This document outlines a draft contract line item number (CLIN) schedule for a 72kW Ground Power Unit (GPU) contract opportunity with the Department of the Air Force Materiel Command Lifecycle Management Center. The CLIN schedule includes line items for development, production, and sustainment of 144kW GPUs, 72kW GPUs, and universal load banks over multiple contract periods and option years. Key requirements include first article units and non-recurring engineering for development in the basic contract period, low-rate initial production lots in Option Period I, and full-rate production in Option Periods II through VII with quantities ranging from 63 to 480 units per CLIN. Supporting CLINs cover data, travel, conferences, spare parts and engineering changes.

View the file

Other files for this federal contract opportunity

Other files attached to 72kW Ground Power Units (GPU), newest first.
File Type Posted
QA 12.docx DOCX document
Final Statement of Work (SOW)_1 Sep 21.pdf PDF
Updated Informal Draft RFP FA8532-21-R-0011.pdf PDF
DRAFT GPM LM_8 Sep 2021.doc DOC document
GPM_Pre-Solicitation_Conference_Brief.pptx PPTX presentation
Conference Attachment 3_Informal Draft Request for Proposal FA8532-21-R-0011.pdf PDF
Draft CDRLs C010 through C017.pdf PDF
Conference Attachment 1_3d Conceptual Illustration_144KW Generator.PDF PDF
Conference Attachment 2_Timeline.pptx PPTX presentation
Conference Attachment 4_Sections L and M.pdf PDF
RFP Attachment 2 - Oral Presentations for Discussions Slide Deck.pptx PPTX presentation
RFP Attachment 7 - Past Performance Questionnaire.pdf PDF
RFP Attachment 10_Price Spreadsheet.xlsx XLSX spreadsheet
Informal Draft Request for Proposal FA8532-21-R-0011.pdf PDF
Draft GPM Ordering Guide.docx DOCX document
RFP Attachment 1 - Past Performance Information (PPI) for Offerors.pdf PDF
RFP Attachment 5 - Relevancy Table.pdf PDF
RFP Attachment 6 - Subcontractor and Teaming Member Consent Form.pdf PDF
RFP Attachment 8 - Client Authorization Letter.pdf PDF
RFP Attachment 9 - GPU Engine Derating Calculation Worksheet --DRAFT WATERMARK ADDED.pdf PDF
Document Updates and Pre-Solicitation Conference.docx DOCX document
RFP Attachment 5 - Relevancy Table.pdf PDF
RFP Attachment 10_Price Spreadsheet.xlsx XLSX spreadsheet
Draft CDRLs.pdf PDF
RFP Attachment 1 - Past Performance Information (PPI) for Offerors.pdf PDF
RFP Attachment 2 - Oral Presentations for Discussions Slide Deck.pptx PPTX presentation
Statement of Work (SOW).pdf PDF
M-900. EVALUATION BASIS FOR AWARD.pdf PDF
RFP Attachment 8 - Client Authorization Letter.pdf PDF
Informal Draft Request for Proposal FA8532-21-R-0001.pdf PDF
Government Strategy Update for Industry Awareness.docx DOCX document
DRAFT GPM LM.doc DOC document
Draft LM and CLIN Schedule.docx DOCX document
SOW_GPM_2021-05-20.docx DOCX document
Export Controlled Draft Purchase Descriptions.docx DOCX document
CUI_Training.pptx PPTX presentation
Sample_CUI_Cover_Markings.pptx PPTX presentation
Controlled_Unclassified_Information_Requirements.docx DOCX document
GPM Consolidated Industry Feedback Responses.docx DOCX document
Announcement on Purchase Descriptions.docx DOCX document
Industry QA 6.docx DOCX document
Industry QA 5.docx DOCX document
Follow up QA for Industry Day - Number 4.docx DOCX document
Follow up QA for Industry Day - Number 3.docx DOCX document
Follow up QA for Industry Day - Number 2.docx DOCX document
Follow up QA for Industry Day.docx DOCX document
72kW GPU - High Level Parallel Testing.pptx PPTX presentation
QA Received from Industry Day.docx DOCX document
72kW Generator Industry Day Briefing 16-17 Sep 2020.pptx PPTX presentation
72GPU TEP.xlsx XLSX spreadsheet
Show all 50

