C

EL

: 2 4-

-0

-0 0-

C

H U

R C

H S

T.

R

ES

ID

EN

TI

AL

N /F

L

EF

LA

R

J

AS

O N

A

R O

BI

N

D

PA

R C

EL

: 2 4-

-0

-0 0-

C

H U

R C

H S

T.

EX

EM

PT

D

W

EL

LI

N

G V

ET

ER

AN

S

N /F

L

EF

LA

R

R

IC

H

AR

D R

D

O N

N A

M

PA

R C

EL

: 2 4-

-0

-0 0-

C

H U

R C

H S

T.

R

ES

ID

EN

TI

AL

N /F

S

TA

N

LE

Y

JE

FF

R

EY

M

E

LI

ZA

BE

TH

A

PA

R C

EL

: 2 4-

-0

-1 0-

C

H U

R C

H S

T.

R

ES

ID

EN

TI

AL

N /F

J

EF

FE

R

S C

H R

IS

TO

PH

ER

L

IS

A

PA

R

C

EL

: 2

4-

-0

-2

0-

C H

U R

C H

S T.

40.00'

1.2

0'

1.

89.88'

.8 0'

.0

3'

1.

53.07'

N/F

EXEMPT - LOCAL MUNICIPALITY

N/F WEST CONSHOHOCKEN BOROUGH

PARCEL #: 24-00-00476-00-2

CHURCH ST.

DEED BK:4078 PG:300

EXEMPT - LOCAL MUNICIPALITY

N/F WEST CONSHOHOCKEN BOROUGH

PARCEL #: 24-00-00476-00-4

CHURCH ST.

N/F EXEMPT - LOCAL MUNICIPALITYN/F WEST CONSHOHOCKEN BOROUGHPARCEL #: 24-00-00124-00-5

BALLIGOMINGO RD.

DEED BK:4218 PG:169

18'

N 36°22'36" W 311.64'

N 16°53'34" W 3.32'

N

9°

'5 4"

E

2.

S 31°16'06" E 110.40'

N 57°54'53" E 131.00'

N 18°15'44" W 212.24'

N 03°58'05" W 304.22'

N 46°26'56" W 186.79'

S 26°50'10" E 98.72'

S 57°04'40" W 74.70'

S 32°40'49" E 566.65'

5 FT. CONCRETE

SIDEWALK

5 21

EXISTING STUMP TBR

U:

\A cc ou nt s\W

CO

NM

\w co nm

- m ck en zie p ar k i m pr ov em en ts pr oje ct\

DE

SI

GN

SH

EE

TS

\6 ph as e

2e w or ko ut st at ion s\P lan s\C S0

1.

TE

D:

/2 9/

:2

PM,

B Y:

An ge na T ra n

PL

OT

ST

YL

E:

Pe nn on i N

CS

.st b

PR

OJ

EC

T

ST

AT

US

CS0501

BY

N

O

D

AT

E R

EV

IS

IO

N

S

PH

AS

E 2E

M

AC

KE

N

ZI

E

PA

R

K W

O R

KO

U

T

ST

AT

IO

N S

C H

U R

C H

S

TR

EE

T

W

ES

T C

O N

SH

O

H O

C

KE

N ,P

A

FO

R

D S

TR

EE

T W

ES

T

C O

N

SH

O H

O C

KE

N

, P A

BO

R

O U

G H

O F

W

ES

T C

O N

SH

O

H O

C

KE

N

WCONM23001

1" = 30'

KRH

SHEET

APPROVED BY

OF2 7

DRAWN BY

DRAWING SCALE

DATE

PROJECT

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES

ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTED

TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON

THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION

OR ADAPTATION BY PENNONI ASSOCIATES FOR THE

SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS

SOLE RISK AND WITHOUT LIABILITY OR LEGAL

EXPOSURE TO PENNONI ASSOCIATES; AND OWNER

SHALL INDEMNIFY AND HOLD HARMLESS PENNONI

ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND

EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

AL

L

D

IM

EN

SI

O N

S M

U

ST

B E

VE

R

IF

IE

D B

Y C

O N

TR

AC

TO

R

AN

D

O W

N

ER

M U

ST

B

E N

O

TI

FI

ED

O F

AN

Y

D

IS

C R

EP

AN

C

IE

S

BE

FO

R

E

PR

O C

EE

D

IN

G

W

IT

H W

O R

K

00 30' 60'

NORTH

PE

N

N O

N I A

SS

O

C

IA

TE

S

IN

C

H or iz on D riv e, S ui te

Ki ng o f P ru ss ia

, P A

T

0.

7.

F

0.

7.

U:

\A cc ou nt s\W

CO

NM

\w co nm

- m ck en zie p ar k i m pr ov em en ts pr oje ct\

DE

SI

GN

SH

EE

TS

\6 ph as e

2e w or ko ut st at ion s\P lan s\C S0

1.

TE

D:

/2 9/

:2

PM,

B Y:

An ge na T ra n

PL

OT

ST

YL

E:

Pe nn on i N

CS

.st b

PR

OJ

EC

T

ST

AT

US

EX

IS

TI

N

G F

EA

TU

R

ES

P

LA

N

GDK

2026/10/13

EXISTING PLAYGROUND AREA/EQUIPMENT TO BE REMOVED

EXISTING CONCRETE SIDEWALK TO BE REMOVED

LEGEND

EXISTING GRAVEL PATH

EXISTING ASPHALT PATH

EXISTING CONCRETE CURB

EXISTING CONCRETE SIDEWALK

EXISTING DECIDUOUS TREE

EXISTING CONTOUR LINE

EXISTING SIGN

EXISTING UNDERGROUND ELECTRIC

EXISTING LIGHT

BY

A

T N

O .1

/1 0/

R

EV

IS

ED

P

ER

M

C

PC

C O

M M

EN

TS

D

AT

ED

0/

SITE BENCHMARK

CAPPED IRON PIN

N=277,776.89' E=2,648,477.90

ELEV=200.68

WOODED

AREA

WOODED

AREA

15" METAL

UNKNOWN

UTILITY COVER

.0

3'

N/F

EXEMPT - LOCAL MUNICIPALITY

N/F WEST CONSHOHOCKEN BOROUGH

PARCEL #: 24-00-00476-00-2

CHURCH ST.

DEED BK:4078 PG:300

EXEMPT - LOCAL MUNICIPALITY

N/F WEST CONSHOHOCKEN BOROUGH

PARCEL #: 24-00-00476-00-4

CHURCH ST.

N/F EXEMPT - LOCAL MUNICIPALITYN/F WEST CONSHOHOCKEN BOROUGHPARCEL #: 24-00-00124-00-5

BALLIGOMINGO RD.

