This document contains a price spreadsheet and risk factor analysis for a solicitation seeking 72kW ground power units. Key details include:
The solicitation is from the Department of the Air Force and seeks first article units, low-rate initial production units, and full-rate production units of 72kW GPUs over seven ordering years. Pricing is provided for CLINs covering production units of the 72kW GPUs by quantity and ordering year, as well as data and non-recurring engineering CLINs. A risk factor analysis is included assessing cost elements of materials, labor, and manufacturing for the production unit CLIN ranges based on the unit pricing from prior ordering years. No unit pricing is currently provided, as offerors are to enter data only in the highlighted fields.
The spreadsheet contains extensive details on the solicitation's requirements, but pricing terms have not yet been populated pending offeror inputs. The risk factor analysis outlines the methodology to be applied for assessing escalation between ordering years.
View the file
Other files for this federal contract opportunity
Show all 50
72kW Ground Power Units (GPU) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Group A
| Price Spreadsheet | ||||||
| Solicitation FA8532-21-R-0011 | ||||||
| Group A | ||||||
| Offeror shall enter data in yellow highlighted fields only | ||||||
| Offeror: | ||||||
| ORDERING PERIOD I | ||||||
| BASIC Contract Period (36 Months) | ||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Unit Price | Total Price |
| 0001 | FFP | 144kW GPU First Article | ||||
| 0001AA | FFP | First Article Units | 6 | EA | $0 | $0 |
| 0001AB | FFP | NRE against CLIN 0001AA, to include testing costs | 1 | LO | $0 | $0 |
| 0002 | FFP | 72kW GPU First Article | ||||
| 0002AA | FFP | First Article Units | 6 | EA | $0 | $0 |
| 0002AB | FFP | NRE against CLIN 0002AA, to include testing costs | 1 | LO | $0 | $0 |
| 0003 | FFP | Universal Load Bank First Article | ||||
| 0003AA | FFP | First Article Units | 8 | EA | $0 | $0 |
| 0003AB | FFP | NRE against CLIN 0003AA, to include testing costs | 1 | LO | $0 | $0 |
| 0004 | Data | |||||
| 0004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | |
| 0004AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | |
| 0004AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | |
| 0004AD | FFP | TECHNICAL REPORT-STUDY SERVICES (B001) | 1 | LO | $0 | $0 |
| 0004AE | FFP | TECHNICAL REPORT-STUDY SERVICES (Test readiness review documentation package) (B002) | 1 | LO | $0 | $0 |
| 0004AF | NSP | SYSTEM SAFETY PROGRAM PLAN (C001) | 1 | LO | NSP | |
| 0004AG | NSP | SYSTEM SAFETY HAZARD ANALYSIS REPORT (C002) | 1 | LO | NSP | |
| 0004AH | NSP | CORROSION PREVENTION AND CONTROL PLAN (C003) | 1 | LO | NSP | |
| 0004AJ | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | |
| 0004AK | NSP | TECHNICAL REPORT - STUDY SERVICES (CYBERSECURITY ANALYSIS) (C005) | 1 | LO | NSP | |
| 0004AL | NSP | RISK MANAGEMENT FRAMEWORK (RMF) (C006) | 1 | LO | NSP | |
| 0004AM | NSP | SOFTWARE ASSURANCE EVALUATION REPORT (SAER) (C007) | 1 | LO | NSP | |
| 0004AN | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | |
| 0004AP | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | |
| 0004AQ | FFP | LOGISTICS PRODUCT DATA (C010) | 1 | LO | $0 | $0 |
| 0004AR | FFP | ENGINEERING DATA FOR PROVISIONING (C011) | 1 | LO | $0 | $0 |
| 0004AS | FFP | LOGISTICS PRODUCT DATA - 72 kW GPU (C012) | 1 | LO | $0 | $0 |
| 0004AT | FFP | ENGINEERING DATA FOR PROVISIONING - 72 kW GPU (C013) | 1 | LO | $0 | $0 |
| 0004AU | FFP | LOGISTICS PRODUCT DATA - 144 kW ULB (C014) | 1 | LO | $0 | $0 |
| 0004AV | FFP | ENGINEERING DATA FOR PROVISIONING - 144 kW ULB (C015) | 1 | LO | $0 | $0 |
| 0004AW | FFP | AIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - 144 kW GPU (D001) | 1 | LO | $0 | $0 |
| 0004AX | FFP | AIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - 72 kW GPU (D002) | 1 | LO | $0 | $0 |
| 0004AY | FFP | AIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - 144 kW ULB (D003) | 1 | LO | $0 | $0 |
| 0004AZ | FFP | TRAINING MATERIAL (D005) | 1 | LO | $0 | $0 |
| 0004BA | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 |
| 0004BB | FFP | TECHNICAL REPORT - STUDY SERVICES (DESIGN ANALYSIS) (E001) | 1 | LO | $0 | $0 |
| 0004BC | FFP | FIRST ARTICLE TEST PLAN (E002) | 1 | LO | $0 | $0 |
| 0004BD | FFP | FIRST ARTICLE TEST PROCEDURE (E003) | 1 | LO | $0 | $0 |
| 0004BE | FFP | TEST-INSPECTION REPORT (FIRST ARTICLE TEST REPORT) (E004) | 1 | LO | $0 | $0 |
| 0004BF | FFP | TEST-INSPECTION REPORT (72kW FIRST CONNECT TEST REPORT) (E005) | 1 | LO | $0 | $0 |
| 0004BG | FFP | TEST-INSPECTION REPORT (144kW FIRST CONNECT TEST REPORT) (E006) | 1 | LO | $0 | $0 |
| 0004BH | FFP | TEST-INSPECTION REPORT (ULB FIRST CONNECT TEST REPORT) (E007) | 1 | LO | $0 | $0 |
| 0004BJ | NSP | PRODUCTION ACCEPTANCE TEST PROCEDURE (E008) | 1 | LO | NSP | |
| 0004BK | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | |
| 0004BL | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | |
| 0004BM | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | |
| 0004BN | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | |
| 0005 | CRNF | Travel | 1 | LO | $0 | |
| 0006 | FFP | Post Award Conference, to Include Provisioning Guidance Conference, Technical Order Guidance Conference | 1 | LO | $3,000 | $3,000 |
| 0007 | FFP | 144kW GPU LRIP Production Units | ||||
| 1-10 | 10 | EA | $0 | $0 | ||
| 11-16 | 6 | EA | $0 | $0 | ||
| 16 | $0 | |||||
| 0008 | FFP | 72kW GPU LRIP Production Units | ||||
| 1-10 | 10 | EA | $0 | $0 | ||
| 11-17 | 7 | EA | $0 | $0 | ||
| 17 | $0 | |||||
| 0009 | FFP | Universal Load Bank LRIP Production Units | ||||
| 1-10 | 10 | EA | $0 | $0 | ||
| 11-16 | 6 | EA | $0 | $0 | ||
| 16 | $0 | |||||
| 0010 | TBN | LRU Spares | 1 | LO | TBN | |
| BASIC CONTRACT TOTAL | $3,000 | |||||
| ORDERING YEAR I (12 MONTHS) Full-rate | ||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Unit Price | Total |
| 1001 | FFP | 144kW GPU Production Units | ||||
| 1-10 | 10 | EA | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | ||
| 51-64 | 14 | EA | $0 | $0 | ||
| 64 | $0 | |||||
| 1002 | 72kW GPU Production Units (266) | |||||
| 1002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 266 = 66) |
| 1-10 | 10 | EA | $0 | $0 | |||||
| 11-50 | 40 | EA | $0 | $0 | |||||
| 51-66 | 16 | EA | $0 | $0 | |||||
| 66 | $0 | ||||||||
| 1002AB | FFP | 72kW GPU Competitive Quantity (.50 x 266 = 133) | |||||||
| 1-10 | 10 | EA | $0 | $0 | |||||
| 11-50 | 40 | EA | $0 | $0 | |||||
| 51-100 | 50 | EA | $0 | $0 | |||||
| 101-133 | 33 | EA | $0 | $0 | |||||
| 133 | $0 | ||||||||
| 1003 | FFFP | Universal Load Bank Production Units | |||||||
| 1-10 | 10 | EA | $0 | $0 | |||||
| 11-50 | 40 | EA | $0 | $0 | |||||
| 51-60 | 10 | EA | $0 | $0 | |||||
| 60 | $0 | ||||||||
| 1004 | Data | ||||||||
| 1004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 1004AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 1004AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 1004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 1004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 1004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 1004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | |||
| 1004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 1004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 1004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | ||||
| 1004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | ||||
| 1005 | CRNF | Travel | 1 | LO | $0 | ||||
| 1006 | TBN | LRU Spares | 1 | LO | TBN | ||||
| ORDERING YEAR I TOTAL | $0 | ||||||||
| ORDERING YEAR II (12 MONTHS) | 2.5% | ||||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Ordering Year I Unit Price | Risk | Escalation | Ordering Year II Computed Unit Price | Ordering Year II Computed Total Price |
| 2001 | FFP | 144kW GPU Production Units | |||||||
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-66 | 16 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 66 | $0 | ||||||||
| 2002 | 72kW GPU Production Units (480) | ||||||||
| 2002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 480 = 120) |
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-120 | 20 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 120 | $0 | ||||||||
| 2002AB | FFP | 72kW GPU Competitive Quantity (.50 x 480 = 240) | |||||||
| 1- 10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11 - 50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51 - 100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-150 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 151-200 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 201-240 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 240 | $0 | ||||||||
| 2003 | FFP | Universal Load Bank Production Units | |||||||
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-60 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 60 | $0 | ||||||||
| 2004 | Data | ||||||||
| 2004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 2004AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 2004AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 2004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 2004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 2004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 2004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | $0 | $0 | |
| 2004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 2004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 2004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | ||||
| 2004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | ||||
| 2005 | CRNF | Travel | 1 | LO | CRNF | ||||
| 2006 | TBN | LRU Spares | 1 | LO | TBN | ||||
| ORDERING YEAR II TOTAL: | $0 | ||||||||
| OPTION I | |||||||||
| ORDERING PERIOD II | |||||||||