72kW Ground Power Units (GPU) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Draft CLIN Schedule CLIN Description QTY/BEQ Unit of Issue (U/I Notes

OWENS, BRANDI R GS-13 USAF AFMC AFLCMC/WNKAA: OWENS, BRANDI R GS-13 USAF AFMC AFLCMC/WNKAA:

First submittal OWENS, BRANDI R GS-13 USAF AFMC AFLCMC/WNKAA: OWENS, BRANDI R GS-13 USAF AFMC AFLCMC/WNKAA:

This is the time we have to send approval or disapproval with comments to the contractor.

OWENS, BRANDI R GS-13 USAF AFMC AFLCMC/WNKAA: OWENS, BRANDI R GS-13 USAF AFMC AFLCMC/WNKAA:

This is how long the contractor will have to resubmit based on disapproval commentsBASIC CONTRACT PERIOD (24 MONTHS)
Group A
0001144kW GPU First Article
0001AAFirst Article Units6EA
0001ABNRE against CLIN 0001AA, to include testing costs1LO
000272kW GPU First Article
0002AAFirst Article Units6EA
0002ABNRE against CLIN 0002AA, to include testing costs1LO
0003Universal Load Bank First Article
0003AAFirst Article Units8EA
0003ABNRE against CLIN 0003AA, to include testing costs1LO
0004DATA
0004AACONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)NSP
0004ABCONFERENCE AGENDA (A002)NSP
0004ACCONFERENCE MINUTES (A003)NSP
0004ADTECHNICAL REPORT-STUDY SERVICES (B001)
0004AESYSTEM SAFETY PROGRAM PLAN (C001)NSP
0004AFSYSTEM SAFETY HAZARD ANALYSIS REPORT (C002)NSP
0004AGCORROSION PREVENTION AND CONTROL PLAN (C003)NSP
0004AHCOUNTERFEIT PROTECTION PLAN (C004)NSP
0004AJTECHNICAL REPORT - STUDY SERVICES (CYBERSECURITY ANALYSIS) (C005)NSP
0004AKRISK MANAGEMENT FRAME (RMF) (C006)NSP
0004ALSOFTWARE ASSURANCE EVALUATION REPORT (SAER) (C007)NSP
0004AMCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)NSP
0004ANCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)NSP
0004APLOGISTICS PRODUCT DATA (C010)
0004AQENGINEERING DATA FOR PROVISIONING (C011)
0004ARAIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - Group A (D001)
0004ASTRAINING MATERIAL (D002)
0004ATPACK-UP DATA (D003)
0004AUTECHNICAL REPORT - STUDY SERVICES (DESIGN ANALYSIS) (E001)
0004AVFIRST ARTICLE TEST PLAN (E002)
0004AWFIRST ARTICLE TEST PROCEDURE (E003)
0004AXTEST-INSPECTION REPORT (FIRST ARTICLE TEST REPORT) (E004)
0004AYTEST-INSPECTION REPORT (72kW FIRST CONNECT TEST REPORT) (E005)
0004AZTEST-INSPECTION REPORT (144kW FIRST CONNECT TEST REPORT) (E006)
0004BATEST-INSPECTION REPORT (ULB FIRST CONNECT TEST REPORT) (E007)
0004BBPRODUCTION ACCEPTANCE TEST PROCEDURE (E008)NSP
0004BCTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)NSP
0004BDENGINEERING CHANGE PROPOSAL (ECP) (F001)TBN
0004BENOTICE OF REVISION (NOR) (F002)NSP
0004BFREQUEST FOR VARIANCE (RFV) (F003)NSP
0005Travel1LO
0006Post Award Conference, to Include Provisioning Guidance Conference, Technical Order Guidance Conference1LO
Group B
000772kW GPU First Article
0007AAFirst Article Units6EA
0007ABNRE against CLIN 0001AA, to include testing costs1LO
0008DATA
0008AACONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
0008ABCONFERENCE AGENDA (A002)1LONSP
0008ACCONFERENCE MINUTES (A003)1LONSP
0008ADTECHNICAL REPORT-STUDY SERVICES (TRR) (B001)1LONSP
0008AESYSTEM SAFETY PROGRAM PLAN (C001)1LONSP
0008AFSYSTEM SAFETY HAZARD ANALYSIS REPORT (C002)1LONSP
0008AGCORROSION PREVENTION AND CONTROL PLAN (C003)1LONSP
0008AHCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
0008AJTECHNICAL REPORT - STUDY SERVICES (CYBERSECURITY ANALYSIS) (C005)1LONSP
0008AKRISK MANAGEMENT FRAMEWORK (RMF) (C006)1LONSP
0008ALSOFTWARE ASSURANCE EVALUATION REPORT (SAER) (C007)1LONSP
0008AMCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
0008ANCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
0008APLOGISTICS PRODUCT DATA (C010)1LO
0008AQENGINEERING DATA FOR PROVISIONING (C011)1LO
0008ARAIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - Group B (D001)1LO
0008ASTRAINING MATERIAL (D002)1LO
0008ATPACK-UP DATA (D003)1LO
0008AUTECHNICAL REPORT - STUDY SERVICES (DESIGN ANALYSIS) (E001)1LO
