RFP Attachment 10_Price Spreadsheet.xlsx

XLSX spreadsheet 159 KB Posted

Attached to
72kW Ground Power Units (GPU) Federal contract opportunity
Solicitation number
FA8532-21-R-72GPU
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document contains a price spreadsheet and risk factor analysis for a solicitation seeking 72kW ground power units. Key details include:

The solicitation is from the Department of the Air Force and seeks first article units, low-rate initial production units, and full-rate production units of 72kW GPUs over seven ordering years. Pricing is provided for CLINs covering production units of the 72kW GPUs by quantity and ordering year, as well as data and non-recurring engineering CLINs. A risk factor analysis is included assessing cost elements of materials, labor, and manufacturing for the production unit CLIN ranges based on the unit pricing from prior ordering years. No unit pricing is currently provided, as offerors are to enter data only in the highlighted fields.

The spreadsheet contains extensive details on the solicitation's requirements, but pricing terms have not yet been populated pending offeror inputs. The risk factor analysis outlines the methodology to be applied for assessing escalation between ordering years.

View the file

Other files for this federal contract opportunity

Other files attached to 72kW Ground Power Units (GPU), newest first.
File Type Posted
QA 12.docx DOCX document
Final Statement of Work (SOW)_1 Sep 21.pdf PDF
DRAFT GPM LM_8 Sep 2021.doc DOC document
Updated Informal Draft RFP FA8532-21-R-0011.pdf PDF
GPM_Pre-Solicitation_Conference_Brief.pptx PPTX presentation
Draft CDRLs C010 through C017.pdf PDF
Conference Attachment 1_3d Conceptual Illustration_144KW Generator.PDF PDF
Conference Attachment 2_Timeline.pptx PPTX presentation
Conference Attachment 4_Sections L and M.pdf PDF
Conference Attachment 3_Informal Draft Request for Proposal FA8532-21-R-0011.pdf PDF
RFP Attachment 1 - Past Performance Information (PPI) for Offerors.pdf PDF
RFP Attachment 5 - Relevancy Table.pdf PDF
RFP Attachment 6 - Subcontractor and Teaming Member Consent Form.pdf PDF
RFP Attachment 8 - Client Authorization Letter.pdf PDF
RFP Attachment 9 - GPU Engine Derating Calculation Worksheet --DRAFT WATERMARK ADDED.pdf PDF
RFP Attachment 2 - Oral Presentations for Discussions Slide Deck.pptx PPTX presentation
RFP Attachment 7 - Past Performance Questionnaire.pdf PDF
Informal Draft Request for Proposal FA8532-21-R-0011.pdf PDF
Draft GPM Ordering Guide.docx DOCX document
Document Updates and Pre-Solicitation Conference.docx DOCX document
RFP Attachment 5 - Relevancy Table.pdf PDF
RFP Attachment 10_Price Spreadsheet.xlsx XLSX spreadsheet
Draft CDRLs.pdf PDF
Statement of Work (SOW).pdf PDF
M-900. EVALUATION BASIS FOR AWARD.pdf PDF
RFP Attachment 8 - Client Authorization Letter.pdf PDF
Informal Draft Request for Proposal FA8532-21-R-0001.pdf PDF
RFP Attachment 1 - Past Performance Information (PPI) for Offerors.pdf PDF
RFP Attachment 2 - Oral Presentations for Discussions Slide Deck.pptx PPTX presentation
Government Strategy Update for Industry Awareness.docx DOCX document
Draft LM and CLIN Schedule.docx DOCX document
DRAFT GPM LM.doc DOC document
SOW_GPM_2021-05-20.docx DOCX document
Draft Purchase Description Feedback Extension.docx DOCX document
Export Controlled Draft Purchase Descriptions.docx DOCX document
CUI_Training.pptx PPTX presentation
Sample_CUI_Cover_Markings.pptx PPTX presentation
Controlled_Unclassified_Information_Requirements.docx DOCX document
GPM Consolidated Industry Feedback Responses.docx DOCX document
Announcement on Purchase Descriptions.docx DOCX document
Industry QA 6.docx DOCX document
Industry QA 5.docx DOCX document
Follow up QA for Industry Day - Number 4.docx DOCX document
Follow up QA for Industry Day - Number 3.docx DOCX document
Follow up QA for Industry Day - Number 2.docx DOCX document
Follow up QA for Industry Day.docx DOCX document
72kW GPU - High Level Parallel Testing.pptx PPTX presentation
QA Received from Industry Day.docx DOCX document
72kW Generator Industry Day Briefing 16-17 Sep 2020.pptx PPTX presentation
72GPU TEP.xlsx XLSX spreadsheet
Show all 50

