8 00 01 15 List of Drawing Sheet.pdf
PDF 202 KB Posted
- Solicitation number
- 36C25821B0005
About this file
This solicitation is for construction services for Project 600-14-116 to renovate phlebotomy, pathology, histology and other lab spaces in Building 126 at the Tibor Rubin VA Medical Center in Long Beach, California. The contractor shall utilize the construction documents and specifications prepared by SRD Architects. The requirement calls for the alteration of real property. The solicitation includes the IFB and all attachments with full details of the project. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 is the contracting agency.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project 600-14-116, Renovate Pathology, Histology/Cytology, Other Lab Spaces B126 and B7 Swing Space.
Tibor Rubin VA Medical Center, Long Beach, CA
07-01-15
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
GI-000 COVER SHEET
GI-001 DRAWING INDEX
GI-002 PROJECT INFORMANTION, VICINITY MAP
GI-003 SYMBOLS AND ABBREVIATIONS
GI-004 GENERAL NOTES
GI-005 GENERAL NOTES
GI-010 TYPICAL DEVICE MOUNTING HEIGHT
GI-011 TYPICAL DEVICE MOUNTING HEIGHT
GI-012 ACCESSIBILITY ACCESS DIAGRAMS
GI-013 ACCESSIBILITY ACCESS STANDARD DIAGRAMS
GI-014 ACCESSIBILITY ACCESS STANDARD DIAGRAMS
GI-100 LIFE SAFETY CODE ANALYSIS
GI-101 FIRE AND LIFE SAFETY PLAN / EGRESS PATH - FIRST FLOOR
GI-102 LIFE SAFETY PLAN / EGRESS PATHS - FIRST FLOOR
GI-103 LIFE SAFETY PLAN / EGRESS PATHS - SECOND FLOOR
GI-104 LIFE SAFETY PLAN / EGRESS PATHS - SECOND FLOOR
GI-105 LIFE SAFETY PLAN / EGRESS PATHS - SECOND FLOOR
GI-201 3D RENDERINGS - FIRST FLOOR PHLEBOTOMY
GI-202 3D RENDERINGS - SECOND FLOOR HISTOLOGY/CYTOLOGY
GI-203 3D RENDERINGS - SECOND FLOOR ACCESSIONING/SPECIAL PROCEDURE
Structural
S-0 STRUCTURAL GENERAL NOTES
S-1 STRUCTURAL DETAILS
Architectural
7-AD-101
DEMOLITION / REMODEL FLOOR AND REFLECTED CEILING PLAN - BLDG 7 FIRST
FLOOR
7-AS-101 PHASING PLAN - BLDG 7 FIRST FLOOR
AS-100 ARCHITECTURAL SITE PLAN
AS-101 PHASING PLAN - FIRST FLOOR
AS-102 PHASING PLAN - SECOND FLOOR
AD-101 DEMOLITION PLAN - FIRST FLOOR
AD-102 DEMOLITION PLAN - SECOND FLOOR
Other Lab Spaces B126 and B7 Swing Space.
Tibor Rubin VA Medical Center, Long Beach, CA
07-01-15
00 01 15 - 2
AD-111 DEMOLITION REFLECTED CEILING PLAN - FIRST FLOOR
AD-112 DEMOLITION REFLECTED CEILING PLAN - SECOND FLOOR
AD-201 EXISTING PHOTOGRAPHS
AD-202 EXISTING PHOTOGRAPHS - HISTOLOGY / CYTOLOGY
AD-203 EXISTING PHOTOGRAPHS - INPATIENT LAB
AD-204 EXISTING PHOTOGRAPHS
AD-205 EXISTING PHOTOGRAPHS
AD-206 EXISTING PHOTOGRAPHS
AD-207 EXISTING PHOTOGRAPHS - BUILDING 7 SWING SPACE