| ORDERING YEAR III (12 MONTHS) | 2.5% | ||||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Ordering Year II Computed Unit Price | Risk | Escalation | Odering Year III Computed Unit Price | Ordering Year III Computed Total Price |
| 3001 | FFP | 144kW GPU Production Units | |||||||
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-54 | 4 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 54 | $0 | ||||||||
| 3002 | FFP | 72kW GPU Production Units (440) | |||||||
| 3002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 440 = 110) |
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-110 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 110 | $0 | ||||||||
| 3002AB | FFP | 72kW GPU Competitive Quantity (.50 x 440 = 220) | |||||||
| 1- 10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11 - 50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-150 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 151-200 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 201-220 | 20 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 220 | $0 | ||||||||
| 3003 | FFP | Universal Load Bank Production Units | |||||||
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-60 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 60 | $0 | ||||||||
| 3004 | Data | ||||||||
| 3004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 3004AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 3004AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 3004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 3004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 3004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 3004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | $0 | $0 | |
| 3004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 3004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 3004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | ||||
| 3004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | ||||
| 3005 | CRNF | Travel | 1 | LO | CRNF | ||||
| 3006 | TBN | LRU Spares | 1 | LO | TBN | ||||
| ORDERING YEAR III TOTAL: | $0 | ||||||||
| ORDERING YEAR IV (12 MONTHS) | 2.5% | ||||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Ordering Year III Computed Unit Price | Risk | Escalation | Ordering Year IV Computed Unit Price | Ordering Year IV Computed Total Price |
| 4001 | FFP | 144kW GPU Production Units | |||||||
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-36 | 26 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 36 | $0 | ||||||||
| 4002 | FFP | 72kW GPU Production Units (432) | |||||||
| 4002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 432 = 108) |
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-108 | 8 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 108 | $0 | ||||||||
| 4002AB | FFP | 72kW GPU Competitive Quantity (.50 x 432 = 216) | |||||||
| 1- 10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11 - 50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51 - 100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-150 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 151-200 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 201-216 | 16 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 216 | $0 | ||||||||
| 4003 | FFP | Universal Load Bank Production Units | |||||||
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-60 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 60 | $0 | ||||||||
| 4004 | Data | ||||||||
| 4004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 4004AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 4004AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 4004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 4004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 4004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 4004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | $0 | $0 | |
| 4004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 4004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 4004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | ||||
| 4004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | ||||
| 4005 | CRNF | Travel | 1 | LO | CRNF | ||||
| 4006 | TBN | LRU Spares | 1 | LO | TBN | ||||
| ORDERING YEAR IV TOTAL: | $0 | ||||||||
| ORDERING YEAR V (12 MONTHS) | 2.5% | ||||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Ordering Year IV Computed Unit Price | Risk | Escalation | Ordering Year V Computed Unit Price | Ordering Year V Computed Total Price |
| 5001 | FFP | 144kW GPU Production Units | 8 | EA | $0 | $ - 0 | $0 | $0 | $0 |
| 5002 | FFP | 72kW GPU Production Units (432) | |||||||
| 5002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 432 = 108) |
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-108 | 8 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 108 | $0 | ||||||||
| 5002AB | FFP | 72kW GPU Competitive Quantity (.50 x 432 = 216) | |||||||
