12892020 Amendment 0005.pdf
PDF 787 KB Posted
- Solicitation number
- 7385095
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(E)AS-1
(E )V
AC
P
U M
P
(E )V
AC
P
U M
P
(E )V
AC
P
U M
P
(E )V
AC
P
U M
P
(E )V
AC
P
U M
P
(E)VAC PUMP
(E)VAC PUMP
(E)VAC PUMP
(E)VAC PUMP
(E)SCRUBBER
(E)HW PUMP (TYP)
(E)ET
(E)CONTROL BOX
TO/FROM BUILDING LOADS
TO/FROM TEMPORARY CHILLER
(E)BYPASS VALVE
(E)8"CHS
(E)8"CHR
BT-1
HEAT TRACE BOX
8.1
JKLM
(E)6"CHR
(E)6"CHS
M-301
(E)AS-1
(E )V
AC
P
U M
P
(E )V
AC
P
U M
P
(E )V
AC
P
U M
P
(E )V
AC
P
U M
P
(E )V
AC
P
U M
P
(E)VAC PUMP
(E)VAC PUMP
(E)VAC PUMP
(E)VAC PUMP
(E)SCRUBBER
(E)HW PUMP (TYP)
(E)ET
(E)CONTROL BOX
TO/FROM BUILDING LOADS
(E)BYPASS VALVE
(E)8"CHS
(E)8"CHR
BT-1
HEAT TRACE BOX
8.1
JKLM
48"CHR
8"CHS 4
TO/FROM TEMPORARY CHILLER
(E)6"CHS
(E)6"CHR
CHP-1 CHP-2 CHP-3
6"CHR (TYP 3)
6"CHR (TYP 3)
8"CHR
(E)8"CHR
(E)8"CHR
8"CHR
KEYPLAN GRAPHIC SCALE:
4' 0 8' 12'4' 16'2'
3/16"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
FINAL SUBMITTAL
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
EE
MP112
LE
VE
L
- P
HA
SE
PI
PI
NG
P
LA
N
MCM
CEH CEH
MARCH 22, 2024
199.23
7385095
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
N
AV
FA
C
S
YS
C O
M M
ID
'N
AV
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M
AR
IN
E
C O
R
PS
A
IR
S
TA
TI
O
N
R E
P
LA
C E
C H
IL
LE
R S
B
F
R C
E
12892020
GENERAL SHEET NOTES
1 CONTRACTOR TO VERIFY EXISTING CONDITIONS.
MINIMIZE AND COORDINATE SYSTEM OUTAGES WITH
CHERRY POINT PRIOR TO START OF WORK.
2 FOR DEMOLITION PLANS, REMOVE ALL INCLUDING BUT
NOT LIMITED TO, PIPING, VALVES, SENSORS, AND
APPURTENANCES AS INDICATED. DEMOLISH ENTIRE
COOLING WATER SYSTEM INCLUDING PUMPS, PIPING,
COOLING TOWERS, AND CONTROLS.
3 PHASE 2 CONSISTS OF REMOVING CAPS PROVIDED IN
PHASE ONE AND PROVIDING EQUIPMENT CONNECTIONS
TO TEES WHERE CAPS WERE REMOVED. TIE IN CHILLER
SUPPLY PIPING TO MAIN AS INDICATED AND UPDATE
CONTROLS.
4 FLOW ARROWS INDICATE PIPE IS ACTIVELY FLOWING
WATER IN THIS PARTICULAR PHASE.
SHEET KEYNOTES
1 REMOVE TEMPORARILY INSTALLED CAP IN PREPERATION
FOR NEW PIPING IN PHASE 2.
2 PROVIDE NEW CHILLED WATER PUMPS WITH STRAINER,
SUCTION DIFFUSER, AND FLEX CONNECTIONS. REFER TO
B3/M-501 FOR MORE INFORMATION.
3 RETAIN EXISTING TO REMAIN CONTROL BOX CONTAINING
WATER COOLED CHILLER CONTROLLER FOR REUSE
UNDER NEW WORK. LOCATE HEAT TRACE CONTROLS
HERE.
4 UP TO ROOF THROUGH NEW ROOF CURB. SEE
ARCHITECTURAL PLANS AND C3/M-501 FOR MORE
INFORMATION.
SCALE: 3/16" = 1'-0"MP112
LEVEL 1 - PHASE 2 DEMO - PIPING PLAN1
SCALE: 3/16" = 1'-0"MP112
LEVEL 1 - PHASE 2 NEW WORK - PIPING PLAN2
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
AM
EN
DM
EN
T
-0
2-
File details come from the government source that posted it. Updated .