This document contains clarification questions and answers regarding construction project 600-14-116 at the VA Long Beach Health Care System campus to renovate phlebotomy, pathology and multiple lab spaces in Building 126. The clarifications provide additional details on equipment specifications, such as confirming a 32-inch flat screen monitor on wall and serial numbers for specified equipment. It also addresses questions on patching concrete walls where ductwork is removed, the freight elevator capacity of 5,000 pounds, and that the hazardous materials abatement plan should be prepared by the general contractor or abatement subcontractor as the asbestos flooring locations are identified in the hazardous materials report.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clarifications Construction - Bldg 126 Renovate Phlebotomy, Pathology and Multiple Project Number 600-14-116 VA Long Beach Health Care System (VALBHCS - 600) 02/19/2021
| RFI Number |
| Question |
| Answer |
Referencing Vet Link Monitor (EQ-5130) furnished and installed by contractor in Equipment List.
EQ-513 on Plan QJ-101 & Equipment List QJ-106 is 32" Flat Screen high resolution LED Monitor on the wall.
Referencing Sheet 7-AD-101 keynote 4 calls out for patching the exterior concrete wall where the vents are removed.
Refer to existing photographs on AD-207 for patching of concrete wall at removed of ductwork. The size of openings are based on size of the ductwork being removed. Thickness of the concrete patch shall match thickness of the existing wall.
Referencing maximum weight allowed in the freight elevator.
Freight elevator has a maximum capacity of 5000 lb.
Referencing project information notes on sheet GI-002, abatement of ACM flooring in the corridors.
There are no additional details outside of what is in the hazardous materials report.
Location is provided in asbestos report.
Quantity will be found through field investigation.
The Hazardous Material Abatement Plan should be prepared by GC/Abatement Subcontractor.
Serial Numbers for specified equipment are as follows:
With the blocks that do not have a Serial Number listed; it is not required.