The document is a Request for Information (RFI) spreadsheet for the Fort Thompson Duplex Construction project, containing 26 detailed technical questions and responses from potential bidders to the Indian Health Service (IHS). The RFI addresses specific construction details for duplex buildings in Fort Thompson, South Dakota, including inquiries about materials, utilities, mechanical systems, and construction specifications.
Key project details include a 100% set-aside for Indian Small Business Economic Enterprises (ISBEE) under NAICS code 236116, with a $45 million size standard. The project involves constructing one duplex building with an option for a second, serving as staff quarters for the Fort Thompson Service Unit. The construction duration is 365 calendar days after Notice to Proceed, and the solicitation will be evaluated using a Lowest Price Technically Acceptable (LPTA) method. Notably, the RFI confirms specific details such as water and sewer service installation, plumbing requirements, and clarifications on utility connections, with responses indicating that only services for the currently constructed units should be installed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B05 Amendment 6.pdf | ||
| S111.pdf | ||
| RFIs 12.8.2025.xlsx | XLSX spreadsheet | |
| B05 Amendment 5.pdf | ||
| B05 Amendment 4.pdf | ||
| RFIs 11.12.2025.xlsx | XLSX spreadsheet | |
| RFIs 11.07.2025.xlsx | XLSX spreadsheet | |
| B05 Amendment 3.pdf | ||
| RFIs 11.05..2025.xlsx | XLSX spreadsheet | |
| B05 Amendment 2.pdf | ||
| B05 Amendment 1.pdf | ||
| Site Visit sign in 10.15.25.pdf | ||
| Specifications Vol 2_Duplex Construction.pdf | ||
| RFIs 10.29.2025.xlsx | XLSX spreadsheet | |
| Specifications Vol 1_Duplex Construction.pdf | ||
| Geotech report.pdf | ||
| RFIs 10.23.2025.xlsx | XLSX spreadsheet | |
| Attachment 5 Self Performed Calculation Sheet.docx | DOCX document | |
| Attachment 4 Civil Plans.pdf | ||
| Attachment 6 Company Specialized Experience Form.docx | DOCX document | |
| B01 25R00076.pdf | ||
| Attachment 2 SOW.pdf | ||
| Attachment 3 Crawlspace Plans.pdf | ||
| Attachment 8 IHS IEE Representation Form.pdf | ||
| Attachment 1 Wage Determination SD20250003.pdf | ||
| Attachment 7 Past Performance Questionnaire.docx | DOCX document |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Number | RFI | Response |
| 1 | What material is the water proofing membrane shown on the concrete foundation walls? Is it a fabric type membrane or a painted on petroleum based type of membrane? Is a specification avaialble? | See specifications - Division 07 |
| 2 | The appliances are tagged “To Be Determined”. Are the appliances to be included? Is there a specification available? | See specifications - Section 113013 |
| 3 | Are window shades to be included? I do not see a reference on the window page. | See specifications - Section 122413 |
| 4 | Has anyone inquired about changing the I-Joist floor assembly to 18” floor trusses, similar to the duplexes in Wanblee, Kyle and Pine Ridge? | I will forward this change to our Designers. |
| 5 | What is a T-BUR line is? Is this an internal IHS line? | |
| 6 | Is a specification book and geo tech report available for these duplexes? | See SAM.gov posting updated 10/24/2025 |
| 7 | Structural drawings show stair framing but no stairs appear in the architectural. Please confirm that there are no stairs. | confirmed - there are no stairs |
| 8 | Structural framing plan looks like the TJI’s are bearing on a ledge on the inside of the foundation, but the detail shows it bearing on top of the foundation. Please confirm construction. | I will forward this question to our Designers. |
| 9 | How is the party wall to be framed as there are no details. Should we include an extra TJI and a gable end truss at each wall? Please clarify. | I will forward this question to our Designers. |
| 10 | Civil plans shown 1” PE water service line feeding duplexes. Does this line need to be larger to also accommodate the fire sprinkler system? | I will forward this question to our Designers. |
| 11 | Are we to bid the project to include the ground source heat pump and in-ground hydronic piping system, or will this be changed to a forced air system? If forced air, will it be electric or gas? | Bid based on current drawings and specs |
| 12 | Plans show water lines and back flow preventer in the garages, which could be a freeze concern. Shall we plan on having this plumbing relocated to the mechanical rooms? | I will forward this question to our Designers. |
| 13 | Will the answers previously provided to the RFI's submitted during the 2023 solicitation for this project apply to this current solicitation? It appears the drawings have not changed from 2023. If so, please issue formally. | This is a new solicitaiton, previous RFI's will not be considered. |
| 14 | The interior elevations show that the exterior of the cabinets are Oak (wood) but the interiors are white melamine. Do you want the entire cabinet to be residential quality wood? Or do you want a high-quality commercial cabinet with an interior of white melamine shelf/interior finish and the outside being a flat oak veneer door? Typically, we would use plastic laminate on the exterior in lieu of oak veneer as veneer is much more expensive. | I will forward this question to our Designers. |
| 15 | Please provide color information for the cabinets. | I will forward this question to our Designers. |
| 16 | Elevations call for countertops to be Plastic laminate countertops w/ 3mm PVC edges but the detail shown on 11/A411 shows a solid surface SS-1 countertop. Please confirm what material we are to bid as countertops for both kitchen an bath areas. | I will forward this question to our Designers. |
| 17 | Will there be window sills other than a drywall return? If so, what is the material? | I will forward this question to our Designers. |
| 18 | What type of brackets do you want under the restroom laminate shelves in the restrooms(9/A411)? | I will forward this question to our Designers. |
| 19 | Please confirm that this bid should on the Northern Cheyenne Tribe (as indicated in the TOPR) since Fort Thompson, SD is located within the Crow Creek Sioux Reservation. | confirmed - Fort Thompson is located within the Crow Creek Reservation |
| 20 | As far as the sanitary goes, only two duplexes are being constructed at this time so should we plan on tying into the existing sanitary on both North and South sides as well as including both manholes and only installing the services for the two duplexes or all 4? | Yes, that is correct. |
| 21 | As far as the watermain goes, only two duplexes are being constructed at this time so should we plan on tying into the existing watermain on both the North and South sides as well and only installing the services for the two duplexes or all 4? Or should we just figure installing all underground utilities? | Only install the water service to the units being constructed now. |
| 22 | Is there a specifications document? | See SAM.gov posting updated 10/24/2025 |
| 23 | Will the SD state plumbing commission be inspecting plumbing or not due to tribal laws? | No they will not. |
| 24 | Do we need to include a submittal of all materials, faucets and equipment needed for the plumbing or will the IHS provide that? | Include in a submittal. |
| 25 | Would a submittal be needed to change domestic water piping from overhead to the crawlspace due to cold climate? We cannot pipe water in unconditioned space | Include in a submittal |
| 26 | It is unclear what the scope is of the site utilities required as part of this RFP. The SOW references C204, C308, C309 and C310, which all show the new utility mains for 4 units. Are we to install the new water and sewer mains and manholes as shown on C204 as part of this project, or are the mains already installed, and we are just tying into them for the new duplexes? Please clarify what is required. | The mains are not installed. Install new sewer including both manholes. Water and sewer service will only be needed to the units currently being constructed |