DEED BK:4218 PG:169

N 36°22'36" W 311.64'

N

9°

'5

N 18°15'44" W 212.24'

N 03°58'05" W 304.22'

5 FT. CONCRETE

PROPOSED TRAPEZE RACK ON

13' x 30' MULCH SAFETY SURFACE

PROPOSED 6-ELEMENT WORKOUT STATION ON

MULCH SAFETY SURFACE (CARDIO WALKER,

CHEST PRESS, LATERAL PULL DOWN, LEG

EXTENSION, LEG PRESS, RECUMBENT CYCLE)

PROPOSED SIT-UP STATION

ON 4' x 12' MULCH SAFETY

SURFACE

PROPOSED HI-LO CHIN

UP STATION ON 4' x 13'

MULCH SAFETY SURFACE

12" RCP

" R

C P

12" RCP

18" RCP

12" R C

P

12" RCP

" C

M P

15" CMP

18" CMP

18" CMP

EX INL-3

GRATE 198.04

INV IN 194.09 (EX INL-3 TO EX INL-4)

INV OUT 194.12 (EX INL-2 TO EX INL-3)

EX INL-4 (ELEVATED INLET)

GRATE 198.77

INV IN 195.17 (EX INL-4 TO EX INL-5)

INV OUT 195.04 (EX INL-3 TO EX INL-4)

EX INL-5

GRATE 198.14

INV OUT 195.74 (EX INL-4 TO EX INL-5)

EX INL-7 (INV OUT FAILED)

GRATE 197.20

INV IN 194.90 (EX INL-7 TO EX INL-8)

INV OUT 194.90 (EX INL-6 TO EX INL-7)

EX INL-9

GRATE 197.40

INV IN 195.90 (EX INL-9 TO )

INV OUT 195.80 (EX INL-8 TO EX INL-9)

EX INL-10

GRATE 199.07

5 21

45 FT

F

T

17 FT

30.5 FT

x x x x

200.86 200.79

200.86

200.77 x x x x200.84

200.94

200.38

200.69

PROPOSED BALANCE BEAM ON

4' x 16' MULCH SAFETY SURFACE

198.22

199.74

199.40

199.14

200.08 x x xx x x x x

198197.91

197.63197.41 198.32

200.08 x x x x x x x x

198.04198.14

PROPOSED ASSISTED FUNCTIONAL

TRAINER ON 9' x 9' MULCH SAFETY

SURFACE

U:

\A cc ou nt s\W

CO

NM

\w co nm

- m ck en zie p ar k i m pr ov em en ts pr oje ct\

DE

SI

GN

SH

EE

TS

\6 ph as e

2e w or ko ut st at ion s\P lan s\C S1

1.

TE

D:

/2 9/

:2

PM,

B Y:

An ge na T ra n

PL

OT

ST

YL

E:

Pe nn on i N

CS

.st b

PR

OJ

EC

T

ST

AT

US

CS1001

BY

N

O

D

AT

E R

EV

IS

IO

N

S

C H

U R

C H

S

TR

EE

T

W

ES

T C

O N

SH

O

H O

C

KE

N ,P

A

FO

R

D S

TR

EE

T W

ES

T

C O

N

SH

O H

O C

KE

N

, P A

BO

R

O U

G H

O F

W

ES

T C

O N

SH

O

H O

C

KE

N

WCONM23001

1" = 20'

KRH

SHEET

APPROVED BY

OF3 7

DRAWN BY

DRAWING SCALE

DATE

PROJECT

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES

ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTED

TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON

THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION

OR ADAPTATION BY PENNONI ASSOCIATES FOR THE

SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS

SOLE RISK AND WITHOUT LIABILITY OR LEGAL

EXPOSURE TO PENNONI ASSOCIATES; AND OWNER

SHALL INDEMNIFY AND HOLD HARMLESS PENNONI

ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND

EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

AL

L

D

IM

EN

SI

O N

S M

U

ST

B E

VE

R

IF

IE

D B

Y C

O N

TR

AC

TO

R

AN

D

O W

N

ER

M U

ST

B

E N

O

TI

FI

ED

O F

AN

Y

D

IS

C R

EP

AN

C

IE

S

BE

FO

R

E

PR

O C

EE

D

IN

G

W

IT

H W

O R

K

00 20' 40'

NORTH

PE

N

N O

N I A

SS

O

C

IA

TE

S

IN

C

H or iz on D riv e, S ui te

Ki ng o f P ru ss ia

, P A

T

0.

7.

F

0.

7.

U:

\A cc ou nt s\W

CO

NM

\w co nm

- m ck en zie p ar k i m pr ov em en ts pr oje ct\

DE

SI

GN

SH

EE

TS

\6 ph as e

2e w or ko ut st at ion s\P lan s\C S1

1.

TE

D:

/2 9/

:2

PM,

B Y:

An ge na T ra n

PL

OT

ST

YL

E:

Pe nn on i N

CS

.st b

PR

OJ

EC

T

ST

AT

US

SI

TE

A N

D G

R

AD

IN

G

P

LA

N

PROPOSED MULCH SAFETY SURFACE

LEGEND

EXISTING GRAVEL PATH

EXISTING ASPHALT PATH

EXISTING CONCRETE CURB

EXISTING CONCRETE SIDEWALK

EXISTING DECIDUOUS TREE

EXISTING CONTOUR LINE

EXISTING SIGN

EXISTING UNDERGROUND ELECTRIC

EXISTING LIGHT

2026/10/13

PH

AS

E 2E

M

AC

KE

N

ZI

E

PA

R

K W

O R

KO

U

T

ST

AT

IO

N S

BY

A

T N

O .1

/1 0/

R

EV

IS

ED

P

ER

M

C

PC

C O

M M

EN

TS

D

AT

ED

0/

/2

General Notes:

1. County funding from the Montco 2040

Grant Program acknowledgement will be provided on the entrance sign along Church Street.

2. Spot elevations are subject to change.

Contractor to coordinate with design engineer on elevations of mulch safety surfaces prior to construction.

HI-LO CHIN UP BAR DETAIL

N.T.S.

LEG EXTENSION DETAIL

N.T.S.

LAT PUT DOWN DETAIL

N.T.S.

CHEST PRESS DETAIL

N.T.S.

BALANCE BEAM DETAIL

N.T.S.

U:

\A cc ou nt s\W

CO

NM

\W

CO

NM

- M cK en zie

P ar k I m pr ov em en ts Pr oje ct\

DE

SI

GN

SH

EE

TS

\6

Ph as e

2E W or ko ut S ta tio ns \P lan s\C

S6

1.

TE

D:

/1

0/

:1

AM,

B

Y:

Gr eg or y K er r P

LO

TS

TY

LE

: Pe nn on i N

CS

.st b

PR

OJ

EC

T

ST

AT

US

CS6001

BY

N

O

D

AT

E R

EV

IS

IO

N

S

PH

AS

E 2E

M

AC

KE

N

ZI

E

PA

R

K W

O R

KO

U

T

ST

AT

IO

N S

C H

U R

C H

S

TR

EE

T

W

ES

T C

O N

SH

O

H O

C

KE

N ,P

A

FO

R

D S

TR

EE

T W

ES

T

C O

N

SH

O H

O C

KE

N

, P A

BO

R

O U

G H

O F

W

ES

T C

O N

SH

O

H O

C

KE

N

WCONM23001

GDK

2026/10/13

KRH

SHEET

APPROVED BY

OF4 7

DRAWN BY

DRAWING SCALE

DATE

PROJECT

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES

ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTED

TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON

THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION

OR ADAPTATION BY PENNONI ASSOCIATES FOR THE

SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS

SOLE RISK AND WITHOUT LIABILITY OR LEGAL

EXPOSURE TO PENNONI ASSOCIATES; AND OWNER

SHALL INDEMNIFY AND HOLD HARMLESS PENNONI

ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND

EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

AL

L

D

IM

EN

SI

O N

S M

U

ST

B E

VE

R

IF

IE

D B

Y C

O N

TR

AC

TO

R

AN

D

O W

N

ER

M U

ST

B

E N

O

TI

FI

ED

O F

AN

Y

D

IS

C R

EP

AN

C

IE

S

BE

FO

R

E

PR

O C

EE

D

IN

G

W

IT

H W

O

K

SI

TE

D

ET

AI

LS

PE

N

N O

N I A

SS

O

C

IA

TE

S

IN

C

H or iz on D riv e, S ui te

Ki ng o f P ru ss ia

, P A

T

0.

7.

F

0.

7.

