This document is a Chilled Water System Control Diagram (drawing M-702) for a technical HVAC system, prepared by Mason-Hanger for NAVFAC (Naval Facilities Engineering Command). The detailed technical drawing provides a comprehensive schematic of a chilled water plant management system, including multiple components such as childers, control valves, flexible pipe connectives, and various measurement points like temperature and flow sensors.

The diagram's accompanying notes describe a complex chilled water control system designed to integrate with a building's digital control infrastructure. Key system features include temperature and pressure monitoring, digital system controllers, bypass valve controls, and capabilities for managing chiller loads across multiple points (ACC-1 LOAD, ACC-2 LOAD). The system appears engineered for precise environmental control, with redundant measurement and control mechanisms to ensure consistent performance and efficiency in a mechanical/HVAC application.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHILLED WATER SYSTEM CONTROL DIAGRAM

GENERAL:

A SINGLE CHILLED-WATER PLANT MANAGEMENT SYSTEM SHALL BE PROVIDED TO

CONTROL OPERATION AND STAGING OF THE CHILLERS AND CHILLED WATER

PUMPS. FUNCTIONS SHALL INCLUDE BUT NOT BE LIMITED TO MODULATING THE

BUILDING CHILLED WATER BYPASS VALVE, CHILLER START/STOP, MONITORING

EXISTING BUILDING CHILLED WATER SUPPLY AND RETURN TEMPERATURES[(E)

CHW-ST & (E)CHW-RT], CHILLER LOADS [ACC-1-LOAD & ACC-2-LOAD], AND OTHER

POINTS AS INDICATED ON THE POINTS LIST ON DRAWING M-703.

THE CHILLED-WATER PLANT MANAGEMENT SYSTEM SHALL ALTERNATE PUMP

OPERATION. SCHEDULED CHILLED WATER PUMPS HAVE N + 1 REDUNDANCY AND

CHILLERS SHALL AUTOMATICALLY SWITCH TO THE AVAILABLE PUMP IN CASE OF

PUMP FAILURE. PUMPS ARE CONSTANT FLOW AND NO MODULATION IS REQUIRED.

THE CHILLER AND PUMP SEQUENCES SHALL BE COORDINATED WITH THE CHILLER

MANUFACTURER REQUIREMENTS TO AVOID THE PUMP NOT STARTING AND THE

CHILLER HAVING A FREEZING/FAILURE EVENT.

THE CHILLED-WATER PLANT MANAGEMENT SYSTEM SHALL INTEGRATE WITH THE

EXISTING CAMPUS BUILDING AUTOMATION SYSTEM DDC CONTROLLER.

BUILDING CHILLED WATER BYPASS VALVE CONTROL:

A DIFFERENTIAL PRESSURE TRANSMITTER [(E)CHW-DP] SHALL SENSE THE

CHILLED WATER SYSTEM DIFFERENTIAL PRESSURE BETWEEN THE SUPPLY AND

RETURN MAINS. IF THE CHILLED WATER SYSTEM DIFFERENTIAL PRESSURE RISES

ABOVE SETPOINT [(E)CHW-DP-SP], THE DIGITAL SYSTEM CONTROLLER SHALL

MODULATE THE BUILDING CHILLED WATER BYPASS VALVE OPEN TO BYPASS

CHILLED WATER FROM THE SUPPLY MAIN TO THE RETURN MAIN. IF THE BUILDING

CHILLED WATER SYSTEM DIFFERENTIAL PRESSURE SENSOR FALLS BELOW

SETPOINT [(E)CHW-DP-SP],THE DIGITAL SYSTEM CONTROLLER SHALL MODULATE

THE BUILDING CHILLED WATER BYPASS VALVE CLOSED TO ALLOW MORE CHILLED

WATER TO FLOW INTO THE SUPPLY MAIN. THE BYPASS CONTROL VALVE SHALL

MODULATE TO MAINTAIN A FIXED DIFFERENTIAL PRESSURE AS FOUND BY THE TAB

CONTRACTOR.

BUILDING TONNAGE MONITORING:

A FLOW METER SHALL INPUT SUPPLY CHILLED WATER FLOW TO THE BUILDING TO

THE DIGITAL SYSTEM CONTROLLER. THE DIGITAL SYSTEM SHALL CALCULATE THE

INSTANTANEOUS BUILDING TONNAGE AT 10 MINUTE INTERVALS. THE DIGITAL

SYSTEM SHALL ALSO SUM BUILDING TON HOURS ON A WEEKLY BASIS AND STORE

IT IN A DATABASE AND SHALL INCLUDE THE DATES THE SUMMATION OCCURRED.

THIS INFORMATION SHALL BE AVAILABLE ON THE EXISTING NETWORK.