| 1- 10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11 - 50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51 - 100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-150 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 151-200 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 201-216 | 16 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 216 | $0 | ||||||||
| 5003 | FFP | Universal Load Bank Production Units | |||||||
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-36 | 26 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 36 | $0 | ||||||||
| 5004 | Data | ||||||||
| 5004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 5004AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 5004AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 5004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 5004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 5004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 5004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | $0 | $0 | |
| 5004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 5004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 5004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | ||||
| 5004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | ||||
| 5005 | CRNF | Travel | 1 | LO | CRNF | ||||
| 5006 | TBN | LRU Spares | 1 | LO | TBN | ||||
| ORDERING YEAR V TOTAL: | $0 | ||||||||
| ORDERING YEAR VI (12 MONTHS) | 2.5% | ||||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Ordering Year V Computed Unit Price | Risk | Escalation | Ordering Year VI Computed Unit Price | Ordering Year VI Computed Total Price |
| 6002 | FFP | 72kW GPU Production Units (432) | |||||||
| 6002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 432 = 108) |
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0.00 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-108 | 8 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 108 | $0 | ||||||||
| 6002AB | FFP | 72kW GPU Competitive Quantity (.50 x 432 = 216) | |||||||
| 1- 10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11 - 50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51 - 100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-150 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 151-200 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 201-216 | 16 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 216 | $0 | ||||||||
| 6004 | Data | ||||||||
| 6004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 6004AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 6004AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 6004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 6004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 6004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 6004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | $0 | $0 | |
| 6004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 6004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 6004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | ||||
| 6004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | ||||
| 6005 | CRNF | Travel | 1 | LO | CRNF | ||||
| 6006 | TBN | LRU Spares | 1 | LO | TBN | ||||
| ORDERING YEAR VI TOTAL: | $0 | ||||||||
| ORDERING YEAR VII (12 MONTHS) | 2.5% | ||||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Ordering Year VI Computed Unit Price | Risk | Escalation | Ordering Year VII Computed Unit Price | Ordering Year VII Computed Total Price |
| 7002 | FFP | 72kW GPU Production Units (400) | |||||||
| 7002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 400 = 100) |
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 100 | $0 | ||||||||
| 7002AB | FFP | 72kW GPU Competitive Quantity (.50 x 400 = 200) | |||||||
| 1- 10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11 - 50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51 - 100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-150 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 151-200 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 200 | $0 | $0 | |||||||
| 7004 | Data | ||||||||
| 7004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | NSP | |||
| 7004AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | NSP | |||
| 7004AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | NSP | |||
| 7004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | NSP | |||
| 7004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | NSP | |||
| 7004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | NSP | |||
| 7004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | $0 | $0 | |
| 7004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | NSP | |||
| 7004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | TBN | |||
| 7004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | NSP | |||
| 7004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | NSP | |||
| 7005 | CRNF | Travel | 1 | LO | CRNF | ||||
| 7006 | TBN | LRU Spares | 1 | LO | TBN | TBN | |||