BY

A

T N

O .1

/1 0/

R

EV

IS

ED

P

ER

M

C

PC

C O

M M

EN

TS

D

AT

ED

0/

LEG PRESS DETAIL

N.T.S.

TRAPEZE RACK DETAIL

N.T.S.

SIT-UP STATION DETAIL

N.T.S. RECUMBENT BIKE DETAIL

N.T.S.

UP351 ASSISTED FUNCTIONAL TRAINER DETAIL

N.T.S.

CARDIO WALKER DETAIL

N.T.S.

MULCH SAFETY SURFACE DETAIL

N.T.S.

6"

EXISTING GRADE ELEVATION

FOUNDATION TO BE

FLUSH WITH MULCH (TYP.)

MULCH

GEOTEXTILE FABRIC

This project is financed in part by Montgomery County through:

Montco 2040 Implementation Grant Program.

FUNDING SIGN DETAIL

N.T.S.

MULCH BED EDGING (TYP.)

8.5"

11"

U:

\A cc ou nt s\W

CO

NM

\W

CO

NM

- M cK en zie

P ar k I m pr ov em en ts Pr oje ct\

DE

SI

GN

SH

EE

TS

\6

Ph as e

2E W or ko ut S ta tio ns \P lan s\C

S6

2.

TE

D:

/1

0/

:1

AM,

B

Y:

Gr eg or y K er r P

LO

TS

TY

LE

: Pe nn on i N

CS

.st b

PR

OJ

EC

T

ST

AT

US

CS6002

BY

N

O

D

AT

E R

EV

IS

IO

N

S

PH

AS

E 2E

M

AC

KE

N

ZI

E

PA

R

K W

O R

KO

U

T

ST

AT

IO

N S

C H

U R

C H

S

TR

EE

T

W

ES

T C

O N

SH

O

H O

C

KE

N ,P

A

FO

R

D S

TR

EE

T W

ES

T

C O

N

SH

O H

O C

KE

N

, P A

BO

R

O U

G H

O F

W

ES

T C

O N

SH

O

H O

C

KE

N

WCONM23001

GDK

2026/10/13

KRH

SHEET

APPROVED BY

OF5 7

DRAWN BY

DRAWING SCALE

DATE

PROJECT

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES

ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTED

TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON

THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION

OR ADAPTATION BY PENNONI ASSOCIATES FOR THE

SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS

SOLE RISK AND WITHOUT LIABILITY OR LEGAL

EXPOSURE TO PENNONI ASSOCIATES; AND OWNER

SHALL INDEMNIFY AND HOLD HARMLESS PENNONI

ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND

EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

AL

L

D

IM

EN

SI

O N

S M

U

ST

B E

VE

R

IF

IE

D B

Y C

O N

TR

AC

TO

R

AN

D

O W

N

ER

M U

ST

B

E N

O

TI

FI

ED

O F

AN

Y

D

IS

C R

EP

AN

C

IE

S

BE

FO

R

E

PR

O C

EE

D

IN

G

W

IT

H W

O

SI

TE

D

ET

AI

LS

PE

N

N O

N I A

SS

O

C

IA

TE

S

IN

C

H or iz on D riv e, S ui te

Ki ng o f P ru ss ia

, P A

T

0.

7.

F

0.

7.

BY

A

T N

O .1

/1 0/

R

EV

IS

ED

P

ER

M

C

PC

C O

M M

EN

TS

D

AT

ED

0/

SITE BENCHMARK

CAPPED IRON PIN

N=277,776.89' E=2,648,477.90

ELEV=200.68

WOODED

AREA

WOODED

AREA

15" METAL

UNKNOWN

UTILITY COVER

.8

0'

.0

3'

N/F

EXEMPT - LOCAL MUNICIPALITY

N/F WEST CONSHOHOCKEN BOROUGH

PARCEL #: 24-00-00476-00-2

CHURCH ST.

DEED BK:4078 PG:300

EXEMPT - LOCAL MUNICIPALITY

N/F WEST CONSHOHOCKEN BOROUGH

PARCEL #: 24-00-00476-00-4

N/F EXEMPT - LOCAL MUNICIPALITYN/F WEST CONSHOHOCKEN BOROUGHPARCEL #: 24-00-00124-00-5

BALLIGOMINGO RD.

DEED BK:4218 PG:169

N

9°

'5

N 18°15'44" W 212.24'

N 03°58'05" W 304.22'

S 32°40'49" E 566.65'

PR

O

PO

SE

D C

O M

PO

ST

F

IL

TE

R

S O

C K

(T

YP

12" RCP

" R

C P

12" RCP

18" RCP

12" R C

P

12" RCP

" C

M P

" C

M P

18" CMP

15" CMP18" CMP

18" CMP

EX INL-3

GRATE 198.04

INV IN 194.09 (EX INL-3 TO EX INL-4)

INV OUT 194.12 (EX INL-2 TO EX INL-3)

EX INL-4 (ELEVATED INLET)

GRATE 198.77

INV IN 195.17 (EX INL-4 TO EX INL-5)

INV OUT 195.04 (EX INL-3 TO EX INL-4)

GRATE 196.67

INV IN 194.42 (EX INL-6 TO EX INL-7)

INV OUT 194.37 (EX INL-2 TO EX INL-6)

EX INL-7 (INV OUT FAILED)

GRATE 197.20

INV IN 194.90 (EX INL-7 TO EX INL-8)

INV OUT 194.90 (EX INL-6 TO EX INL-7)

INV IN 195.50 (EX INL-8 TO EX INL-9)

INV IN 195.53 (EX INL-8 TO EX INL-11)

INV OUT 195.65 (EX INL-7 TO EX INL-8)

EX INL-9

GRATE 197.40

INV IN 195.90 (EX INL-9 TO )

INV OUT 195.80 (EX INL-8 TO EX INL-9)

EX INL-10

GRATE 199.07

PROPOSED TRAPEZE RACK ON

13' x 30' MULCH SAFETY SURFACE

PROPOSED 6-ELEMENT WORKOUT STATION ON

MULCH SAFETY SURFACE (CARDIO WALKER,

CHEST PRESS, LATERAL PULL DOWN, LEG

EXTENSION, LEG PRESS, RECUMBENT CYCLE)

PROPOSED SIT-UP STATION

ON 4' x 12' MULCH SAFETY

SURFACE

PROPOSED HI-LO CHIN

UP STATION ON 4' x 13'

MULCH SAFETY SURFACE

45 FT

F

T

17 FT

30.5 FT

x x x x

200.86 200.79

200.86

200.77 x x x x200.84

200.94

200.38

200.69

PROPOSED BALANCE BEAM ON

4' x 16' MULCH SAFETY SURFACE

198.22

199.74

199.40

199.14

200.08 x x xx x x x x

198197.91

197.63197.41 198.32

200.08 x x x x x x x x

198.04198.14

PROPOSED ASSISTED FUNCTIONAL

TRAINER ON 9' x 9' MULCH SAFETY

SURFACE

5 21

PROPOSED COMPOST FILTER SOCK (TYP.)

U:

\A cc ou nt s\W

CO

NM

\w co nm

- m ck en zie p ar k i m pr ov em en ts pr oje ct\

DE

SI

GN

SH

EE

TS

\6 ph as e

2e w or ko ut st at ion s\P lan s\C S8

1.