AE-101 REMODEL FLOOR PLAN - FIRST FLOOR
AE-102 REMODEL FLOOR PLAN - SECOND FLOOR
AE-103 REMODEL FLOOR PLAN - SECOND FLOOR
AE-104 REMODEL FLOOR PLAN - SECOND FLOOR
AE-105 REMODEL FLOOR PLAN - SECOND FLOOR
AE-106 REMODEL FLOOR PLAN - SECOND FLOOR
AE-107 REMODEL FLOOR PLAN - SECOND FLOOR ROOF
AE-108 DIMENSION FLOOR PLAN - FIRST FLOOR - AREA A
AE-109 DIMENSION FLOOR PLAN - SECOND FLOOR - AREA B
AE-110 DIMENSION FLOOR PLAN - SECOND FLOOR - AREA C
AE-111 REMODEL REFLECTED CEILING PLAN - FIRST FLOOR
AE-112 REMODEL REFLECTED CEILING PLAN - SECOND FLOOR
AE-113 REMODEL REFLECTED CEILING PLAN - SECOND FLOOR
AE-114 REMODEL REFLECTED CEILING PLAN - SECOND FLOOR
AE-115 REMODEL REFLECTED CEILING PLAN - SECOND FLOOR
AE-201 INTERIOR ELEVATIONS
AE-202 INTERIOR ELEVATIONS
AE-203 INTERIOR ELEVATIONS
AE-204 INTERIOR ELEVATIONS
AE-205 INTERIOR ELEVATIONS
AE-206 INTERIOR ELEVATIONS
AE-207 INTERIOR ELEVATIONS
AE-208 INTERIOR ELEVATIONS
AE-209 INTERIOR ELEVATIONS
AE-210 INTERIOR ELEVATIONS
AE-211 INTERIOR ELEVATIONS
AE-212 INTERIOR ELEVATIONS
AE-213 INTERIOR ELEVATIONS
AE-214 INTERIOR ELEVATIONS
AE-215 INTERIOR ELEVATIONS
AE-216 INTERIOR ELEVATIONS
AE-217 INTERIOR ELEVATIONS
Other Lab Spaces B126 and B7 Swing Space.
Tibor Rubin VA Medical Center, Long Beach, CA
07-01-15
00 01 15 - 3
AE-218 INTERIOR ELEVATIONS
AE-219 INTERIOR ELEVATIONS
AE-220 INTERIOR ELEVATIONS
AE-221 INTERIOR ELEVATIONS
AE-222 INTERIOR ELEVATIONS
AE-223 INTERIOR ELEVATIONS
AE-300 BUILDING SECTIONS
AE-400 ENLARGED FLOOR PLANS - FIRST FLOOR
AE-401 ENLARGED FLOOR PLANS - SECOND FLOOR
AE-402 ENLARGED FLOOR PLANS - SECOND FLOOR
AE-500 INTERIOR PLAN DETAILS
AE-501 INTERIOR PLAN DETAILS
AE-502 INTERIOR PLAN DETAILS
AE-505 INTERIOR WALL DETAILS
AE-506 INTERIOR WALL DETAILS
AE-507 INTERIOR WALL DETAILS
AE-510 PENETRATION DETAILS
AE-511 CASEWORK TYPES AND DETAILS
AE-512 CASEWORK TYPES AND DETAILS
AE-513 CASEWORK TYPES AND DETAILS
AE-515 MISCELLANEOUS DETAILS
AE-516 MISCELLANEOUS DETAILS
AE-517 ROOF DETAILS
AE-520 SUSPENDED CEILING SYSTEM
AE-521 CEILING DETAILS - ACOUSTICAL CEILING
AE-522 CEILING DETAILS - GYPSUM BOARD
AE-601 DOOR TYPES AND SCHEDULE
AE-602 DOOR DETAILS
AE-603 STOREFRONT TYPES AND DETAILS
AE-605 FLOOR DETAILS
AF-101 ROOM FINISH PLAN - FIRST FLOOR
AF-102 ROOM FINISH PLAN - SECOND FLOOR
AF-601 ROOM FINISH SCHEDULE
AW-100 INTERIOR SIGNAGE TYPES AND DETAILS
AW-101 INTERIOR SIGNAGE TYPES AND DETAILS
AW-102 SIGNAGE PLAN - FIRST FLOOR
AW-103 SIGNAGE PLAN - SECOND FLOOR - AREA B
AW-104 SIGNAGE PLAN - SECOND FLOOR - AREA C
EQUIPMENT
QJ-101 EQUIPMENT PLAN - FIRST FLOOR
Other Lab Spaces B126 and B7 Swing Space.