| ORDERING YEAR VII TOTAL: | $0 | ||||||||
| TOTAL EVALUATED PRICE: | $3,000 |
Group A Risk Factor
| Solicitation FA8532-21-R-0011 |
| Group A Risk Factor |
ORDERING YEAR II
| 144kW GPU Production Units | 72kW GPU Production Units | 72kW GPU Production Units | Universal Load Bank | ||||||||||||||||||||||||
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 2001 | 1- 10 | Ordering Year I Unit Price: | $ - 0 | 2002AA | 1- 10 | Ordering Year I Unit Price: | $ - 0 | 2002AB | 1- 10 | Ordering Year I Unit Price: | $ - 0 | 2003 | 1- 10 | Ordering Year I Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 2001 | 11-50 | Ordering Year I Unit Price: | $ - 0 | 2002AA | 11-50 | Ordering Year I Unit Price: | $ - 0 | 2002AB | 11-50 | Ordering Year I Unit Price: | $ - 0 | 2003 | 11-50 | Ordering Year I Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 2001 | 51-66 | Ordering Year I Unit Price: | $ - 0 | 2002AA | 51-100 | Ordering Year I Unit Price: | $ - 0 | 2002AB | 51-100 | Ordering Year I Unit Price: | $ - 0 | 2003 | 51-60 | Ordering Year I Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | $0 | Labor | 19% | $ - 0 | |||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | $0 | Other | 10% | $ - 0 | |||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 2002AA | 101-120 | Ordering Year I Unit Price: | $ - 0 | 2002AB | 101-150 | Ordering Year I Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | |||||
| 2002AB | 151-200 | Ordering Year I Unit Price: | $ - 0 | |||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | ||
| Copper | 14% | $ - 0 | 2.18% | $0 | ||
| Steel | 15% | $ - 0 | 1.53% | $0 | ||
| Generators | 10% | $ - 0 | 1.59% | $0 | ||
| Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | ||||
| Other | 10% | $ - 0 | ||||
| TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | |||||
| 2002AB | 201-240 | Ordering Year I Unit Price: | $ - 0 | |||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | ||
| Copper | 14% | $ - 0 | 2.18% | $0 | ||
| Steel | 15% | $ - 0 | 1.53% | $0 | ||
| Generators | 10% | $ - 0 | 1.59% | $0 | ||
| Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | ||||
| Other | 10% | $ - 0 | ||||
| TOTAL: | 100% | $ - 0 | $0 |
ORDERING YEAR III
| 144kW GPU Production Units | 72kW GPU Production Units | 72kW GPU Production Units | Universal Load Bank | ||||||||||||||||||||||||
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 3001 | 1- 10 | Ordering Year II Computed Unit Price: | $ - 0 | 3002AA | 1- 10 | Ordering Year II Computed Unit Price: | $ - 0 | 3002AB | 1- 10 | Ordering Year II Computed Unit Price: | $ - 0 | 3003 | 1- 10 | Ordering Year II Computed Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 3001 | 11-50 | Ordering Year II Computed Unit Price: | $ - 0 | 3002AA | 11-50 | Ordering Year II Computed Unit Price: | $ - 0 | 3002AB | 11-50 | Ordering Year II Computed Unit Price: | $ - 0 | 3003 | 11-50 | Ordering Year II Computed Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | $0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | |||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 3001 | 51-54 | Ordering Year II Computed Unit Price: | $ - 0 | 3002AA | 51-100 | Ordering Year II Computed Unit Price: | $ - 0 | 3002AB | 51-100 | Ordering Year II Computed Unit Price: | $ - 0 | 3003 | 51-60 | Ordering Year II Computed Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 3002AA | 101-110 | Ordering Year II Computed Unit Price: | $ - 0 | 3002AB | 101-150 | Ordering Year II Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | |||||
| 3002AB | 151-200 | Ordering Year II Computed Unit Price: | $ - 0 | |||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | ||
| Copper | 14% | $ - 0 | 2.18% | $0 | ||
| Steel | 15% | $ - 0 | 1.53% | $0 | ||
| Generators | 10% | $ - 0 | 1.59% | $0 | ||
| Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | ||||
| Other | 10% | $ - 0 | ||||
| TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | ||||||
| 3002AB | 201-220 | Ordering Year II Computed Unit Price: | $ - 0 | ||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | |||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | |||
| Copper | 14% | $ - 0 | 2.18% | $0 | |||
| Steel | 15% | $ - 0 | 1.53% | $0 | |||
| Generators | 10% | $ - 0 | 1.59% | $0 | |||
| Engine | 19% | $ - 0 | 1.59% | $0 | |||
| Labor | 19% | $ - 0 | |||||
| Other | 10% | $ - 0 | |||||
| TOTAL: | 100% | $ - 0 | $0 | ||||
| ORDERING YEAR IV |
| 144kW GPU Production Units | 72kW GPU Production Units | 72kW GPU Production Units | Universal Load Bank | ||||||||||||||||||||||||
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 4001 | 1- 10 | Ordering Year III Computed Unit Price: | $ - 0 | 4002AA | 1- 10 | Ordering Year III Computed Unit Price: | $ - 0 | 4002AB | 1- 10 | Ordering Year III Computed Unit Price: | $ - 0 | 4003 | 1- 10 | Ordering Year III Computed Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 4001 | 11-36 | Ordering Year III Computed Unit Price: | $ - 0 | 4002AA | 11-50 | Ordering Year III Computed Unit Price: | $ - 0 | 4002AB | 11-50 | Ordering Year III Computed Unit Price: | $ - 0 | 4003 | 11-50 | Ordering Year III Computed Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | CLIN | Range | |||||||||||||||