TE

D:

/2 9/

:3

PM,

B Y:

An ge na T ra n

PL

OT

ST

YL

E:

Pe nn on i N

CS

.st b

PR

OJ

EC

T

ST

AT

US

CS8001

BY

N

O

D

AT

E R

EV

IS

IO

N

S

PH

AS

E 2E

M

AC

KE

N

ZI

E

PA

R

K W

O R

KO

U

T

ST

AT

IO

N S

C H

U R

C H

S

TR

EE

T

W

ES

T C

O N

SH

O

H O

C

KE

N ,P

A

FO

R

D S

TR

EE

T W

ES

T

C O

N

SH

O H

O C

KE

N

, P A

BO

R

O U

G H

O F

W

ES

T C

O N

SH

O

H O

C

KE

N

WCONM23001

1" = 20'

KRH

SHEET

APPROVED BY

OF6 7

DRAWN BY

DRAWING SCALE

DATE

PROJECT

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES

ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTED

TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON

THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION

OR ADAPTATION BY PENNONI ASSOCIATES FOR THE

SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS

SOLE RISK AND WITHOUT LIABILITY OR LEGAL

EXPOSURE TO PENNONI ASSOCIATES; AND OWNER

SHALL INDEMNIFY AND HOLD HARMLESS PENNONI

ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND

EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

AL

L

D

IM

EN

SI

O N

S M

U

ST

B E

VE

R

IF

IE

D B

Y C

O N

TR

AC

TO

R

AN

D

O W

N

ER

M U

ST

B

E N

O

TI

FI

ED

O F

AN

Y

D

IS

C R

EP

AN

C

IE

S

BE

FO

R

E

PR

O C

EE

D

IN

G

W

IT

H W

O R

K

00 20' 40'

NORTH

PE

N

N O

N I A

SS

O

C

IA

TE

S

IN

C

H or iz on D riv e, S ui te

Ki ng o f P ru ss ia

, P A

T

0.

7.

F

0.

7.

U:

\A cc ou nt s\W

CO

NM

\w co nm

- m ck en zie p ar k i m pr ov em en ts pr oje ct\

DE

SI

GN

SH

EE

TS

\6 ph as e

2e w or ko ut st at ion s\P lan s\C S8

1.

TE

D:

/2 9/

:3

PM,

B Y:

An ge na T ra n

PL

OT

ST

YL

E:

Pe nn on i N

CS

.st b

PR

OJ

EC

T

ST

AT

US

E& S

PL

AN

2026/10/13

PROPOSED 12" COMPOST FILTER SOCK

LEGEND

EXISTING GRAVEL PATH

EXISTING ASPHALT PATH

EXISTING CONCRETE CURB

EXISTING CONCRETE SIDEWALK

EXISTING DECIDUOUS TREE

EXISTING CONTOUR LINE

EXISTING SIGN

EXISTING UNDERGROUND ELECTRIC

EXISTING LIGHT

BY

A

T N

O .1

/1 0/

R

EV

IS

ED

P

ER

M

C

PC

C O

M M

EN

TS

D

AT

ED

0/

COMPOST SOCK WASHOUT

INSPECTION AND MAINTENANCE NOTES

1. INSPECT AND VERIFY THAT CONCRETE WASHOUT BMP'S ARE IN PLACE PRIOR

TO THE COMMENCEMENT OF CONCRETE WORK.

2. DURING PERIODS OF CONCRETE WORK, INSPECT DAILY TO VERIFY

CONTINUED PERFORMANCE

A. CHECK OVERALL CONDITION AND PERFORMANCE.

B. CHECK REMAINING CAPACITY (% FULL).

C. IF USING SELF-INSTALLED WASHOUT FACILITIES, VERIFY PLASTIC

LINERS ARE INTACT AND SIDEWALLS ARE NOT DAMAGED.

D. IF USING PREFABRICATED CONTAINERS, CHECK FOR LEAKS.

3. WASHOUT FACILITIES SHALL BE MAINTAINED TO PROVIDE ADEQUATE

HOLDING CAPACITY WITH A MINIMUM FREEBOARD OF 12 INCHES.

4. WASHOUT FACILITIES MUST BE CLEANED, OR NEW FACILITIES MUST BE

CONSTRUCTED AND READY FOR USE ONCE THE WASHOUT IS 75% FULL.

5. IF THE WASHOUT IS NEARING CAPACITY, VACUUM AND DISPOSE OF THE

WASTE MATERIAL IN AN APPROVED MANNER.

A. DO NOT DISCHARGE LIQUID OR SLURRY TO WATERWAYS, STORM

DRAINS OR DIRECTLY ONTO GROUND.

B. DO NOT USE SANITARY SEWER WITHOUT LOCAL APPROVAL.

C. PLACE A SECURE, NON-COLLAPSING, NON WATER COLLECTING COVER

OVER THE CONCRETE WASHOUT FACILITY PRIOR TO PREDICTED WET

WEATHER TO PREVENT ACCUMULATION AND OVERFLOW OF

PRECIPITATION.

D. REMOVE AND DISPOSE OF HARDENED CONCRETE AND RETURN THE

STRUCTURE TO A FUNCTIONAL CONDITION. CONCRETE MAY BE REUSED

ONSITE OR HAULED AWAY FOR DISPOSAL OR RECYCLING.

6. WHEN YOU REMOVE MATERIALS FROM THE SELF-INSTALLED CONCRETE

WASHOUT, BUILD A NEW STRUCTURE;OR, IF THE PREVIOUS STRUCTURE IS

STILL INTACT, INSPECT FOR SIGNS OF WEAKENING OR DAMAGE, AND MAKE

ANY NECESSARY REPAIRS. RE-LINE THE STRUCTURE WITH NEW PLASTIC

AFTER EACH CLEANING.

1. WHEN TEMPORARY CONCRETE WASHOUT FACILITIES ARE NO LONGER REQUIRED

FOR THE WORK, THE HARDENED CONCRETE, SLURRIES AND LIQUIDS SHALL BE

REMOVED AND PROPERLY DISPOSED OF.

2. MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE WASHOUT FACILITIES

SHALL BE REMOVED FROM THE SITE OF THE WORK AND DISPOSED OF OR

RECYCLED.

3. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCES CAUSED BY THE

REMOVAL OF THE TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE

BACKFILLED, REPAIRED, AND STABILIZED TO PREVENT EROSION.

REMOVAL OF TEMPORARY CONCRETE WASHOUT FACILITIES

Maximum Drainage Area = 1/2 acre.

Inlet protection is not required for inlet tributary to sediment basin or trap. Berms required for all installations.

Earthen berm in roadway shall be maintained until roadway is stoned. Road subbase berm on roadway shall be maintained until roadway is paved. Earthen berm in channel shall be maintained until permanent stabilization is completed or to remain permanently.

DO NOT USE ON MAJOR PAVED ROADWAYS WHERE PONDING MAY

CAUSE TRAFFIC HAZARDS

SANDBAG

INSTALLATION DETAIL

ELEVATION VIEW

1/4" NYLON ROPE

EXPANSION RESTRAINT

2" X 2" X 3/4"

RUBBER BLOCK (TYP)

BERM

2 MIN

2 MIN

1' MIN

PLAN VIEW

ISOMETRIC VIEW

1" REBAR FOR

BAG REMOVAL

FROM INLET

INLET

GRATE

3' -0

4'-0"

2'-0"

FLOW

BERM

2 MIN:1

3:1

1. SEEDED AREAS THAT HAVE WASHED AWAY SHALL BE FILLED AND GRADED, AS NECESSARY, AND THEN RESSEDED. A STRAW COVER SHALL BE APPLIED TO RETAIN THE SEED ALONG WITH AN ANCHORING METHOD DESCRIBED ON THE ATTACHED MULCH ANCHORING GUIDE, UNTIL IT HAS A CHANCE TO ROOT

PROPERLY.

2. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMP'S MUST BE MAINTAINED PROPERLY.

MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT CONTROL BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGARDING, RESEEDING, REMULCHING, AND

RENETTING, MUST BE PERFORMED IMMEDIATELY, IF EROSION AND SEDIMENT CONTROL BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE

REQUIRED.

3. SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN LANDSCAPED AREAS OUTSIDE OF STEEP SLOPES, WETLANDS, FLOODPLAINS OR DRAINAGE SWALES AND IMMEDIATELY STABILIZED, OR PLACED IN

TOPSOIL STOCKPILES.

ROCK CONSTRUCTION ENTRANCE

1. SEDIMENT DEPOSITED ON PAVED ROADWAYS SHALL BE REMOVED AND RETURNED TO THE

CONSTRUCTION SITE. NOTE: WASHING THE ROADWAY OR SWEEPING THE DEPOSITS INTO DITCHES, SEWERS, CULVERTS, OR OTHER DRAINAGEWAYS IS NOT ACCEPTABLE.

2. ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL BE CONSTANTLY MAINTAINED TO THE SPECIFIED

DIMENSIONS BY ADDING ROCK.

3. INSPECT AFTER EACH STORM EVENT AND ON A WEEKLY BASIS. NEEDED REPAIRS SHOULD BE

INITIATED IMMEDIATELY AFTER INSPECTION.

OWNER / OPERATOR WILL BE RESPONSIBLE FOR THE PROPER CONSTRUCTION, STABILIZATION, AND

MAINTENANCE OF ALL EROSION AND SEDIMENTATION CONTROLS AND RELATED ITEMS INCLUDED

WITHIN THESE PLANS

1. EROSION AND SEDIMENTATION CONTROLS MUST BE CONSTRUCED, STABILIZED AND

FUNCTIONAL BEFORE GENERAL SITE DISTURBANCE WITHIN THE TRIBUTARY AREA OF THOSE

CONTROLS BEGINS.

2. THE OPERATOR SHALL ASSURE THAT THE APPROVED EROSION & SEDIMENT CONTROL PLAN IS

PROPERLY AND COMPLETELY IMPLEMENTED.

3. AT LEAST 7 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, THE OPERATOR

SHALL INVITE ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES, THE LANDOWNER, ALL

APPROPRIATE MUNICIPAL OFFICIALS, THE EROSION AND SEDIMENT CONTROL PLAN PREPARER,

TO AN ON-SITE MEETING. ALSO, AT LEAST 3 DAYS BEFORE STARTING ANY EARTH DISTURBANCE

ACTIVITIES, ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES SHALL NOTIFY THE

PENNSYLVANIA ONE CALL SYSTEM INCORPORATED AT 1-800-242-1776 FOR BURIED UTILITIES

LOCATIONS.

4. THE E&S CONTROL PLAN MAPPING MUST DISPLAY A PA ONE CALL SYSTEM INCORPORATED

SYMBOL INCLUDING THE SITE IDENTIFICATION NUMBER.

5. SHOULD ANY MEASURES CONTAINED WITHIN THIS PLAN PROVE TO BE INCAPABLE OF

ADEQUATELY REMOVING SEDIMENT FROM ON-SITE FLOWS PRIOR TO THE DISCHARGE OF OR

STABILIZING OF SURFACES INVOLVED, ADDITIONAL MEASURES MUST BE IMPLEMENTED

IMMEDIATELY BY THE OWNER/ DEVELOPER TO ELIMINATE SUCH PROBLEMS.

6. THE LIMITS OF WORK SHOWN ON THIS PLAN ARE THE REAL EXTENT REQUIRED FOR

CONSTRUCTION. THE CONTRACTOR SHALL ADHERE TO THESE LIMITS IN MINIMIZING DISTURBED

LAND, AND ALL CONSTRUCTION SHALL BE CONDUCTED WITHIN THESE LIMITS.

7. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL

FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL

IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO ELIMINATE POTENTIAL FOR

ACCELERATED EROSION AND/OR SEDIMENT POLLUTION.

8. BEFORE INITIATING ANY REVISIONS TO THE APPROVED EROSION AND SEDIMENT CONTROL

PLAN OR REVISIONS TO OTHER PLANS WHICH MAY AFFECT THE EFFECTIVENESS OF THE

APPROVED E&S CONTROL PLAN, THE OPERATOR MUST RECEIVE APPROVAL OF THE REVISIONS

FROM THE BOROUGH ENGINEER. THE OPERATOR SHALL ASSURE THAT THE APPROVED

EROSION AND SEDIMENT CONTROL PLAN IS PROPERLY AND COMPLETELY IMPLEMENTED.

IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL

FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL

IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO ELIMINATE POTENTIAL FOR

ACCELERATED EROSION AND/OR SEDIMENT POLLUTION.

9. TOPSOIL TAKEN FROM CONSTRUCTION AREAS SHALL BE SEEDED WITH A VEGETATIVE COVER

AND STOCKPILED FOR REUSE IN FINISH GRADING. STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2:1 OR FLATTER. SILT FENCING SHALL BE INSTALLED ON THE LOW SIDE OF THE PILE. THERE SHALL BE NO EARTH DISTURBANCE WITHIN THE STOCKPILE

AREA.

10. ALL PUMPING OF SEDIMENT LADEN WATER OR POTENTIALLY SEDIMENT LADEN WATER SHALL

BE THROUGH A SEDIMENT CONTROL BMP, SUCH AS A PUMPED WATER FILTER BAG

DISCHARGING OVER NON-DISTURBED AREAS.

11. ANY DISTURBED AREA, ON WHICH ACTIVITY HAS CEASED FOR AN EXTENDED AMOUNT OF TIME, MUST BE SEEDED AND MULCHED IMMEDIATELY. DURING NON-GERMINATING PERIODS, MULCH

MUST BE APPLIED AT RECOMMENDED RATES.

12. DISTURBED AREAS WHICH ARE NOT AT FINISH GRADE AND WHICH WILL BE RE-DISTURBED

WITHIN ONE YEAR MAY BE SEEDED AND MULCHED WITH A QUICK GROWING TEMPORARY SEED

MIXTURE AND MULCH. DISTURBED AREAS WHICH ARE EITHER AT FINISH GRADE OR WILL NOT

BE RE-DISTURBED WITHIN ONE YEAR MUST BE SEEDED WITH A PERMANENT SEED MIXTURE AND

MULCHED.

13. FILLS GREATER THAN 3:1 SLOPE AND CUTS GREATER THAN 2-1/2:1 SHALL BE SEEDED AND

MULCHED, AND PROTECTED WITH EROSION CONTROL MATTING (SEE INSTALLATION

INSTRUCTIONS).

14. THERE IS TO BE NO EARTH DISTURBANCE OR VEGETATIVE CLEARING IN AREAS OF STAKED (OR

FENCED) WETLANDS. EARTH DISTURBANCE WITHIN THESE AREAS WITHOUT THE REQUIRED

PERMITS WILL RESULT IN POTENTIAL VIOLATION OF COMMONWEALTH AND FEDERAL WETLANDS

REGULATIONS.

15. DUST CONTROL SHALL BE PROVIDED BY THE CONTRACTOR AT ALL TIMES DURING

CONSTRUCTION.

16. CONSTRUCTION VEHICLES LEAVING THE SITE SHALL NOT DEPOSIT ANY MATERIAL OUTSIDE OF

THE PROJECT SITE BOUNDARIES AND/OR A PUBLIC RIGHT-OF-WAY. ANY MATERIAL DEPOSITED

SHALL BE IMMEDIATELY REMOVED.

17. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE

OF CONSTRUCTION. EACH STAGE SHALL BE COMPLETED BEFORE ANY FOLLOWING STAGE IS

INITIATED. CLEARING AND GRUBBING SHALL BE LIMITED ONLY TO THOSE AREAS DESCRIBED IN

EACH STAGE.

18. AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL STABILIZATION WHEN IT HAS A

MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT

NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED SURFACE

EROSION AND SUBSURFACE CHARACTERISTICS SUFFICIENT TO RESIST SLIDING AND OTHER

MOVEMENTS. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE, THE OPERATOR

SHALL STABILIZE ANY AREAS DISTURBED BY THE ACTIVITIES. DURING NON-GERMINATING

PERIODS, MULCH MUST BE APPLIED AT THE SPECIFIED RATES. DISTURBED AREAS WHICH ARE

NOT AT FINISHED GRADE AND WHICH WILL BE REDISTURBED WITHIN 1 YEAR MUST BE

STABILIZED IN ACCORDANCE WITH THE TEMPORARY VEGETATIVE STABILIZATION

SPECIFICATIONS. DISTURBED AREAS WHICH ARE AT FINISHED GRADE OR WHICH WILL NOT BE

REDISTURBED WITHIN 1 YEAR MUST BE STABILIZED IN ACCORDANCE WITH THE PERMANENT

VEGETATIVE STABILIZATION SPECIFICATIONS.

19. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT

BMP CONTROLS MUST BE REMOVED. AREAS DISTURBED DURING REMOVAL OF THE BMP'S MUST

BE STABILIZED IMMEDIATELY.

20. SEDIMENT TRACKED ONTO ANY ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE

CONSTRUCTION SITE BY THE END OF EACH WORKDAY AND DISPOSED AS A MANNER DESCRIBED

IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED OR SWEPT INTO ANY

ROAD SIDE DITCH, STORM SEWER OR SURFACE WATER.

21. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN

ACCORDANCE WITH THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER

APPROVED METHOD.

22. SHOULD ANY AREAS OF EXCAVATION BE FOUND TO CONTAIN CONTAMINANTS THE

CONTRACTOR SHALL IMMEDIATELY CONTACT THE DESIGN ENGINEER.

UNFORSEEN EROSIVE CONDITIONS

1. SHOULD UNFORSEEN EROSIVE CONDITIONS DEVELOP DURING CONSTRUCTION, THE

CONTRACTOR SHALL TAKE ACTION TO REMEDY SUCH CONDITIONS AND TO PREVENT

DAMAGE TO ADJACENT PROPERTIES AS A RESULT OF INCREASED RUNOFF AND/OR

SEDIMENT DISPLACEMENT. STOCKPILES OF WOOD CHIPS, HAY BALES, CRUSHED

STONE, AND OTHER MULCHES SHALL BE HELD IN READINESS TO DEAL IMMEDIATELY

WITH EMERGENCY PROBLEMS OF EROSION.

1. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON

SITE IS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY

FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT

QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING. IF THE SITE WILL NEED TO

IMPORT OR EXPORT MATERIAL FROM THE SITE, THE RESPONSIBILITY FOR PERFORMING

ENVIRONMENTAL DUE DILIGENCE AND DETERMINATION OF CLEAN FILL WILL REST WITH

THE CONTRACTOR.

2. CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NON-WATER SOLUBLE,

NON-DECOMPOSABLE, INERT, SOLID MATERIAL. THE TERM INCLUDES SOIL, ROCK, STONE,

DREDGED MATERIAL, USED ASPHALT, AND BRICK, BLOCK OR CONCRETE FROM

CONSTRUCTION AND DEMOLITION ACTIVITIES THAT IS SEPARATE FROM OTHER WASTE

AND IS RECOGNIZABLE AS SUCH. THE TERM DOES NOT INCLUDE MATERIALS PLACED IN

OR ON THE WATERS OF THE COMMONWEALTH UNLESS OTHERWISE AUTHORIZED. (THE

TERM "USED ASPHALT" DOES NOT INCLUDE MILLED ASPHALT OR ASPHALT THAT HAS BEEN

PROCESSED FOR RE-USE).

3. CLEAN FILL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE: FILL

MATERIALS AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE STILL

QUALIFIES AS CLEAN FILL PROVIDED THE TESTING REVEALS THAT THE FILL MATERIAL

CONTAINS CONCENTRATIONS OF REGULATED SUBSTANCES THAT ARE BELOW THE

RESIDENTIAL LIMITS IN TABLES FP-1A AND FP-1B FOUND IN THE DEPARTMENT'S POLICY

"MANAGEMENT OF FILL".

4. ANY PERSON PLACING CLEAN FILL THAT HAS BEEN AFFECTED BY A SPILL OR RELEASE OF

A REGULATED SUBSTANCE MUST USE FORM FP-001 TO CERTIFY THE ORIGIN OF THE FILL

MATERIAL AND THE RESULTS OF THE ANALYTICAL TESTING TO QUALIFY THE MATERIAL AS

CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE OWNER OF THE PROPERTY

RECEIVING THE FILL. A COPY OF FORM FP-001 CAN BE FOUND AT THE END OF THESE

INSTRUCTIONS.

5. ENVIRONMENTAL DUE DILIGENCE: THE APPLICANT MUST PERFORM ENVIRONMENTAL DUE

DILIGENCE TO DETERMINE IF THE FILL MATERIALS ASSOCIATED WITH THE PROJECT

QUALIFY AS CLEAN FILL. ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS: INVESTIGATIVE

TECHNIQUES, INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS,

ELECTRONIC DATA BASE SEARCHES, REVIEW OF PROPERTY OWNERSHIP, REVIEW OF

PROPERTY USE HISTORY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES,

TRANSACTION SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS OR

AUDITS. ANALYTICAL TESTING IS NOT A REQUIRED PART OF DUE DILIGENCE UNLESS

VISUAL INSPECTION AND/OR REVIEW OF THE PAST LAND USE OF THE PROPERTY

INDICATES THAT THE FILL MAY HAVE BEEN SUBJECTED TO A SPILL OR RELEASE OF

REGULATED SUBSTANCE. IF THE FILL MAY HAVE BEEN AFFECTED BY A SPILL OR RELEASE

OF A REGULATED SUBSTANCE, IT MUST BE TESTED TO DETERMINE IF IT QUALIFIES AS

CLEAN FILL. TESTING SHOULD BE PERFORMED IN ACCORDANCE WITH APPENDIX A OF THE

DEPARTMENT'S POLICY "MANAGEMENT OF FILL".

6. FILL MATERIAL THAT DOES NOT QUALIFY AS CLEAN FILL IS REGULATED FILL. REGULATED

FILL IS WASTE AND MUST BE MANAGED IN ACCORDANCE WITH THE DEPARTMENT'S

MUNICIPAL OR RESIDUAL WASTE REGULATIONS BASED ON 25 PA. CODE CHAPTERS 287

RESIDUAL WASTE MANAGEMENT OR 271 MUNICIPAL WASTE MANAGEMENT, WHICHEVER IS

APPLICABLE. THESE REGULATIONS ARE AVAILABLE ON-LINE AT WWW.PACODE.COM.

1. AREAS WHICH ARE TO BE TOP-SOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES

(6 TO 12 INCHES ON COMPACTED SOILS) PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE

VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND

MULCHING, I.E. YARDS.

2. MULCH WITH MULCH CONTROL NETTING OR EROSION CONTROL BLANKETS MUST BE INSTALLED ON

ALL SLOPES 3:1 AND STEEPER.

