QA 12.docx

DOCX document 21 KB Posted

Attached to
72kW Ground Power Units (GPU) Federal contract opportunity
Solicitation number
FA8532-21-R-72GPU
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document contains questions and answers from a pre-solicitation conference for a federal contract opportunity. The contract is seeking proposals to integrate existing technologies into new packages to produce 72kW, 144kW, and 144kW ultra-low emissions battery ground power units. The basic period of performance is three years to allow for extensive testing of the integrated systems. The Group A end items will be competed on a full and open basis, while the Group B end item is set aside for small businesses. Proposals should be evaluated based on the criteria in the solicitation rather than deviating from standard technical approaches. An entry technology readiness level of 8 is required as this is not a design/development effort but rather an integration of existing technologies.

View the file

Other files for this federal contract opportunity

Other files attached to 72kW Ground Power Units (GPU), newest first.
File Type Posted
Updated Informal Draft RFP FA8532-21-R-0011.pdf PDF
Final Statement of Work (SOW)_1 Sep 21.pdf PDF
DRAFT GPM LM_8 Sep 2021.doc DOC document
Conference Attachment 3_Informal Draft Request for Proposal FA8532-21-R-0011.pdf PDF
GPM_Pre-Solicitation_Conference_Brief.pptx PPTX presentation
Draft CDRLs C010 through C017.pdf PDF
Conference Attachment 1_3d Conceptual Illustration_144KW Generator.PDF PDF
Conference Attachment 2_Timeline.pptx PPTX presentation
Conference Attachment 4_Sections L and M.pdf PDF
RFP Attachment 2 - Oral Presentations for Discussions Slide Deck.pptx PPTX presentation
RFP Attachment 7 - Past Performance Questionnaire.pdf PDF
RFP Attachment 10_Price Spreadsheet.xlsx XLSX spreadsheet
Informal Draft Request for Proposal FA8532-21-R-0011.pdf PDF
Draft GPM Ordering Guide.docx DOCX document
RFP Attachment 1 - Past Performance Information (PPI) for Offerors.pdf PDF
RFP Attachment 5 - Relevancy Table.pdf PDF
RFP Attachment 6 - Subcontractor and Teaming Member Consent Form.pdf PDF
RFP Attachment 8 - Client Authorization Letter.pdf PDF
RFP Attachment 9 - GPU Engine Derating Calculation Worksheet --DRAFT WATERMARK ADDED.pdf PDF
RFP Attachment 1 - Past Performance Information (PPI) for Offerors.pdf PDF
RFP Attachment 2 - Oral Presentations for Discussions Slide Deck.pptx PPTX presentation
Document Updates and Pre-Solicitation Conference.docx DOCX document
RFP Attachment 5 - Relevancy Table.pdf PDF
RFP Attachment 10_Price Spreadsheet.xlsx XLSX spreadsheet
Draft CDRLs.pdf PDF
Statement of Work (SOW).pdf PDF
M-900. EVALUATION BASIS FOR AWARD.pdf PDF
RFP Attachment 8 - Client Authorization Letter.pdf PDF
Informal Draft Request for Proposal FA8532-21-R-0001.pdf PDF
Government Strategy Update for Industry Awareness.docx DOCX document
DRAFT GPM LM.doc DOC document
Draft LM and CLIN Schedule.docx DOCX document
SOW_GPM_2021-05-20.docx DOCX document
Draft Purchase Description Feedback Extension.docx DOCX document
Export Controlled Draft Purchase Descriptions.docx DOCX document
Sample_CUI_Cover_Markings.pptx PPTX presentation
CUI_Training.pptx PPTX presentation
Controlled_Unclassified_Information_Requirements.docx DOCX document
GPM Consolidated Industry Feedback Responses.docx DOCX document
Announcement on Purchase Descriptions.docx DOCX document
Industry QA 6.docx DOCX document
Industry QA 5.docx DOCX document
Follow up QA for Industry Day - Number 4.docx DOCX document
Follow up QA for Industry Day - Number 3.docx DOCX document
Follow up QA for Industry Day - Number 2.docx DOCX document
Follow up QA for Industry Day.docx DOCX document
72kW GPU - High Level Parallel Testing.pptx PPTX presentation
QA Received from Industry Day.docx DOCX document
72kW Generator Industry Day Briefing 16-17 Sep 2020.pptx PPTX presentation
72GPU TEP.xlsx XLSX spreadsheet
Show all 50

72kW Ground Power Units (GPU) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers 6 October 2021

Q1: Is the single contract award for Group A end items intended to be a Small Business Set Aside award?

A: No, the Group A end items will be competed on a full and open basis. The Group B end item will be competed as a small business set aside.

Q2: Will the USAF entertain proposals that deviate from traditionally, technically-acceptable, standard diesel internal combustion engine generators if the technical approach meets/exceeds objective and threshold values for MTBF modes?

A: The Government will evaluate proposals strictly against the stated evaluation criteria in the RFP provisions “Instructions to Offerors” and “Evaluation Basis for Award”. Drafts of these provisions (identified as Section L and Section M respectively) are posted under notice ID number FA8532-21-R-72GPU. Also, the Government would like to ensure a mutual understanding of the lack of thresholds/objectives within the purchase descriptions. Information concerning why that approach has been approved was discussed during the pre-solicitation conference—in which a recording is available upon request via DoD SAFE. Please contact the identified POCs (Contracting Officer and Buyer) to request a copy.

Q3: For Group A end items: 72kW GPU, 144kW GPU and 144kW ULB, does the 36-month/three-year basic period contract include a phase I-III traditional development/prototype/test effort? If not, what entry TRL is required for proposal bid efforts?

A: This effort is not a design/development effort; it is an integration effort in that existing technologies are required to be integrated into a new package. While the Government understands some design/development effort may be expended, this is not the bulk of the work on this contract. The three-year basic contract period was determined appropriate due to the extensive amount of testing required. As such, the TRL and MRL is 8.

The Government created a top-level program schedule of expected events that will take place during the three-year basic contract period of performance as a part of the pre-solicitation conference presentation material. This document is posted under related notice ID number FA8532-21-R-72GPU.