| 4002AA | 51-100 | Ordering Year III Computed Unit Price: | $ - 0 | 4002AB | 51-100 | Ordering Year III Computed Unit Price: | $ - 0 | 4003 | 51-60 | Ordering Year III Computed Unit Price: | $ - 0 | |||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 4002AA | 101-108 | Ordering Year III Computed Price: | $ - 0 | 4002AB | 101-150 | Ordering Year III Computed Unit Price: | $ - 0 | ||||||
| Ordering Year III Computed Unit Price: | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | ||||||
| 4002AB | 151-200 | Ordering Year III Computed Unit Price: | $ - 0 | ||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | |||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | |||
| Copper | 14% | $ - 0 | 2.18% | $0 | |||
| Steel | 15% | $ - 0 | 1.53% | $0 | |||
| Generators | 10% | $ - 0 | 1.59% | $0 | |||
| ` | Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | |||||
| Other | 10% | $ - 0 | |||||
| TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | ||||||
| 4002AB | 201-216 | Ordering Year III Computed Unit Price: | $ - 0 | ||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | |||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | |||
| Copper | 14% | $ - 0 | 2.18% | $0 | |||
| Steel | 15% | $ - 0 | 1.53% | $0 | |||
| Generators | 10% | $ - 0 | 1.59% | $0 | |||
| Engine | 19% | $ - 0 | 1.59% | $0 | |||
| Labor | 19% | $ - 0 | |||||
| Other | 10% | $ - 0 | |||||
| TOTAL: | 100% | $ - 0 | $0 | ||||
| ORDERING YEAR V |
| 144kW GPU Production Units | 72kW GPU Production Units | 72kW GPU Production Units | Universal Load Bank | ||||||||||||||||||||||||
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 5001 | 1-8 | Ordering Year IV Computed Unit Price: | $ - 0 | 5002AA | 1-10 | Ordering Year IV Computed Unit Price: | $ - 0 | 5002AB | 1- 10 | Ordering Year IV Computed Unit Price: | $ - 0 | 5003 | 1- 10 | Ordering Year IV Computed Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | CLIN | Range | |||||||||||||||
| 5002AA | 11-50 | Ordering Year IV Computed Unit Price: | $ - 0 | 5002AB | 11-50 | Ordering Year IV Computed Unit Price: | $ - 0 | 5003 | 11-36 | Ordering Year IV Computed Unit Price: | $ - 0 | |||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 5002AA | 51-100 | Ordering Year IV Computed Unit Price: | $ - 0 | 5002AB | 51-100 | Ordering Year IV Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 5002AA | 101-108 | Ordering Year IV Computed Unit Price: | $ - 0 | 5002AB | 101-150 | Ordering Year IV Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | |||||
| 5002AB | 151-200 | Ordering Year IV Computed Unit Price: | $ - 0 | |||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | ||
| Copper | 14% | $ - 0 | 2.18% | $0 | ||
| Steel | 15% | $ - 0 | 1.53% | $0 | ||
| Generators | 10% | $ - 0 | 1.59% | $0 | ||
| Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | ||||
| Other | 10% | $ - 0 | ||||
| TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | |||||
| 5002AB | 201-216 | Ordering Year IV Computed Unit Price: | $ - 0 | |||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | ||
| Copper | 14% | $ - 0 | 2.18% | $0 | ||
| Steel | 15% | $ - 0 | 1.53% | $0 | ||
| Generators | 10% | $ - 0 | 1.59% | $0 | ||
| Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | ||||
| Other | 10% | $ - 0 | ||||
| TOTAL: | 100% | $ - 0 | $0 |
ORDERING YEAR VI
| 72kW GPU Production Units | 72kW GPU Production Units | ||||||||||||
| CLIN | Range | CLIN | Range | ||||||||||
| 6002AA | 1- 10 | Ordering Year V Computed Unit Price: | $ - 0 | 6002AB | 1- 10 | Ordering Year V Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 6002AA | 11-50 | Ordering Year V Computed Unit Price: | $ - 0 | 6002AB | 11-50 | Ordering Year V Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 6002AA | 51-100 | Ordering Year V Computed Unit Price: | $ - 0 | 6002AB | 51-100 | Ordering Year V Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 6002AA | 101-108 | Ordering Year V Computed Unit Price: | $ - 0 | 6002AB | 101-150 | Ordering Year V Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | |||||
| 6002AB | 151-200 | Ordering Year V Computed Unit Price: | $ - 0 | |||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | ||
| Copper | 14% | $ - 0 | 2.18% | $0 | ||
| Steel | 15% | $ - 0 | 1.53% | $0 | ||
| Generators | 10% | $ - 0 | 1.59% | $0 | ||
| Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | ||||
| Other | 10% | $ - 0 | ||||
| TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | ||||||
| 6002AB | 201-216 | Ordering Year V Computed Unit Price: | $ - 0 | ||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | |||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | |||
| Copper | 14% | $ - 0 | 2.18% | $0 | |||
| Steel | 15% | $ - 0 | 1.53% | $0 | |||
| Generators | 10% | $ - 0 | 1.59% | $0 | |||
| Engine | 19% | $ - 0 | 1.59% | $0 | |||
| Labor | 19% | $ - 0 | |||||
| Other | 10% | $ - 0 | |||||
| TOTAL: | 100% | $ - 0 | $0 | ||||
| ORDERING YEAR VII |
| 72kW GPU Production Units | 72kW GPU Production Units | ||||||||||||
| CLIN | Range | CLIN | Range | ||||||||||
| 7002AA | 1- 10 | Ordering Year VI Computed Unit Price: | $ - 0 | 7002AB | 1- 10 | Ordering Year VI Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 7002AA | 11-50 | Ordering Year VI Computed Unit Price: | $ - 0 | 7002AB | 11-50 | Ordering Year VI Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | $0 | |||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | $0 | |||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 7002AA | 51-100 | Ordering Year VI Computed Unit Price: | $ - 0 | 7002AB | 51-100 | Ordering Year VI Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | $0 | |||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | $0 | |||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | |||||
| 7002AB | 101-150 | Ordering Year VI Computed Unit Price: | $ - 0 | |||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | ||
| Copper | 14% | $ - 0 | 2.18% | $0 | ||
| Steel | 15% | $ - 0 | 1.53% | $0 | ||
| Generators | 10% | $ - 0 | 1.59% | $0 | ||
| Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | $0 | |||
| Other | 10% | $ - 0 | $0 | |||
| TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | |||||
| 7002AB | 151-200 | Ordering Year VI Computed Unit Price: | $ - 0 | |||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | ||
| Copper | 14% | $ - 0 | 2.18% | $0 | ||
| Steel | 15% | $ - 0 | 1.53% | $0 | ||
| Generators | 10% | $ - 0 | 1.59% | $0 | ||
| Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | $0 | |||
| Other | 10% | $ - 0 | $0 | |||
| TOTAL: | 100% | $ - 0 | $0 |
Group B
| Price Spreadsheet | ||||||
| Solicitation FA8532-21-R-0011 | ||||||
| Group B | ||||||
| Offeror shall enter data in yellow highlighted fields only | ||||||
| Offeror: | ||||||
| ORDERING PERIOD I | ||||||
| BASIC Contract Period (36 Months) | ||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Unit Price | Total Price |
| 0011 | FFP | 72kW GPU First Article | ||||
| 0011AA | FFP | First Article Units | 6 | EA | $0 | $0 |
| 0011AB | FFP | NRE against CLIN 0002AA, to include testing costs | 1 | LO | $0 | $0 |
| 0012 | Data | |||||
| 0012AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | |
| 0012AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | |
| 0012AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | |
| 0012AD | FFP | TECHNICAL REPORT-STUDY SERVICES (B001) | 1 | LO | $0 | $0 |
| 0012AE | FFP | TECHNICAL REPORT-STUDY SERVICES (Test readiness review documentation package) (B002) | 1 | LO | $0 | $0 |
| 0012AF | NSP | SYSTEM SAFETY PROGRAM PLAN (C001) | 1 | LO | NSP | |
| 0012AG | NSP | SYSTEM SAFETY HAZARD ANALYSIS REPORT (C002) | 1 | LO | NSP | |
| 0012AH | NSP | CORROSION PREVENTION AND CONTROL PLAN (C003) | 1 | LO | NSP | |
| 0012AJ | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | |
| 0012AK | NSP | TECHNICAL REPORT - STUDY SERVICES (CYBERSECURITY ANALYSIS) (C005) | 1 | LO | NSP | |
| 0012AL | NSP | RISK MANAGEMENT FRAMEWORK (RMF) (C006) | 1 | LO | NSP | |
| 0012AM | NSP | SOFTWARE ASSURANCE EVALUATION REPORT (SAER) (C007) | 1 | LO | NSP | |
| 0012AN | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | |
| 0012AP | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | |
| 0012AQ | FFP | LOGISTICS PRODUCT DATA - 72 kW GPU (C016) | 1 | LO | $0 | $0 |
| 0012AR | FFP | ENGINEERING DATA FOR PROVISIONING - 72 kW GPU (C017) | 1 | LO | $0 | $0 |
| 0012AS | FFP | AIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - Group B (D004) | 1 | LO | $0 | $0 |
| 0012AT | FFP | TRAINING MATERIAL (D005) | 1 | LO | $0 | $0 |
| 0012AU | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 |
| 0012AV | FFP | TECHNICAL REPORT - STUDY SERVICES (DESIGN ANALYSIS) (E001) | 1 | LO | $0 | $0 |
| 0012AW | FFP | FIRST ARTICLE TEST PLAN (E002) | 1 | LO | $0 | $0 |
| 0012AX | FFP | FIRST ARTICLE TEST PROCEDURE (E003) | 1 | LO | $0 | $0 |
| 0012AY | FFP | TEST-INSPECTION REPORT (FIRST ARTICLE TEST REPORT) (E004) | 1 | LO | $0 | $0 |
| 0012AZ | FFP | TEST-INSPECTION REPORT (72kW FIRST CONNECT TEST REPORT) (E005) | 1 | LO | $0 | $0 |
| 0012BA | NSP | PRODUCTION ACCEPTANCE TEST PROCEDURE (E008) | 1 | LO | NSP | |
| 0012BB | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | |
| 0012BC | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | |
| 0012BD | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | |
| 0012BE | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | |
| 0013 | CRNF | Travel | 1 | LO | $0 | |
| 0014 | FFP | Post Award Conference, to Include Provisioning Guidance Conference, Technical Order Guidance Conference | 1 | LO | $3,000 | $3,000 |
| 0015 | FFP | 72kW GPU LRIP Production Units | ||||
