B05 Amendment No. A00004.pdf

PDF 724 KB Posted

Attached to
Mescalero Indian Hospital Expansion & Renovation
Solicitation number
75H701-22-R-00039
Issued by

View the file

Other files

File Type Posted
B01 Attachment J03 Drawings Addendum No. 5.pdf PDF
B05 Attachment A22-1 Pre-Proposal Inquiries 1-104.pdf PDF
B05 Amendment No. A00022.pdf PDF
B01 Attachment J01 Specifications Addendum No. 1.pdf PDF
B05 Amendment No. A00021.pdf PDF
B05 Attachment A20-1 Pre-Proposal Inquiries 1-101.pdf PDF
B05 Amendment No. A00020.pdf PDF
B05 Attachment 01 Wage Determination NM20230025_06_09_2023.pdf PDF
B05 Amendment No. A00019.pdf PDF
B05 Amendment No. A00018.pdf PDF
B05 Attachment A18-1 Pre-Proposal Inquiries 1-100.pdf PDF
B01 Attachment J03 Drawings Addendum No. 3_Rev1.pdf PDF
B05 Amendment No. A00017.pdf PDF
B01 Attachment J32 QPEC letter.pdf PDF
B05 Attachment A17-1 Pre-Proposal Inquiries 1-95.pdf PDF
B05 Attachment A16-1 Pre-Proposal Inquiries 1-85.pdf PDF
B01 Attachment J30 Nystrom Horizontal Expansion Control System.pdf PDF
B01 Attachment J31 Kingspan Accent Fincut sheet.pdf PDF
B01 Attachment J03 Drawings Addendum No. 3.pdf PDF
B05 Attachment 01 Wage Determination NM20230025_03_31_2023.pdf PDF
B01 Attachment J03 Drawings Addendum No. 4.pdf PDF
B05 Amendment No. A00016.pdf PDF
B01 Attachment J29 Ground Set Flagpoles.pdf PDF
B05 Amendment No. A00015.pdf PDF
B05 Amendment No. A00014.pdf PDF
B01 Attachment J25 Rigid vinyl sheet specifications.pdf PDF
B05 Attachment A13-1 Pre-Proposal Inquiries 1-69.pdf PDF
B01 Attachment J28 CMU COLOR Onyx Split.pdf PDF
B05 Amendment No. A00013.pdf PDF
B01 Attachment J26 3form installation manual.pdf PDF
B01 Attachment J27 3form Antique Fleur Spec Sheet.pdf PDF
B01 Attachment J23 Wall guards specifications.pdf PDF
B01 Attachment J24 High impact corner guard specifications.pdf PDF
B01 Attachment J22 Dog House Detail.pdf PDF
B05 Amendment No. A00012.pdf PDF
B01 Attachment J20 Soil borings.pdf PDF
B05 Attachment A12-1 Pre-Proposal Inquiries 1-30.pdf PDF
B01 Attachment J18 Price Breakdown- revised January 2023.xlsx XLSX spreadsheet
B01 Attachment J21 HABS Report.pdf PDF
B01 Attachment J03 Drawings Addendum No. 2.pdf PDF
B05 Attachment 01 Wage Determination NM20230025_01_06_2023.pdf PDF
B05 Amendment No. A00011.pdf PDF
B05 Amendment No. A00010.pdf PDF
B05 Amendment No. A00009.pdf PDF
B05 Amendment No. A00008.pdf PDF
B05 Amendment No. A00007.pdf PDF
B05 Amendment No. A00006.pdf PDF
B01 Attachment J13 IHS IEE Representation Form_Jan 2022.pdf PDF
B05 Amendment No. A00005.pdf PDF
B05 Attachment A3-1 Pre-Proposal Inquiries 1-7.pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A00004

The purpose of this amendment is to:

1) Issue the pre-proposal site visit meeting agenda and sign-in sheet

The proposal due date remains the same, June 10, 2022, 2:00PM CT.

Indian Health Service (IHS) Division of Engineering Services (DES) 1301 Young Street, Suite 840 Dallas, TX 75202

75H701-22-R-00039

131038

1 5

05/26/2022

05/11/2022

SF30 CONTINUATION OF BLOCK NARRATIVE

SUMMARY OF CHANGES

The solicitation is hereby amended to address the following:

1. Issue the pre-proposal site visit meeting agenda and sign-in sheet

This amendment does not extend the proposal due date/time June 10, 2022, 2:00pm CDT.

As stated in the Solicitation, all inquiries must be received no later than 14 days prior to the proposal receipt date (June 10, 2022) to allow time for a response.

NOTICE TO OFFERORS: Offerors must acknowledge receipt of any and all amendments by number and date on their cover letter in their offer or by submitting a signed copy of the SF30. All other terms and conditions remain unchanged.