72kW Ground Power Units (GPU) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Group A

Price Spreadsheet
Solicitation FA8532-21-R-0011
Group A
Offeror shall enter data in yellow highlighted fields only
Offeror:
ORDERING PERIOD I
BASIC Contract Period (36 Months)
CLINTypeDescriptionQty/BEQU/IUnit PriceTotal Price
0001FFP144kW GPU First Article
0001AAFFPFirst Article Units6EA$0$0
0001ABFFPNRE against CLIN 0001AA, to include testing costs1LO$0$0
0002FFP72kW GPU First Article
0002AAFFPFirst Article Units6EA$0$0
0002ABFFPNRE against CLIN 0002AA, to include testing costs1LO$0$0
0003FFPUniversal Load Bank First Article
0003AAFFPFirst Article Units8EA$0$0
0003ABFFPNRE against CLIN 0003AA, to include testing costs1LO$0$0
0004Data
0004AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
0004ABNSPCONFERENCE AGENDA (A002)1LONSP
0004ACNSPCONFERENCE MINUTES (A003)1LONSP
0004ADFFPTECHNICAL REPORT-STUDY SERVICES (B001)1LO$0$0
0004AEFFPTECHNICAL REPORT-STUDY SERVICES (Test readiness review documentation package) (B002)1LO$0$0
0004AFNSPSYSTEM SAFETY PROGRAM PLAN (C001)1LONSP
0004AGNSPSYSTEM SAFETY HAZARD ANALYSIS REPORT (C002)1LONSP
0004AHNSPCORROSION PREVENTION AND CONTROL PLAN (C003)1LONSP
0004AJNSPCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
0004AKNSPTECHNICAL REPORT - STUDY SERVICES (CYBERSECURITY ANALYSIS) (C005)1LONSP
0004ALNSPRISK MANAGEMENT FRAMEWORK (RMF) (C006)1LONSP
0004AMNSPSOFTWARE ASSURANCE EVALUATION REPORT (SAER) (C007)1LONSP
0004ANNSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
0004APNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
0004AQFFPLOGISTICS PRODUCT DATA (C010)1LO$0$0
0004ARFFPENGINEERING DATA FOR PROVISIONING (C011)1LO$0$0
0004ASFFPLOGISTICS PRODUCT DATA - 72 kW GPU (C012)1LO$0$0
0004ATFFPENGINEERING DATA FOR PROVISIONING - 72 kW GPU (C013)1LO$0$0
0004AUFFPLOGISTICS PRODUCT DATA - 144 kW ULB (C014)1LO$0$0
0004AVFFPENGINEERING DATA FOR PROVISIONING - 144 kW ULB (C015)1LO$0$0
0004AWFFPAIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - 144 kW GPU (D001)1LO$0$0
0004AXFFPAIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - 72 kW GPU (D002)1LO$0$0
0004AYFFPAIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - 144 kW ULB (D003)1LO$0$0
0004AZFFPTRAINING MATERIAL (D005)1LO$0$0
0004BAFFPTRAINING MATERIAL - PACK-UP DATA (D006)1LO$0$0
0004BBFFPTECHNICAL REPORT - STUDY SERVICES (DESIGN ANALYSIS) (E001)1LO$0$0
0004BCFFPFIRST ARTICLE TEST PLAN (E002)1LO$0$0
0004BDFFPFIRST ARTICLE TEST PROCEDURE (E003)1LO$0$0
0004BEFFPTEST-INSPECTION REPORT (FIRST ARTICLE TEST REPORT) (E004)1LO$0$0
0004BFFFPTEST-INSPECTION REPORT (72kW FIRST CONNECT TEST REPORT) (E005)1LO$0$0
0004BGFFPTEST-INSPECTION REPORT (144kW FIRST CONNECT TEST REPORT) (E006)1LO$0$0
0004BHFFPTEST-INSPECTION REPORT (ULB FIRST CONNECT TEST REPORT) (E007)1LO$0$0
0004BJNSPPRODUCTION ACCEPTANCE TEST PROCEDURE (E008)1LONSP
0004BKNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
0004BLTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
0004BMNSPNOTICE OF REVISION (NOR) (F002)1LONSP
0004BNNSPREQUEST FOR VARIANCE (RFV) (F003)1LONSP
0005CRNFTravel1LO$0
0006FFPPost Award Conference, to Include Provisioning Guidance Conference, Technical Order Guidance Conference1LO$3,000$3,000
0007FFP144kW GPU LRIP Production Units
1-1010EA$0$0
11-166EA$0$0
16$0
0008FFP72kW GPU LRIP Production Units
1-1010EA$0$0
11-177EA$0$0
17$0
0009FFPUniversal Load Bank LRIP Production Units
1-1010EA$0$0
11-166EA$0$0
16$0
0010TBNLRU Spares1LOTBN
BASIC CONTRACT TOTAL$3,000
ORDERING YEAR I (12 MONTHS) Full-rate
CLINTypeDescriptionQty/BEQU/IUnit PriceTotal
1001FFP144kW GPU Production Units
1-1010EA$0$0
11-5040EA$0$0
51-6414EA$0$0
64$0
100272kW GPU Production Units (266)
1002AAFFP72kW GPU Guarantee Quantity (.25 x 266 = 66)
1-1010EA$0$0
11-5040EA$0$0
51-6616EA$0$0
66$0
1002ABFFP72kW GPU Competitive Quantity (.50 x 266 = 133)
1-1010EA$0$0
11-5040EA$0$0
51-10050EA$0$0
101-13333EA$0$0
133$0
1003FFFPUniversal Load Bank Production Units
1-1010EA$0$0
11-5040EA$0$0
51-6010EA$0$0
60$0
1004Data
1004AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
1004ABNSPCONFERENCE AGENDA (A002)1LONSP
1004ACNSPCONFERENCE MINUTES (A003)1LONSP
1004ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
1004AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
1004AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