| 1-10 | 10 | EA | $0 | $0 | ||
| 11-17 | 7 | EA | $0 | $0 | ||
| 17 | $0 | |||||
| 0016 | TBN | LRU Spares | 1 | LO | TBN | |
| BASIC CONTRACT TOTAL | $3,000 | |||||
| ORDERING YEAR I (12 MONTHS) Full-rate | ||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Unit Price | Total |
| 1007 | 72kW GPU Production Units (266) | |||||
| 1007AA | FFP | 72kW GPU Guarantee Quantity (.25 x 266 = 67) |
| 1-10 | 10 | EA | $0 | $0 | |||||
| 11-50 | 40 | EA | $0 | $0 | |||||
| 51-67 | 17 | EA | $0 | $0 | |||||
| 67 | $0 | ||||||||
| 1007AB | FFP | 72kW GPU Competitive Quantity (.50 x 266 = 133) | |||||||
| 1-10 | 10 | EA | $0 | $0 | |||||
| 11-50 | 40 | EA | $0 | $0 | |||||
| 51-100 | 50 | EA | $0 | $0 | |||||
| 101-133 | 33 | EA | $0 | $0 | |||||
| 133 | $0 | ||||||||
| 1008 | Data | ||||||||
| 1008AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 1008AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 1008AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 1008AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 1008AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 1008AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 1008AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | |||
| 1008AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 1008AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 1008AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | ||||
| 1008AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | ||||
| 1009 | CRNF | Travel | 1 | LO | $0 | ||||
| 1010 | TBN | LRU Spares | 1 | LO | TBN | ||||
| ORDERING YEAR I TOTAL | $0 | ||||||||
| ORDERING YEAR II (12 MONTHS) | 2.5% | ||||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Ordering Year I Unit Price | Risk | Escalation | Ordering Year II Computed Unit Price | Ordering Year II Computed Total Price |
| 2007 | 72kW GPU Production Units (480) | ||||||||
| 2007AA | FFP | 72kW GPU Guarantee Quantity (.25 x 480 = 120) |
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-120 | 20 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 120 | $0 | ||||||||
| 2007AB | FFP | 72kW GPU Competitive Quantity (.50 x 480 = 240) | |||||||
| 1- 10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11 - 50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51 - 100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-150 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 151-200 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 201-240 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 240 | $0 | ||||||||
| 2008 | Data | ||||||||
| 2008AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 2008AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 2008AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 2008AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 2008AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 2008AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 2008AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | $0 | $0 | |
| 2008AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 2008AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 2008AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | ||||
| 2008AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | ||||
| 2009 | CRNF | Travel | 1 | LO | CRNF | ||||
| 2010 | TBN | LRU Spares | 1 | LO | TBN | ||||
| ORDERING YEAR II TOTAL: | $0 | ||||||||
| OPTION I | |||||||||
| ORDERING PERIOD II | |||||||||
| ORDERING YEAR III (12 MONTHS) | 2.5% | ||||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Ordering Year II Computed Unit Price | Risk | Escalation | Odering Year III Computed Unit Price | Ordering Year III Computed Total Price |
| 3007 | FFP | 72kW GPU Production Units (440) | |||||||
| 3002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 440 = 110) |
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-110 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 110 | $0 | ||||||||
| 3007AB | FFP | 72kW GPU Competitive Quantity (.50 x 440 = 220) | |||||||
| 1- 10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11 - 50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-150 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 151-200 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 201-220 | 20 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 220 | $0 | ||||||||
| 3008 | Data | ||||||||
| 3008AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 3008AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 3008AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 3008AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 3008AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 3008AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 3008AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | $0 | $0 | |
| 3008AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 3008AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 3008AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP |