12892019 Amendment 0003.pdf

PDF 338 KB Posted

Attached to
Project No. 7385095 Replace Chillers, Building 4224
Solicitation number
7385095
Issued by

About this file

This document is a naval facilities engineering drawing (MP111) for a chiller replacement project at Marine Corps Air Station Cherry Point in North Carolina. The project involves a phased demolition and replacement of water-cooled chillers, cooling towers, and associated condenser water piping. Phase 1 specifically focuses on removing existing water-cooled chillers, cooling towers, and installing a new buffer tank while maintaining building operations through temporary chiller connections. Key details include patching roof penetrations, removing pumps and associated equipment, disposing of refrigerant and compressor oil according to RCRA procedures, and retaining existing control boxes for future use. The project is being executed by NAVFAC SYSCOM Mid-Atlantic, with the drawing dated March 22, 2024 and a revision noted for 8/26/25. The technical drawings provide detailed piping plans for both demolition and new work at Level 1, showing the precise layout of existing and proposed mechanical systems.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-1 P-2 P-3 P-4 P-5

(E)AS-1

WC-1 WC-2

M-301

(E )V

AC

P

U M

P

(E )V

AC

P

U M

P

(E )V

AC

P

U M

P

(E )V

AC

P

U M

P

(E )V

AC

P

U M

P

(E)VAC PUMP

(E)VAC PUMP

(E)VAC PUMP

(E)VAC PUMP

(E)SCRUBBER

(E)HW PUMP (TYP)

(E)ET

TO/FROM BUILDING LOADS

(E)CONTROL BOX

(E)BYPASS VALVE

(E)8"CHS

(E)8"CHR

6"CHR (TYP)

3"D

6"CWR

8"CWR 4

3"D

8"CWS

6"CWS 8"CWS

8"CWS8"CWS 6"CWS 8"CWS

6"CWS6"CWS

6"CWR

6"CWS

(ABV)

(BLW)6"CWR

6"CWS

(ABV)

(BLW)

2 2

TO/FROM TEMPORARY CHILLER

8.1

JKLM

M-301

(E)6"CHS

(E)6"CHR

M-301

M-301

(E)AS-1

(E )V

AC

P

U M

P

(E )V

AC

P

U M

P

(E )V

AC

P

U M

P

(E )V

AC

P

U M

P

(E )V

AC

P

U M

P

(E)VAC PUMP

(E)VAC PUMP

(E)VAC PUMP

(E)VAC PUMP

(E)SCRUBBER

(E)HW PUMP (TYP)

(E)ET

(E)CONTROL BOX

TO/FROM BUILDING LOADS

(E)BYPASS VALVE

(E)8"CHS

(E)8"CHR

BT-1

HEAT TRACE BOX

TO/FROM TEMPORARY CHILLER

8.1

JKLM

(E)6"CHS

(E)6"CHR

6"CHR

8"CHR

8"CHR

8"CHS

M-301

6" TEE TAP (TYP 3)

KEYPLAN GRAPHIC SCALE:

4' 0 8' 12'4' 16'2'

3/16"GRAPHIC SCALE: = 1'-0"

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

MAXIMO WORKORDER NO:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

PROJECT NO:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S

YS

TE

M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

FINAL SUBMITTAL

NICHOLAS A. HALL

NICHOLAS A. HALL

PATRICK FAULKNER

EE

MP111

LE

VE

L

-P

HA

SE

PI

PI

NG

P

LA

N

MCM

CEH CEH

MARCH 22, 2024

199.23

7385095

CH

ER

RY

P

OI

NT

, N

OR

TH

C

AR

OL

IN

A

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

N A

VF

AC

S

YS

C O

M M

ID

'N

A V

FA

C

S

YS

C O

M M

ID

-A

TL

AN

TI

C

FR

C

-E , M

A R

IN

E

C O

R

PS

A

IR

S

TA

TI

O

N

R E

P

LA

C E

C H

IL

LE

R S

B

F

R C

E

12892019

GENERAL SHEET NOTES

1 CONTRACTOR TO VERIFY EXISTING CONDITIONS.

MINIMIZE AND COORDINATE SYSTEM OUTAGES WITH

CHERRY POINT PRIOR TO START OF WORK.

2 FOR DEMOLITION PLANS, REMOVE ALL INCLUDING BUT

NOT LIMITED TO, PIPING, VALVES, SENSORS, AND

APPURTENANCES AS INDICATED. DEMOLISH ENTIRE

COOLING WATER SYSTEM INCLUDING PUMPS, PIPING,

COOLING TOWERS, AND CONTROLS.

3 PHASE 1 CONSISTS OF REMOVING THE WATER COOLED

CHILLERS, REMOVING THE COOLING TOWERS AND

ASSOCIATED CONDENSER WATER PIPING, AND

INSTALLING THE BUFFER TANK. TEMPORARY CHILLER

CONNECTIONS ARE MADE TO MAINTAIN OPERATION OF

THE BUILDING.

4 SYSTEM OUTAGE WILL OCCUR STARTING WITH PHASE 1

DEMOLITION UNTIL COMPLETION OF PHASE 1 ONE NEW

WORK.

SHEET KEYNOTES

1 CAP TEE TEMPORARILY UNTIL CONNECTION TO PIPING IN

PHASE 2.

2 DEMOLISH CHILLER AND CHILLED WATER SUPPLY AND

RETURN PIPING INCLUDING CHILLER ISOLATION VALVES.

REFRIGERANT AND COMPRESSOR OIL TO BE DISPOSED

OF BY CONTRACTOR IN ACCORDANCE WITH RCRA

PROCEDURES. DEMOLISH CHILLER PAD.

3 INSTALL NEW BUFFER TANK ON EXISTING PUMP PADS.

4 PIPING UP TO ROOF ABOVE. PATCH AND REPAIR 3"

PENETRATION AND MAINTAIN 8" PENETRATIONS.

PREPARE FOR NEW ROOF CURB.

5 REMOVE PUMP, GROUT, FASTENERS, ANCHORS, ETC,

AND PREPARE PAD FOR REUSE, TYPICAL OF 5.

6 RETAIN EXISTING TO REMAIN CONTROL BOX CONTAINING

WATER COOLED CHILLER CONTROLLER FOR REUSE

UNDER NEW WORK. LOCATE HEAT TRACE CONTROLS

HERE.

7 PATCH AND REPAIR WALL TO MATCH EXISTING.

SCALE: 3/16" = 1'-0"MP111

LEVEL 1 - PHASE 1 DEMO - PIPING PLAN1

SCALE: 3/16" = 1'-0"MP111

LEVEL 1 - PHASE 1 NEW WORK - PIPING PLAN2

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

03/22/2024

REVISED 8/26/25

File details come from the government source that posted it. Updated .