1004AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1LO$0$0
1004AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
1004AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
1004AKNSPNOTICE OF REVISION (NOR) (F002)1LONSP
1004ALNSPREQUEST FOR VARIANCE (RFV) (F003)1LONSP
1005CRNFTravel1LO$0
1006TBNLRU Spares1LOTBN
ORDERING YEAR I TOTAL$0
ORDERING YEAR II (12 MONTHS)2.5%
CLINTypeDescriptionQty/BEQU/IOrdering Year I Unit PriceRiskEscalationOrdering Year II Computed Unit PriceOrdering Year II Computed Total Price
2001FFP144kW GPU Production Units
1-1010EA$0$0$0$0$0
11-5040EA$0$0$0$0$0
51-6616EA$0$0$0$0$0
66$0
200272kW GPU Production Units (480)
2002AAFFP72kW GPU Guarantee Quantity (.25 x 480 = 120)
1-1010EA$0$0$0$0$0
11-5040EA$0$0$0$0$0
51-10050EA$0$0$0$0$0
101-12020EA$0$0$0$0$0
120$0
2002ABFFP72kW GPU Competitive Quantity (.50 x 480 = 240)
1- 1010EA$0$0$0$0$0
11 - 5040EA$0$0$0$0$0
51 - 10050EA$0$0$0$0$0
101-15050EA$0$0$0$0$0
151-20050EA$0$0$0$0$0
201-24040EA$0$0$0$0$0
240$0
2003FFPUniversal Load Bank Production Units
1-1010EA$0$0$0$0$0
11-5040EA$0$0$0$0$0
51-6010EA$0$0$0$0$0
60$0
2004Data
2004AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
2004ABNSPCONFERENCE AGENDA (A002)1LONSP
2004ACNSPCONFERENCE MINUTES (A003)1LONSP
2004ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
2004AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
2004AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
2004AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1LO$0$0$0$0
2004AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
2004AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
2004AKNSPNOTICE OF REVISION (NOR) (F002)1LONSP
2004ALNSPREQUEST FOR VARIANCE (RFV) (F003)1LONSP
2005CRNFTravel1LOCRNF
2006TBNLRU Spares1LOTBN
ORDERING YEAR II TOTAL:$0
OPTION I
ORDERING PERIOD II
ORDERING YEAR III (12 MONTHS)2.5%
CLINTypeDescriptionQty/BEQU/IOrdering Year II Computed Unit PriceRiskEscalationOdering Year III Computed Unit PriceOrdering Year III Computed Total Price
3001FFP144kW GPU Production Units
1-1010EA$0$0$0$0$0
11-5040EA$0$0$0$0$0
51-544EA$0$0$0$0$0
54$0
3002FFP72kW GPU Production Units (440)
3002AAFFP72kW GPU Guarantee Quantity (.25 x 440 = 110)
1-1010EA$0$0$0$0$0
11-5040EA$0$0$0$0$0
51-10050EA$0$0$0$0$0
101-11010EA$0$0$0$0$0
110$0
3002ABFFP72kW GPU Competitive Quantity (.50 x 440 = 220)
1- 1010EA$0$0$0$0$0
11 - 5040EA$0$0$0$0$0
51-10050EA$0$0$0$0$0
101-15050EA$0$0$0$0$0
151-20050EA$0$0$0$0$0
201-22020EA$0$0$0$0$0
220$0
3003FFPUniversal Load Bank Production Units
1-1010EA$0$0$0$0$0
11-5040EA$0$0$0$0$0
51-6010EA$0$0$0$0$0
60$0
3004Data
3004AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
3004ABNSPCONFERENCE AGENDA (A002)1LONSP
3004ACNSPCONFERENCE MINUTES (A003)1LONSP
3004ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
3004AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
3004AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
3004AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1LO$0$0$0$0
3004AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
3004AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
3004AKNSPNOTICE OF REVISION (NOR) (F002)1LONSP
3004ALNSPREQUEST FOR VARIANCE (RFV) (F003)1LONSP
3005CRNFTravel1LOCRNF
3006TBNLRU Spares1LOTBN
ORDERING YEAR III TOTAL:$0
ORDERING YEAR IV (12 MONTHS)2.5%
CLINTypeDescriptionQty/BEQU/IOrdering Year III Computed Unit PriceRiskEscalationOrdering Year IV Computed Unit PriceOrdering Year IV Computed Total Price
4001FFP144kW GPU Production Units
1-1010EA$0$0$0$0$0
11-3626EA$0$0$0$0$0
36$0
4002FFP72kW GPU Production Units (432)
4002AAFFP72kW GPU Guarantee Quantity (.25 x 432 = 108)
1-1010EA$0$0$0$0$0
11-5040EA$0$0$0$0$0
51-10050EA$0$0$0$0$0
101-1088EA$0$0$0$0$0
108$0
4002ABFFP72kW GPU Competitive Quantity (.50 x 432 = 216)
1- 1010EA$0$0$0$0$0
11 - 5040EA$0$0$0$0$0
51 - 10050EA$0$0$0$0$0
101-15050EA$0$0$0$0$0
151-20050EA$0$0$0$0$0
201-21616EA$0$0$0$0$0
216$0
4003FFPUniversal Load Bank Production Units
1-1010EA$0$0$0$0$0
11-5040EA$0$0$0$0$0
51-6010EA$0$0$0$0$0
60$0
4004Data
4004AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
4004ABNSPCONFERENCE AGENDA (A002)1LONSP
4004ACNSPCONFERENCE MINUTES (A003)1LONSP
4004ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
4004AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