3. STRAW MULCH SHALL BE APPLIED IN LONG STRANDS, NOT CHOPPED OR FINELY BROKEN.

4. GRADED AREAS ARE TO BE TEMPORARILY SEEDED AND MULCHED IMMEDIATELY FOLLOWING

EARTHMOVING PROCEDURES. TEMPORARY SEED SHALL BE ANNUAL RYE GRASS APPLIED AT THE

RATES SPECIFIED. MULCH SHALL BE HAY OR STRAW APPLIED AT THE RATE OF AT LEAST 3 TONS PER

ACRE.

5. PRIOR TO CONSTRUCTION SOIL TESTING SHALL BE PERFORMED TO DETERMINE ACTUAL RATES OF LIME APPLICATION. AT A MINIMUM, LIME SHALL BE APPLIED TO ALL TEMPORARILY SEEDED AREAS AT A RATE OF 410 LBS PER 1,000 SQ. YDS. PER TABLE 11.2 OF THE PA DEP EROSION AND SEDIMENT

POLLUTION CONTROL PROGRAM MANUAL.

6. PRIOR TO CONSTRUCTION SOIL TESTING SHALL BE PERFORMED TO DETERMINE ACTUAL RATES OF FERTILIZER APPLICATION FOR SEEDED AREAS. AT A MINIMUM, ALL TEMPORARILY SEEDED AREAS SHALL HAVE 10-10-10 FERTILIZER APPLIED AT A RATE OF 100 LBS PER 1,000 SQ. YDS. PER TABLE 11.2

OF THE PA DEP EROSION AND SEDIMENT POLLUTION CONTROL PROGRAM MANUAL.

7. ESTABLISH PERMANENT SEEDING AS SOON AS POSSIBLE AFTER FINAL GRADING IS COMPLETED.

PERMANENT SEEDING SHALL BE AT THE RATES SPECIFIED. LIME SHALL BE APPLIED AT A MINIMUM RATE OF 2,480 LBS PER 1,000 SQ. YDS. AND 10-10-20 FERTILIZER APPLIED AT A RATE OF 210 LBS PER 1,000 SQ. YDS. PER TABLE 11.2 OF THE PA DEP EROSION AND SEDIMENT POLLUTION CONTROL

PROGRAM MANUAL.

8. PERMANENTLY SEEDED AREAS SHALL HAVE HAY OR STRAW APPLIED AT THE RATE OF AT LEAST 3

TONS PER ACRE.

9. ANY AREAS WHERE HYDROSEED IS USED, MULCH IS NEEDED AT A MINIMUM RATE OF 3 TONS PER

ACRE.

TEMPORARY STABILIZATION & PERMANENT STABILIZATION

EROSION CONTROL BLANKETS (CURLEX MAT)

1. CURLEX MAT SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S

RECOMMENDATIONS.

2. INSPECT AFTER EACH STORM EVENT AND ON A WEEKLY BASIS. NEEDED REPAIRS SHOULD BE

INSTALLED IMMEDIATELY AFTER INSPECTION.

COMPLETION CERTIFICATE AND FINAL PLANS

WITHIN 30 DAYS AFTER THE COMPLETION OF EARTH DISTURBANCE ACTIVITIES AUTHORIZED BY

THIS PERMIT, INCLUDING THE PERMANENT STABILIZATION OF THE SITE AND PROPER

INSTALLATION OF PCSM BMPS IN ACCORDANCE WITH THE APPROVED PCSM PLAN, OR UPON

SUBMISSION OF THE NOT IF SOONER, THE PERMITTEE SHALL FILE WITH THE DEPARTMENT OR

BUCKS COUNTY CONSERVATION DISTRICT A STATEMENT SIGNED BY A LICENSED

PROFESSIONAL AND BY THE PERMITTEE CERTIFYING THAT WORK HAS BEEN PERFORMED IN

ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS PERMIT AND THE APPROVED E&S

AND PCSM PLANS.

CLEAN FILL & ENVIRONMENTAL DUE DILIGENCE

MAINTENANCE NOTESSTANDARD E&S CONTROL PLAN NOTES

INLET FILTER BAG

1. INLET FILTER BAGS SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE

MANUFACTURER'S RECOMMENDATIONS.

2. INSPECT AFTER EACH STORM EVENT AND ON A WEEKLY BASIS. NEEDED REPAIRS SHALL BE

CORRECTED IMMEDIATELY AFTER INSPECTION.

COMPOST CONCRETE WASHOUT

1. ALL CONCRETE WASHOUTS SHALL BE INSPECTED DAILY. DAMAGED OR LEAKING WASHOUTS SHALL BE

DEACTIVATED AND REPAIRED OR REPLACED IMMEDIATELY.

2. CONCRETE WASHOUT AREAS SHALL BE CLEARED OF CONCRETE/DEBRIS WHEN IT REACHES 75% OF

CAPACITY.

3. IMPERVIOUS GEOMEMBRANES SHALL BE REPLACED WITH EACH CLEANING OF THE WASHOUT.

4. CONCRETE MUST BE REMOVED BY FOLLOWING PROPER RECYCLING AND DISPOSAL OF MATERIALS

SPECIFICATIONS FOR LOCAL, STATE AND FEDERAL REQUIREMENTS AS REFERENCED IN THE RECYCLE &

DISPOSAL OF MATERIALS SECTION ON THIS SHEET.

CONSTRUCTION SEQUENCE

ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE FOLLOWING SEQUENCE.

EACH STAGE WILL BE COMPLETED IN COMPLIANCE WITH CHAPTER 102 REGULATIONS BEFORE ANY FOLLOWING STAGE IS INITIATED. CLEARING AND GRUBBING SHALL BE LIMITED TO ONLY THOSE AREAS DESCRIBED IN EACH

STAGE.

AT LEAST 7 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, THE OPERATOR SHALL INVITE ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES, ALL APPROPRIATE MUNICIPAL OFFICIALS AND THE EROSION AND SEDIMENT CONTROL PREPARER AND THE DESIGNATED LICENSED PROFESSIONAL TO A SCHEDULED PRE-CONSTRUCTION MEETING. ALSO, AT LEAST 3 WORKING DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, ALL CONTRACTORS INVOLVED SHALL NOTIFY THE PENNSYLVANIA ONE CALL SYSTEM, INC. AT

1-800-242-1776 FOR BURIED UTILITY LOCATIONS.

THE OPERATOR SHALL REMOVE FROM THE SITE, RECYCLE, OR DISPOSE OF ALL BUILDING MATERIALS AND WASTES IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA CODE

260.1 et seq. AND 287.1 et seq.

THE OPERATOR SHALL ASSURE THAT AN EROSION AND SEDIMENT CONTROL PLAN HAS BEEN PREPARED, APPROVED BY THE BOROUGH AND IS BEING IMPLEMENTED AND MAINTAINED FOR ALL PROPOSED SOIL/ROCK

SPOIL AND BORROW AREAS ON OR OFFSITE.

UPON COMPLETION OR TEMPORARY CESSATION OF THE EARTH DISTURBANCE ACTIVITY THAT WILL EXCEED 4 DAYS, OR ANY STAGE THEREOF, THE PROJECT SITE SHALL BE IMMEDIATELY STABILIZED WITH THE APPROPRIATE TEMPORARY OR PERMANENT STABILIZATION. (PLEASE NOTE THAT HYDROSEED IS NOT CONSIDERED STABILIZATION UNTIL IT GERMINATES). HAY OR STRAW MULCH MUST BE APPLIED AT 3.0 TONS PER

ACRE.

AS SOON AS SLOPES, CHANNELS, DITCHES, AND OTHER DISTURBED AREAS REACH FINAL GRADE, THEY MUST BE

STABILIZED.