0008AVFIRST ARTICLE TEST PLAN (E002)1LO
0008AWFIRST ARTICLE TEST PROCEDURE (E003)1LO
0008AXTEST-INSPECTION REPORT (FIRST ARTICLE TEST REPORT) (E004)1LO
0008AYTEST-INSPECTION REPORT (72kW FIRST CONNECT TEST REPORT) (E005)1LO
0008AZPRODUCTION ACCEPTANCE TEST PROCEDURE (E008)1LO
0008BATEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LO
0008BBENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
0008BCNOTICE OF REVISION (NOR) (F002)1LONSP
0008BDREQUEST FOR VARIANCE (RFV) (F003)NSP
0009Travel1LO
0010Post Award Conference, to Include Provisioning Guidance Conference, Technical Order Guidance Conference1LO
OPTION PERIOD I (12 MONTHS) LRIP
Group A
1001144kW GPU Production Units63EA
100272kW GPU Production Units120EA
1003Universal Load Bank Production Units59EA
1004DATA
1004AACONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
1004ABCONFERENCE AGENDA (A002)1LONSP
1004ACCONFERENCE MINUTES (A003)1LONSP
1004ADCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
1004AECOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
1004AFCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
1004AGPACK-UP DATA (D003)1LO
1004AHTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
1004AJENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
1004AKNOTICE OF REVISION (NOR) (F002)1LONSP
1004ALREQUEST FOR VARIANCE (RFV) (F003)1LONSP
1005Travel1LO
1006LRU Spares1LOTBN
Group B
100772kW GPU Production Units - LRIP120EA
1008DATA
1008AACONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
1008ABCONFERENCE AGENDA (A002)1LONSP
1008ACCONFERENCE MINUTES (A003)1LONSP
1008ADCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
1008AECOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
1008AFCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
1008AGPACK-UP DATA (D003)1LO
1008AHTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
1008AJENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
1008AKNOTICE OF REVISION (NOR) (F002)1LONSP
1008ALREQUEST FOR VARIANCE (RFV) (F003)1LONSP
1009Travel1LO
1010LRU Spares1LOTBN
OPTION PERIOD II (12 MONTHS) Full-rate
Group A
2001144kW GPU Production Units63EA
200272kW GPU Production Units480EA
2002AAOption Period Guarantee Qty120EA
2002ABOption Period Competitive Qty240EA
2003Universal Load Bank Production Units59EA
2004DATA
2004AACONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
2004ABCONFERENCE AGENDA (A002)1LONSP
2004ACCONFERENCE MINUTES (A003)1LONSP
2004ADCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
2004AECOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
2004AFCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
2004AGPACK-UP DATA (D003)1LO
2004AHTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
2004AJENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
2004AKNOTICE OF REVISION (NOR) (F002)1LONSP
2004ALREQUEST FOR VARIANCE (RFV) (F003)1LONSP
2005Travel1LO
2006LRU Spares1LOTBN
Group B
200772kW GPU Production Units480EA
2007AAOption Period Guarantee Qty120EA
2007ABOption Period Competitive Qty240EA
2008DATA
2008AACONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
2008ABCONFERENCE AGENDA (A002)1LONSP
2008ACCONFERENCE MINUTES (A003)1LONSP
2008ADCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
2008AECOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
2008AFCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
2008AGPACK-UP DATA (D003)1LO
2008AHTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
2008AJENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
2008AKNOTICE OF REVISION (NOR) (F002)1LONSP
2008ALREQUEST FOR VARIANCE (RFV) (F003)1LONSP
2009Travel1LO
2010LRU Spares1LOTBN
OPTION PERIOD III (12 MONTHS)
Group A
3001144kW GPU Production Units63EA
300272kW GPU Production Units480EA
3002AAOption Period Guarantee Qty120EA
3002ABOption Period Competitive Qty240EA
3003Universal Load Bank Production Units59EA
3004DATA
3004AACONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