4004AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
4004AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1LO$0$0$0$0
4004AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
4004AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
4004AKNSPNOTICE OF REVISION (NOR) (F002)1LONSP
4004ALNSPREQUEST FOR VARIANCE (RFV) (F003)1LONSP
4005CRNFTravel1LOCRNF
4006TBNLRU Spares1LOTBN
ORDERING YEAR IV TOTAL:$0
ORDERING YEAR V (12 MONTHS)2.5%
CLINTypeDescriptionQty/BEQU/IOrdering Year IV Computed Unit PriceRiskEscalationOrdering Year V Computed Unit PriceOrdering Year V Computed Total Price
5001FFP144kW GPU Production Units8EA$0$ - 0$0$0$0
5002FFP72kW GPU Production Units (432)
5002AAFFP72kW GPU Guarantee Quantity (.25 x 432 = 108)
1-1010EA$0$0$0$0$0
11-5040EA$0$0$0$0$0
51-10050EA$0$0$0$0$0
101-1088EA$0$0$0$0$0
108$0
5002ABFFP72kW GPU Competitive Quantity (.50 x 432 = 216)
1- 1010EA$0$0$0$0$0
11 - 5040EA$0$0$0$0$0
51 - 10050EA$0$0$0$0$0
101-15050EA$0$0$0$0$0
151-20050EA$0$0$0$0$0
201-21616EA$0$0$0$0$0
216$0
5003FFPUniversal Load Bank Production Units
1-1010EA$0$0$0$0$0
11-3626EA$0$0$0$0$0
36$0
5004Data
5004AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
5004ABNSPCONFERENCE AGENDA (A002)1LONSP
5004ACNSPCONFERENCE MINUTES (A003)1LONSP
5004ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
5004AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
5004AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
5004AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1LO$0$0$0$0
5004AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
5004AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
5004AKNSPNOTICE OF REVISION (NOR) (F002)1LONSP
5004ALNSPREQUEST FOR VARIANCE (RFV) (F003)1LONSP
5005CRNFTravel1LOCRNF
5006TBNLRU Spares1LOTBN
ORDERING YEAR V TOTAL:$0
ORDERING YEAR VI (12 MONTHS)2.5%
CLINTypeDescriptionQty/BEQU/IOrdering Year V Computed Unit PriceRiskEscalationOrdering Year VI Computed Unit PriceOrdering Year VI Computed Total Price
6002FFP72kW GPU Production Units (432)
6002AAFFP72kW GPU Guarantee Quantity (.25 x 432 = 108)
1-1010EA$0$0$0$0$0
11-5040EA$0$0$0$0$0.00
51-10050EA$0$0$0$0$0
101-1088EA$0$0$0$0$0
108$0
6002ABFFP72kW GPU Competitive Quantity (.50 x 432 = 216)
1- 1010EA$0$0$0$0$0
11 - 5040EA$0$0$0$0$0
51 - 10050EA$0$0$0$0$0
101-15050EA$0$0$0$0$0
151-20050EA$0$0$0$0$0
201-21616EA$0$0$0$0$0
216$0
6004Data
6004AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
6004ABNSPCONFERENCE AGENDA (A002)1LONSP
6004ACNSPCONFERENCE MINUTES (A003)1LONSP
6004ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
6004AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
6004AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
6004AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1LO$0$0$0$0
6004AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
6004AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
6004AKNSPNOTICE OF REVISION (NOR) (F002)1LONSP
6004ALNSPREQUEST FOR VARIANCE (RFV) (F003)1LONSP
6005CRNFTravel1LOCRNF
6006TBNLRU Spares1LOTBN
ORDERING YEAR VI TOTAL:$0
ORDERING YEAR VII (12 MONTHS)2.5%
CLINTypeDescriptionQty/BEQU/IOrdering Year VI Computed Unit PriceRiskEscalationOrdering Year VII Computed Unit PriceOrdering Year VII Computed Total Price
7002FFP72kW GPU Production Units (400)
7002AAFFP72kW GPU Guarantee Quantity (.25 x 400 = 100)
1-1010EA$0$0$0$0$0
11-5040EA$0$0$0$0$0
51-10050EA$0$0$0$0$0
100$0
7002ABFFP72kW GPU Competitive Quantity (.50 x 400 = 200)
1- 1010EA$0$0$0$0$0
11 - 5040EA$0$0$0$0$0
51 - 10050EA$0$0$0$0$0
101-15050EA$0$0$0$0$0
151-20050EA$0$0$0$0$0
200$0$0
7004Data
7004AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSPNSP
7004ABNSPCONFERENCE AGENDA (A002)1LONSPNSP
7004ACNSPCONFERENCE MINUTES (A003)1LONSPNSP
7004ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1LONSPNSP
7004AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSPNSP
7004AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSPNSP
7004AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1LO$0$0$0$0
7004AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSPNSP
7004AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBNTBN
7004AKNSPNOTICE OF REVISION (NOR) (F002)1LONSPNSP
7004ALNSPREQUEST FOR VARIANCE (RFV) (F003)1LONSPNSP
7005CRNFTravel1LOCRNF
7006TBNLRU Spares1LOTBNTBN
ORDERING YEAR VII TOTAL:$0
TOTAL EVALUATED PRICE:$3,000

