GPM Consolidated Industry Feedback Responses.docx

DOCX document 366 KB Posted

Attached to
72kW Ground Power Units (GPU) Federal contract opportunity
Solicitation number
FA8532-21-R-72GPU
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document provides responses to industry questions regarding Solicitation Number FA8532-21-R-72GPU for 72kW Ground Power Units (GPUs). The responses remove the requirements for 72kW and 144kW GPUs to operate with three phase 380 VAC, 50 Hz input power. They shall now accept both single phase 120 VAC 60 Hz and single phase 220 VAC 50 Hz low amperage input power to operate onboard winterization devices. Additionally, the requirement for 3% input THD has been reduced to 5% input THD to better align with 400 Hz converter specifications. The 72kW GPU must also be capable of air transport with KC-10, KC-135, and KC-46 aircraft. References are provided to military standards for wheels and hubs. Excerpts from an Air Force technical order are included regarding solar battery charger usage and installation.

View the file

Other files for this federal contract opportunity

Other files attached to 72kW Ground Power Units (GPU), newest first.
File Type Posted
QA 12.docx DOCX document
Updated Informal Draft RFP FA8532-21-R-0011.pdf PDF
DRAFT GPM LM_8 Sep 2021.doc DOC document
Final Statement of Work (SOW)_1 Sep 21.pdf PDF
Conference Attachment 3_Informal Draft Request for Proposal FA8532-21-R-0011.pdf PDF
Draft CDRLs C010 through C017.pdf PDF
Conference Attachment 1_3d Conceptual Illustration_144KW Generator.PDF PDF
Conference Attachment 2_Timeline.pptx PPTX presentation
Conference Attachment 4_Sections L and M.pdf PDF
GPM_Pre-Solicitation_Conference_Brief.pptx PPTX presentation
RFP Attachment 2 - Oral Presentations for Discussions Slide Deck.pptx PPTX presentation
RFP Attachment 7 - Past Performance Questionnaire.pdf PDF
RFP Attachment 10_Price Spreadsheet.xlsx XLSX spreadsheet
Informal Draft Request for Proposal FA8532-21-R-0011.pdf PDF
Draft GPM Ordering Guide.docx DOCX document
RFP Attachment 1 - Past Performance Information (PPI) for Offerors.pdf PDF
RFP Attachment 5 - Relevancy Table.pdf PDF
RFP Attachment 6 - Subcontractor and Teaming Member Consent Form.pdf PDF
RFP Attachment 8 - Client Authorization Letter.pdf PDF
RFP Attachment 9 - GPU Engine Derating Calculation Worksheet --DRAFT WATERMARK ADDED.pdf PDF
RFP Attachment 1 - Past Performance Information (PPI) for Offerors.pdf PDF
RFP Attachment 2 - Oral Presentations for Discussions Slide Deck.pptx PPTX presentation
Statement of Work (SOW).pdf PDF
M-900. EVALUATION BASIS FOR AWARD.pdf PDF
RFP Attachment 8 - Client Authorization Letter.pdf PDF
Informal Draft Request for Proposal FA8532-21-R-0001.pdf PDF
Document Updates and Pre-Solicitation Conference.docx DOCX document
RFP Attachment 5 - Relevancy Table.pdf PDF
RFP Attachment 10_Price Spreadsheet.xlsx XLSX spreadsheet
Draft CDRLs.pdf PDF
Government Strategy Update for Industry Awareness.docx DOCX document
DRAFT GPM LM.doc DOC document
Draft LM and CLIN Schedule.docx DOCX document
SOW_GPM_2021-05-20.docx DOCX document
Draft Purchase Description Feedback Extension.docx DOCX document
Export Controlled Draft Purchase Descriptions.docx DOCX document
Sample_CUI_Cover_Markings.pptx PPTX presentation
CUI_Training.pptx PPTX presentation
Controlled_Unclassified_Information_Requirements.docx DOCX document
Announcement on Purchase Descriptions.docx DOCX document
Industry QA 6.docx DOCX document
Industry QA 5.docx DOCX document
Follow up QA for Industry Day - Number 4.docx DOCX document
Follow up QA for Industry Day - Number 3.docx DOCX document
Follow up QA for Industry Day - Number 2.docx DOCX document
Follow up QA for Industry Day.docx DOCX document
72kW GPU - High Level Parallel Testing.pptx PPTX presentation
QA Received from Industry Day.docx DOCX document
72kW Generator Industry Day Briefing 16-17 Sep 2020.pptx PPTX presentation
72GPU TEP.xlsx XLSX spreadsheet
Show all 50

72kW Ground Power Units (GPU) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q & A 5 and 6 Consolidated Government Answers Note: 72kW GPU and 144kW GPU requirement to operate with three phase 380 VAC, 50 Hz input power has been removed.

Note: 72kW GPU and 144kW GPU shall be required to accept both single phase 120 VAC 60 Hz and single phase 220 VAC 50 Hz low amperage input power to operate any on-board winterization devices such as engine oil heaters, engine coolant heaters, battery warmers, etc.

Note: the requirement for 3% input THD has been reduced to 5% input THD (3% individual) to better align with the newest version of the in-revision 400 Hz converter Unified Facilities Guide Specifications (UFGS).

Note: 72kW GPU shall be capable of being air transported, as palletized cargo, with KC-10, KC-135, and KC-46 aircraft.

What is meant by “military standard hubs”? Refer to SAE AS8090 paragraph 3.18 and its reference to MIL-W-8005 Wheels and Hubs, for Industrial Pneumatic Tires.

What is meant by “military standard wheels”? Refer to SAE AS8090 paragraph 3.18 and its reference to MIL-W-8005 Wheels and Hubs, for Industrial Pneumatic Tires.

What is meant by “solar charger” and can the Government provide additional details? See AF TO 1-1A-15 excerpt (pages 2 and 3, below) regarding solar batter chargers usage and installation. No Federal endorsement implied of any single manufacturers product.

1.

2.

<End of Document> 3.

DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited.

image2.png image3.png image4.png image1.png

File details come from the government source that posted it. Updated .