Amendment 003

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

USCG Air Station Kodiak Construction Services For Design/Build Repairs to the Hangar I Fire Protection Systems

USCG CEU JUNEAU DET

SEATTLE 915 SECOND AVE, RM

2664 SEATTLE, WA 98174-1011

ALL PROSPECTIVE OFFERORS

SAME AS BLOCK 6

70Z08718RPJT900

01/05/2018

12/14/2017 x x

1. If attending the Site Visit on January 10, 2018, it will begin at 9:00 AM (AK) at USCG Base Kodiak, Hangar 1 - passenger terminal. Note: It is recommended the contractor bring a Safety Vest/PPE to wear during the walk through.

2. See the attached, "Site Visit/Pre-Proposal Key Points" page.

USCG AIRSTA Kodiak Construction Services for Design/Build Repairs Hangar I Fire Protection Systems Solicitation Number: 70Z08718RPJT900

SITE VISIT/PRE-PROPOSAL KEY POINTS

Purpose of this Pre-proposal conference is for informational purposes only and does not change the content of the solicitation.

PROPOSAL DUE DATE: February 6, 2018 at 2:00 PM Pacific

Submit Proposal via email to: heather.s.brubeck@uscg.mil

Questions must be submitted in writing and submitted via email to heather.s.brubeck@uscg.mil no later than January 23, 2018.

Changes to the RFP and answers to the questions will only be made through the issuance of an amendment.

The Government will award a contract resulting from this solicitation to the responsible contractor whose proposal is the Lowest Price Technically Acceptable Offer (LPTA).

Please Note: Only the lowest priced offer will be evaluated for technical acceptability. If the lowest priced offer is found not to be technically acceptable, then the next lowest priced offer will be evaluated. This process will continue until a technically acceptable offer is identified; all offers may not be evaluated.

Proposals will be evaluated on the basis of the established criteria in the solicitation.

VOLUME I – TECHNICAL PROPOSAL

The technical proposal shall address all of the evaluation factors listed in Section M of the Solicitation (See Section L for submittal requirements). It must consist of sufficient documentation to show evidence that the contractor meets ALL the requirements as specified below:

1. Contractor and Sub-Contractor Experience

2. Key Personnel Experience

3. Conceptual Design and Construction Schedule

4. Past Performance

The government will evaluate the proposal on the technical criteria as either ACCEPTABLE or UNACCEPTABLE. All four factors must be acceptable to be eligible for award.

VOLUME II – PRICE PROPOSAL

Complete the SF1442 and Section B, SUPPLIES OR SERVICES AND PRICES/COSTS.

The lowest priced proposal shall be determined by the pricing information submitted by the contractor in Section B.

NOTE: If an offeror does not provide ALL required submittals as requested you WILL NOT be considered technically acceptable.

File details come from the government source that posted it.