QA 12.docx
DOCX document 21 KB Posted
- Attached to
- 72kW Ground Power Units (GPU) Federal contract opportunity
- Solicitation number
- FA8532-21-R-72GPU
About this file
This document contains questions and answers from a pre-solicitation conference for a federal contract opportunity. The contract is seeking proposals to integrate existing technologies into new packages to produce 72kW, 144kW, and 144kW ultra-low emissions battery ground power units. The basic period of performance is three years to allow for extensive testing of the integrated systems. The Group A end items will be competed on a full and open basis, while the Group B end item is set aside for small businesses. Proposals should be evaluated based on the criteria in the solicitation rather than deviating from standard technical approaches. An entry technology readiness level of 8 is required as this is not a design/development effort but rather an integration of existing technologies.
View the file
Other files for this federal contract opportunity
Show all 50
72kW Ground Power Units (GPU) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers 6 October 2021
Q1: Is the single contract award for Group A end items intended to be a Small Business Set Aside award?
A: No, the Group A end items will be competed on a full and open basis. The Group B end item will be competed as a small business set aside.
Q2: Will the USAF entertain proposals that deviate from traditionally, technically-acceptable, standard diesel internal combustion engine generators if the technical approach meets/exceeds objective and threshold values for MTBF modes?
A: The Government will evaluate proposals strictly against the stated evaluation criteria in the RFP provisions “Instructions to Offerors” and “Evaluation Basis for Award”. Drafts of these provisions (identified as Section L and Section M respectively) are posted under notice ID number FA8532-21-R-72GPU. Also, the Government would like to ensure a mutual understanding of the lack of thresholds/objectives within the purchase descriptions. Information concerning why that approach has been approved was discussed during the pre-solicitation conference—in which a recording is available upon request via DoD SAFE. Please contact the identified POCs (Contracting Officer and Buyer) to request a copy.
Q3: For Group A end items: 72kW GPU, 144kW GPU and 144kW ULB, does the 36-month/three-year basic period contract include a phase I-III traditional development/prototype/test effort? If not, what entry TRL is required for proposal bid efforts?
A: This effort is not a design/development effort; it is an integration effort in that existing technologies are required to be integrated into a new package. While the Government understands some design/development effort may be expended, this is not the bulk of the work on this contract. The three-year basic contract period was determined appropriate due to the extensive amount of testing required. As such, the TRL and MRL is 8.
The Government created a top-level program schedule of expected events that will take place during the three-year basic contract period of performance as a part of the pre-solicitation conference presentation material. This document is posted under related notice ID number FA8532-21-R-72GPU.