Tibor Rubin VA Medical Center, Long Beach, CA
07-01-15
00 01 15 - 4
QJ-102 EQUIPMENT PLAN - SECOND FLOOR
QJ-103 EQUIPMENT PLAN - SECOND FLOOR
QJ-104 EQUIPMENT LIST
QJ-105 EQUIPMENT LIST
QJ-106 EQUIPMENT LIST
SECURITY
TY - 001 PHYSICAL ACCESS CONTROL SYSTEM
TY - 002 PHYSICAL ACCESS CONTROL SYSTEM - DOOR DIAGRAMS
FIRE PROTECTION
FX-001 GENERAL NOTES AND SHEET INDEX
FD-101 DEMOLITION FIRE PROTECTION PLAN - FIRST FLOOR
FD-102 DEMOLITION FIRE PROTECTION PLAN - SECOND FLOOR
FX-102 OVERALL SECOND FLOOR REMODEL FIRE PROTECTION PLAN
FX-201 REMODEL FIRE PROTECTION PLAN - FIRST FLOOR
FX-202 REMODEL FIRE PROTECTION PLAN - SECOND FLOOR AREA A
FX-203 REMODEL FIRE PROTECTION PLAN - SECOND FLOOR AREA C
FX-401 DETAILS
MECHANICAL
MH-001 GENERAL NOTES AND SHEET INDEX
MH-002 LEGENDS, ABBREVIATIONS, AND SYMBOLS
MH-003 EQUIPMENT SCHEDULES
MH-004 EQUIPMENT SCHEDULES
MH-005 ROOM VENTILATION AND PRESSURIZATION SCHEDULE
MH-006 ROOM VENTILATION AND PRESSURIZATION SCHEDULE
MH-007 PRESSURIZATION AND VENTILATION SCHEDULE
MH-008 AIRFLOW DIAGRAMS
MH-009 NARRATIVE OF THE SCOPE OF WORK
MH-010 SEQUENCE OF OPERATIONS 1ST FLOOR
MH-011 SEQUENCE OF OPERATIONS 2ND FLOOR
7-MD-101 MECHANICAL DEMOLITION PLAN - SWING SPACE
MD-101 MECHANICAL DEMOLITION PLAN - FIRST FLOOR
MD-102 MECHANICAL DEMOLITION PLAN - SECOND FLOOR
MD-103 DEMOLITION MECHANICAL PLAN - DEMO ROOF AREA B
MH-101 MECHANICAL REMODEL PLAN - FIRST FLOOR
MH-101-P REMODEL MECHANICAL PIPING PLAN - FIRST FLOOR
MH-102 OVERALL REMODEL MECHANICAL PLAN - SECOND FLOOR
MH-201 MECHANICAL REMODEL PLAN - SECOND FLOOR
MH-201-P REMODEL MECHANICAL PIPING PLAN - SECOND FLOOR
Other Lab Spaces B126 and B7 Swing Space.
Tibor Rubin VA Medical Center, Long Beach, CA
07-01-15
00 01 15 - 5
MH-202 MECHANICAL REMODEL PLAN - SECOND FLOOR
MH-202-P REMODEL MECHANICAL PIPING PLAN - SECOND FLOOR
MH-203 MECHANICAL REMODEL PLAN - SECOND FLOOR
MH-204 MECHANICAL REMODEL PLAN - SECOND FLOOR
MH-205 MECHANICAL ROOF PLAN - AREA B
MH-206 MECHANICAL ROOF PLAN - AREA C
MH-401 MECHANICAL DETAILS
MH-402 MECHANICAL DETAILS
MH-403 MECHANICAL DETAILS
MH-601 ZONING SCHEMATIC
MH-602 PHLEBOTOMY SCHEMATIC & SOO
MH-603 WAITING AND RECEPTION SCHEMATIC & SOO
MH-604 PROCESSIGN & SUPERVISOR OFFICE SCHEMATIC DIAGRAM & SOO
MH-605 ELECTRICAL ROOM & HAC CLOSET SCHEMATIC DIAGRAM
MH-606 ACCESIONING & SPECIAL PROCEDURES SCHEMATIC DIAGRAM
MH-607 MOLECULAR PATHOLOGY SCHEMATIC DIAGRAM
MH-608 HISTOLOGYCYTOLOGY SCHEMATIC DIAGRAM
PLUMBING
PL-001 GENERAL NOTES AND SHEET INDEX
PL-002 PLUMBING SCHEDULES
7-PD-101 DEMOLITION PLUMBING - BLDG 7 FIRST FLOOR
PD-100 DEMOLITION OVERALL PLUMBING PLAN - FIRST FLOOR
PD-101 DEMOLITION PLUMBING PLAN - FIRST FLOOR W&V
PD-101.1 DEMOLITION PLUMBING PLAN - FIRST FLOOR WATER
PD-200 DEMOLITION OVERALL PLUMBING PLAN - SECOND FLOOR WATER
PD-201 DEMOLITION PLUMBING PLAN - SECOND FLOOR W&V
PD-201.1 DEMOLITION PLUMBING PLAN - SECOND FLOOR WATER
PL-100 REMODEL OVERALL PLUMBING PLAN - FIRST FLOOR
PL-101 REMODEL PLUMBING PLAN - FIRST FLOOR W&V
PL-101.1 REMODEL PLUMBING PLAN - FIRST FLOOR WATER
PL-200 REMODEL OVERALL PLUMBING PLAN - SECOND FLOOR
PL-201.1 REMODEL PLUMBING PLAN - SECOND FLOOR AREA A WATER
PL-202 REMODEL PLUMBING PLAN - SECOND FLOOR AREA C W&V
PL-202.1 REMODEL PLUMBING PLAN - SECOND FLOOR AREA C WATER
PL-203 REMODEL PLUMBING PLAN - SECOND FLOOR AREA E W&V
PL-203.1 REMODEL PLUMBING PLAN - SECOND FLOOR AREA E WATER
PL-401 PLUMBING DETAILS
ELECTRICAL
EE-001 GENERAL NOTES, APPLICABLE CODES & DRAWING LIST
Other Lab Spaces B126 and B7 Swing Space.