Group A Risk Factor

Solicitation FA8532-21-R-0011
Group A Risk Factor

ORDERING YEAR II

144kW GPU Production Units72kW GPU Production Units72kW GPU Production UnitsUniversal Load Bank
CLINRangeCLINRangeCLINRangeCLINRange
20011- 10Ordering Year I Unit Price:$ - 02002AA1- 10Ordering Year I Unit Price:$ - 02002AB1- 10Ordering Year I Unit Price:$ - 020031- 10Ordering Year I Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRangeCLINRangeCLINRangeCLINRange
200111-50Ordering Year I Unit Price:$ - 02002AA11-50Ordering Year I Unit Price:$ - 02002AB11-50Ordering Year I Unit Price:$ - 0200311-50Ordering Year I Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRangeCLINRangeCLINRangeCLINRange
200151-66Ordering Year I Unit Price:$ - 02002AA51-100Ordering Year I Unit Price:$ - 02002AB51-100Ordering Year I Unit Price:$ - 0200351-60Ordering Year I Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0$0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0Other10%$ - 0$0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRangeCLINRange
2002AA101-120Ordering Year I Unit Price:$ - 02002AB101-150Ordering Year I Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRange
2002AB151-200Ordering Year I Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0
Labor19%$ - 0
Other10%$ - 0
TOTAL:100%$ - 0$0
CLINRange
2002AB201-240Ordering Year I Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0
Labor19%$ - 0
Other10%$ - 0
TOTAL:100%$ - 0$0