WATER PUMPED FROM WORK AREAS SHALL BE TREATED FOR SEDIMENT REMOVAL PRIOR TO DISCHARGING TO

A SURFACE WATER.

ALL SUBSOILS SHALL BE SCARIFIED PRIOR TO TOPSOIL PLACEMENT. LICENSED PROFESSIONAL OVERSIGHT SHALL BE REQUIRED PRIOR TO TOPSOIL PLACEMENT TO CONFIRM EARTH SCARIFICATION. AREAS WHICH ARE TO BE TOP-SOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES (6 TO 12 INCHES ON COMPACTED SOILS) PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 6 INCHES OF

TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING, I.E. YARDS.

NO MORE THAN 15,000 SF OF DISTURBED AREA SHALL REACH FINAL GRADE BEFORE INITIATING SEEDING AND

MULCHING OPERATIONS.

1. PRIOR TO PROCEEDING WITH CONSTRUCTION ACTIVITES, THE CONTRACTOR SHALL FAMILIARIZE HIMSELF/HERSELF WITH ALL NOTES ON THE APPROVED EROSION & SEDIMENT POLLUTION CONTROL PLANS.

2. PRIOR TO PROCEEDING WITH CONSTRUCTION, CONFIRM THE LOCATION AND ELEVATION OF ALL EXISTING

UTILITIES. MAINTAIN AND PROTECT ALL EXISTING UTILITIES TO REMAIN AT ALL TIMES.

SEQUENCE OF CONSTRUCTION:

1. INSTALL ROCK CONSTRUCTION ENTRANCE AT THE PROPOSED ACCESS DRIVE OFF OF CHURCH ROAD DRIVEWAY AT THE LOCATION SHOWN ON THE APPROVED PLAN. ALL CONSTRUCTION VEHICLES SHALL

ENTER AND/OR EXIT THE SITE THROUGH CHURCH ST. ENTRANCE DURING CONSTRUCTION.

2. BEGIN INSTALLATION OF THE COMPOST FILTER SOCK AND INLET PROTECTION.

3. AFTER INSTALLATION OF ALL COMPOST FILTER SOCK IS COMPLETED, THE CONTRACTOR MAY BEGIN

EXCAVATION FOR CONCRETE PADS.

4. ONCE ALL E&S MEASURES HAVE BEEN INSTALLED AND STAKE OUT COMPLETED, COMMENCE WITH THE

INSTALLATION OF CONCRETE PADS.

5. AFTER INSTALLATION OF CONCRETE PADS, START WORK ON WORKOUT EQUIPMENT.

6. ONCE IMPROVEMENTS ARE COMPLETED AND ONCE THE SITE HAS ACHIEVED A MINIMUM OF 70% UNIFORM PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER SUFFICIENT TO RESIST ACCELERATED SURFACE EROSION, REMOVE TEMPORARY EROSION AND SEDIMENTATION BMP'S INCLUDING

ALL COMPOST SOCKS.

FL

OW

FLOW

DISTURBED AREA

UNDISTURBED AREA

SECTION

DISTURBED AREA

UNDISTURBED AREA

NOTES:

SOCK FABRIC SHALL MEET STANDARDS OF TABLE 4.1 OF THE PA DEP EROSION

CONTROL MANUAL. COMPOST SHALL MEET THE STANDARDS OF TABLE 4.2 OF THE PA

DEP EROSION CONTROL MANUAL.

COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF

THE BARRIER SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO

THE MAIN BARRIER ALIGNMENT. MAXIMUM SLOPE LENGTH ABOVE ANY BARRIER

SHALL NOT EXCEED THAT SPECIFIED FOR THE SIZE OF THE SOCK AND THE SLOPE OF

ITS TRIBUTARY AREA.

TRAFFIC SHALL NOT BE PERMITTED TO CROSS COMPOST FILTER SOCKS.

ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES 1/2 THE ABOVE

GROUND HEIGHT OF THE BARRIER AND DISPOSED IN THE MANNER DESCRIBED

ELSEWHERE IN THE PLAN.

COMPOST FILTER SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF

EVENT. DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER’S

SPECIFICATIONS OR REPLACED WITHIN 24 HOURS OF INSPECTION.

BIODEGRADABLE COMPOST FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS;

PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE

REPLACED ACCORDING TO MANUFACTURER’S RECOMMENDATIONS.

UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE

REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE

LATTER CASE, THE MESH SHALL BE CUT OPEN AND THE MULCH SPREAD AS A SOIL

SUPPLEMENT.

12 IN.

MIN.

STANDARD CONSTRUCTION DETAIL #4-1

COMPOST FILTER SOCK

NOT TO SCALE

COMPOST

FILTER SOCK

2 IN. x 2 IN. WOODEN

STAKES PLACED

10 FT ON CENTER

EXISTING

CONTOURS

2 IN. x 2 IN. WOODEN STAKES

PLACED 10 FT ON CENTER

COMPOST FILTER SOCK

BLOWN/PLACED

FILTER MEDIA

U:

\A cc ou nt s\W

CO

NM

\W

CO

NM

- M cK en zie

P ar k I m pr ov em en ts Pr oje ct\

DE

SI

GN

SH

EE

TS

\6

Ph as e

2E W or ko ut S ta tio ns \P lan s\C

S8

1.

TE

D:

/1

0/

:1

AM,

B

Y:

Gr eg or y K er r P

LO

TS

TY

LE

: Pe nn on i N

CS

.st b

PR

OJ

EC

T

ST

AT

US

CS8501

BY

N

O

D

AT

E R

EV

IS

IO

N

S

PH

AS

E 2E

M

AC

KE

N

ZI

E

PA

R

K W

O R

KO

U

T

ST

AT

IO

N S

C H

U R

C H

S

TR

EE

T

W

ES

T C

O N

SH

O

H O

C

KE

N ,P

A

FO

R

D S

TR

EE

T W

ES

T

C O

N

SH

O H

O C

KE

N

, P A

BO

R

O U

G H

O F

W

ES

T C

O N

SH

O

H O

C

KE

N

WCONM23001

GDK

2026/10/13

KRH

SHEET

APPROVED BY

OF7 7

DRAWN BY

DRAWING SCALE

DATE

PROJECT

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES

ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTED

TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON

THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION

OR ADAPTATION BY PENNONI ASSOCIATES FOR THE

SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS

SOLE RISK AND WITHOUT LIABILITY OR LEGAL

EXPOSURE TO PENNONI ASSOCIATES; AND OWNER

SHALL INDEMNIFY AND HOLD HARMLESS PENNONI

ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND

EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

AL

L

D

IM

EN

SI

O N

S M

U

ST

B E

VE

R

IF

IE

D B

Y C

O N

TR

AC

TO

R

AN

D

O W

N

ER

M U

ST

B

E N

O

TI

FI

ED

O F

AN

Y

D

IS

C R

EP

AN

C

IE

S

BE

FO

R

E

PR

O C

EE

D

IN

G

W

IT

H W

O

E& S

D

ET

AI

LS

PE

N

N O

N I A

SS

O

C

IA

TE

S

IN

C

H or iz on D riv e, S ui te

Ki ng o f P ru ss ia

, P A

T

0.

7.

F

0.

7.

BY

A

T N

O .1

/1 0/

R

EV

IS

ED

P

ER

M

C

PC

C O

M M

EN

TS

D

AT

ED

0/

1_COVER
COVER SHEET
2_EXISTING
DEMO PLAN
3_SITE
SITE PLAN
4_SITE DETAILS
CS6001
5_SITE DETAILS
CS6002
6_E&S
E&S PLAN
7_E&S DETAILS
CS8501

File details come from the government source that posted it. Updated .