B05 Attachment A12-1 Pre-Proposal Inquiries 1-30.pdf

PDF 276 KB Posted

Attached to
Mescalero Indian Hospital Expansion & Renovation
Solicitation number
75H701-22-R-00039
Issued by

View the file

Other files

File Type Posted
B01 Attachment J03 Drawings Addendum No. 5.pdf PDF
B05 Attachment A22-1 Pre-Proposal Inquiries 1-104.pdf PDF
B05 Amendment No. A00022.pdf PDF
B01 Attachment J01 Specifications Addendum No. 1.pdf PDF
B05 Amendment No. A00021.pdf PDF
B05 Attachment A20-1 Pre-Proposal Inquiries 1-101.pdf PDF
B05 Amendment No. A00020.pdf PDF
B05 Attachment 01 Wage Determination NM20230025_06_09_2023.pdf PDF
B05 Amendment No. A00019.pdf PDF
B05 Amendment No. A00018.pdf PDF
B05 Attachment A18-1 Pre-Proposal Inquiries 1-100.pdf PDF
B01 Attachment J03 Drawings Addendum No. 3_Rev1.pdf PDF
B05 Amendment No. A00017.pdf PDF
B01 Attachment J32 QPEC letter.pdf PDF
B05 Attachment A17-1 Pre-Proposal Inquiries 1-95.pdf PDF
B05 Attachment A16-1 Pre-Proposal Inquiries 1-85.pdf PDF
B01 Attachment J30 Nystrom Horizontal Expansion Control System.pdf PDF
B01 Attachment J31 Kingspan Accent Fincut sheet.pdf PDF
B01 Attachment J03 Drawings Addendum No. 3.pdf PDF
B05 Attachment 01 Wage Determination NM20230025_03_31_2023.pdf PDF
B01 Attachment J03 Drawings Addendum No. 4.pdf PDF
B05 Amendment No. A00016.pdf PDF
B01 Attachment J29 Ground Set Flagpoles.pdf PDF
B05 Amendment No. A00015.pdf PDF
B05 Amendment No. A00014.pdf PDF
B01 Attachment J25 Rigid vinyl sheet specifications.pdf PDF
B05 Attachment A13-1 Pre-Proposal Inquiries 1-69.pdf PDF
B01 Attachment J28 CMU COLOR Onyx Split.pdf PDF
B05 Amendment No. A00013.pdf PDF
B01 Attachment J26 3form installation manual.pdf PDF
B01 Attachment J27 3form Antique Fleur Spec Sheet.pdf PDF
B01 Attachment J23 Wall guards specifications.pdf PDF
B01 Attachment J24 High impact corner guard specifications.pdf PDF
B01 Attachment J22 Dog House Detail.pdf PDF
B05 Amendment No. A00012.pdf PDF
B01 Attachment J20 Soil borings.pdf PDF
B01 Attachment J18 Price Breakdown- revised January 2023.xlsx XLSX spreadsheet
B01 Attachment J21 HABS Report.pdf PDF
B01 Attachment J03 Drawings Addendum No. 2.pdf PDF
B05 Attachment 01 Wage Determination NM20230025_01_06_2023.pdf PDF
B05 Amendment No. A00011.pdf PDF
B05 Amendment No. A00010.pdf PDF
B05 Amendment No. A00009.pdf PDF
B05 Amendment No. A00008.pdf PDF
B05 Amendment No. A00007.pdf PDF
B05 Amendment No. A00006.pdf PDF
B01 Attachment J13 IHS IEE Representation Form_Jan 2022.pdf PDF
B05 Amendment No. A00005.pdf PDF
B05 Amendment No. A00004.pdf PDF
B05 Attachment A3-1 Pre-Proposal Inquiries 1-7.pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment of Solicitation Amendment A00012 under Solicitation 75H701-22-R-00039 Mescalero Indian Hospital Expansion & Renovation

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-21-R-00049

PROJECT:

Mescalero Indian Hospital Expansion & Renovation

LOCATION: Mescalero, NM

PROJECT NO: 131038

DOCUMENT

OWNER: Shaukat Syed PHONE: 214-767-3934 DOCUMENTS:

DATE: DEPARTMENT: IHS/DES

Item No.

Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response

Amendment A00003 dated 05/25/2022

1. RFP

Drawings S-2, S-3, & S-6 doesn’t give exact elevation for top footings.

The footing schedule on drawing S-2 detail A-4 doesn’t indicate elevations either. Please provide footing elevations on sheet S-5.

COR Sheets C-2, C-3 and C-5 show finish floor elevations for existing building and new addition.

2. RFP

Currently, the specification calls for Air Blocc 07 regard to above project. We would like to request that our AIR-SHIELD LMP be reviewed as a liquid membrane vapor permeable material here. Please let me know if it’s acceptable it would be greatly appreciated.

CO

Specification section 012500 Substitution Procedures explains the administrative and procedural requirements for substitutions. IHS does not give prior approval on any materials prior to award.

3. RFP Would you consider renovations under $5 million for past performance examples? CO

Each project submitted is evaluated as a whole when determining relevancy and the project cost is only one part of determining relevancy. As stated in Section L.11, Factor 1, “Relevant” is defined as experience with managing renovation/expansion projects that are similar to those as described in the Scope of Work (See Section C of this solicitation).” So while the range is stated of submitting projects between $5M and $10M, any project submitted outside this range will be determined relevant or not relevant based on the project as a whole.

4. RFP Would you consider renovations in other specialty areas, outside of hospital settings CO

Please see answer to Question #3. Also, as stated in Section L.11 Factor 1, at least 1 project shall demonstrate relevant experience in a medical office/clinic/hospital renovation/expansion. In addition, it is important to note that this Factor states, “Offers that demonstrate a greater depth and breadth of recent and more relevant construction experience in medical office/clinic/hospital renovation/expansion shall be rated more favorably.”

Mescalero Indian Hospital Expansion & Renovation

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-21-R-00049

PROJECT:

Mescalero Indian Hospital Expansion & Renovation

LOCATION: Mescalero, NM

PROJECT NO: 131038

DOCUMENT

OWNER: Shaukat Syed PHONE: 214-767-3934 DOCUMENTS:

DATE: DEPARTMENT: IHS/DES

Item No.

5. RFP

On page 65, L.11. Proposal Preparation Instructions, Volume 1 (Technical Proposal), Factor 1: Specialized experience Submission Requirements: Offerors are required to submit a comprehensive and complete technical proposal that demonstrates their ability to perform the work described in this solicitation and demonstrate a minimum of 7 years’ experience doing work of similar scope and complexity. Offerors shall exhibit relevant past experience by reporting written narratives for a minimum of three (3) but no more than five (5) relevant renovation/expansion construction projects between $5,000,000 and $10,000,000 in project cost. In order to increase the competition and an overall strong response from capable small businesses for the referenced solicitation, would the Government consider submission of construction projects between $1,000,000.00 and $10,000,000 in project cost?

CO Please see answer to Question #3.

6. RFP

We received this project today and we are not listed as an Approved Lightning Protection Manufacturer. We would like to be listed as an Approved Lightning Protection Manufacturer on this project and future projects.

CO Please see answer to Question #2.

7. RFP Can an Asbestos Abatement Survey be provided? CO See Attachment J19 Asbestos Report

Mescalero Indian Hospital Expansion & Renovation

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-21-R-00049

PROJECT:

Mescalero Indian Hospital Expansion & Renovation

LOCATION: Mescalero, NM

PROJECT NO: 131038

DOCUMENT

OWNER: Shaukat Syed PHONE: 214-767-3934 DOCUMENTS:

DATE: DEPARTMENT: IHS/DES

Item No.

Amendment A00012 dated 01/30/2023

8.