ORDERING YEAR III

144kW GPU Production Units72kW GPU Production Units72kW GPU Production UnitsUniversal Load Bank
CLINRangeCLINRangeCLINRangeCLINRange
30011- 10Ordering Year II Computed Unit Price:$ - 03002AA1- 10Ordering Year II Computed Unit Price:$ - 03002AB1- 10Ordering Year II Computed Unit Price:$ - 030031- 10Ordering Year II Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRangeCLINRangeCLINRangeCLINRange
300111-50Ordering Year II Computed Unit Price:$ - 03002AA11-50Ordering Year II Computed Unit Price:$ - 03002AB11-50Ordering Year II Computed Unit Price:$ - 0300311-50Ordering Year II Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0$0Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRangeCLINRangeCLINRangeCLINRange
300151-54Ordering Year II Computed Unit Price:$ - 03002AA51-100Ordering Year II Computed Unit Price:$ - 03002AB51-100Ordering Year II Computed Unit Price:$ - 0300351-60Ordering Year II Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRangeCLINRange
3002AA101-110Ordering Year II Computed Unit Price:$ - 03002AB101-150Ordering Year II Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRange
3002AB151-200Ordering Year II Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0
Labor19%$ - 0
Other10%$ - 0
TOTAL:100%$ - 0$0
CLINRange
3002AB201-220Ordering Year II Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0
Labor19%$ - 0
Other10%$ - 0
TOTAL:100%$ - 0$0
ORDERING YEAR IV
144kW GPU Production Units72kW GPU Production Units72kW GPU Production UnitsUniversal Load Bank
CLINRangeCLINRangeCLINRangeCLINRange
40011- 10Ordering Year III Computed Unit Price:$ - 04002AA1- 10Ordering Year III Computed Unit Price:$ - 04002AB1- 10Ordering Year III Computed Unit Price:$ - 040031- 10Ordering Year III Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRangeCLINRangeCLINRangeCLINRange
400111-36Ordering Year III Computed Unit Price:$ - 04002AA11-50Ordering Year III Computed Unit Price:$ - 04002AB11-50Ordering Year III Computed Unit Price:$ - 0400311-50Ordering Year III Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRangeCLINRangeCLINRange
4002AA51-100Ordering Year III Computed Unit Price:$ - 04002AB51-100Ordering Year III Computed Unit Price:$ - 0400351-60Ordering Year III Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRangeCLINRange
4002AA101-108Ordering Year III Computed Price:$ - 04002AB101-150Ordering Year III Computed Unit Price:$ - 0
Ordering Year III Computed Unit Price:Element %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRange
4002AB151-200Ordering Year III Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0
`Engine19%$ - 01.59%$0
Labor19%$ - 0
Other10%$ - 0
TOTAL:100%$ - 0$0
CLINRange
4002AB201-216Ordering Year III Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0
Labor19%$ - 0
Other10%$ - 0
TOTAL:100%$ - 0$0
ORDERING YEAR V
144kW GPU Production Units72kW GPU Production Units72kW GPU Production UnitsUniversal Load Bank
CLINRangeCLINRangeCLINRangeCLINRange
50011-8Ordering Year IV Computed Unit Price:$ - 05002AA1-10Ordering Year IV Computed Unit Price:$ - 05002AB1- 10Ordering Year IV Computed Unit Price:$ - 050031- 10Ordering Year IV Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRangeCLINRangeCLINRange
5002AA11-50Ordering Year IV Computed Unit Price:$ - 05002AB11-50Ordering Year IV Computed Unit Price:$ - 0500311-36Ordering Year IV Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRangeCLINRange
5002AA51-100Ordering Year IV Computed Unit Price:$ - 05002AB51-100Ordering Year IV Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRangeCLINRange
5002AA101-108Ordering Year IV Computed Unit Price:$ - 05002AB101-150Ordering Year IV Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRange
5002AB151-200Ordering Year IV Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0
Labor19%$ - 0
Other10%$ - 0
TOTAL:100%$ - 0$0
CLINRange
5002AB201-216Ordering Year IV Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0
Labor19%$ - 0
Other10%$ - 0
TOTAL:100%$ - 0$0

