12892020 Amendment 0005.pdf

PDF 787 KB Posted

Attached to
Project No. 7385095 Replace Chillers, Building 4224
Solicitation number
7385095
Issued by

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(E)AS-1

(E )V

AC

P

U M

P

(E )V

AC

P

U M

P

(E )V

AC

P

U M

P

(E )V

AC

P

U M

P

(E )V

AC

P

U M

P

(E)VAC PUMP

(E)VAC PUMP

(E)VAC PUMP

(E)VAC PUMP

(E)SCRUBBER

(E)HW PUMP (TYP)

(E)ET

(E)CONTROL BOX

TO/FROM BUILDING LOADS

TO/FROM TEMPORARY CHILLER

(E)BYPASS VALVE

(E)8"CHS

(E)8"CHR

BT-1

HEAT TRACE BOX

8.1

JKLM

(E)6"CHR

(E)6"CHS

M-301

(E)AS-1

(E )V

AC

P

U M

P

(E )V

AC

P

U M

P

(E )V

AC

P

U M

P

(E )V

AC

P

U M

P

(E )V

AC

P

U M

P

(E)VAC PUMP

(E)VAC PUMP

(E)VAC PUMP

(E)VAC PUMP

(E)SCRUBBER

(E)HW PUMP (TYP)

(E)ET

(E)CONTROL BOX

TO/FROM BUILDING LOADS

(E)BYPASS VALVE

(E)8"CHS

(E)8"CHR

BT-1

HEAT TRACE BOX

8.1

JKLM

48"CHR

8"CHS 4

TO/FROM TEMPORARY CHILLER

(E)6"CHS

(E)6"CHR

CHP-1 CHP-2 CHP-3

6"CHR (TYP 3)

6"CHR (TYP 3)

8"CHR

(E)8"CHR

(E)8"CHR

8"CHR

KEYPLAN GRAPHIC SCALE:

4' 0 8' 12'4' 16'2'

3/16"GRAPHIC SCALE: = 1'-0"

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

MAXIMO WORKORDER NO:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

PROJECT NO:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

FINAL SUBMITTAL

NICHOLAS A. HALL

NICHOLAS A. HALL

PATRICK FAULKNER

EE

MP112

LE

VE

L

- P

HA

SE

PI

PI

NG

P

LA

N

MCM

CEH CEH

MARCH 22, 2024

199.23

7385095

CH

ER

RY

P

OI

NT

, N

OR

TH

C

AR

OL

IN

A

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

N

AV

FA

C

S

YS

C O

M M

ID

'N

AV

FA

C S

YS

C

O M

M

ID

-A

TL

AN

TI

C

FR

C -E

, M

AR

IN

E

C O

R

PS

A

IR

S

TA

TI

O

N

R E

P

LA

C E

C H

IL

LE

R S

B

F

R C

E

12892020

GENERAL SHEET NOTES

1 CONTRACTOR TO VERIFY EXISTING CONDITIONS.

MINIMIZE AND COORDINATE SYSTEM OUTAGES WITH

CHERRY POINT PRIOR TO START OF WORK.

2 FOR DEMOLITION PLANS, REMOVE ALL INCLUDING BUT

NOT LIMITED TO, PIPING, VALVES, SENSORS, AND

APPURTENANCES AS INDICATED. DEMOLISH ENTIRE

COOLING WATER SYSTEM INCLUDING PUMPS, PIPING,

COOLING TOWERS, AND CONTROLS.

3 PHASE 2 CONSISTS OF REMOVING CAPS PROVIDED IN

PHASE ONE AND PROVIDING EQUIPMENT CONNECTIONS

TO TEES WHERE CAPS WERE REMOVED. TIE IN CHILLER

SUPPLY PIPING TO MAIN AS INDICATED AND UPDATE

CONTROLS.

4 FLOW ARROWS INDICATE PIPE IS ACTIVELY FLOWING

WATER IN THIS PARTICULAR PHASE.

SHEET KEYNOTES

1 REMOVE TEMPORARILY INSTALLED CAP IN PREPERATION

FOR NEW PIPING IN PHASE 2.

2 PROVIDE NEW CHILLED WATER PUMPS WITH STRAINER,

SUCTION DIFFUSER, AND FLEX CONNECTIONS. REFER TO

B3/M-501 FOR MORE INFORMATION.

3 RETAIN EXISTING TO REMAIN CONTROL BOX CONTAINING

WATER COOLED CHILLER CONTROLLER FOR REUSE

UNDER NEW WORK. LOCATE HEAT TRACE CONTROLS

HERE.

4 UP TO ROOF THROUGH NEW ROOF CURB. SEE

ARCHITECTURAL PLANS AND C3/M-501 FOR MORE

INFORMATION.

SCALE: 3/16" = 1'-0"MP112

LEVEL 1 - PHASE 2 DEMO - PIPING PLAN1

SCALE: 3/16" = 1'-0"MP112

LEVEL 1 - PHASE 2 NEW WORK - PIPING PLAN2

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

AM

EN

DM

EN

T

-0

2-

File details come from the government source that posted it. Updated .