CHILLER CONTROL:

UPON A CALL FOR COOLING, THE MAIN CHILLER SHALL OPEN ITS RESPECTIVE

CONTROL VALVE [CV-1 OR CV-2] AND START THE LEAD PUMP. AFTER THE CHILLED

WATER FLOW SWITCH [ACC-1-FS OR ACC-2-FS] PROVES FLOW, THE DIGITAL

SYSTEM SHALL ENABLE THE LEAD CHILLER [ACC-1-SS OR ACC-2-SS]. THE LEAD

CHILLER SHALL INITIATE ITS START SEQUENCE TO MAINTAIN THE DESIGN LEAVING

WATER TEMPERATURE [ACC-1-LWT OR ACC-2-LWT] THROUGH ITS OWN ON-BOARD

CONTROLS. IF THE BUILDING CHILLED WATER SUPPLY TEMPERATURE [(E)CHW-ST]

IS ABOVE SETPOINT BY 2°F (ADJ) FOR 15 MINUTES (ADJ), ENABLE THE LAG

CHILLER'S CHILLED WATER PUMP [ACC-1-SS OR ACC-2-SS] AND OPEN THE LAG

CHILLER'S CONTROL VALVE. AFTER THE CHILLED WATER FLOW SWITCH [ACC-1-FS

OR ACC-2-FS] PROVES FLOW, THE DIGITAL SYSTEM SHALL ENABLE THE LAG

CHILLER [ACC-1-SS OR ACC-2-SS]. THE LAG CHILLER SHALL INITIATE ITS START

SEQUENCE TO MAINTAIN THE DESIGN LEAVING WATER TEMPERATURE [(E)CHW-

SP] THROUGH ITS OWN ON-BOARD CONTROLS. IF THE BUILDING CHILLED WATER

SUPPLY TEMPERATURE [(E)CHW-ST] IS 2°F (ADJ) BELOW SETPOINT [(E)CHW-SP]

FOR 30 MINUTES (ADJ) AND THE LAG CHILLER IS AT OR BELOW THE 30% (ADJ)

CHILLER LOAD [ACC-1-LOAD OR ACC-2-LOAD] (ADJ), THE DIGITAL SYSTEM

CONTROLLER SHALL DISABLE THE LAG CHILLER. THE CHILLER CONTROLLER

SHALL CLOSE ITS RESPECTIVE CONTROL VALVE AND SHUT DOWN THE LAG PUMP

BASED UPON ITS OWN LOGIC. IF THE BUILDING CHILLED WATER SUPPLY

TEMPERATURE [(E)CHW-ST] IS LESS THAN SETPOINT [(E)CHW-SP] BY 2°F (ADJ) AND

CHILLER IS AT OR BELOW 10% CHILLER LOAD [ACC-1-LOAD OR ACC-2-LOAD], THE

DIGITAL SYSTEM SHALL DISABLE THE LEAD CHILLER. THE LEAD CHILLER PUMP

SHALL CONTINUE TO OPERATE AN ADDITIONAL 5 MINUTES (ADJ). IF THE BUILDING

CHILLED WATER SUPPLY TEMPERATURE [(E)CHW-ST] IS 4°F (ADJ) ABOVE

SETPOINT [(E)CHW-SP] FOR 15 MINUTES (ADJ), THE DIGITAL SYSTEM CONTROLLER

SHALL INITIATE THE CHILLER START SEQUENCE AS DESCRIBED ABOVE. WHEN

THE DIGITAL SYSTEM CONTROLLER INITIATES CHILLER SHUTDOWN, THE

CHILLER'S SHALL CLOSE ITS RESPECTIVE CONTROL VALVE [CV-1 OR CV-2] ONLY

AFTER PUMP HAS SHUT DOWN AND FLOW SWITCH [ACC-1-FS OR ACC-2-FS]

PROVES NO FLOW. THE DIGITAL SYSTEM CONTROLLER SHALL ALTERNATE LEAD

AND LAG CHILLERS ON A WEEKLY BASIS.

(E)BBV

ACC-1

D.V.

(E)AS-1

M

CHP-2

CHS

CHR

CHS

(E)CHR (E)CHR

(E)CHS

CHR

TT DPT

(E)CHW ET

(E)MAKE UP WATER

(E)CHW-ST

(E)CHW-RTTT

TT

(E)CHW-DP

CHP-1

CHP-1-S

CHP-1-SS

(E)CHW-FLOW

BT

-1

TT

ACC-1-EWT

ACC-1-LWT

ACC-2

CHS

CHR

TT

FLEXIBLE PIPE CONNECTORS (TYP) TT M

CV-2

CHP-2-S

CHP-2-SSFLEXIBLE PIPE CONNECTORS (TYP)

ACC-1-FS

ACC-2-EWT

ACC-2-LWT

ACC-2-FS

ACC-1-LOAD

ACC-1-S

ACC-1-SS

ACC-2-LOAD

ACC-2-S

ACC-2-SS

TT

(E)CHW-SP (VIRTUAL POINT)

DP

(E)CHW-DP-SP (VIRTUAL POINT)

M

CV-1

CHP-3

CHP-3-S

CHP-3-SS

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

MAXIMO WORKORDER NO:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

PROJECT NO:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

FINAL SUBMITTAL

NICHOLAS A. HALL

NICHOLAS A. HALL

PATRICK FAULKNER

EE

M-702

CH

IL

LE

D

W

AT

ER

D

IA

G

RA

M

A

ND

C O

NT

RO

LS

MCM

CEH CEH

MARCH 22, 2024

199.23

7385095

CH

ER

RY

P

OI

NT

, N

OR

TH

C

AR

OL

IN

A

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

N

AV

FA

C

S

YS

C O

M M

ID

'N

AV

FA

C S

YS

C

O M

M

ID

-A

TL

AN

TI

C

FR

C -E

, M

AR

IN

E

C O

R

PS

A

IR

S

TA

TI

O

N

R E

P

LA

C E

C H

IL

LE

R S

B

F

R C

E

12892026

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

AM

EN

DM

EN

T

-0

2-

File details come from the government source that posted it. Updated .