ORDERING YEAR VI

72kW GPU Production Units72kW GPU Production Units
CLINRangeCLINRange
6002AA1- 10Ordering Year V Computed Unit Price:$ - 06002AB1- 10Ordering Year V Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRangeCLINRange
6002AA11-50Ordering Year V Computed Unit Price:$ - 06002AB11-50Ordering Year V Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRangeCLINRange
6002AA51-100Ordering Year V Computed Unit Price:$ - 06002AB51-100Ordering Year V Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRangeCLINRange
6002AA101-108Ordering Year V Computed Unit Price:$ - 06002AB101-150Ordering Year V Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRange
6002AB151-200Ordering Year V Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0
Labor19%$ - 0
Other10%$ - 0
TOTAL:100%$ - 0$0
CLINRange
6002AB201-216Ordering Year V Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0
Labor19%$ - 0
Other10%$ - 0
TOTAL:100%$ - 0$0
ORDERING YEAR VII
72kW GPU Production Units72kW GPU Production Units
CLINRangeCLINRange
7002AA1- 10Ordering Year VI Computed Unit Price:$ - 07002AB1- 10Ordering Year VI Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0
Other10%$ - 0Other10%$ - 0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRangeCLINRange
7002AA11-50Ordering Year VI Computed Unit Price:$ - 07002AB11-50Ordering Year VI Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0$0
Other10%$ - 0Other10%$ - 0$0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRangeCLINRange
7002AA51-100Ordering Year VI Computed Unit Price:$ - 07002AB51-100Ordering Year VI Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0Engine19%$ - 01.59%$0
Labor19%$ - 0Labor19%$ - 0$0
Other10%$ - 0Other10%$ - 0$0
TOTAL:100%$ - 0$0TOTAL:100%$ - 0$0
CLINRange
7002AB101-150Ordering Year VI Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0
Labor19%$ - 0$0
Other10%$ - 0$0
TOTAL:100%$ - 0$0
CLINRange
7002AB151-200Ordering Year VI Computed Unit Price:$ - 0
Cost ElementElement %Element $Risk Factor %Risk Factor $
Aluminum13%$ - 02.70%$0
Copper14%$ - 02.18%$0
Steel15%$ - 01.53%$0
Generators10%$ - 01.59%$0
Engine19%$ - 01.59%$0
Labor19%$ - 0$0
Other10%$ - 0$0
TOTAL:100%$ - 0$0