END OF SUMMARY OF CHANGES

AGENDA

Pre-Proposal Site Visit Meeting

Project Name: Mescalero Indian Hospital Expansion & Renovation.

(Project # 131038)

Location: 318 Abalone Loop, Mescalero, NM 88340 Date: Wednesday, May 25, 2022, 11:00AM MT

1. Offerors Sign-in:

2. Introductions:

a. Indian Health Service

• Jennifer J. Scroggins, Contracting Officer

• Shaukat Syed, Contract Specialist

• Sandra Bitsie, Contracting Officer’s Representative

3. Bidding & Contract Requirements

a. Solicitation Issued: Wednesday May 11, 2022, Solicitation No. 75H701-22-R-00039

b. Proposals Due: Friday, June 10, 2022 2PM CT

c. Project Funded by I.H.S.

d. Instruction to Offerors

• All questions are to be submitted in writing for an official response.

• Verbal responses at the pre-proposal conference will not be binding.

4. Contract Overview: Review Solicitation No. 75H701-22-R-00039

a. Type of Contract – Firm Fixed Price construction contract being solicited as Total Small Business

Set-Aside with preference given to Indian Economic Enterprises.

b. Construction contract will be between the Indian Health Service and the successful Contractor.

c. Period of Performance: 480 calendar days from issuance of NTP.

d. Items to be submitted with proposal - all documents featured in Section L of the RFP.

e. Daily Reports and Logs – Contractor is required to maintain and submit throughout the entire course of the project.

f. Direct all formal inquiries regarding the bidding documents and technical clarifications in writing to Contracting Officer and Contract Specialist.

g. Contracting Officer will transmit to all prospective Offerors of record such amendment necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding. Questions must be submitted in writing to be formally answered in an amendment.

h. All inquiries are due by close of business May 30, 2022

i. Amendments to date: 3

5. Project Scope:

The Contractor will be required to provide all labor, tools, equipment, work facilities, supervisory efforts, testing and all other necessary incidentals for the expansion/renovation of the Mescalero Indian Hospital.

This acquisition will build a new 7,421 sq. ft. laboratory and patient care and support. In addition, it will renovate 4,000 sq. ft. of existing space that includes existing laboratory, pharmacy, waiting area and urgent care. This proposed facility will serve a projected FY2025 user population of 5,500. The original hospital is built in 1968 and is 19,560 sq. ft. The facility was built 50 years ago and is in a state of overcapacity due to size and limited patient exams rooms. The project will add an additional 7 exam rooms, larger pharmacy, laboratory, waiting rooms and patient registration and benefits. A new IT(office, server room and training room) will be located in the existing laboratory. Please refer to Solicitation Attachments for further details.

6. Technical Information/Requirements (Highlights Only)

a. Safety – The successful Contractor will be required to assign a competent person to ensure that construction is performed in accordance with all OSHA safety requirements.

b. Permits – Contractor shall obtain all required permits, insurance, fees, etc. required to work in

Otero County, New Mexico. Any cost associated with third party inspection of electrical, mechanical, plumbing, etc. that may be required by the County or State will be the responsibility of the Contractor.

c. Testing & Deliverables - Test & Certification & Commissioning: Prior to acceptance of the project, the contractor shall test all systems to insure proper operation and complete the commissioning process. The COR shall be advised of all testing 48 hours in advance to allow representation during the testing.

d. Record Drawings (STP 4.0) – The Contractor shall provide two reproducible sets of As- Constructed Drawings (aka Red-Lines)

7. Utility Coordination: Coordinate utility connections with the applicable utility provider. The Contractor shall be responsible for payment of tapping or connection fees. The Contractor shall install utilities as designed and with the approval of the utility provider.

8. IHS Contacts:

Contracting Officer:

Jennifer J. Scroggins

IHS-DES

1301 Young Street, Suite 840 Dallas, TX 75202-5433 Phone: (214) 767-6613 Email: Jenny.Scroggins@ihs.gov

Contract Specialist:

Shaukat Syed

IHS-DES

1301 Young Street, Suite 840 Dallas, TX 75202 Phone: (214) 767-3934 Email: Shaukat.Syed@ihs.gov

9. Contractor Questions – Please submit all questions by in writing by COB May 30, 2022 to Jenny.Scroggins@ihs.gov and Shaukat.syed@ihs.gov mailto:Jenny.Scroggins@ihs.gov mailto:Shaukat.Syed@ihs.gov mailto:Jenny.Scroggins@ihs.gov mailto:Shaukat.syed@ihs.gov

Shaukat Syed IHS DES Shaukat.Syed@ihs.gov

File details come from the government source that posted it. Updated .