3004ABCONFERENCE AGENDA (A002)1LONSP
3004ACCONFERENCE MINUTES (A003)1LONSP
3004ADCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
3004AECOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
3004AFCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
3004AGPACK-UP DATA (D003)1LO
3004AHTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
3004AJENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
3004AKNOTICE OF REVISION (NOR) (F002)1LONSP
3004ALREQUEST FOR VARIANCE (RFV) (F003)1LONSP
3005Travel1LO
3006LRU Spares1LOTBN
Group B
300772kW GPU Production Units480EA
3007AAOption Period Guarantee Qty120EA
3007ABOption Period Competitive Qty240EA
3008DATA
3008AACONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
3008ABCONFERENCE AGENDA (A002)1LONSP
3008ACCONFERENCE MINUTES (A003)1LONSP
3008ADCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
3008AECOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
3008AFCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
3008AGPACK-UP DATA (D003)1LO
3008AHTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
3008AJENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
3008AKNOTICE OF REVISION (NOR) (F002)1LONSP
3008ALREQUEST FOR VARIANCE (RFV) (F003)1LONSP
3009Travel1LO
3010LRU Spares1LOTBN
OPTION PERIOD IV (12 MONTHS)
Group A
4001144kW GPU Production Units55EA
400272kW GPU Production Units480EA
4002AAOption Period Guarantee Qty120EA
4002ABOption Period Competitive Qty240EA
4003Universal Load Bank Production Units59EA
4004DATA
4004AACONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
4004ABCONFERENCE AGENDA (A002)1LONSP
4004ACCONFERENCE MINUTES (A003)1LONSP
4004ADCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
4004AECOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
4004AFCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
4004AGPACK-UP DATA (D003)1LO
4004AHTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
4004AJENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
4004AKNOTICE OF REVISION (NOR) (F002)1LONSP
4004ALREQUEST FOR VARIANCE (RFV) (F003)1LONSP
4005Travel1LO
4006LRU Spares1LOTBN
Group B
400772kW GPU Production Units480EA
4007AAOption Period Guarantee Qty120EA
4007ABOption Period Competitive Qty240EA
4008DATA
4008AACONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
4008ABCONFERENCE AGENDA (A002)1LONSP
4008ACCONFERENCE MINUTES (A003)1LONSP
4008ADCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
4008AECOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
4008AFCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
4008AGPACK-UP DATA (D003)1LO
4008AHTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
4008AJENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
4008AKNOTICE OF REVISION (NOR) (F002)1LONSP
4008ALREQUEST FOR VARIANCE (RFV) (F003)1LONSP
4009Travel1LO
4010LRU Spares1LOTBN
OPTION PERIOD V (12 MONTHS)
Group A
5001144kW GPU Production Units0EA
500272kW GPU Production Units480EA
5002AAOption Period Guarantee Qty120EA
5002ABOption Period Competitive Qty240EA
5003Universal Load Bank Production Units56EA
5004DATA
5004AACONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
5004ABCONFERENCE AGENDA (A002)1LONSP
5004ACCONFERENCE MINUTES (A003)1LONSP
5004ADCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
5004AECOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
5004AFCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
5004AGPACK-UP DATA (D003)1LO
5004AHTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
5004AJENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
5004AKNOTICE OF REVISION (NOR) (F002)1LONSP
5004ALREQUEST FOR VARIANCE (RFV) (F003)1LONSP
5005Travel1LO
5006LRU Spares1LOTBN
Group B
500772kW GPU Production Units480EA
5007AAOption Period Guarantee Qty120EA
5007ABOption Period Competitive Qty240EA
5008DATA
5008AACONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
5008ABCONFERENCE AGENDA (A002)1LONSP
