About this file

This meeting minutes template outlines details for a construction contract between the Department of Veterans Affairs and an unnamed contractor. Key information includes the contract number and project number for renovating phlebotomy, pathology, and multiple lab spaces at the Tibor Rubin VA Medical Center in Long Beach, California. The template lists sections for attendees, progression of work with percentage completion metrics, action items due from both the government and contractor along with associated details and due dates, and an additional notes section. It provides a means to document discussions, tasks, and deliverables associated with the contract for renovating several medical lab spaces at the specified VA facility.

View the file

Other files

File Type Posted
25 - Clarifications - 20210301.docx DOCX document
36C25821B0005 0003.docx DOCX document
23 08 71 00-REV1 Door Hardware.pdf PDF
24 AE-601 - DOOR TYPES AND SCHEDULE.pdf PDF
36C25821B0005 0002.docx DOCX document
22 - Clarifications - 20210219.docx DOCX document
18 VA Long Beach ACM Survey Report -B7.pdf PDF
36C25821B0005 0001.docx DOCX document
17 AE-101 - REMODEL FLOOR PLAN - FIRST FLOOR.pdf PDF
21 Site Visit SignIn Sheet 600-14-116 Bldg 126 Reno.pdf PDF
19 Elix Product Data - 51_SPLT_APPENDIX_B_EQUIP PRODUCT DATA.pdf PDF
20 - RFI Log _Responses 20210211.docx DOCX document
12 DBA Wage Determination General Decision Number CA20200022 01-08-2021.pdf PDF
16 AE-601 - DOOR TYPES AND SCHEDULE.pdf PDF
5 600-14 116 APPENDIX_C_PRODUCT DATA R1.pdf PDF
14 Material Approval Submittal Template.pdf PDF
2 600-14-116 SPEC FINAL SUBMITTAL VOL2.pdf PDF
4 600-14-116 APPENDIX_B_EQUIP PRODUCT DATA.pdf PDF
7 IT-SOP 07-013 Cable Installation Labeling and Testing Ver. 2.pdf PDF
1 600-14-116 SPEC FINAL SUBMITTAL VOL1.pdf PDF
3 600-14-116 APPENDIX A ASBESTOS INSPECTION REPORT.pdf PDF
8 00 01 15 List of Drawing Sheet.pdf PDF
15 VHA STANDARDIZED VENDOR FILE PROCEDURE.docx DOCX document
6 600-14-116 DRAWINGS FINAL .pdf PDF
10 01 00 00 GENERAL REQUIREMENTS.pdf PDF
9 00 01 10 VHA MASTER SPECIFICATIONS .pdf PDF
11 01 35 26 SAFETY REQUIREMENTS.pdf PDF
12 DBA Wage Determination General Decision Number CA20200022 01-01-2021.pdf PDF
IFB - 36C25821B0005_1 FINAL - .docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF VETERANS AFFAIRS

Network Contracting Office (NCO) 22G

777 Missouri Ave., Phoenix, AZ 85014

Meeting Minutes

DATE CONTRACTOR

PROJECT TITLE

CONTRACT NUMBER

PROJECT NUMBER

PURCHASE ORDER (PO) NUMBER

Attendees

Name Organization Phone Email

The Contracting Officer is the only person authorized to bind the U.S. Government.

***individuals whom act outside their delegated authority may be held personally liable IAW FAR 1.602-2(7)(v)***

1. PROGRESSION OF WORK

Projected Percentage of Completion: %

Actual Percentage of Completion: %

Contract Period of Performance End Date:

2. ACTION ITEMS DUE FROM GOVERNMENT

Type Description (Identifier, number, etc) Date of

Submission

3. ACTION ITEMS DUE FROM CONTRACTOR

Type Description (Identifier, number, etc) Due Date

4. ADDITIONAL NOTES (DISCUSSION)

Signature below constitutes acknowledgement that the details listed herein as they pertain to this document, are complete and accurate to the best of signers knowledge and belief.

CONTRACTOR (date)

CONTRACTING OFFICER REPRESENTATIVE (COR) (date)

DATE:
CONTRACTOR:
PROJECT TITLE:
CONTRACT NUMBER:
PROJECT NUMBER:
PURCHASE ORDER PO NUMBER:
NameRow1:
OrganizationRow1:
PhoneRow1:
EmailRow1:
NameRow2:
OrganizationRow2:
PhoneRow2:
EmailRow2:
NameRow3:
OrganizationRow3:
PhoneRow3:
EmailRow3:
NameRow4:
OrganizationRow4:
PhoneRow4:
EmailRow4:
NameRow5:
OrganizationRow5:
PhoneRow5:
EmailRow5:
NameRow6:
OrganizationRow6:
PhoneRow6:
EmailRow6:
NameRow7:
OrganizationRow7:
PhoneRow7:
EmailRow7:
Contract Period of Performance End Date:
Description Identifier number etcRow1:
Date of SubmissionRow1:
Description Identifier number etcRow2:
Date of SubmissionRow2:
Description Identifier number etcRow3:
Date of SubmissionRow3:
Description Identifier number etcRow4:
Date of SubmissionRow4:
Description Identifier number etcRow5:
Date of SubmissionRow5:
Description Identifier number etcRow6:
Date of SubmissionRow6:
Description Identifier number etcRow7:
Date of SubmissionRow7:
Description Identifier number etcRow8:
Date of SubmissionRow8:
Description Identifier number etcRow9:
Date of SubmissionRow9:
Description Identifier number etcRow1_2:
Due DateRow1:
Description Identifier number etcRow2_2:
Due DateRow2:
Description Identifier number etcRow3_2:
Due DateRow3:
Description Identifier number etcRow4_2:
Due DateRow4:
Description Identifier number etcRow5_2:
Due DateRow5:
Description Identifier number etcRow6_2:
Due DateRow6:
Description Identifier number etcRow7_2:
Due DateRow7:
Description Identifier number etcRow8_2:
Due DateRow8:
4 ADDITIONAL NOTES DISCUSSION:
Projected Percentage:
Actual Percentage:
KTR Sig Date:
Contractor Name & Title:
COR Name and Title:
COR Sig Date:
Type G to C_1: [--select--]
Type G to C_2: [--select--]
Type G to C_3: [--select--]
Type G to C_4: [--select--]
Type G to C_5: [--select--]
Type G to C_6: [--select--]
Type G to C_8: [--select--]
Type G to C_7: [--select--]
Type G to C_9: [--select--]
Type KTR to G _ 01: [--select--]
Type KTR to G _ 02: [--select--]
Type KTR to G _ 04: [--select--]
Type KTR to G _ 03: [--select--]
Type KTR to G _ 05: [--select--]
Type KTR to G _ 06: [--select--]
Type KTR to G _ 07: [--select--]
Type KTR to G _ 08: [--select--]

File details come from the government source that posted it. Updated .