RFP

During the site visit it was stated to check that the right updated drawings are being utilized. Please confirm the file on SAM.GOV titled “B01 Attachment J02 Drawings.pdf” that is 36MB and has 97 pdf pages is correct.

CO Please see B01 Attachment J03 Drawings Addendum No. 2, which contains the drawings that have been revised.

9.

RFP

The B01 Attachment J18 Price Breakdown. NMGRT is indicated at (6.3125%). Per recently published rates from NM Secretary of State after July 1, 2022 the rate will be changing to 6.1875% for Otero- Remainder of County. Please advise which rate to use for the bid price breakdown.

CO Please use 6.1875% as the rate for NMGRT. The rate has been updated in B01 Attachment J18 Price Breakdown – revised January 2023.

10.

RFP

The B01 Attachment J18 Price Breakdown. Between NMGRT and Subtotal there is a line titled “TERO”. Please advise what this is and what cost are applied to it.

CO TERO has been deleted from the price schedule. See Attachment J18 Price Breakdown – revised January 2023.

11. RFP

The B01 Attachment J18 Price Breakdown. The position of NMGRT in the totaling order is incorrect on the provided form. NMGRT is calculated on the Subtotal after construction cost, Overhead and Profit, prior to Total Cost. Please consider changing.

Example:

Construction Subtotal: $100,000.00 GC Overhead & Profit: $30,000.00 Subtotal: $130,000.00

NMGRT (8.5000%): $11,050.00

Total Cost: $141,050.00

CO The position of NMGRT has been corrected. . See Attachment J18 Price Breakdown – revised January 2023

12. RFP Are safety certificates excluded from the resume page limitation and overall technical volume page count?

CO Safety certificates are included in the 30 page limitation.

13.

RFP Document, Section H Paragraph H.27(c) states that the contractor must be in “strict compliance with the Monacan Health Center policies……”. We assume that this is an error, please confirm or please provide the Monacan Health Center policies.

CO Yes, this was an error. It should be “Mescalero Indian Hospital policies”. Please see Amendment A00012 for a revised copy of Section H, Paragraph H.27.

Mescalero Indian Hospital Expansion & Renovation

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-21-R-00049

PROJECT:

Mescalero Indian Hospital Expansion & Renovation

LOCATION: Mescalero, NM

PROJECT NO: 131038

DOCUMENT

OWNER: Shaukat Syed PHONE: 214-767-3934 DOCUMENTS:

DATE: DEPARTMENT: IHS/DES

Item No.

14.

The site visit agenda item 6.c states “Testing & Deliverables-Test & Certification & Commissioning: Prior to acceptance of the project, the contractor shall test all systems to insure proper operation and complete the commissioning process. The COR shall be advised of all testing 48 hours in advance to allow representation during the testing.”

Specification 019133 page 7 item 1.6.B.1 states “CxA: The designated person, company, or entity that plans, schedules, and coordinates the commission team to implement the commissioning process. Owner will engage the CxA under a separate contract.” Please confirm Owner will provide the Commissioning/CxA.

COR

Commissioning Process will be handled by IHS under a separate contract.

15.

Please provide the Geotech report for foundation.

Geotech was not required for this project. Soil borings for the original construction are provided by Sheet C-1 (B01 Attachment J20 Soil borings)

16.

RFP

Part 4 Section 270001-2 States that 3 each of the 7’ Aluminum 19” 2 post racks shall be provided. Does Telecom Room 1187 require 3 racks as well?

Yes. Telecom room 1187 does require 3 racks. See Part 5 section 27001 execution.

17. RFP Can you please explain diagram that’s on section 270001-7? COR Diagram indicates the Hierarchy of the existing system. New construction install is indicated on sheets SP-1 and SP-2.

18. RFP Is the Low Voltage contractor responsible for Demo of area labeled Special Systems Demo Plan DSP-1?

COR Yes, Contractor is responsible for DSP-1 demo.

19. RFP Is the Low Voltage Contractor responsible for work on print labeled TY- 1?

COR Plans for TY-1 are meant for information purposes for current access/security systems.