Group B

Price Spreadsheet
Solicitation FA8532-21-R-0011
Group B
Offeror shall enter data in yellow highlighted fields only
Offeror:
ORDERING PERIOD I
BASIC Contract Period (36 Months)
CLINTypeDescriptionQty/BEQU/IUnit PriceTotal Price
0011FFP72kW GPU First Article
0011AAFFPFirst Article Units6EA$0$0
0011ABFFPNRE against CLIN 0002AA, to include testing costs1LO$0$0
0012Data
0012AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
0012ABNSPCONFERENCE AGENDA (A002)1LONSP
0012ACNSPCONFERENCE MINUTES (A003)1LONSP
0012ADFFPTECHNICAL REPORT-STUDY SERVICES (B001)1LO$0$0
0012AEFFPTECHNICAL REPORT-STUDY SERVICES (Test readiness review documentation package) (B002)1LO$0$0
0012AFNSPSYSTEM SAFETY PROGRAM PLAN (C001)1LONSP
0012AGNSPSYSTEM SAFETY HAZARD ANALYSIS REPORT (C002)1LONSP
0012AHNSPCORROSION PREVENTION AND CONTROL PLAN (C003)1LONSP
0012AJNSPCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
0012AKNSPTECHNICAL REPORT - STUDY SERVICES (CYBERSECURITY ANALYSIS) (C005)1LONSP
0012ALNSPRISK MANAGEMENT FRAMEWORK (RMF) (C006)1LONSP
0012AMNSPSOFTWARE ASSURANCE EVALUATION REPORT (SAER) (C007)1LONSP
0012ANNSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
0012APNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
0012AQFFPLOGISTICS PRODUCT DATA - 72 kW GPU (C016)1LO$0$0
0012ARFFPENGINEERING DATA FOR PROVISIONING - 72 kW GPU (C017)1LO$0$0
0012ASFFPAIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - Group B (D004)1LO$0$0
0012ATFFPTRAINING MATERIAL (D005)1LO$0$0
0012AUFFPTRAINING MATERIAL - PACK-UP DATA (D006)1LO$0$0
0012AVFFPTECHNICAL REPORT - STUDY SERVICES (DESIGN ANALYSIS) (E001)1LO$0$0
0012AWFFPFIRST ARTICLE TEST PLAN (E002)1LO$0$0
0012AXFFPFIRST ARTICLE TEST PROCEDURE (E003)1LO$0$0
0012AYFFPTEST-INSPECTION REPORT (FIRST ARTICLE TEST REPORT) (E004)1LO$0$0
0012AZFFPTEST-INSPECTION REPORT (72kW FIRST CONNECT TEST REPORT) (E005)1LO$0$0
0012BANSPPRODUCTION ACCEPTANCE TEST PROCEDURE (E008)1LONSP
0012BBNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
0012BCTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
0012BDNSPNOTICE OF REVISION (NOR) (F002)1LONSP
0012BENSPREQUEST FOR VARIANCE (RFV) (F003)1LONSP
0013CRNFTravel1LO$0
0014FFPPost Award Conference, to Include Provisioning Guidance Conference, Technical Order Guidance Conference1LO$3,000$3,000
0015FFP72kW GPU LRIP Production Units
1-1010EA$0$0
11-177EA$0$0
17$0
0016TBNLRU Spares1LOTBN
BASIC CONTRACT TOTAL$3,000
ORDERING YEAR I (12 MONTHS) Full-rate
CLINTypeDescriptionQty/BEQU/IUnit PriceTotal
100772kW GPU Production Units (266)
1007AAFFP72kW GPU Guarantee Quantity (.25 x 266 = 67)
1-1010EA$0$0
11-5040EA$0$0
51-6717EA$0$0
67$0
1007ABFFP72kW GPU Competitive Quantity (.50 x 266 = 133)
1-1010EA$0$0
11-5040EA$0$0
51-10050EA$0$0
101-13333EA$0$0
133$0
1008Data
1008AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
1008ABNSPCONFERENCE AGENDA (A002)1LONSP
1008ACNSPCONFERENCE MINUTES (A003)1LONSP
1008ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
1008AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
1008AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
1008AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1LO$0$0
1008AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
1008AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
1008AKNSPNOTICE OF REVISION (NOR) (F002)1LONSP
1008ALNSPREQUEST FOR VARIANCE (RFV) (F003)1LONSP
1009CRNFTravel1LO$0
1010TBNLRU Spares1LOTBN
ORDERING YEAR I TOTAL$0
ORDERING YEAR II (12 MONTHS)2.5%
CLINTypeDescriptionQty/BEQU/IOrdering Year I Unit PriceRiskEscalationOrdering Year II Computed Unit PriceOrdering Year II Computed Total Price
200772kW GPU Production Units (480)
2007AAFFP72kW GPU Guarantee Quantity (.25 x 480 = 120)
1-1010EA$0$0$0$0$0
11-5040EA$0$0$0$0$0
51-10050EA$0$0$0$0$0
101-12020EA$0$0$0$0$0
120$0
2007ABFFP72kW GPU Competitive Quantity (.50 x 480 = 240)
1- 1010EA$0$0$0$0$0
11 - 5040EA$0$0$0$0$0
51 - 10050EA$0$0$0$0$0
101-15050EA$0$0$0$0$0
151-20050EA$0$0$0$0$0
201-24040EA$0$0$0$0$0
240$0
2008Data
2008AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
2008ABNSPCONFERENCE AGENDA (A002)1LONSP
2008ACNSPCONFERENCE MINUTES (A003)1LONSP
2008ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
2008AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
2008AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
2008AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1LO$0$0$0$0
2008AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
2008AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
2008AKNSPNOTICE OF REVISION (NOR) (F002)1LONSP
2008ALNSPREQUEST FOR VARIANCE (RFV) (F003)1LONSP
2009CRNFTravel1LOCRNF
2010TBNLRU Spares1LOTBN
ORDERING YEAR II TOTAL:$0
OPTION I
ORDERING PERIOD II
ORDERING YEAR III (12 MONTHS)2.5%
CLINTypeDescriptionQty/BEQU/IOrdering Year II Computed Unit PriceRiskEscalationOdering Year III Computed Unit PriceOrdering Year III Computed Total Price
3007FFP72kW GPU Production Units (440)
3002AAFFP72kW GPU Guarantee Quantity (.25 x 440 = 110)
1-1010EA$0$0$0$0$0
11-5040EA$0$0$0$0$0
51-10050EA$0$0$0$0$0
101-11010EA$0$0$0$0$0
110$0
3007ABFFP72kW GPU Competitive Quantity (.50 x 440 = 220)
1- 1010EA$0$0$0$0$0
11 - 5040EA$0$0$0$0$0
51-10050EA$0$0$0$0$0
101-15050EA$0$0$0$0$0
151-20050EA$0$0$0$0$0
201-22020EA$0$0$0$0$0
220$0
3008Data
3008AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
3008ABNSPCONFERENCE AGENDA (A002)1LONSP
3008ACNSPCONFERENCE MINUTES (A003)1LONSP
3008ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
3008AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
3008AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
3008AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1LO$0$0$0$0
3008AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
3008AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
3008AKNSPNOTICE OF REVISION (NOR) (F002)1LONSP

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .