72kW GPU - High Level Parallel Testing.pptx

PPTX presentation 318 KB Posted

Attached to
72kW Ground Power Units (GPU) Federal contract opportunity
Solicitation number
FA8532-21-R-72GPU
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document provides information on a federal solicitation for 72kW Ground Power Units. The solicitation seeks industry feedback on additional questions and responses from an Industry Day event. Six units are required for first article testing, including in-plant, facility, and aircraft compatibility testing. Reliability testing will begin once all six first article units are available. The Department of the Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base is the contracting agency. Industry should check associated postings for full solicitation details and direct all questions to the updated points of contact.

View the file

Other files for this federal contract opportunity

Other files attached to 72kW Ground Power Units (GPU), newest first.
File Type Posted
QA 12.docx DOCX document
QA 11.docx DOCX document
Final Statement of Work (SOW)_1 Sep 21.pdf PDF
Updated Informal Draft RFP FA8532-21-R-0011.pdf PDF
QA from Presolicitation Conference .docx DOCX document
Pre-Solicitation Conference Follow-Up.docx DOCX document
GPM_Pre-Solicitation_Conference_Brief.pptx PPTX presentation
Conference Attachment 3_Informal Draft Request for Proposal FA8532-21-R-0011.pdf PDF
RFP Attachment 2 - Oral Presentations for Discussions Slide Deck.pptx PPTX presentation
RFP Attachment 7 - Past Performance Questionnaire.pdf PDF
RFP Attachment 10_Price Spreadsheet.xlsx XLSX spreadsheet
Informal Draft Request for Proposal FA8532-21-R-0011.pdf PDF
Draft GPM Ordering Guide.docx DOCX document
Document Updates and Pre-Solicitation Conference.docx DOCX document
RFP Attachment 3 - List of Fill-In Clauses to be Completed.pdf PDF
Document Updates and Pre-Solicitation Conference.docx DOCX document
RFP Attachment 5 - Relevancy Table.pdf PDF
RFP Attachment 10_Price Spreadsheet.xlsx XLSX spreadsheet
Draft CDRLs.pdf PDF
RFP Attachment 1 - Past Performance Information (PPI) for Offerors.pdf PDF
RFP Attachment 2 - Oral Presentations for Discussions Slide Deck.pptx PPTX presentation
L-900. INSTRUCTIONS TO OFFERORS.pdf PDF
RFP Attachment 3 - List of Fill-In Clauses to be Completed.pdf PDF
RFP Attachment 6 - Subcontractor and Teaming Member Consent Form.pdf PDF
RFP Attachment 7 - Past Performance Questionnaire.pdf PDF
RFP Attachment 9 - GPU Engine Derating Calculation Worksheet --DRAFT WATERMARK ADDED.pdf PDF
Draft GPM Ordering Guide.docx DOCX document
DRAFT GPM LM.doc DOC document
GPM Draft CLIN Schedule.xlsx XLSX spreadsheet
Draft LM and CLIN Schedule.docx DOCX document
Export Controlled Draft Purchase Description.docx DOCX document
SOW_GPM_2021-05-20.docx DOCX document
Draft_SOW_Information.docx DOCX document
Industry Questions for Feedback_8.docx DOCX document
Draft Purchase Description Feedback Extension.docx DOCX document
Export Controlled Draft Purchase Descriptions.docx DOCX document
CUI_Training.pptx PPTX presentation
Sample_CUI_Cover_Markings.pptx PPTX presentation
Controlled_Unclassified_Information_Requirements.docx DOCX document
GPM Consolidated Industry Feedback Responses.docx DOCX document
Announcement on Purchase Descriptions.docx DOCX document
Industry QA 6.docx DOCX document
Industry QA 5.docx DOCX document
Follow up QA for Industry Day - Number 4.docx DOCX document
Follow up QA for Industry Day - Number 3.docx DOCX document
Follow up QA for Industry Day - Number 2.docx DOCX document
Follow up QA for Industry Day.docx DOCX document
QA Received from Industry Day.docx DOCX document
72kW Generator Industry Day Briefing 16-17 Sep 2020.pptx PPTX presentation
72GPU TEP.xlsx XLSX spreadsheet
Show all 50

72kW Ground Power Units (GPU) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

72kW GPU High Level Parallel Tests 1st Article Testing

OT&E

- In-plant / facility testing

- Aircraft compatibility testing Safety, Power Output, EMI/EMC, Reliability Mobility, Enviro, etc.

6 Units 2 Units A/C for OT&E Remaining A/C 2 Units 4 Units

OT&E

2 Units Includes In-plant, facility, and aircraft compatibility testing Notes:

- Only one 1st Article Unit is needed to start testing

- All six 1st Article Units must be available for reliability testing to begin

AFLCMC… Providing the Warfighter’s Edge

Note: Question and answers from both open discussions and one-on-one discussions will be posted to beta.SAM.gov and are considered public record unless industry identifies the content of those discussions/questions/answers as proprietary information.

image1.jpeg image2.jpeg image3.png

File details come from the government source that posted it. Updated .