20.

RFP Is the Building historical? Per sheet DA-1 under demolition notes (2) it mentions the building has historical significance and there are architectural features to be preserved. During the pre-bid conference, it was mentioned the building was not considered historical. Please advise.

COR The building is eligible but not submitted for listing. Per the THPO notice and HABS report (B01 Attachment J21 HABS report) certain architectural features like the mosaic tile is required to be preserved.

21. RFP Will a Geotechnical Report be provided for consideration prior to proposal submission? There is not one provided as of 5/30/2022.

COR Please see answer to Question No. 15.

22.

RFP

Where is the staging area? Will a site plan be provided for consideration prior to proposal submission? Where will parking be designated for subcontractors?

COR Staging area will be determined at the start of construction.

One half of paved parking south of construction. Other is open area east of housing.

Mescalero Indian Hospital Expansion & Renovation

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-21-R-00049

PROJECT:

Mescalero Indian Hospital Expansion & Renovation

LOCATION: Mescalero, NM

PROJECT NO: 131038

DOCUMENT

OWNER: Shaukat Syed PHONE: 214-767-3934 DOCUMENTS:

DATE: DEPARTMENT: IHS/DES

Item No.

23. RFP There is no SWPPP plan. Will one be provided for consideration prior to proposal submission?

COR The area to be disturbed by new construction is less than 1 acre. Therefore, a SWPPP was not prepared.

24. RFP Will landscaping and irrigations plans be provided? Contract generated? COR There are no landscaping and irrigations plans. Contractor to field verify.

25. RFP Is Med Gas required? COR Yes, refer to Plumbing Sheets DP-1 and P-7.

26. RFP Will alternate project phasing be considered? COR No alternate phasing due to lab and pharmacy space limitations.

27.

RFP Document, Section C Paragraph IV(B) states that the contractor is allowed to utilize a limited portion of the existing parking lots for storage of equipment and materials. Is there a desired area of the parking lot(s) that has already been designated for this storage, and will the contractor’s project office be able to be located in the same area?

Please provide any desired location if yet known.

Please see answer to Question No. 22

28.

RFP Document, Section C Paragraph II(B.5) indicates that Primary Care and Laboratory will move into the new (building addition) space once construction of the addition is complete, and the Pharmacy will vacate their current space. Both of these activities will need to be completed prior to the renovation phase of the project, along with all other personnel or departments vacating the existing building space where the renovation work will take place. How many calendar days should the contractor plan on for these moves to take place, and will the contract “clock” be stopped during this time?

A minimum of 60 calendar days should be allotted for these moves to take place. Contractor clock will not be stopped as there will be other items (punch list items, etc.) to be worked on.

29.

Attachment J02 Drawings, sheet DA-1, states in Demolition Notes (2) that the building has historical significance, and that there are architectural features to be preserved and relocated. Please confirm that the noted Mosaic Tile wall is what is being referenced, and if there any other items of historical significance. Also, please indicate if NPS/SHPO will be involved in the project from any historical standpoint.

Please see the Answer to Question No. 20

Mescalero Indian Hospital Expansion & Renovation

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-21-R-00049

PROJECT:

Mescalero Indian Hospital Expansion & Renovation

LOCATION: Mescalero, NM

PROJECT NO: 131038

DOCUMENT

OWNER: Shaukat Syed PHONE: 214-767-3934 DOCUMENTS:

DATE: DEPARTMENT: IHS/DES

Item No.

30.

Attachment J02 Drawings, sheets S-1 and S-2, both include references to the Geotechnical Report. Sheet S-1 indicates in General Structural Notes, Section 5 Site Grading & Earthwork, Paragraph B(3) that “on-site” soil can be utilized for filling if it meets the requirements contained in the Geotechnical Engineering Report, and Sheet S-2 indicates in Detail A-1 the requirements for structural fill per the Geotechnical Report. Please provide the Geotechnical Report that was utilized for this design.

Please see answer to Question No. 15.