This is a mechanical/plumbing underfloor plan drawing labeled "M-4" that appears to be part of the construction documents for the Claremore site preparation project. The drawing shows detailed plumbing layouts and connections below the floor level, including pipe sizes, routing, and connections. It was prepared by Hudgins Thompson Ball Associates (architects/engineers) and contains various plumbing notations, including a specific note about a 2-inch line connection in the west wall. The drawing is a technical blueprint that would be used by contractors to understand the underground plumbing requirements for the modular building installation project.
This drawing is one component of the larger construction bid package for the $1-5 million site preparation project at Claremore Indian Hospital, which involves preparing the site for a new 64'8" x 72' modular clinical building. The document appears to be from a complete set of construction drawings that bidders would use to develop their proposals for the 120-day construction project that must be completed by September 15, 2025.
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Floor penetration for 2"-L doesn't exist, connected to 2"-S in wall to the west