B05 Attachment A3-1 Pre-Proposal Inquiries 1-7.pdf

PDF 233 KB Posted

Attached to
Mescalero Indian Hospital Expansion & Renovation
Solicitation number
75H701-22-R-00039
Issued by

View the file

Other files

File Type Posted
B01 Attachment J03 Drawings Addendum No. 5.pdf PDF
B05 Attachment A22-1 Pre-Proposal Inquiries 1-104.pdf PDF
B05 Amendment No. A00022.pdf PDF
B01 Attachment J01 Specifications Addendum No. 1.pdf PDF
B05 Amendment No. A00021.pdf PDF
B05 Attachment A20-1 Pre-Proposal Inquiries 1-101.pdf PDF
B05 Amendment No. A00020.pdf PDF
B05 Attachment 01 Wage Determination NM20230025_06_09_2023.pdf PDF
B05 Amendment No. A00019.pdf PDF
B05 Amendment No. A00018.pdf PDF
B05 Attachment A18-1 Pre-Proposal Inquiries 1-100.pdf PDF
B01 Attachment J03 Drawings Addendum No. 3_Rev1.pdf PDF
B05 Amendment No. A00017.pdf PDF
B01 Attachment J32 QPEC letter.pdf PDF
B05 Attachment A17-1 Pre-Proposal Inquiries 1-95.pdf PDF
B05 Attachment A16-1 Pre-Proposal Inquiries 1-85.pdf PDF
B01 Attachment J30 Nystrom Horizontal Expansion Control System.pdf PDF
B01 Attachment J31 Kingspan Accent Fincut sheet.pdf PDF
B01 Attachment J03 Drawings Addendum No. 3.pdf PDF
B05 Attachment 01 Wage Determination NM20230025_03_31_2023.pdf PDF
B01 Attachment J03 Drawings Addendum No. 4.pdf PDF
B05 Amendment No. A00016.pdf PDF
B01 Attachment J29 Ground Set Flagpoles.pdf PDF
B05 Amendment No. A00015.pdf PDF
B05 Amendment No. A00014.pdf PDF
B01 Attachment J25 Rigid vinyl sheet specifications.pdf PDF
B05 Attachment A13-1 Pre-Proposal Inquiries 1-69.pdf PDF
B01 Attachment J28 CMU COLOR Onyx Split.pdf PDF
B05 Amendment No. A00013.pdf PDF
B01 Attachment J26 3form installation manual.pdf PDF
B01 Attachment J27 3form Antique Fleur Spec Sheet.pdf PDF
B01 Attachment J23 Wall guards specifications.pdf PDF
B01 Attachment J24 High impact corner guard specifications.pdf PDF
B01 Attachment J22 Dog House Detail.pdf PDF
B05 Amendment No. A00012.pdf PDF
B01 Attachment J20 Soil borings.pdf PDF
B05 Attachment A12-1 Pre-Proposal Inquiries 1-30.pdf PDF
B01 Attachment J18 Price Breakdown- revised January 2023.xlsx XLSX spreadsheet
B01 Attachment J21 HABS Report.pdf PDF
B01 Attachment J03 Drawings Addendum No. 2.pdf PDF
B05 Attachment 01 Wage Determination NM20230025_01_06_2023.pdf PDF
B05 Amendment No. A00011.pdf PDF
B05 Amendment No. A00010.pdf PDF
B05 Amendment No. A00009.pdf PDF
B05 Amendment No. A00008.pdf PDF
B05 Amendment No. A00007.pdf PDF
B05 Amendment No. A00006.pdf PDF
B01 Attachment J13 IHS IEE Representation Form_Jan 2022.pdf PDF
B05 Amendment No. A00005.pdf PDF
B05 Amendment No. A00004.pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment of Solicitation Amendment A00003 under Solicitation 75H701-22-R-00039 Mescalero Indian Hospital Expansion & Renovation

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-21-R-00049

PROJECT:

Mescalero Indian Hospital Expansion & Renovation

LOCATION: Mescalero, NM

PROJECT NO: 131038

DOCUMENT

OWNER: Shaukat Syed PHONE: 214-767-3934 DOCUMENTS:

DATE: DEPARTMENT: IHS/DES

Item No.

Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response

Amendment A00003 dated 05/25/2022

1. RFP

Drawings S-2, S-3, & S-6 doesn’t give exact elevation for top footings.

The footing schedule on drawing S-2 detail A-4 doesn’t indicate elevations either. Please provide footing elevations on sheet S-5.

COR Sheets C-2, C-3 and C-5 show finish floor elevations for existing building and new addition.

2. RFP

Currently, the specification calls for Air Blocc 07 regard to above project. We would like to request that our AIR-SHIELD LMP be reviewed as a liquid membrane vapor permeable material here. Please let me know if it’s acceptable it would be greatly appreciated.

CO

Specification section 012500 Substitution Procedures explains the administrative and procedural requirements for substitutions. IHS does not give prior approval on any materials prior to award.

3. RFP Would you consider renovations under $5 million for past performance examples? CO

Each project submitted is evaluated as a whole when determining relevancy and the project cost is only one part of determining relevancy. As stated in Section L.11, Factor 1, “Relevant” is defined as experience with managing renovation/expansion projects that are similar to those as described in the Scope of Work (See Section C of this solicitation).” So while the range is stated of submitting projects between $5M and $10M, any project submitted outside this range will be determined relevant or not relevant based on the project as a whole.

4. RFP Would you consider renovations in other specialty areas, outside of hospital settings CO

Please see answer to Question #3. Also, as stated in Section L.11 Factor 1, at least 1 project shall demonstrate relevant experience in a medical office/clinic/hospital renovation/expansion. In addition, it is important to note that this Factor states, “Offers that demonstrate a greater depth and breadth of recent and more relevant construction experience in medical office/clinic/hospital renovation/expansion shall be rated more favorably.”

Amendment of Solicitation Amendment A00003 under Solicitation 75H701-22-R-00039 Mescalero Indian Hospital Expansion & Renovation

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-21-R-00049

PROJECT:

Mescalero Indian Hospital Expansion & Renovation

LOCATION: Mescalero, NM

PROJECT NO: 131038

DOCUMENT

OWNER: Shaukat Syed PHONE: 214-767-3934 DOCUMENTS:

DATE: DEPARTMENT: IHS/DES

Item No.

Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response

5. RFP

On page 65, L.11. Proposal Preparation Instructions, Volume 1 (Technical Proposal), Factor 1: Specialized experience Submission Requirements: Offerors are required to submit a comprehensive and complete technical proposal that demonstrates their ability to perform the work described in this solicitation and demonstrate a minimum of 7 years’ experience doing work of similar scope and complexity. Offerors shall exhibit relevant past experience by reporting written narratives for a minimum of three (3) but no more than five (5) relevant renovation/expansion construction projects between $5,000,000 and $10,000,000 in project cost. In order to increase the competition and an overall strong response from capable small businesses for the referenced solicitation, would the Government consider submission of construction projects between $1,000,000.00 and $10,000,000 in project cost?

CO Please see answer to Question #3.

6. RFP

We received this project today and we are not listed as an Approved Lightning Protection Manufacturer. We would like to be listed as an Approved Lightning Protection Manufacturer on this project and future projects.

CO Please see answer to Question #2.

7. RFP Can an Asbestos Abatement Survey be provided? CO See Attachment J19 Asbestos Report