Tibor Rubin VA Medical Center, Long Beach, CA
07-01-15
00 01 15 - 6
EE-002 SYMBOLS LIST AND ABBREVIATIONS
EE-003 SINGLE LINE DIAGRAM AND LOAD SCHEDULES
EE-004 SINGLE LINE DIAGRAM
EE-005 PANEL SCHEDULES
EE-006 PANEL SCHEUDLES
EE-007 LIGHTING FIXTURE SCHEDULES
EE-008 FIRST FLOOR LIGHTING PHOTOMETRICS
EE-009 SECOND FLOOR LIGHTING PHOTOMETRICS AREA B
EE-010 SECOND FLOOR LIGHTING PHOTOMETRICS AREA C
EE-011 SECOND FLOOR LIGHTING PHOTOMETRICS CORRIDORS
EE-100 SITE PLAN
7-ED-101 DEMOLITION / REMODEL FLOOR AND RCP - BLDG 7 FIRST FLOOR
ED-101 DEMOLITION POWER AND SIGNAL PLAN - FIRST FLOOR
ED-102 DEMOLITION POWER AND SIGNAL PLAN - SECOND FLOOR
ED-111 DEMOLITION LIGHTING PLAN - FIRST FLOOR
ED-112 DEMOLITION LIGHTING PLAN - SECOND FLOOR
EE-101 REMODEL POWER PLAN - FIRST FLOOR
EE-102 OVERALL MODEL PLAN - SECOND FLOOR
EE-103 REMODEL POWER PLAN - SECOND FLOOR
EE-104 REMODEL POWER PLAN - SECOND FLOOR
EE-111 REMODEL LIGHTING PLAN - FIRST FLOOR
EE-112 REMODEL LIGHTING PLAN - SECOND FLOOR OVERALL
EE-113 REMODEL LIGHTING PLAN - SECOND FLOOR AREA B
EE-114 REMODEL LIGHTING PLAN - SECOND FLOOR AREA C
EE-115 REMODEL LIGHTING PLAN - SECOND FLOOR
EE-121 REMODEL SIGNAL PLAN - FIRST FLOOR
EE-123 REMODEL SIGNAL PLAN - SECOND FLOOR
EE-124 REMODEL SIGNAL PLAN - SECOND FLOOR
EE-131 REMODEL FIRE ALARM PLAN - FIRST FLOOR
EE-133 REMODEL FIRE ALARM PLAN - SECOND FLOOR
EE-134 REMODEL FIRE ALARM PLAN - SECOND FLOOR
EE-135 ELECTRICAL ROOF PLAN - AREA B
EE-136 ELECTRICAL ROOF PLAN - AREA C
EE-507 FIRE ALARM RISER DIAGRAMS AND BATTERY CALCULATIONS
EE-508 FIRE ALARM DETAILS
EE-601 ELECTRICAL DETAILS
EE-602 ELECTRICAL DETAILS
EE-603 ELECTRICAL DETAILS
RESOURCE
RS-101 EXISTING STRUCTURAL PLAN - SECOND FLOOR
Other Lab Spaces B126 and B7 Swing Space.
Tibor Rubin VA Medical Center, Long Beach, CA
07-01-15
00 01 15 - 7
RS-102 EXISTING STRUCTURAL PLAN - SECOND FLOOR
RS-103 EXISTING STRUCTURAL PLAN - SECOND FLOOR ROOF
RS-104 EXISTING STRUCTURAL PLAN - SECOND FLOOR ROOF
RS-105 EXISTING STRUCTURAL DETAILS
RS-106 EXISTING STRUCTURAL DETAILS
- - - END - - -
File details come from the government source that posted it. Updated .