72kW Generator Industry Day Briefing 16-17 Sep 2020.pptx
PPTX presentation 352 KB Posted
- Attached to
- 72kW Ground Power Units (GPU) Federal contract opportunity
- Solicitation number
- FA8532-21-R-72GPU
About this file
This briefing document outlines requirements for a 72kW Ground Power Unit procurement. The Air Force Materiel Command seeks proposals for a multiple award IDIQ contract over 10 years to provide 5,000 72kW GPUs to power fixed and rotary wing aircraft. Technical requirements include simultaneous output of 72kW at 400Hz and 28.5V DC. Testing will include first article, aircraft compatibility, and operational evaluation. Evaluation criteria emphasize past performance supplying 270V DC and sustained production. The proposed contract encourages small business participation and estimates a total value of $600 million.
View the file
Other files for this federal contract opportunity
Show all 50
72kW Ground Power Units (GPU) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
72kW Generator Power Unit (GPU) Industry Day 16-17 Sep 2020 Relious Grant Support Equipment & Vehicles
AFLCMC/WNZ
(478) 222-1647 relious.grant.2@us.af.mil
AFLCMC… Providing the Warfighter’s Edge
Disclaimer The Government does not intend to award a contract on the basis of the information received at this event.
Discussions are for informational purposes only. The contents of any future RFP take precedence over anything provided during this briefing and one-on-one sessions.
Questions and answers may be posted to beta.SAM.gov and are considered public record. No proprietary data will be posted.
Costs incurred as a result of this meeting are considered bid and proposal cost and will not be reimbursed by the Government.
All information in this briefing is current as of today but is subject to change.
Note: Question and answers from both open discussions and one-on-one discussions will be posted to beta.SAM.gov and are considered public record unless industry identifies the content of those discussions/questions/answers as proprietary information.
72kW GPU Industry Day Overview Agenda 72kW GPU POC List 72kW GPU Program Description Major Technical Requirements Testing Proposed Contract Strategy Proposals and Evaluations Order Competition One-on-One Session Discussions Industry Day Participants
Agenda
| 8:00-8:10 AM | Opening Remarks & Introductions |
| 8:10-9:00 AM | Large Session Briefing |
| 9:00-12:20 AM | One-on-One Discussions |
| 12:20-1:30 PM | Lunch |
| 1:40-5:00 PM | One-on-One Discussions |
Wednesday, 16 Sep 2020
* 10 min break will be taken after each one-on-one discussion
Agenda
| 8:00-11:10 AM | One-on-One Discussions |
| 11:10-12:30 PM | Lunch |
| 12:40-4:00 PM | One-on-One Discussions |
Thursday, 17 Sep 2020
* 10 min break will be taken after each one-on-one discussion
72kW GPU POC Listing
| Title | Name | Phone | ||
| Lead Program Manager | Relious Grant | Relious.grant.2@us.af.mil | (478) 222-1647 | |
| Lead Logistics Manager | Wesley Hollingsworth | wesley.hollingsworth@us.af.mil | (478) 222-1897 | |
| Lead Procuring Contracting Officer | Brandi Owens | brandi.owens@us.af.mil | (478) 222-1910 | |
| Contract Specialist | Reid Sawyer | Reid.sawyer@us.af.mil | (478) 327- 4701 | |
| Lead Engineer | Jeffrey Hill | Jeffrey.hill.23@us.af.mil | (478) 222-1840 | |
| Engineering Technical Advisors | Jason Hogan | |||
| Natalia Spangenberg | Jason.hogan@us.af.mil | |||
| Natalia.spangenberg@us.af.mil | (478) 222- 2306 |
(478) 222- 3274
72kW GPU Program Description Sourcing of 72kW GPU requirement provide external power to any Air Force fixed or rotary wing aircraft, to include remotely piloted aircraft Fleet Replacement – 5,000 GPU over 8 Years New 60hz Input Architecture Modular Frequency Converter Architecture Two Year Integration and Testing Timeline
Major Technical Requirements Power Output Requirements – 72kW/90kVA 115/200 VAC at 400 Hz 230/400 VAC at 400 Hz
28.5 VDC up to 17kW
270 VDC
120 VAC 60 Hz up to 4.8kW (simultaneous with all other outputs) Possible Requirements Simultaneous Power not to exceed 72kW/90kVA 115/200 VAC at 400 Hz
28.5 VDC
CMBRE Receptacle
Testing First Article Testing Aircraft Compatibility Testing Operational Testing & Evaluation
Maximize Parallel Testing
Proposed Contract Strategy Anticipated 10 Year Period of Performance Two year Basic Period 8 Annual Ordering Periods
Multiple Award Indefinite Delivery/Indefinite Quantity (IDIQ)
Firm Fixed Price Pricing Arrangement
Estimated contract value: $600M
Proposals and Evaluations Streaming Proposal Process Virtual Oral Presentations – Technical & Past Performance What parts of your proposal would best suited for oral presentation?
Past Performance Experience with 270V DC is important Sustained Production is important 3 or 5 Years AF Conduct Prior Customer Interviews Price – Ceiling FFP Production Price Past Performance to be more important than Price
Order Competition Multiple Awards Planned All Awardees would produce first article Some awards may be reserved for SB
Production Order Competition FAR 16.5 Competition Price Proposed Schedule Past Performance in PQDRs and Schedule Compliance
One-on-One Session Discussions Collaborative discussions to include:
Industry-prepared questions/comments Industry-prepared suggestions for improvement
Key topics include but are not limited to:
Technical Approach Source Selection Strategy Order Competition Strategy
One-on-one sessions are limited to approximately 45 min
Unless specifically identified as proprietary, information from one-on-one discussions may be captured and posted to beta.SAM.gov for transparency purposes
Questions ?
image4.jpeg image5.jpeg image3.png image1.jpeg image2.jpeg
File details come from the government source that posted it. Updated .