5008ACCONFERENCE MINUTES (A003)1LONSP
5008ADCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
5008AECOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
5008AFCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
5008AGPACK-UP DATA (D003)1LO
5008AHTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
5008AJENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
5008AKNOTICE OF REVISION (NOR) (F002)1LONSP
5008ALREQUEST FOR VARIANCE (RFV) (F003)1LONSP
5009Travel1LO
5010LRU Spares1LOTBN
OPTION PERIOD VI (12 MONTHS)
Group A
6001144kW GPU Production Units0EA
600272kW GPU Production Units480EA
6002AAOption Period Guarantee Qty120EA
6002ABOption Period Competitive Qty240EA
6003Universal Load Bank Production Units0EA
6004DATA
6004AACONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
6004ABCONFERENCE AGENDA (A002)1LONSP
6004ACCONFERENCE MINUTES (A003)1LONSP
6004ADCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
6004AECOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
6004AFCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
6004AGPACK-UP DATA (D003)1LO
6004AHTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
6004AJENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
6004AKNOTICE OF REVISION (NOR) (F002)1LONSP
6004ALREQUEST FOR VARIANCE (RFV) (F003)1LONSP
6005Travel1LO
6006LRU Spares1LOTBN
Group B
600772kW GPU Production Units480EA
6007AAOption Period Guarantee Qty120EA
6007ABOption Period Competitive Qty240EA
6008DATA
6008AACONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
6008ABCONFERENCE AGENDA (A002)1LONSP
6008ACCONFERENCE MINUTES (A003)1LONSP
6008ADCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
6008AECOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
6008AFCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
6008AGPACK-UP DATA (D003)1LO
6008AHTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
6008AJENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
6008AKNOTICE OF REVISION (NOR) (F002)1LONSP
6008ALREQUEST FOR VARIANCE (RFV) (F003)1LONSP
6009Travel1LO
6010LRU Spares1LOTBN
OPTION PERIOD VII (12 MONTHS)
Group A
7001144kW GPU Production Units0EA
700272kW GPU Production Units276EA
7002AAOption Period Guarantee Qty69EA
7002ABOption Period Competitive Qty138EA
7003Universal Load Bank Production Units0EA
7004DATA
7004AACONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
7004ABCONFERENCE AGENDA (A002)1LONSP
7004ACCONFERENCE MINUTES (A003)1LONSP
7004ADCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
7004AECOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
7004AFCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
7004AGPACK-UP DATA (D003)1LO
7004AHTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
7004AJENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
7004AKNOTICE OF REVISION (NOR) (F002)1LONSP
7004ALREQUEST FOR VARIANCE (RFV) (F003)1LONSP
7005Travel1LO
7006LRU Spares1LOTBN
Group B
700772kW GPU Production Units276EA
7007AAOption Period Guarantee Qty69EA
7007ABOption Period Competitive Qty138EA
7008DATA
7008AACONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1LONSP
7008ABCONFERENCE AGENDA (A002)1LONSP
7008ACCONFERENCE MINUTES (A003)1LONSP
7008ADCOUNTERFEIT PROTECTION PLAN (C004)1LONSP
7008AECOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1LONSP
7008AFCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1LONSP
7008AGPACK-UP DATA (D003)1LO
7008AHTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1LONSP
7008AJENGINEERING CHANGE PROPOSAL (ECP) (F001)1LOTBN
7008AKNOTICE OF REVISION (NOR) (F002)1LONSP
7008ALREQUEST FOR VARIANCE (RFV) (F003)1LONSP
7009Travel1LO
7010LRU Spares1LOTBN

Acronym List

AcronymSpelled out
BEQBest Estimated Quantity
EAEach
GPUGround Power Unit
kWkilo-Watt
LOLot
LRIPLow-Rate Initial Production
LRULine Replaceable Unit
QTYQuantity
NRENon-Recurring Engineering
NSPNot Separately Priced
TBNTo Be Negotiated